About this file

This is a Request for Quote (RFQ) document issued by the Ohio Department of Developmental Disabilities (DODD) for the Tiffin Developmental Center, solicitation number SRC0000042930. The project involves the removal and replacement of exterior doors and frames at two buildings: the Nevada building requires replacement of 5 doors, and the Garza building requires replacement of 16 doors. All doors must be architectural, wide-style aluminum with tie-rod construction, one-inch insulated glass units (IGU), and commercial-grade closures. The Nevada building doors require Von Duprin push bars with key and lever sets, while the Garza building requires 15 doors with Von Duprin chexit 98/99 delayed egress push bars and one door with a standard push bar; all hardware cores will be provided by the agency. A mandatory site visit is scheduled for November 16, 2026, at 9:00 A.M. at the Tiffin Developmental Center (600 North River Road, Tiffin, Ohio 44883), with check-in at Administration Building #310. Quotes are due by December 2, 2026, prior to 2:00 P.M. The inquiry period runs from November 5, 2026, through November 25, 2026, at 2:00 P.M., with all inquiries submitted through the OhioBuys website. The contract is estimated to become effective December 9, 2026, and remain in effect through June 30, 2027.

The contract will be awarded to the lowest responsive and responsible bidder. Bidders must include all parts, labor, and fees for acquiring necessary permits in their quote. The contractor is responsible for obtaining all required permits and will be reimbursed at actual cost; no work may commence until the agency acknowledges receipt of permits. Prevailing wage requirements apply if the project exceeds established threshold levels under Ohio Revised Code Chapter 4115, with rates established by the Ohio Department of Commerce, Wage and Hour Bureau for the work location. All personnel performing services must meet criminal background clearance requirements under Ohio Revised Code Sections 5123.08 and 5123.081, and comply with drug and alcohol prohibitions. Work must be completed between 7:00 A.M. and 3:30 P.M., Monday through Friday, unless prior arrangements are made. The contractor must be regularly engaged in exterior door and frame installation and Von Duprin delayed egress hardware installation, maintain all necessary licenses and certifications, and use trained, qualified personnel directly employed by the contractor. Required submissions include the Standard Affirmation and Disclosure Form, Contractor Information Form, and Contractor Certification Statement Form (if claiming preferences such as Buy American or Buy Ohio). No subcontractors are permitted without prior written approval from Tiffin Developmental Center.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tiffin Developmental Center – TDC Door Project – Garza and Nevada

Solicitation: SRC0000042930

Purpose: This solicitation is for the Garza and Nevada building’s exterior doors Request To Purchase 8958:

RFQ Schedule:

· RFQ Issued: 11/5/2026

· Inquiry Period Begins: 11/5/2026

· Site Visit : 11/16/2026 at 9:00 AM

· Inquiry Period Ends: 11/25/2026 at 2:00 PM

· Quotes Due: 12/2/2026 prior to 2:00PM

Site Information:

Tiffin Developmental Center 600 North River Road Tiffin, Ohio, 44883

Site Visit:

A site visit is mandatory to view the exact scope of work, at which time potential bidders may review all specifications of each individual door and frame location.

The site visit will be conducted at the Tiffin Developmental Center Site Visit Date: 11/16/2026 Site Visit Time: 9:00 AM Potential Bidders for the site visit shall check in at the Administration Building #310 for Check-in upon arrival and ask for Bryan Spero Maintenance Superintendent

Specifications:

Nevada Building:

· Removal and replacement of 5 exterior doors and frames.

· Doors to be Architectural, Wide style aluminum, Tie Rod construction, one-inch IGU glass, with Von Duprin push bar with key and lever for exterior in SFIC. Core will be provided. All finish work and caulking included.

· All doors will require a commercial grade closure.

Garza Building:

· Removal and replacement of 16 exterior doors and frames.

· 15 of the 16 doors will include Von Duprin chexit 98/99 delayed egress push bar with SFIC core. Core will be supplied.

· 1 door will require a standard Von Duprin push bar with key and lever set in SFIC core will be provided.

· All 16 doors to be Architectural, Wide style aluminum, Tie Rod construction, one-inch IGU glass. All finish work and caulking included.

· All doors will require a commercial grade closure.

Requirements:

No work on the equipment covered herein shall be done by subcontractors unless prior approval is obtained from Tiffin Developmental Center. Contractor must use trained and qualified personnel directly employed and supervised by him/her, preferably the same technician for each time of service. The bidder shall be regularly engaged in the business of removing and installing exterior doors and frames, and the installation of Von Duprin delayed egress hardware.

The contractor shall maintain all necessary licenses, certifications, and registrations throughout the term of the awarded contract. Contractor shall perform all services with reasonable care, skill and diligence as would normally be provided by an experienced consultant and in accordance with industry standards.

Tiffin Developmental Center is a Medicaid-certified Intermediate Care Facility for Individuals with Intellectual Disabilities (ICF/IID), operated by the Ohio Department of Developmental Disabilities (DODD), serving individuals with developmental and other disabilities. All individuals to be providing services on the grounds of any DODD Developmental Center shall have not been found guilty of, or pleaded guilty to, any offense set forth in Section 5123.08(1), (2), or (3) of the Ohio Revised Code; nor employ any person to provide services under this RFP who has been found guilty of, or pleaded guilty to any offense set forth in Section 5123.081(1), (2), or (3) of the Ohio Revised Code. The person(s) providing services under this contract will be subject to a criminal background check prior to performing any services at any DODD Developmental Center.

Awarded Contractor shall certify that all its employees, while working at any DODD Developmental Center, will not purchase, transfer, use, be under the influence of, or possess illegal drugs or alcohol, or abuse prescription drugs in any way. Contractor shall comply with all applicable provisions of the Rehabilitation Act of 1973 and the Americans with Disabilities Act (ADA), both in the provision of specified services and in its employment practices.

