TE 1.2 CAC Procedures.pdf
PDF 142 KB Posted
- Solicitation number
- SP3300-24-Q-0020
- Issued by
-
Defense Logistics Agency Distribution
About this file
This technical exhibit outlines procedures for contractors to obtain, use, and return Common Access Cards (CACs) when performance requires access to a federal facility. Contractors must have employees complete form DD 1172-2 and verify account information in the Trusted Associate Sponsorship System to obtain CACs from a Real-Time Automated Personnel Identification System office. Contractors must notify the contracting officer representative within one business day of each CAC issued, control and account for CACs at all times, and report lost or stolen CACs immediately. Procedures are also defined for expiring or terminating employee CACs and collecting CACs at contract completion. Contractors must submit monthly reports of employees with CACs and note any changes. Failure to follow these procedures may result in work stoppages, invoice disapprovals, withholding of final payment, and documentation in the Contractor Performance Assessment Reporting System.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 9 DL1818 Visit Notification Form.pdf | ||
| SP3300-24-Q-0020.docx | DOCX document | |
| Attachment 2 Equipment List.xlsx | XLSX spreadsheet | |
| Attachment 10 8570_CE ESS LCAT Reqs.docx | DOCX document | |
| Attachment 7 DD2875 System Authorization Access Request.pdf | ||
| Attachment 5 DLAD QA COSR-project-RO_v1.pdf | ||
| Attachment 8 DL0584 Visitor Register Form.pdf | ||
| Contractor Personnel Security_v0814.pdf | ||
| Attachment 1 PWS.docx | DOCX document | |
| Attachment 6 DLAD QASP-project-site_v1.docx | DOCX document | |
| Attachment 3 US Department of Labor Wage Determination.pdf | ||
| Attachment 4 DLAD QA CAP-project-RO_v1.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 1.2
COMMON ACCESS CARD (CAC) PROCEDURES
Performance under this contract may require the contractor to obtain a Common Access Card (CAC). If CACs are issued under this contract, the contractor shall complete and comply with the following steps to obtain, control, and turn-in Government-issued CACs, as well as establish procedures to control and account for contractor CACs at all times. This process is only for the issuance and accountability of CACs. Contractors may be required to provide additional forms and follow additional procedures for other forms of access and/or background/security checks depending on local site/installation requirements.
1. The contractor has each contractor employee requiring a CAC to report to the Trusted Agent (TA) to complete and sign Sections I and II of the DD Form 1172-2. The TA for DLA Distribution Corpus Christi is located within the Security Office.
o For Section II, Block 22 - If the contractor employee signs and the DD Form 1172-2 it is then retained by the TA. This form provides verification for the employee information.
2. The TA will submit the DD form 1172-2 into the Trusted Associate Sponsorship System (TASS). Each contractor employee must verify his/her account information upon receipt of an email from the Government containing a username and password for TASS. The web link for TASS is included in the email.
3. Each contractor employee will receive an email via TASS when his/her account has been approved. The email will notify the employee to obtain a Government-issued CAC from the nearest Real-Time Automated Personnel Identification System (RAPIDS) office. The email will also provide a link that identifies the locations of RAPIDS offices.
4. Each contractor employee shall obtain his/her issued CAC from the RAPIDS office.
5. The contractor, within one (1) business day of issuance, provides written notice via email to the COR (or the KO, if no COR was designated) for each contractor CAC issued identifying the contractor employee’s name, the date of issuance, and the date of expiration of the CAC. This notification may be made individually for each contractor employee or together for a group of contractor employees.
6. The contractor establishes procedures to control and account for Government-issued contractor CACs at all times, to include the following:
TE 1.2 – CAC Procedures
Attachment #
Source Selection Information - SEE FAR 2.101
AND 3.104
http://www.cac.mil/docs/1172-2-Instructions.pdf o Ensure contractor CACs issued for this contract are only used for the purpose of performing under this contract.
o Ensure contractor CACs are secured in a manner that precludes unauthorized use and that recognizes the CAC is the property of the U.S. Government.
o Ensure contractor employees do not abuse or place holes in their CACs.
o Ensure contractor employees do not display their CACs in public.
