This is a Bid Tabulation Report for a federal highway construction project. The project, identified as WV NP NERI 107(3), involves the repair of a slide on Cunard River Access Road using an anchored soldier pile wall located in Fayette County, West Virginia, within the New River Gorge National Park and Preserve. The solicitation number is 693C73-26-B-000016, with bids opened on August 13, 2026, in Ashburn, Virginia. The contract was awarded to Danhill Construction Company on September 1, 2026.
The bid tabulation includes 12 responsive contractors and one non-responsive bidder (Xenturis LLC, bid amount $8,308,000.00). The lowest responsive bid was submitted by Danhill Construction Company at $5,346,871.83, compared to the engineer's estimate of $7,850,000.00. Other significant bids ranged from Orders Construction Company, Inc. at $5,936,041.80 to Kovilic Construction Company Inc at $7,781,525.00. The project comprises multiple line items covering mobilization, survey and staking, contractor testing, soil erosion control, clearing and grubbing, removal of various infrastructure elements, roadway excavation, structural steel soldier piles, ground anchors, drilled shafts, pipe culverts, geotextiles, riprap, lagging, asphalt pavement, temporary traffic control, and field office operations. Unit prices and total amounts are detailed for each contractor's bid across all pay items, enabling comprehensive cost comparison among the competing firms.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION REPORT
Project No. : WV NP NERI 107(3) Project Name: REPAIR OF A SLIDE ON CUNARD RIVER
ACCESS ROAD USING AN ANCHORED
SOLDIER PILE WALL
Contractor Responsive? Base Schedule A Xenturis LLC No $8,308,000.00 Kovilic Construction Company Inc $7,781,525.00 Aspen Construction Company $7,765,764.13 Triptych Construction, LLC $7,698,535.00 Construction Solutions Group, LLC $7,680,051.73 Abrams Group Construction LLC $7,630,926.07 Randy Kinder Excavating, Inc. $7,598,223.55 Rock Supremacy LLC $7,225,815.00 Central Southern Construction Corp. $7,163,780.00
Eclipse Co., LLC $7,160,377.25 Orders Construction Company, Inc. $5,936,041.80 Danhill Construction Company $5,346,871.83 Engineer's Estimate $7,850,000.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Emily McCleary
Project No. : WV NP NERI 107(3) Project Name: REPAIR OF A SLIDE
ON CUNARD RIVER
ACCESS ROAD USING
AN ANCHORED
SOLDIER PILE WALL
Division: Eastern Federal Lands
Schedule: A Schedule Type: Base Lead Designer: Damon Hassan Solicitation No. : 693C73-26-B-000016 Opened at: Ashburn, Virginia Opened by: Emily McCleary State: WV County: Fayette Federal Land: New River Gorge
National Park and Preserve
Bid Open Date and Time: 08/13/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive Xenturis LLC, 3010 Santa Fe Court, Missoula, MT, 59808
$8,308,000.00 No
Kovilic Construction Company Inc, 3721 N Carnation Street, Franklin Park, IL, 60131
$7,781,525.00
Aspen Construction Company, 3798 State Highway 371 NW, Hackensack, MN, 56452
$7,765,764.13
Triptych Construction, LLC, 2876 NE Diamond Lake Blvd, Roseburg, OR, 97470
$7,698,535.00
Construction Solutions Group, LLC, 425 Highland Ave, St. Louis, MO, 63122
