This solicitation is for the Monongahela National Forest Project WV ERFO FS 2016-1(2) located in Webster County, West Virginia. The project consists of repairing multiple segments of three forest roads totaling approximately 3.4 miles, and includes embankment reconstruction, box culvert and bridge replacements, repair of slope failure, small pipe culvert replacements, shoulder and ditch reconditioning, and other miscellaneous work. The project price range is estimated between $1,000,000 to $5,000,000. Sealed bids from certified Small Business Concerns will be accepted, with a bid due date to be specified on the solicitation form. The soliciting agency is the Department of Transportation Federal Highway Administration.

View the file

Other files for this federal contract opportunity

Other files attached to Monongahela National Forest, newest first.
File Type Posted
Results of Bid Opening - WV ERFO FS 2016-1(2).pdf PDF
WV ERFO FS 2016-1 SHPO Response.pdf PDF
MONOGAHELA BRIDGE DETAIL.pdf PDF
FP14_Eng.pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
TCE Deborah Kinder.pdf PDF
IFB-Solicitation -WV ERFO FS 2016-1(2).pdf PDF
MONONGAHELA ABUTMENT INSTALLATION-Model.pdf PDF
Categorical Exclusion Form (NEPA).pdf PDF
Final_08092019_WV_ERFO_2_3_4_5_Biological Opinion.pdf PDF
VETS-4212 Form.pdf PDF
WV ERFO 2016-1 (2) FR 425 Culvert Replacement BO.PDF PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

In addition, the Grantee, its successors, assigns, agents, contractors, and employees agree to the following conditions of entry:

1. DAMAGE TO PROPERTY: Shall exercise care to avoid damaging the property in any manner not consistent with the purpose for which this agreement is issued.

2. COOPERATION WITH GRANTOR: Shall at all times cooperate with Grantor(s) and comply with reasonable requests not inconsistent with the purpose for which this agreement is issued.

3. CLEARING: If necessary, shall perform felling, bucking, and decking of merchantable timber according to acceptable logging practices with a minimum of breakage, damage, and waste. Shall saw the merchantable timber into standard log lengths with proper trim allowance and deck on the landowner's property in locations suitable for loading by the landowner with self-loaders.

4. CLEANUP: Shall spread material uniformly over the construction site, seed, and fertilize.

Upon completion of the approach, shall clean all the ground occupied of all rubbish, excess material, temporary structures, and equipment.

5. ACCEPTANCE: All parts of the approach site shall be left in acceptable condition.

U.S. DEPARTMENT OF TRANSPORTATION

Federal Highway Administration

Grantee

By:

Title

Date

�-l�·io Date

Chief or Engineering

3/18/2020

2020-03-18T13:32:50-0400
LAURIN R LINEMAN