Taylor Park Improvements Phase 1 Contract Doc.pdf

PDF 733 KB Posted

Attached to
Taylor Park Improvements- Phase 1
Solicitation number
PE-66492-NONST-2027-000000008
Issued by
Douglas County, Georgia

About this file

Taylor Park Improvements Phase 1 Contract Summary

This is a bid sheet and project specification document from the City of Bloomingdale, Georgia, for improvements to Taylor Park. The scope of work includes construction of concrete sidewalks according to attached plans and specifications, removal and disposal of an existing concrete basketball court and goals, and removal and replacement of miscellaneous items that may conflict with sidewalk construction, such as fencing, bleachers, and landscaping. The project must be completed within 60 calendar days of the Notice to Proceed, with work commencing within 10 calendar days thereafter. Seven days are included for adverse weather delays. The contractor must coordinate working hours with the City Recreation Department to minimize disruption to park operations. No specific response dates, bidders' meetings, or award dates are provided in this document. The contract award will be made by the Mayor and City Council of Bloomingdale following analysis and approval of submitted bids.

Bids are submitted on a lump sum basis that includes all labor, tools, equipment, materials, and work required to complete the project. The City will retain 10 percent of payment pending satisfactory project completion. Liquidated damages of $500 per day apply for failure to complete work within the specified timeframe, including any approved extensions. The contractor must obtain all necessary permits, provide installer qualifications demonstrating at least five years of successful pavement work experience, submit a written "not to exceed" amount prior to starting work, and carry required insurance coverage. Concrete specifications require ready-mixed concrete meeting ASTM C 94 standards with a minimum 28-day strength of 4000 PSI, and all work must comply with State of Georgia Public Parks compliance requirements. The contractor is responsible for property damage from equipment and vehicles, securing the work area during concrete curing, and preventing weather-related damage to finished concrete.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SHEET

TAYLOR PARK IMPROVEMENTS – PHASE 1

BLOOMINGDALE, GA

Scope of Work:

Project to include improvements to Taylor Park

1. Construction of concrete sidewalks as shown on the attached plan and as described in the above specifications.

2. Removal and disposal of existing concrete basketball court and goals.

3. Removal and replacement of misc items that may be in conflict with sidewalk construction.

(ie. Fencing, bleachers, landscaping, etc.)

Lump Sum Bid Price: $____________

Instruction to Bidders:

1. Bids must be submitted as directed in the Advertisement.

2. Bids received after the time indicated shall be returned unopened.

3. Bids may be withdrawn at any time to opening upon request of the Bidder.

4. The City reserves the right to reject any and all bids.

5. In the event only one bid is received it will be opened, analyzed, and, if approved by the Mayor and City

Council, awarded.

6. The award of the contract will be made by the Mayor and City Council of the City of Bloomingdale.

Following their approval, the contractor will be issued a Notice to Proceed.

7. The Contractor that is awarded the project shall secure and maintain such insurance policies as are required.

Specific Project Requirements

1. The work shall be completed within 60 calendar days and commence within (10) calendar days after the date of the Notice to Proceed. It is agreed that 7 days are included for adverse weather days. Upon receipt of notice that the work is ready for final inspection and acceptance, a final inspection will be completed by the City. When all work is found to be satisfactory and per the plans and specifications the

City will issue a final acceptance.

2. Contractor to coordinate working hours with City Recreation Department to minimize disruption to the park. The necessity to maintain the facility in continuous operation may require that certain elements of the work under this Contract be utilized and operated by the Owner before completion and acceptance of the entire work under this Contract. The Owner reserves the right to occupy and operate portions of the work which are complete and which are required to maintain operation of the facility.

3. Failure to complete the work within the number of days stipulated, including any extensions given, shall result in liquidated damages in the amount of $500 a day.

4. 10% retainage will be held by the City pending satisfactory completion of the project.

5. Payment for the work completed under this Contract will be made at the lump sum bid. The lump sum shall include the furnishing of all labor, tools, equipment and materials and the performance of all work required to complete the project as indicated and specified above.