$7,680,051.73
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Emily McCleary
Emily McCleary
Contract Specialist
14 August 2026
Danhill Construction Company 1 September 2026
Abrams Group Construction
LLC,
3645 HWY 90,
Pace, FL, 32571
$7,630,926.07
Randy Kinder Excavating, Inc., 12965 Carrier Lane, Dexter, MO, 63841
$7,598,223.55
Rock Supremacy LLC, 65175 N Highway 97, Bend, OR, 97701
$7,225,815.00
Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204
$7,163,780.00
Eclipse Co., LLC, 11554 East Washington Street, Chagrin Falls, OH, 44023
$7,160,377.25
Orders Construction Company, Inc., 501 6TH Avenue, Saint Albans, WV, 25177
$5,936,041.80
Danhill Construction Company, 9033 Midland Trail, Glen Ferris, WV, 25090
$5,346,871.83
Engineer's Estimate $7,850,000.00
Project No. : WV NP NERI 107(3) Project Name: REPAIR OF A SLIDE ON CUNARD
RIVER ACCESS ROAD USING AN
ANCHORED SOLDIER PILE WALL
Schedule: A Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
A0100 15101-0000 MOBILIZATION Aspen Construction Company $1,991,935.36
Construction Solutions Group, LLC $1,603,193.50
Central Southern Construction Corp. $1,000,000.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0100 15101-0000 MOBILIZATION Danhill Construction Company $948,333.00
Triptych Construction, LLC $943,500.00
Rock Supremacy LLC $889,000.00 Xenturis LLC $821,277.51 Eclipse Co., LLC $789,077.00 Randy Kinder Excavating, Inc. $664,424.81
Kovilic Construction Company Inc $500,000.00
Abrams Group Construction LLC $338,921.84
Orders Construction Company, Inc. $330,000.00
Engineer's Estimate ALL LPSM LPSM $621,777.50
A0120 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Central Southern Construction Corp. $415,000.00
Triptych Construction, LLC $111,300.00
Construction Solutions Group, LLC $108,500.00
Xenturis LLC $104,031.85 Kovilic Construction Company Inc $100,000.00
Rock Supremacy LLC $93,000.00 Aspen Construction Company $77,280.87
Danhill Construction Company $57,500.00
Eclipse Co., LLC $51,985.00 Abrams Group Construction LLC $51,516.12
Orders Construction Company, Inc. $51,000.00
Randy Kinder Excavating, Inc. $48,643.34
Engineer's Estimate ALL LPSM LPSM $190,000.00
A0140 15401-0000 CONTRACTOR
TESTING
Central Southern Construction Corp. $415,000.00
Eclipse Co., LLC $234,419.50 Randy Kinder Excavating, Inc. $205,390.61
Triptych Construction, LLC $128,200.00
Rock Supremacy LLC $121,000.00 Xenturis LLC $120,457.93
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0140 15401-0000 CONTRACTOR
TESTING
Construction Solutions Group, LLC $116,105.00
Abrams Group Construction LLC $101,500.31
Danhill Construction Company $86,250.00
Aspen Construction Company $77,280.87
Orders Construction Company, Inc. $51,000.00
Kovilic Construction Company Inc $50,000.00
Engineer's Estimate ALL LPSM LPSM $175,000.00
A0160 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
Eclipse Co., LLC 430.000 $63.00 $27,090.00 Orders Construction Company, Inc. 430.000 $27.00 $11,610.00
Kovilic Construction Company Inc 430.000 $25.00 $10,750.00
Abrams Group Construction LLC 430.000 $24.40 $10,492.00
Xenturis LLC 430.000 $19.71 $8,475.30 Randy Kinder Excavating, Inc. 430.000 $18.07 $7,770.10