8. If a contractor CAC is lost or stolen:
o The contractor employee shall immediately notify the contractor and the TA that the contractor CAC has been lost or stolen.
o The contractor shall immediately notify the COR (or the KO, if no COR was designated), detailing the circumstances regarding the lost or stolen contractor CAC, as follows:
In person, followed within one (1) business day by a written notice via email, or In writing, via email, or By telephone, followed within one (1) business day by a written notice via email.
o The contractor shall report the lost or stolen CAC card to the local DLA Police/host installation police, who will provide the contractor a police report. If there is no local DLA Police/host installation police, or no police report is provided, the contractor shall provide information to the COR/KO, as applicable, detailing the circumstances of how the CAC was lost or stolen. The COR/KO will provide a memorandum for the contractor employee to support issuance of new CAC and submit to the TA.
o The contractor has the contractor employee bring the report/memorandum to the nearest RAPIDS office. If the CAC can be reissued within 24 hours, bring the report/memorandum to the nearest CAC office for reissue. If the CAC cannot be reissued in 24 hours, follow the steps for a new CAC, beginning at Step 1.
9. If the expiration date for a contractor CAC is prior to completion of the contract and the contractor employee is to continue working under the contract and still requires a CAC, the contractor:
o Notifies the COR as follows:
In person, followed within one (1) business day by a written notice via email, or In writing, via email, or By telephone, followed within one (1) business day by a written notice via email.
o No less than two (2) weeks prior to the current CAC’s expiration date, Stops by the TA's office to issue a new CAC.
o Brings the expiring CAC to the RAPIDS office for turn-in and receives new CAC.
o Notifies the COR and TA once a new CAC has been issued.
10. The contractor/contractor employee turns in any found CACs immediately, via hand-carry, to the nearest Federal law enforcement office or their TA.
11. The contractor immediately collects all contractor CAC(s) from the contractor employee(s) at:Contract completion or termination and turns them into the TA who will sign for them.
TE 1.2 – CAC Procedures
SOURCE SELECTION INFORMATION - SEE FARA 2.101 AND 3.104
o Termination/Reassignment of an employee (this includes any reason the employee is no longer working for the contractor under the contract or otherwise no longer requires a
CAC)
12. The contractor:
o For contract completion or termination – within one (1) business day after collecting the contractor CAC(s), arranges for turn-in via one of the below methods:
i. If the COR/KO is co-located or near enough that in-person transfer of CACs can be arranged, the contractor:
• Arranges to meet the COR (or the KO, if no COR was designated) to turn-in the collected contractor CAC(s).
• Hand-carries all collected contractor CACs for turn-in to meet the COR (or the KO, if no COR was designated).
• Completes and signs the Government-Issued Contractor CAC Turn-In Receipt with the COR (or the KO, if no COR was designated). The contractor is provided a copy of the receipt.
ii. If in-person transfer of CAC cannot be arranged, the contractor:
• Sends, via certified mail, the CACs to the COR/KO. The contractor includes in the package the Government-Issued Contractor CAC Turn-In Receipt, with signed acknowledgement of contractor turn-in.
• Notifies COR/KO that CACs have been sent via certified mail.
• Receives a completed copy of the receipt from the COR/KO once the
COR/KO has received the CACs.
o For termination/reassignment of an employee:
i. Immediately notifies the COR (or the KO, if no COR was designated) that the employee is no longer working for the contractor under the contract or otherwise no longer requires a CAC, as follows:
• In person, followed within one (1) business day by a written notice via email, or
• In writing, via email, or
• By telephone, followed within one (1) business day by a written notice via email.
ii. Follows the turn-in procedures above for contract completion or termination, as applicable.
Contractor Reporting Requirements: The contractor is required to submit, on a monthly basis, to the COR (or the KO, if no COR was designated) a report of all employees working on the contract who have been issued CAC cards and a verification of whether each listed employee still requires a CAC.
The report must note where changes have occurred (additions or deletions) since the previous month.
TE 1.2 – CAC Procedures
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104
Contractor employees who already have a CAC related to another DLA or DoD contract must be included in the monthly report. Contractor shall note the issuing organization and the CAC expiration date. Contractor is still responsible for notifying the COR/KO when the individual is no longer working under the subject contract.
The above procedures have been established as a DLA security measure. Contractors are advised that failure to comply with any of the above requirements will be considered a violation of the terms and conditions of the contract and the Contracting Officer may take action to remedy such violations.
Specifically, failure to safeguard, follow these procedures, including reporting requirements, or turn-in CACs within the established timeframes may result in the following actions, which are in addition to other actions the Contracting Officer may take under governing law and regulation and the terms and conditions of the contract:
• Immediate work stoppage (issuance of a stop work order), not to be lifted until resolution of CAC issue
• Disapproval of invoices and delay of payment
• Withholding of final payment (in accordance with FAR 52.204-9)
• Documentation of CAC Non-Compliance in the Contractor Performance Assessment Reporting
System (CPARS)
TE 1.2 – CAC Procedures
SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3104
File details come from the government source that posted it. Updated .