CONCRETE SIDEWALK SPECIFICATIONS

1. ALL WORK WILL BE IN ACCORDANCE WITH STATE OF GEORGIA PUBLIC PARKS COMPLIANCE.

2. ALL P.C. CONCRETE SHALL BE READY-MIXED CONCRETE AND BE BATCHED, MIXED, AND TRANSPORTED

IN ACCORDANCE WITH ASTM C 94 AND SHALL HAVE A MINIMUM 28 DAY STRENGTH OF 4000 PSI.

3. MIX MAY BE REQUIRED TO BE SUBMITTED FOR AIR, SLUMP AND CYLINDER CHECK IN SOME

APPLICATIONS. IF REQUIRED, SLUMP MEASURING SHALL BE IN ACCORDANCE WITH ASTM C 143, AIR

CONTENT TESTING SHALL BE IN ACCORDANCE WITH ASTM C 231, AND TESTING OF CYLINDERS SHALL BE

IN ACCORDANCE WITH ASTM C39.

4. REMOVAL WORK INCLUDES DEMOLITION, REMOVAL AND PROPER DISPOSAL OF ALL DEBRIS.

CONTRACTOR TO REMOVE ALL CONCRETE PROJECT RELATED DEBRIS FROM SITE AND DISPOSE OF IN

ACCORDANCE WITH ALL LAWS AND REGULATION.

5. NEW CONSTRUCTION INCLUDES MINIMAL GRADING THAT WILL NOT EXCEED A CUT OR FILL IN EXCESS

OF 10 INCHES

6. CONTRACTOR TO PROVIDE CLEAN TOP SOIL FOR BACKFILL. NO BACKFILLING WILL BE PERMITTED

FROM THE PAVED SURFACE.

7. CONTRACTOR WILL PROVIDE A WRITTEN “NOT TO EXCEED” AMOUNT PRIOR TO STARTING WORK

8. CONTRACTOR MUST NOTIFY THE CITY OF BLOOMINGDLE CONTACT FOR INSPECTION OR VERBAL

APPROV

9. CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL DAMAGE DONE TO FINISHED CONCRETE

AFTER POUR AND BEFORE CURE, CONTRACTOR IS RESPONSIBLE FOR SECURING AREA, ORANGE

CONSTRUCTION FENCE IS AN APPROVED METHOD

10. CONTRACTOR IS RESPONSIBLE FOR ALL PROPERTY DAMAGE FROM EQUIPMENT AND RELATED

VEHICLES, CITY REPRESENTATIVE AND CONTRACTOR TO DISCUSS REPAIR METHODS PRIOR TO THE START

OF ANY WORK

11. ALL ASSOCIATED PERMITS MUST BE OBTAINED BY CONTRACTOR FOR ALL WORK DONE, COPY OF

THAT PERMIT MUST BE KEPT ONSITE DURING WORK

12. INSTALLER QUALIFICATIONS:

a. PROVIDE INSTALLER QUALIFICATIONS ILLUSTRATING THAT THE EXPERIENCED INSTALLER HAS

COMPLETED PAVEMENT WORK SIMILAR IN MATERIAL, DESIGN AND EXTENT TO THAT INDICATED

FOR THIS CONTRACT AND WHOSE WORK HAS RESULTED IN CONSTRUCTION WITH AT LEAST A 5

YEAR RECORD OF SUCCESSFUL IN-SERVICE PERFORMANCE

15. CONCRETE SUPPLIER BUISNESS NAME:

16. TRAFFIC CONTROL:

a. MAINTAIN ACCESS FOR VEHICULAR AND PEDESTRIAN TRAFFIC AS REQUIRED FOR CONSTRUCTION

ACTIVITIES

b. MAINTAIN ACCESS FOR ANY OTHER CONSTRUCTION ACTIVITIES

17. FORM MATERIAL:

a. FORMWORK SHALL MEET THE REQUIREMENTS OF ACI 301-99, CHAPTER 2.

b. PLYWOOD, METAL, METAL-FRAMED PLYWOOD OR OTHER APPROVED PANEL-TYPE MATERIALS TO

PROVIDE FULL-DEPTH, CONTINUOUS, STRAIGHT, SMOOTH EXPOSED SURFACES. THE DESIGN AND

ENGINEERING OF THE FORMWORK, AS WELL AS ITS CONSTRUCTION, SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR.