Central Southern Construction Corp. 430.000 $15.00 $6,450.00
Triptych Construction, LLC 430.000 $12.50 $5,375.00
Rock Supremacy LLC 430.000 $12.00 $5,160.00 Aspen Construction Company 430.000 $11.26 $4,841.80
Danhill Construction Company 430.000 $7.06 $3,035.80
Construction Solutions Group, LLC 430.000 $7.02 $3,018.60
Engineer's Estimate 430.000 LNFT $12.50 $5,375.00
A0180 15706-0400 SOIL EROSION
CONTROL,
SEDIMENT TRAP
Kovilic Construction Company Inc 1.000 $50,000.00 $50,000.00
Eclipse Co., LLC 1.000 $38,588.50 $38,588.50 Randy Kinder Excavating, Inc. 1.000 $34,745.24 $34,745.24
Abrams Group Construction LLC 1.000 $11,523.34 $11,523.34
Triptych Construction, LLC 1.000 $10,700.00 $10,700.00
Central Southern Construction Corp. 1.000 $10,000.00 $10,000.00
Rock Supremacy LLC 1.000 $9,800.00 $9,800.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0180 15706-0400 SOIL EROSION
CONTROL,
SEDIMENT TRAP
Aspen Construction Company 1.000 $9,446.12 $9,446.12
Xenturis LLC 1.000 $7,117.97 $7,117.97 Danhill Construction Company 1.000 $5,175.00 $5,175.00
Construction Solutions Group, LLC 1.000 $3,978.00 $3,978.00
Orders Construction Company, Inc. 1.000 $2,000.00 $2,000.00
Engineer's Estimate 1.000 EACH $10,000.00 $10,000.00
A0200 15706-1000 SOIL EROSION
CONTROL, INLET
PROTECTION
Central Southern Construction Corp. 3.000 $2,500.00 $7,500.00
Randy Kinder Excavating, Inc. 3.000 $2,042.22 $6,126.66
Xenturis LLC 3.000 $1,642.61 $4,927.83 Triptych Construction, LLC 3.000 $1,300.00 $3,900.00
Danhill Construction Company 3.000 $1,222.00 $3,666.00
Rock Supremacy LLC 3.000 $1,200.00 $3,600.00 Kovilic Construction Company Inc 3.000 $1,000.00 $3,000.00
Abrams Group Construction LLC 3.000 $677.84 $2,033.52
Eclipse Co., LLC 3.000 $531.00 $1,593.00 Orders Construction Company, Inc. 3.000 $400.00 $1,200.00
Construction Solutions Group, LLC 3.000 $386.10 $1,158.30
Aspen Construction Company 3.000 $220.94 $662.82
Engineer's Estimate 3.000 EACH $1,000.00 $3,000.00
A0220 15706-1600 SOIL EROSION
CONTROL,
STABILIZED
CONSTRUCTION
EXIT
Randy Kinder Excavating, Inc. 1.000 $30,633.30 $30,633.30
Kovilic Construction Company Inc 1.000 $25,000.00 $25,000.00
Triptych Construction, LLC 1.000 $16,200.00 $16,200.00
Rock Supremacy LLC 1.000 $15,020.00 $15,020.00 Central Southern Construction Corp. 1.000 $15,000.00 $15,000.00
Xenturis LLC 1.000 $13,140.87 $13,140.87 Orders Construction Company, Inc. 1.000 $13,000.00 $13,000.00
Abrams Group Construction LLC 1.000 $12,879.03 $12,879.03
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0220 15706-1600 SOIL EROSION
CONTROL,
STABILIZED
CONSTRUCTION
EXIT
Aspen Construction Company 1.000 $10,972.73 $10,972.73
Eclipse Co., LLC 1.000 $8,172.50 $8,172.50 Danhill Construction Company 1.000 $7,791.00 $7,791.00
Construction Solutions Group, LLC 1.000 $5,352.75 $5,352.75
Engineer's Estimate 1.000 EACH $7,000.00 $7,000.00
A0240 20103-0000 CLEARING AND
GRUBBING
Eclipse Co., LLC 3,250.000 $21.00 $68,250.00 Danhill Construction Company 3,250.000 $15.75 $51,187.50
Central Southern Construction Corp. 3,250.000 $15.00 $48,750.00
Randy Kinder Excavating, Inc. 3,250.000 $14.47 $47,027.50
Aspen Construction Company 3,250.000 $13.59 $44,167.50
