Taylor Park Improvements Phase 2 Contract Doc.pdf
PDF 622 KB Posted
- Attached to
- Taylor Park Improvements- Phase 2
- Solicitation number
- PE-66492-NONST-2027-000000009
- Issued by
- Douglas County, Georgia
About this file
This is a bid sheet and contract document for the City of Bloomingdale, Georgia, for Taylor Park Improvements Phase 2, a construction project involving the development of a concrete basketball court facility. The project scope includes construction of a concrete basketball court meeting high school court requirements with dimensions of 94 feet long and 50 feet wide, a new concrete slab with acrylic sports court paint striping, and acrylic or elastometric sports court coating system for the concrete surface, along with new goals. The project encompasses 6,390 square feet of concrete slab construction and must be completed within 30 calendar days of the Notice to Proceed, with work commencing within 10 calendar days of that notice. Seven days are allocated for adverse weather delays. Bids are to be submitted as directed in the advertisement, with late bids returned unopened. The City of Bloomingdale reserves the right to reject any and all bids, and contract award will be made by the Mayor and City Council following their approval. The contractor will be issued a Notice to Proceed upon award and must secure and maintain all required insurance policies.
The project is bid on a lump sum basis, with the contractor responsible for furnishing all labor, tools, equipment, and materials required for completion. A 10 percent retainage will be held by the City pending satisfactory project completion. Failure to complete the work within the stipulated timeframe will result in liquidated damages of $500 per day. Bidders must provide installer qualifications demonstrating at least five years of successful in-service performance on similar work and must identify the concrete supplier. The concrete must meet 4000 PSI minimum 28-day strength using ready-mixed concrete batched and transported according to ASTM C 94. All work must comply with State of Georgia Public Parks Compliance standards, and the contractor is responsible for obtaining all associated permits and maintaining the work site during construction, including damage prevention and protection of adjacent structures. The contractor must coordinate working hours with the City Recreation Department and must provide a written "not to exceed" amount prior to starting work.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SHEET
TAYLOR PARK IMPROVEMENTS – PHASE 2
BLOOMINGDALE, GA
Scope of Work:
Project to include improvements to Taylor Park
1. Construction of concrete basketball court to meet high school court requirements.
2. New concrete slab with acrylic sports court paint for striping, acrylic or elastometric sports court coating system for concrete surface, and new goals to be included.
Lump Sum Bid Price: $____________ (Price to be held for 90 to 180 days)
Instruction to Bidders:
1. Bids must be submitted as directed in the Advertisement.
2. Bids received after the time indicated shall be returned unopened.
3. Bids may be withdrawn at any time to opening upon request of the Bidder.
4. The City reserves the right to reject any and all bids.
5. In the event only one bid is received it will be opened, analyzed, and, if approved by the Mayor and City
Council, awarded.
6. The award of the contract will be made by the Mayor and City Council of the City of Bloomingdale.
Following their approval, the contractor will be issued a Notice to Proceed.
7. The Contractor that is awarded the project shall secure and maintain such insurance policies as are required.
Specific Project Requirements
1. The work shall be completed within 30 calendar days and commence within (10) calendar days after the date of the Notice to Proceed. It is agreed that 7 days are included for adverse weather days. Upon receipt of notice that the work is ready for final inspection and acceptance, a final inspection will be completed by the City. When all work is found to be satisfactory and per the plans and specifications the
City will issue a final acceptance.
2. Contractor to coordinate working hours with City Recreation Department to minimize disruption to the park. The necessity to maintain the facility in continuous operation may require that certain elements of the work under this Contract be utilized and operated by the Owner before completion and acceptance of the entire work under this Contract. The Owner reserves the right to occupy and operate portions of the work which are complete and which are required to maintain operation of the facility.
3. Failure to complete the work within the number of days stipulated, including any extensions given, shall result in liquidated damages in the amount of $500 a day.
4. 10% retainage will be held by the City pending satisfactory completion of the project.
5. Payment for the work completed under this Contract will be made at the lump sum bid. The lump sum shall include the furnishing of all labor, tools, equipment and materials and the performance of all work required to complete the project as indicated and specified above.