c. USE FLEXIBLE OR CURVED FORMS FOR CURVES OF A RADIUS 100 FEET OR LESS

d. NOTIFY OWNER’S REPRESENTATIVE FOR APPROVAL OF LOCATION AND ALIGNMENT OF FORMS

PRIOR TO INSTALLING CONCRETE

e. BEFORE PLACING THE REINFORCING STEEL OR CONCRETE, THE SURFACES OF THE FORMS SHALL

BE COVERED WITH AN ACCEPTABLE COATING AGENT. THE FORM-RELEASE AGENT MUST BE OF

SUCH THAT WILL NOT BOND WITH, STAIN, OR ADVERSELY AFFECT CONCRETE SURFACES AND

WILL NOT IMPAIR SUBSEQUENT TREATMENTS OF CONCRETE SURFACES

f. FORMS MUST REMAIN IN PLACE FOR AT LEAST 24 HOURS AFTER CONCRETE PLACEMENT

18. REINFORCEMENT:

a. REINFORCEMENT BARS: TO MEET ASTM A 615/A 615M, GRADE 60 AND TO PROVIDE NO LESS

THAN 0.25 SQUARE INCHES PER FOOT (EACH WAY)

b. WELDED WIRE FABRIC: SHALL BE FABRICATED FROM SMOOTH OR DEFORMED WIRE AND TO

CONFORM TO ASTM A 185. IT IS TO BE LOCATED 2” FROM THE TOP SURFACE OF THE CONCRETE.

MINIMUM SIZE OF THE MESH SHALL BE 6”x6” – W2.9 x W2.9.

c. SUPPORTS FOR REINFORCEMENT: CHAIRS, SPACERS, AND OTHER DEVICES FOR SPACING, SUPPORTING, AND FASTENING REINFORCEMENT BARS, WELDED WIRE FABRIC, AND DOWELS IN

PLACE. MANUFACTURE BAR SUPPORTS ACCORDING TO CRSI’S “MANUAL OF STANDARD

PRACTICE” FROM STEEL WIRE, PLASTIC, OR PRECAST CONCRETE OR FIBER-REINFORCED

CONCRETE OF GREATER COMPRESSIVE STRENGTH THAN CONCRETE

d. REINFORCEMENT SHALL BE PLACED WITHIN THE TOLERANCES SPECIFIED IN ACI 117 AND

GUIDELINES SPECIFIED IN ACI 301 SECTION 3.3. MINIMUM CONCRETE COVER FOR

REINFORCEMENT SHALL BE AS REQUIRED IN TABLE 3.3.2.3 OF ACI 301

19. JOINTS: CONSTRUCT EXPANSION AND WEAKENED PLANE JOINTS AND TOOL EDGINGS TRUE TO LINE

WITH FACES PERPENDICULAR TO SURFACE PLANE OF CONCRETE. CONSTRUCT TRANSVERSE JOINTS AT

RIGHT ANGLES TO CENTERLINE UNLESS OTHERWISE INDICATED

a. SAWCUT CONTRACTION JOINTS SHALL BE PROVIDED AT A SPACING NOT GREATER THAN 10 FEET

ON CENTER. CUTTING SHALL BE STARTED AS SOON AS THE CONCRETE HAS HARDENED

SUFFICIENTLY TO PREVENT AGGREGATES BEING DISLODGED BY THE SAW AND BE COMPLETED

BEFORE SHRINKAGE STRESSES BECOME SUFFICIENT TO PRODUCE CRACKING.

b. EXPANSION JOINTS: FORM EXPANSION JOINTS OR PREFORMED JOINT FILLER STRIPS ABUTTING

CONCRETE CURBS, CATCH BASINS, MANHOLES, INLETS, SEAWALLS, STRUCTURES, WALKS, OTHER

FIXED OBJECTS AND WHERE INDICATED. THEY MUST MEET ASTM D3575. FLEXIBLE FOAM

EXPANSION JOINT FILLER, SYNTHETIC FOAM OF ISOMETRIC POLYMERS OR ASPHALTIC MUST

MEET ASTM D 1751

i. LOCATE EXPANSION JOINTS AT INTERVALS OF 30 FEET MAXIMUM, OR AS OTHERWISE

INDICATED

ii. EXTEND JOINT FILLERS FULL WIDTH AND DEPTH OF JOINT

iii. TERMINATE JOINT FILLER MORE THAN 1 INCH BELOW FINISHED SURFACE FOR APPLICATION

OF JOINT SEALANT

iv. FURNISH JOINT FILLERS IN ONE-PIECE LENGTHS. WHERE MORE THAN ONE LENGTH IS

REQUIRED, LACE OR CLIP JOINT FILLER TOGETHER

v. WIDTH TO BE 3/8” MAXIMUM.

