TDD RMAC 24-13 Technical Requirements NVX7000 RMAC 24-13.pdf
PDF 216 KB Posted
- Solicitation number
- W31P4Q-24-Q-0019
About this file
This document is a Technical Requirements specification for a federal contract opportunity. It details the requirements for the procurement of one (1) DMG MORI NVX7000 vertical mill with a MAPPS SIEMENS CELOS Controller. The key requirements include 3D machining capabilities with minimum travel distances, the ability to accommodate large workpieces, and direct scale feedback. Additional technical specifications for the mill and associated components are provided. The opportunity is a combined synopsis/solicitation issued by the Department of the Army Materiel Command Contracting Command Redstone Arsenal, soliciting quotes from DMG MORI USA. Responses are due by 3:00 PM (CST) on August 21, 2022, and the procurement will be awarded as a sole-source to DMG MORI under simplified commercial item procedures. Pricing, delivery, and technical capability will be evaluated. The mill and associated equipment are to be delivered to Redstone Arsenal, Alabama.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RMAC 24-13 TECHNICAL REQUIREMENTS
1.0 Description of Requirement:
The contractor shall provide the following items as specified in the table below:
Item Number Part Description Qty J-A02048 NVX7000Vertical Configured Mill 1
J-005338 Fanuc_F0iMF 1
J-003261 CELOS - ERGOline Touch 1
J-007580 Standard spindle 14,000 min-1, 22/ 18.5 kW (#40)
J-007589 Spindle Taper 7/24 Taper #40 (two-face contact)/ Grip CAT
J-007251 Preparation for Center Through-spindle coolant system J-007251
J-007600 Retention Knob: Special (Center-Through) (7/24 Taper #40)
J-007575 Tool storage capacity 30 tools (#40, STD) 1
J-G00428 Usable Coolant Type: Water-Soluble Coolant 1
J-021791 In-machine chip conveyor (spiral type) + external chip conveyor (hinge + scraper + drum filter type)
J-008010 Interface for Through-Spindle Coolant System (7 MPa, Constant Pressure)
J-006013 Through-spindle coolant/ air (switching specifications) (SK-OP)
J-006012 Coolant gun for machining side 1
J-021391 Shower coolant 1
J-056080 Mist collector zeroFOG #2 (Built-in) (SK-
OP)
J-021552 Full-closed loop control for X, Y, Z-axis (Direct scale feedback)
J-001952 In-machine measuring system (spindle) optical signal transmission type touch sensor
(RENISHAW, OMP60)
J-006035 In-machine measuring system (table) touch sensor (RENISHAW)
J-021329 Signal lamp 3 layers (Red, yellow, green) LED type
J-015384 Interface for EtherNet/IP (SK-OP) 1
J-015385 Interface for Robot (EtherNet/IP), Need to select EtherNet/IP Interface
J-002210 Multi dry filter (SK-OP) 1
J-G00950 Voltage of Customer Factory 200 V 1
J-G00961 Frequency 60 Hz 1
J-004472 Setting Unit inch 1
J-007785 Fast data server (excluding memory card) 1
J-008485 E77550 Memory card for Data server (CF card 2 GB)
J-008240 Part program storage length 2 MB (5,120 m) in total
J-008516 AI contour control II + Fast data server (excluding memory card)
J-008115 External high-speed skip (installation of high-speed skip terminal
J-000080 Screen display English 1
J-011731 IoTconnector (SK-OP) 1
J-011732 NETservice (SK-OP) 1
J-011734 Machine Data Connector (MDC) (SK-OP) 1
N/A Transport costs 1
J-004965 3D Data Model (Skin model) 1
Z-COST01 SV1: Standard Machine Installation 1
Z-COST06 DMG MORI Connect 1
Z-COST07 EG1: Standard Machine Training 1
Additionally, this equipment must meet the requirements stated below:
• 3D machining capability with the following requirements:
o A minimum X-axis travel of 60 inches o A minimum Y-axis travel of 29 inches o A minimum Z-Axis travel of 25 inches
• Machine capability to accommodate a workpiece weight of a minimum of 4300 pounds
• Machine capability to accommodate a workpiece length of 65 inches
• Machine capability to accommodate a workpiece width of 25 inches
• The machine requires direct scale feedback
• The machine shall provide Z-axis drop prevention and centered door opening with and a minimum door opening of 65 inches which will allow for direct access to workpiece.
• MAPPS SIEMENS CELOS Controller
• Machine footprint must fit within an 18 foot by 18 foot space
2.0 Travel:
Travel is not required in the performance of this contract.
3.0 Deliverables:
The above items shall be delivered to the following:
US ARMY AMRDEC
RDMR-WDA-MPA (Attn.) Jennifer I Richman Building 5217, Room 111 Mills Road, Redstone, Arsenal, AL 35898 256-313-8788
CONTRACTORS THAT DO NOT REQUIRE CAC, BUT REQUIRE ACCESS TO A DOD
FACILITY OR INSTALLATION: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
ACCESS AND GENERAL PROTECTION / SECURITY POLICY AND PROCEDURES: This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include associated sub-contractors employees shall comply with applicable installation, facility and area Commander Installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor workforce shall comply with all personal identity verification requirements (CFR clause 52.204- 9, Personal Identity Verification of Contract Personnel) as directed by DoD, Department of the Army Headquarters, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The prime contractor Human Resources/ Security Officer is responsible for the collection of all Redstone Badges and CAC cards issued to their employees.
The Human Resources/Security Officer will then turn over these credentials to the COR. This applies when the contract expires; as well as, when a contractor resigns or is terminated. After accounting for all badges/ CACs, the COR will turn in the credentials at the One Stop Badging Office or CAC Office (MILPO). All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
File details come from the government source that posted it. Updated .