CONCRETE BASKETBALL COURT SPECIFICATIONS
1. ALL WORK WILL BE IN ACCORDANCE WITH STATE OF GEORGIA PUBLIC PARKS COMPLIANCE.
2. ALL P.C. CONCRETE SHALL BE READY-MIXED CONCRETE AND BE BATCHED, MIXED, AND TRANSPORTED
IN ACCORDANCE WITH ASTM C 94 AND SHALL HAVE A MINIMUM 28 DAY STRENGTH OF 4000 PSI.
3. MIX MAY BE REQUIRED TO BE SUBMITTED FOR AIR, SLUMP AND CYLINDER CHECK IN SOME
APPLICATIONS. IF REQUIRED, SLUMP MEASURING SHALL BE IN ACCORDANCE WITH ASTM C 143, AIR
CONTENT TESTING SHALL BE IN ACCORDANCE WITH ASTM C 231, AND TESTING OF CYLINDERS SHALL BE
IN ACCORDANCE WITH ASTM C39.
5. NEW CONSTRUCTION INCLUDES MINIMAL GRADING THAT WILL NOT EXCEED A CUT OR FILL IN EXCESS
OF 10 INCHES
6. CONTRACTOR TO PROVIDE CLEAN TOP SOIL FOR BACKFILL. NO BACKFILLING WILL BE PERMITTED
FROM THE PAVED SURFACE.
7. CONTRACTOR WILL PROVIDE A WRITTEN “NOT TO EXCEED” AMOUNT PRIOR TO STARTING WORK
8. CONTRACTOR MUST NOTIFY THE CITY OF BLOOMINGDLE CONTACT FOR INSPECTION OR VERBAL
APPROV
9. CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL DAMAGE DONE TO FINISHED CONCRETE
AFTER POUR AND BEFORE CURE, CONTRACTOR IS RESPONSIBLE FOR SECURING AREA, ORANGE
CONSTRUCTION FENCE IS AN APPROVED METHOD
10. CONTRACTOR IS RESPONSIBLE FOR ALL PROPERTY DAMAGE FROM EQUIPMENT AND RELATED
VEHICLES, CITY REPRESENTATIVE AND CONTRACTOR TO DISCUSS REPAIR METHODS PRIOR TO THE START
OF ANY WORK
11. ALL ASSOCIATED PERMITS MUST BE OBTAINED BY CONTRACTOR FOR ALL WORK DONE, COPY OF
THAT PERMIT MUST BE KEPT ONSITE DURING WORK
12. INSTALLER QUALIFICATIONS:
a. PROVIDE INSTALLER QUALIFICATIONS ILLUSTRATING THAT THE EXPERIENCED INSTALLER HAS
COMPLETED PAVEMENT WORK SIMILAR IN MATERIAL, DESIGN AND EXTENT TO THAT INDICATED
FOR THIS CONTRACT AND WHOSE WORK HAS RESULTED IN CONSTRUCTION WITH AT LEAST A 5
YEAR RECORD OF SUCCESSFUL IN-SERVICE PERFORMANCE
15. CONCRETE SUPPLIER BUISNESS NAME:
16. TRAFFIC CONTROL:
a. MAINTAIN ACCESS FOR VEHICULAR AND PEDESTRIAN TRAFFIC AS REQUIRED FOR CONSTRUCTION
ACTIVITIES
b. MAINTAIN ACCESS FOR ANY OTHER CONSTRUCTION ACTIVITIES
17. FORM MATERIAL:
a. FORMWORK SHALL MEET THE REQUIREMENTS OF ACI 301-99, CHAPTER 2.
