TC 62-243 02.381.20 Improvements to be Removed Photos-2.pdf
Army Training Circular PDF 634 KB Posted
- Attached to
- Demolition Svcs Christian County FHWA Eligible
- Solicitation number
- RFB-605-2600000143-2
- Issued by
- Clinton County, Kentucky
About this file
This document is an Improvements to be Removed Photographs form from the Kentucky Transportation Cabinet's Department of Highways, Division of Right of Way & Utilities, for a road project in Christian County. The project involves the U.S. 41 to KY 115 Connector (Project No. 12F0 FD52 024 1279702R, Federal Project Number STP 6000 (184)), specifically focusing on Parcel 014. The document contains photographs and details of a 729 sq. ft. stick-framed building located at 8015 Pembroke Rd in Pembroke, KY, with geographic coordinates of 36° 47' 10.62" N, 87° 22'.01" W.
The photographs and accompanying text indicate that the gravel parking area can remain, as the contractor will be building over it. The building itself is to be removed, with specific instructions to pump out, crush, and fill the connected septic system. The document is dated 08/15/2025 and was photographed by Mark Crabtree, providing a comprehensive visual and textual record of the property's condition prior to the planned infrastructure improvements.
View the file
Other versions and copies of TC 62-243
| File | Revision | Posted | Attached to |
|---|---|---|---|
| TC 62-243 Building to be removed (12-198).pdf | Revision not stated | Demolition Service Pike County P. 6 & 19 | |
| TC 62-243 02.381.20 Improvements to be Removed Photos-2.pdf Same revision and size as this file | Revision not stated | Demolition Svcs Christian County FHWA Eligible | |
| TC 62-243 02.381.20 Improvements to be Removed Photos-2.pdf Same revision and size as this file | Revision not stated | Demolition Svcs Christian County FHWA Eligible |
Who attaches TC 62-243
| State | Files |
|---|---|
| Kentucky | 1 |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KENTUCKY TRANSPORTATION CABINET
Department of Highways
DIVISION OF RIGHT OF WAY & UTILITIES
TC 62-243
Rev. 03/2025
IMPROVEMENTS TO BE REMOVED PHOTOGRAPHS
COUNTY ITEM
Christian 02.381.20
PROJECT NO. FEDERAL PROJECT NUMBER PROJECT
12F0 FD52 024 1279702R STP 6000 (184) U.S. 41 to KY 115 Connector
Parcel: 014 Date: 08/15/2025
Photo Taken by: Mark Crabtree
Address: 8015 Pembroke Rd Pembroke KY 42266
Latitude & Longitude: 36 47' 10.62" N 87 22'.01" W
Description: 729 sq. ft. stick framed building. The gravel parking area can stay.The contractor will be building over that area and it does not need to be removed. The building is connected to a septic system that will need to be pumped out, crushed, and filled. 8015 Pembroke Rd. Pembroke KY 42266
Parcel: 014 Date: 8/15/2025
Photo Taken by: Mark Crabtree
Address: 8015 Pembrok Rd Pembroke KY 42266
Latitude & Longitude: 36 47' 10.62" N 87 22'.01" W
Description: 729 sq. ft. stick framed building. The gravel parking area can stay.The contractor will be building over that area and it does not need to be removed. The building is connected to a septic system that will need to be pumped out, crushed, and filled. 8015 Pembroke Rd. Pembroke KY 42266
Parcel: Date:
Photo Taken by:
Address:
Latitude & Longitude:
Description:
File details come from the government source that posted it. Updated .