Contractor shall not be subject to an “unresolved” finding for recovery under Section 9.24 of the Ohio Revised Code. If there is a finding for recovery, the Contractor’s submission will be rejected.

All contract work must be completed during the hours of 7:00 A.M. and 3:30 P.M., Monday through Friday, unless prior arrangements are made with the Developmental Center’s project contact person. Contractor shall complete work for each specific job/task on consecutive days, this includes installation work.

The contractor must always keep the work area safe and must provide and use OSHA-approved barricades for any work that is exposed to the public. Contractor must always secure his tools and materials. Contractor must clean his work area of all refuse and scrap materials at the end of each workday.

The contractor must provide all parts, labor and fees associated with acquiring any necessary permits as required to complete this project-.

Inquiries:

From the issuance date of this solicitation, until a contract is awarded to a bidder, there may not be communications concerning the RFQ between any supplier who expects to submit a quote, and any employee of DODD involved in the issuing of the RFQ. The only exception is provided through the submission of written requests for clarification/interpretation via the RFQ through the OhioBuys website during the inquiry period.

Prospective bidders may make inquiries or seek clarifications regarding this RFQ any time during the inquiry period listed in the solicitation Calendar of Events. To make an inquiry, prospective bidders must use the Inquiry tab on the solicitation in OhioBuys to submit all inquiries or seek clarification.

Prospective bidders submitting inquiries will receive an immediate acknowledgement by e-mail that their inquiry has been received. The prospective bidder who submitted the inquiry will not receive an e-mail response to the question but will need to view the response on the OhioBuys website where it will be posted for viewing by all prospective bidders.

Attachments to an inquiry are not visible to DODD, so please include all questions in the inquiry description field.

DODD will try to respond to all properly posed inquiries within 48 hours, excluding weekends and state holidays. DODD will not respond to any inquiries received after the date and time indicated on the RFQ. Prospective bidders who attempt to seek information or clarifications verbally will be directed to reduce their questions to writing in accordance with the terms of this RFQ and state purchasing policy. No other form of communication is acceptable, and use of any other form of communication or any attempt to communicate with DODD staff or any other agency of the State to discuss this RFQ may result in the bidder being deemed ineligible.

Bid Submittal: Bidders must complete the “Item Grid” and attach an electronic copy of their formal quote within the solicitation in Ohio Buys. The quote must include all parts, labor and fees associated with acquiring any necessary permits required to complete this project.

Permits:

The contractor is responsible for obtaining all permits required by the appropriate authority having jurisdiction (AHJ) for each project. The Agency will reimburse the contractor at actual cost for all required permits. The contractor is solely responsible for determining and interpreting the permitting requirements applicable to each specific project. The contractor shall provide the Agency will all the permits obtained prior to commencing any work. No work may begin until the Agency has received and acknowledged receipt of these permits.

If the contractor fails to obtain required permits and is subsequently found in violation by the AHJ, the contractor shall bear all associated costs, including but not limited to labor, permit fees, stamped construction drawings, and any corrective actions necessary to secure proper permitting.

The contractor must include copies of permit invoices issued by the AHJ along with the contractor’s invoice to the Agency to verify actual permit costs.

The contractor shall provide the Agency with sufficient notice of any scheduled inspections so that the Agency can ensure the work area is accessible and available. Upon completion of work, the contractor shall provide the Agency with copies of all inspection reports and approvals.

Prevailing Wages:

When the project exceeds the prevailing wage threshold levels, the contract is subject to Ohio Prevailing Wage Laws, Chapter 4115 of the Ohio Revised Code and the Contractor shall comply with all provisions contained therein. By submitting a bid, the bidder guarantees that the prevailing wage scale to be paid to all labor employed on the contract shall be in accordance with the published schedule of the prevailing hourly wage and fringe benefits ascertained and determined by Ohio Department of Commerce, Wage and Hour Bureau for the county in which the work is being performed. The following links will provide information on prevailing wage requirements, rates, and laws.

Prevailing Wage Threshold Levels:

https://com.ohio.gov/divisions-and-programs/industrial-compliance/wage-and-hour/guides-and-resources/prevailing-wage-threshold-levels Prevailing Wage Rates:

Contractor shall be responsible for verification of current classification rates for work location(s). Prevailing wage rates may change throughout the life of the project, and it is the responsibility of the contractor to be in line with current rates.

Bidder may access the Ohio Department of Commerce, Wage & Hour Bureau at its website, https://wagehour.com.ohio.gov/w3/webwh.nsf/wrlogin/?openform, to obtain the current wage rates.

Time of Performance:

The initial awarded contract is estimated to become effective on 12/9/2026, and remain effective through June 30, 2027, or until terminated as provided in the contract.

Evaluation / Award: Bids will be evaluated, and the contract will be awarded to the lowest responsive and responsible bidder as determined by the agency.

Attachments:

The following attachments must be completed and submitted as part of the bidder’s quote in OhioBuys in order to be considered for award.

· Standard Affirmation and Disclosure Form - Required The Standard Affirmation and Disclosure Form attached to the RFQ must be completed, signed by an authorized official of the bidder’s organization, and submitted with any quote to be considered.

· Contractor Information Form - Required The Contractor Information Form attached to the RFQ must be completed and submitted with any quote to be considered.

· Contractor Certification Statement Form – If Applicable All bids will be considered for preferences, with Bidders being able to qualify for any number of preferences (i.e., Buy American, Buy Ohio, and VBE). If a bidder is claiming preferences, the Certification Statement Form must be completed and submitted with the quote for it to be applied to quote evaluation.