b. PLYWOOD, METAL, METAL-FRAMED PLYWOOD OR OTHER APPROVED PANEL-TYPE MATERIALS TO
PROVIDE FULL-DEPTH, CONTINUOUS, STRAIGHT, SMOOTH EXPOSED SURFACES. THE DESIGN AND
ENGINEERING OF THE FORMWORK, AS WELL AS ITS CONSTRUCTION, SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
c. NOTIFY OWNER’S REPRESENTATIVE FOR APPROVAL OF LOCATION AND ALIGNMENT OF FORMS
PRIOR TO INSTALLING CONCRETE
d. BEFORE PLACING THE REINFORCING STEEL OR CONCRETE, THE SURFACES OF THE FORMS SHALL
BE COVERED WITH AN ACCEPTABLE COATING AGENT. THE FORM-RELEASE AGENT MUST BE OF
SUCH THAT WILL NOT BOND WITH, STAIN, OR ADVERSELY AFFECT CONCRETE SURFACES AND
WILL NOT IMPAIR SUBSEQUENT TREATMENTS OF CONCRETE SURFACES
e. FORMS MUST REMAIN IN PLACE FOR AT LEAST 24 HOURS AFTER CONCRETE PLACEMENT
18. REINFORCEMENT:
a. REINFORCEMENT BARS: TO MEET ASTM A 615/A 615M, GRADE 60 AND TO PROVIDE NO LESS
THAN 0.25 SQUARE INCHES PER FOOT (EACH WAY)
b. WELDED WIRE FABRIC: SHALL BE FABRICATED FROM SMOOTH OR DEFORMED WIRE AND TO
CONFORM TO ASTM A 185. IT IS TO BE LOCATED 2” FROM THE TOP SURFACE OF THE CONCRETE.
MINIMUM SIZE OF THE MESH SHALL BE 6”x6” – W2.9 x W2.9.
c. SUPPORTS FOR REINFORCEMENT: CHAIRS, SPACERS, AND OTHER DEVICES FOR SPACING, SUPPORTING, AND FASTENING REINFORCEMENT BARS, WELDED WIRE FABRIC, AND DOWELS IN
PLACE. MANUFACTURE BAR SUPPORTS ACCORDING TO CRSI’S “MANUAL OF STANDARD
PRACTICE” FROM STEEL WIRE, PLASTIC, OR PRECAST CONCRETE OR FIBER-REINFORCED
CONCRETE OF GREATER COMPRESSIVE STRENGTH THAN CONCRETE
d. REINFORCEMENT SHALL BE PLACED WITHIN THE TOLERANCES SPECIFIED IN ACI 117 AND
GUIDELINES SPECIFIED IN ACI 301 SECTION 3.3. MINIMUM CONCRETE COVER FOR
REINFORCEMENT SHALL BE AS REQUIRED IN TABLE 3.3.2.3 OF ACI 301
19. JOINTS: CONSTRUCT EXPANSION AND WEAKENED PLANE JOINTS AND TOOL EDGINGS TRUE TO LINE
WITH FACES PERPENDICULAR TO SURFACE PLANE OF CONCRETE. CONSTRUCT TRANSVERSE JOINTS AT
RIGHT ANGLES TO CENTERLINE UNLESS OTHERWISE INDICATED
a. SAWCUT CONTRACTION JOINTS SHALL BE PROVIDED AT A SPACING OF 10 TO 12 FEET. CUTTING
SHALL BE STARTED AS SOON AS THE CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT
AGGREGATES BEING DISLODGED BY THE SAW AND BE COMPLETED BEFORE SHRINKAGE STRESSES
BECOME SUFFICIENT TO PRODUCE CRACKING.
b. EXPANSION JOINTS: FORM EXPANSION JOINTS OR PREFORMED JOINT FILLER STRIPS ABUTTING
CONCRETE CURBS, CATCH BASINS, MANHOLES, INLETS, SEAWALLS, STRUCTURES, WALKS, OTHER
FIXED OBJECTS AND WHERE INDICATED. THEY MUST MEET ASTM D3575. FLEXIBLE FOAM
EXPANSION JOINT FILLER, SYNTHETIC FOAM OF ISOMETRIC POLYMERS OR ASPHALTIC MUST
MEET ASTM D 1751
i. LOCATE EXPANSION JOINTS AT INTERVALS OF 30 FEET MAXIMUM, OR AS OTHERWISE
INDICATED
ii. EXTEND JOINT FILLERS FULL WIDTH AND DEPTH OF JOINT
iii. TERMINATE JOINT FILLER MORE THAN 1 INCH BELOW FINISHED SURFACE FOR APPLICATION
OF JOINT SEALANT
iv. FURNISH JOINT FILLERS IN ONE-PIECE LENGTHS. WHERE MORE THAN ONE LENGTH IS
REQUIRED, LACE OR CLIP JOINT FILLER TOGETHER
v. WIDTH TO BE 3/8” MAXIMUM.
vi. PROTECT TOP EDGE OF JOINT FILLER DURING CONCRETE PLACEMENT WITH METAL, PLASTIC, OR OTHER PREFORMED TEMPORARY CAP. REMOVE PROTECTIVE CAP AFTER CONCRETE HAS
BEEN PLACED ON BOTH SIDES OF JOINT.
vii. ALL EXPANSION JOINTS SHALL BE SEALED. SEALANT SHALL MEET THE REQUIREMENTS OF
ASTM C 920, TYPE S OR M, GRADE P, CLASS 25.
