Taylor ES_Roof_00 21 00_Ad for Bid_20261006.pdf
PDF 124 KB Posted
- Attached to
- Taylor ES - Roof Replacement
- Solicitation number
- PE-77021-NONST-2027-000000219
- Issued by
- Gwinnett County, Georgia
About this file
This Advertisement for Bid document pertains to a roofing modification project at Taylor Elementary School managed by the Gwinnett County Board of Education in Lawrenceville, Georgia. The project encompasses roofing modifications to Buildings 2010 and 2011 at the school located at 600 Taylor School Drive, Lawrenceville, Georgia 30043. Sealed bids for the furnishing of all labor, materials, and services necessary for the construction are due by 3:00 PM local time on November 5, 2026, with public bid opening and reading at the Gwinnett County Board of Education offices, 53 Gwinnett Drive, Lawrenceville, Georgia 30045, Building "C" Conference Room. A mandatory pre-bid conference will be held on site at Taylor Elementary School at 10:00 AM on October 16, 2026, with attendance required by the project manager or estimator; failure to attend results in automatic disqualification. Bid documents, available from Raymond Global, Inc. (Project Manager: Kevin Bonkowski, 1035 Green Street, Suite A, Conyers, Georgia 30012, Phone: 770-483-9592), require submission of an AIA Document A305 Contractor's Qualifications Statement prior to document issuance. A non-refundable fee of $175.00 per hard set is required. The contractor must mobilize within ten days of Notice to Proceed and complete all work by July 23, 2027.
The contract will be awarded on a lump sum basis to the successful bidder, who must submit an AIA Document A310 Bid Bond equal to 5 percent of the Base Bid price made payable to Gwinnett County Public Schools. The successful contractor must furnish a Performance Bond and Labor and Material Payment Bond, each equal to 100 percent of the Contract Sum, executed by a surety company licensed in Georgia with an A.M. Best Company rating of at least Class "A" and Financial Size VI or better. Bids may not be withdrawn for sixty days after opening. Payment will be made upon receipt of certified payment requests as work progresses, with retainage withheld as prescribed in the specifications and General Conditions. The Owner reserves the right to accept or reject any or all bids and to waive technicalities. Raymond Global, Inc. serves as the designer, and Dr. Alexandra Estrella, Superintendent, represents the Gwinnett County Board of Education as the Owner.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Raymond Global, Inc. Taylor ES Roofing Modifications
– Buildings 2010 & 2011
Project No. CON100226152
Advertisement for Bid 00 21 00 1
SECTION 00 21 00
ADVERTISEMENT FOR BID
ROOFING MODIFICATIONS
TAYLOR ELEMENTARY SCHOOL
600 TAYLOR SCHOOL DRIVE,
LAWRENCEVILLE, GEORGIA 30043
GWINNETT COUNTY BOARD OF EDUCATION
GWINNETT COUNTY, GEORGIA
Sealed Bids will be received from Bidders by the Gwinnett County Board of Education, 53 Gwinnett Drive, Lawrenceville, Georgia 30045, Bldg. “C” Conference Room, for: The furnishing of all labor, materials, and services necessary for the construction of the roofing modification project at Taylor Elementary School, until 3:00 PM local time November 05, 2026. Bids will be opened publicly and will be read aloud at the time and place stated above.
Bids received after the above time is called will not be accepted. No phones will be available.
Bid documents may be obtained at the office of Raymond Global, Contact: Kevin Bonkowski, Project Manager, 1035 Green Street, Suite A, Conyers, Georgia 30012, Phone: 770-483-9592. Statement of Qualifications must be received by the Designer and Owner for evaluation prior to issuance of the documents to Contractors. Applications for Bid documents, together with a non-refundable payment of $175.00 per hard set and a Statement of Qualifications, must be received by Raymond Global prior to issuance of the documents to Contractors. These Bid documents, including all drawings and project manual, will be forwarded from the Designer’s office as soon as possible if the Contractor is approved for bidding the project and the Contractor elects to have them shipped.
A copy of the Bid documents, including drawings and project manuals, shall be available, for review only, at the Designer’s office and the Owner’s office.
All Bidders must submit AIA Document A305 Contractor’s Qualifications Statement to be evaluated by the Owner and Designer prior to being issued bidding documents. Bidders who do not submit the A305 Statement will be subject to disqualification. The A305 must show the Contractor’s ability to complete the Contract in a satisfactory manner on projects of similar scope and complexity. References from past clients and projects must be included and will be verified.
As part of the pre-qualification process, mandatory Pre-Bid Conferences will be held on site at Taylor Elementary School at 10:00 AM local time October 16, 2026. Failure to attend the Pre-Bid Conference shall result in disqualification of the Bidders. Representative shall be Project Manager or Estimator directly responsible for the Bid of this project. Any Bidders may be required, at the discretion of the Owner, to furnish evidence satisfactory to the Owner that his proposed subcontractors have sufficient means and experience in the types of work called for to assure completion of the contract in a satisfactory manner. Any Bidders that is disqualified may respond to the Owner in writing within 20 days of the Notice of Disqualification as to why the Bidders feels that the disqualification is unfounded. The written appeal from the disqualified Bidders will not change the decision already made on this project. However, a favorable appeal may open the way for the Bidders in question to Bid on future Gwinnett County Public School projects.
Contract, if awarded, will be on a lump sum basis. The bids may not be withdrawn for a period of sixty (60) days after date of opening. Bids must be accompanied by an AIA Document A310 Bid Bond (2010) made payable to Gwinnett County Public Schools, in an amount equal to 5 percent of the Base Bid price. (Certified, or personal, checks not acceptable.) The successful Bidders will be required to furnish a Performance Bond and a Labor and Material Payment Bond, each equal to 100% of the Contract Sum. These bonds are to be executed by a Surety Company licensed to do business in the State of Georgia, listed on “Department of the Treasury Circular 570”, latest edition, and have an A.M. Best Company rating of at least Class “A”, with a Financial Size of VI or better.
Bonds must be accompanied by letter stating company’s current Owner/Contractor agreement.
Raymond Global, Inc. Taylor ES Roofing Modifications
– Buildings 2010 & 2011
Project No. CON100226152
Advertisement for Bid 00 21 00 2
Time is of the essence to the Contract performance. Notice to Proceed will be issued after the Pre-Construction meeting as soon as all required paper work such as Contracts, Bonds, Insurance, Submittals, etc. are in order.
Contractor shall mobilize within ten (10) days of the Notice to Proceed; however, construction must be performed by a completion date of July 23, 2027.
The Owner will make payments to the successful Contractor upon receipt of requests for payments, having been certified by the Designer, as fully covered and shown in the plans and specifications. Retainage as prescribed in the specifications and General Conditions of the Contract will be withheld.
The above description is an advertisement for the submission of Bids which are to be considered as offers of performance of work by the submitting party. The Owner reserves the right to accept or reject any or all Bids and to waive technicalities.
DESIGNER: RAYMOND GLOBAL
OWNER: GWINNETT COUNTY BOARD OF EDUCATION
DR. ALEXANDRA ESTRELLA, SUPERINTENDENT
| SECTION 00 21 00 |
| ROOFING MODIFICATIONS |
| TAYLOR ELEMENTARY SCHOOL |
| GWINNETT COUNTY BOARD OF EDUCATION |
| GWINNETT COUNTY, GEORGIA |
File details come from the government source that posted it. Updated .