vi. PROTECT TOP EDGE OF JOINT FILLER DURING CONCRETE PLACEMENT WITH METAL, PLASTIC, OR OTHER PREFORMED TEMPORARY CAP. REMOVE PROTECTIVE CAP AFTER CONCRETE HAS

BEEN PLACED ON BOTH SIDES OF JOINT.

vii. ALL EXPANSION JOINTS SHALL BE SEALED. SEALANT SHALL MEET THE REQUIREMENTS OF

ASTM C 920, TYPE S OR M, GRADE P, CLASS 25.

20. PREPARATION & CONCRETE PLACEMENT:

a. ALL WORK MUST HAVE COMPACTED BASE UNLESS OTHERWISE NOTED BY A CITY

REPRESENTATIVE, BASE MUST BE GRADATION OF ¼” MINUS LIMESTONE

b. REMOVE ALL LOOSE MATERIAL FROM COMPACTED BASE PRIOR TO PLACING CONCRETE

c. BEFORE PLACING CONCRETE, COMPLETE AND INSPECT FORMWORK INSTALLATION, REINFORCEMENT STEEL AND ITEMS TO BE IMBEDDED OR CAST IN.

d. MOISTEN BASE COURSE TO PROVIDE A UNIFORM DAMPENED CONDITION AT THE TIME THE

CONCRETE IS PLACED. ENSURE THAT ALL STRUCTURES TO BE CAST IN ARE AT THE REQUIRED

FINISH ELEVATION AND ALIGNMENT

e. FOG-SPRAY FORMS, REINFORCEMENT STEEL, AND SUBGRADE JUST BEFORE PLACING CONCRETE.

KEEP SUBGRADE MOISTURE UNIFORM WITHOUT STANDING WATER, SOFT SPOTS OR DRY AREAS

f. PREVENT CONCRETE FROM SPLATTERING ONTO ADJACENT VERTICAL SURFACES SUCH AS

BUILDINGS, PLANTERS, STONEWORK, RESTROOMS AND SHELTER BUILDINGS WITH 6 MIL. POLY

SHEETS OR SUITABLE ALTERNATIVE. ALL SURFACES ADJOINING THE CONCRETE PLACEMENT SHALL

BE CLEANED PRIOR TO LEAVING THE WORK SITE

g. CONCRETE SHALL NOT BE PLACED DURING RAIN, SLEET, OR SNOW

h. COLD WEATHER PLACEMENT: PROTECT CONCRETE WORK FROM PHYSICAL DAMAGE OR REDUCED

STRENGTH THAT COULD BE CAUSED BY FROST, FREEZING ACTIONS OR LOW TEMPERATURES.

CONCRETE SHALL NOT BE PLACED ON FROZEN GROUND.

i. WHEN AIR TEMPERATURES HAVE FALLEN OR IS EXPECTED TO FALL BELOW 40 DEGREES F

COVER CONCRETE FOR A MINIMUM OF 72 HOURS WITH INSULATED BLANKET AFTER

FINISHING CONCRETE SURFACE

ii. DO NOT USE CALCIUM CHLORIDE, SALT OR OTHER MATERIALS CONTAINING ANTIFREEZE

AGENTS OR CHEMICAL ACCELERATORS, UNLESS OTHERWISE SPECIFIED IN THE DESIGN MIX

i. HOT WEATHER PLACEMENT: COVER REINFORCEMENT STEEL WITH WATER SOAKED BURLAP SO

STEEL TEMPERATURES WILL NOT EXCEED AMBIENT AIR TEMPERATURES IMMEDIATELY BEFORE

EMBEDDING IN CONCRETE

j. IMMEDIATELY AFTER PLACEMENT PROTECT CONCRETE FROM PREMATURE DRYING, EXCESSIVELY

HOT OR COLD TEMPERATURES, AND MECHANICAL INJURY. PROTECTION MEASURES SHALL

CONFORM TO SECTION 5.3.6.5 AND 4.2.2.7 OF ACI 301-99.