20. PREPARATION & CONCRETE PLACEMENT:
a. ALL WORK MUST HAVE COMPACTED BASE UNLESS OTHERWISE NOTED BY A CITY
REPRESENTATIVE, BASE MUST BE GRADATION OF ¼” MINUS LIMESTONE
b. REMOVE ALL LOOSE MATERIAL FROM COMPACTED BASE PRIOR TO PLACING CONCRETE
c. BEFORE PLACING CONCRETE, COMPLETE AND INSPECT FORMWORK INSTALLATION, REINFORCEMENT STEEL AND ITEMS TO BE IMBEDDED OR CAST IN.
d. MOISTEN BASE COURSE TO PROVIDE A UNIFORM DAMPENED CONDITION AT THE TIME THE
CONCRETE IS PLACED. ENSURE THAT ALL STRUCTURES TO BE CAST IN ARE AT THE REQUIRED
FINISH ELEVATION AND ALIGNMENT
e. FOG-SPRAY FORMS, REINFORCEMENT STEEL, AND SUBGRADE JUST BEFORE PLACING CONCRETE.
KEEP SUBGRADE MOISTURE UNIFORM WITHOUT STANDING WATER, SOFT SPOTS OR DRY AREAS
f. PREVENT CONCRETE FROM SPLATTERING ONTO ADJACENT VERTICAL SURFACES SUCH AS
BUILDINGS, PLANTERS, STONEWORK, RESTROOMS AND SHELTER BUILDINGS WITH 6 MIL. POLY
SHEETS OR SUITABLE ALTERNATIVE. ALL SURFACES ADJOINING THE CONCRETE PLACEMENT SHALL
BE CLEANED PRIOR TO LEAVING THE WORK SITE
g. CONCRETE SHALL NOT BE PLACED DURING RAIN, SLEET, OR SNOW
h. COLD WEATHER PLACEMENT: PROTECT CONCRETE WORK FROM PHYSICAL DAMAGE OR REDUCED
STRENGTH THAT COULD BE CAUSED BY FROST, FREEZING ACTIONS OR LOW TEMPERATURES.
CONCRETE SHALL NOT BE PLACED ON FROZEN GROUND.
i. WHEN AIR TEMPERATURES HAVE FALLEN OR IS EXPECTED TO FALL BELOW 40 DEGREES F
COVER CONCRETE FOR A MINIMUM OF 72 HOURS WITH INSULATED BLANKET AFTER
FINISHING CONCRETE SURFACE
ii. DO NOT USE CALCIUM CHLORIDE, SALT OR OTHER MATERIALS CONTAINING ANTIFREEZE
AGENTS OR CHEMICAL ACCELERATORS, UNLESS OTHERWISE SPECIFIED IN THE DESIGN MIX
i. HOT WEATHER PLACEMENT: COVER REINFORCEMENT STEEL WITH WATER SOAKED BURLAP SO
STEEL TEMPERATURES WILL NOT EXCEED AMBIENT AIR TEMPERATURES IMMEDIATELY BEFORE
EMBEDDING IN CONCRETE
j. IMMEDIATELY AFTER PLACEMENT PROTECT CONCRETE FROM PREMATURE DRYING, EXCESSIVELY
HOT OR COLD TEMPERATURES, AND MECHANICAL INJURY. PROTECTION MEASURES SHALL
CONFORM TO SECTION 5.3.6.5 AND 4.2.2.7 OF ACI 301-99.