21. FINISHING: WETTING OF CONCRETE SURFACES DURING SCREEDING, INITIAL FLOATING OR FINISHING

OPERATIONS IS PROHIBITED

a. FLOAT FINISH: BEGIN THE SECOND FLOATING OPERATION WHEN BLEED WATER SHEEN HAS

DISAPPEARED AND THE CONCRETE SURFACE HAS STIFFENED SUFFICIENTLY TO PERMIT

OPERATIONS. FLOAT SURFACE WITH POWER DRIVEN FLOATS, OR BY HAND FLOATING IF AN AREA

IS SMALL OR INACCESSIBLE TO POWER UNITS. FINISH SURFACES TO TRUE PLANES. CUT DOWN

HIGH SPOTS, AND FILL LOW SPOTS. REFLOAT SURFACE IMMEDIATELY TO UNIFORM GRANULAR

TEXTURE

b. CONCRETE SIDEWALKS GET A LIGHT TEXTURED UNIFORM BROOM FINISH

c. FINISHING, TEXTURES AND JOINTS OF NEW CONCRETE ARE TO MATCH ALL ADJACENT PAVEMENT

d. FOR CONCRETE SURFACES NOT IN CONTACT WITH FORMS CURING COMPOUND SHALL BE APPLED

IMMEDIATELY AFTER COMPLETION OF PLACING AND FINISHING. APPLICATION OF A CURING

COMPOUND SHALL CONFORM TO ASTM C309 IN ACCORDANCE WITH THE MANUFACTURER’S

RECOMMENDATIONS. THE CURING COMPOUND MUST BE “CLEAR” AND APPROVED BY THE CITY

PRIOR TO USE.

PROPOSED CONCRETE SIDEWALK

(SEE DETAIL AND SPECIFICATIONS)

10'

10'

25'

6'

20'

20'

25'

25'

25'

25'

10'

25'

53'

10'

10'

10'

10'

7'

TOP OF SIDEWALK TO MATCH

EXISTING ELEVATIONS.

SLOPES OF CONCRETE TO MATCH

EXISTING GRADES WITH MAX. OF 2%

WHERE SIDEWALK IS

ADJACENT TO EXISTING

CONCRETE SLABS, THE

TOP OF SIDEWALK IS TO

BE FLUSH WITH TOP OF

EX. CONCRETE, TYP.

REMOVE EXISTING

CONCRETE BASKETBALL

COURT AND GOALS

SHEET

OF

Pr ep ar ed fo r:

SURVEY DATE:

SE

R

VI

C

ES

, I

N C

E

M C

E N

G

IN

EE

R

IN

G

SCALE:

DATE:

PROJECT NO.:

SURVEYED BY:

CHECKED BY:

DESIGNED BY:

DRAWN BY:

GRAPHIC SCALE: 1" =

0'

C ha th am C en te r S ou th , S ui te

A Sa va nn ah , G

A

Ph

2)

-6

Fa x:

(9

) 2

-4 sa va nn ah em c-en g.

co m w w w

.e m c-en g.

co m

EN

VI

R

O N

M

EN

TA

L

C

IV

IL

M

AR

IN

E

AL

BA

N Y

• A

TL

AN

TA

AU

G U

ST

A

• B R

U N

SW

IC

K

• C

O

LU

M

BU

S G

R

EE

N

VI

LL

E

• S

AV

AN

N

AH

ST

AT

ES

BO

R O

TH

O M

AS

TO

N

D

AT

E N

O

R

EV

IS

IO

N D

ES

C

R

IP

TI

O

N

SI

D

EW

AL

K

LA

YO

U T

PL

AN

PH

AS

E

PI

N

E

BA

R R

EN

R

O

AD

BL

O

O M

IN

G

D

AL

E, G

EO

R

G

IA

TA

YL

O R

P

AR

K

IM

PR

O

VE

M

EN

TS

C

IT

Y O

F

BL

O O

M

IN

G D

AL

E

26-1102

TCB

EMC

MARCH 2026

1" = 20' 10/15/26

20' 20'

20'

10'

SIDEWALK DETAIL

PROFESSIONAL

ENGINEER

REGISTERED

*G

EO

RGIA

ALEC B. METZGER

No. PE30429

Sheets and Views
PHASE 1