21. FINISHING: WETTING OF CONCRETE SURFACES DURING SCREEDING, INITIAL FLOATING OR FINISHING
OPERATIONS IS PROHIBITED
a. FLOAT FINISH: BEGIN THE SECOND FLOATING OPERATION WHEN BLEED WATER SHEEN HAS
DISAPPEARED AND THE CONCRETE SURFACE HAS STIFFENED SUFFICIENTLY TO PERMIT
OPERATIONS. FLOAT SURFACE WITH POWER DRIVEN FLOATS, OR BY HAND FLOATING IF AN AREA
IS SMALL OR INACCESSIBLE TO POWER UNITS. FINISH SURFACES TO TRUE PLANES. CUT DOWN
HIGH SPOTS, AND FILL LOW SPOTS. REFLOAT SURFACE IMMEDIATELY TO UNIFORM GRANULAR
TEXTURE
b. CONCRETE SIDEWALKS GET A LIGHT TEXTURED UNIFORM MEDIUM BROOM FINISH
c. FINISHING, TEXTURES AND JOINTS OF NEW CONCRETE ARE TO MATCH ALL ADJACENT PAVEMENT
d. FOR CONCRETE SURFACES NOT IN CONTACT WITH FORMS CURING COMPOUND SHALL BE APPLED
IMMEDIATELY AFTER COMPLETION OF PLACING AND FINISHING. APPLICATION OF A CURING
COMPOUND SHALL CONFORM TO ASTM C309 IN ACCORDANCE WITH THE MANUFACTURER’S
RECOMMENDATIONS. THE CURING COMPOUND MUST BE “CLEAR” AND APPROVED BY THE CITY
PRIOR TO USE.
65'
104'
5'
10'
30'
5'
5'
5'
6,390 SF CONCRETE SLAB
(SEE CROSS SECTION)
60'
COURT TO BE 94 FT LONG & 50 FT WIDE. STRIPING AND
GOAL TO BE PER HIGH SCHOOL COURT DIMENSIONS.
PAINT TO BE A 100% ACRYLIC SPORTS COURT PAINT
S
S
MATCH EXISTING GROUND
ELEVATIONS FOR CONCRETE
SLAB. SLOPE TO BE 1% MIN.
SHEET
OF
Pr ep ar ed fo r:
SURVEY DATE:
SE
R
VI
C
ES
, I
N C
E
M C
E N
G
IN
EE
R
IN
G
SCALE:
DATE:
PROJECT NO.:
SURVEYED BY:
CHECKED BY:
DESIGNED BY:
DRAWN BY:
GRAPHIC SCALE: 1" =
0'
C ha th am C en te r S ou th , S ui te
A Sa va nn ah , G
A
Ph
2)
-6
Fa x:
(9
) 2
-4 sa va nn ah em c-en g.
co m w w w
.e m c-en g.
co m
EN
VI
R
O N
M
EN
TA
L
C
IV
IL
M
AR
IN
E
AL
BA
N Y
• A
TL
AN
TA
AU
G U
ST
A
• B R
U N
SW
IC
K
• C
O
LU
M
BU
S G
R
EE
N
VI
LL
E
• S
AV
AN
N
AH
ST
AT
ES
BO
R O
TH
O M
AS
TO
N
D
AT
E N
O
R
EV
IS
IO
N D
ES
C
R
IP
TI
O
N
BA
SK
ET
BA
LL
C O
U T
LA
YO
U T
PL
AN
PH
AS
E
PI
N
E
BA
R R
EN
R
O
AD
BL
O
O M
IN
G
D
AL
E, G
EO
R
G
IA
TA
YL
O R
P
AR
K
IM
PR
O
VE
M
EN
TS
C
IT
Y O
F
BL
O O
M
IN
G D
AL
E
26-1102
TCB
EMC
MARCH 2026
1" = 10' 10/15/26
10' 10'
10'
5'
#3 REBAR SPACED AT 12" O.C. EACH WAY
OR 6x6 WELDED WIRE MESH PLACED IN
THE MIDDLE 13 OF THE SLAB
4,000 PSI CONCRETE
W/ MEDIUM BROOM FINISH
SUBGRADE COMPACTED TO 95% STD. PROCTOR
4"
4"
BASKETBALL COURT CROSS SECTION
NOT TO SCALE
6"
GAB COMPACTED TO 95% STD. PROCTOR
100% ACRYLIC OR ELASTOMETRIC
SPORTS COURT COATING SYSTEM
CONTROL JOINT: 12" SAW CUT OR TOOLED JOINTS SPACED EVERY 10 TO 12 FT
PROFESSIONAL
ENGINEER
REGISTERED
*G
EO
RGIA
ALEC B. METZGER
No. PE30429
| Sheets and Views |
| PHASE 2 |
File details come from the government source that posted it. Updated .