Xenturis LLC 3,250.000 $13.14 $42,705.00 Triptych Construction, LLC 3,250.000 $10.50 $34,125.00
Kovilic Construction Company Inc 3,250.000 $10.00 $32,500.00
Rock Supremacy LLC 3,250.000 $10.00 $32,500.00 Construction Solutions Group, LLC 3,250.000 $7.61 $24,732.50
Abrams Group Construction LLC 3,250.000 $5.76 $18,720.00
Orders Construction Company, Inc. 3,250.000 $3.30 $10,725.00
Engineer's Estimate 3,250.000 SQYD $15.25 $49,562.50 A0260 20301-1400 REMOVAL OF INLET Triptych
Construction, LLC 3.000 $5,000.00 $15,000.00
Rock Supremacy LLC 3.000 $4,000.00 $12,000.00 Central Southern Construction Corp. 3.000 $3,500.00 $10,500.00
Aspen Construction Company 3.000 $3,336.28 $10,008.84
Eclipse Co., LLC 3.000 $3,195.50 $9,586.50 Randy Kinder Excavating, Inc. 3.000 $3,063.33 $9,189.99
Xenturis LLC 3.000 $2,737.68 $8,213.04 Danhill Construction Company 3.000 $2,542.00 $7,626.00
Kovilic Construction Company Inc 3.000 $2,000.00 $6,000.00
Abrams Group Construction LLC 3.000 $1,152.33 $3,456.99
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0260 20301-1400 REMOVAL OF INLET Construction Solutions Group, LLC 3.000 $871.65 $2,614.95
Orders Construction Company, Inc. 3.000 $670.00 $2,010.00
Engineer's Estimate 3.000 EACH $3,500.00 $10,500.00 A0280 20301-2400 REMOVAL OF SIGN Triptych
Construction, LLC 12.000 $800.00 $9,600.00
Randy Kinder Excavating, Inc. 12.000 $694.91 $8,338.92
Xenturis LLC 12.000 $547.54 $6,570.48 Danhill Construction Company 12.000 $531.25 $6,375.00
Rock Supremacy LLC 12.000 $500.00 $6,000.00 Abrams Group Construction LLC 12.000 $338.92 $4,067.04
Central Southern Construction Corp. 12.000 $200.00 $2,400.00
Kovilic Construction Company Inc 12.000 $200.00 $2,400.00
Aspen Construction Company 12.000 $177.53 $2,130.36
Eclipse Co., LLC 12.000 $135.50 $1,626.00 Orders Construction Company, Inc. 12.000 $130.00 $1,560.00
Construction Solutions Group, LLC 12.000 $112.32 $1,347.84
Engineer's Estimate 12.000 EACH $370.00 $4,440.00
A0300 20301-3400 REMOVAL OF
WHEELSTOP
Randy Kinder Excavating, Inc. 9.000 $694.91 $6,254.19
Danhill Construction Company 9.000 $641.66 $5,774.94
Triptych Construction, LLC 9.000 $500.00 $4,500.00
Xenturis LLC 9.000 $328.52 $2,956.68 Rock Supremacy LLC 9.000 $300.00 $2,700.00 Aspen Construction Company 9.000 $263.30 $2,369.70
Orders Construction Company, Inc. 9.000 $210.00 $1,890.00
Abrams Group Construction LLC 9.000 $203.35 $1,830.15
Central Southern Construction Corp. 9.000 $200.00 $1,800.00
Eclipse Co., LLC 9.000 $125.00 $1,125.00 Kovilic Construction Company Inc 9.000 $100.00 $900.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0300 20301-3400 REMOVAL OF
WHEELSTOP
Construction Solutions Group, LLC 9.000 $81.90 $737.10
Engineer's Estimate 9.000 EACH $100.00 $900.00
A0320 20302-0300 REMOVAL OF CURB
AND GUTTER,
CONCRETE
Danhill Construction Company 21.000 $507.14 $10,649.94
Xenturis LLC 21.000 $164.26 $3,449.46 Central Southern Construction Corp. 21.000 $150.00 $3,150.00
Orders Construction Company, Inc. 21.000 $130.00 $2,730.00
Aspen Construction Company 21.000 $107.85 $2,264.85
Kovilic Construction Company Inc 21.000 $100.00 $2,100.00
Abrams Group Construction LLC 21.000 $88.12 $1,850.52
Eclipse Co., LLC 21.000 $85.00 $1,785.00 Triptych Construction, LLC 21.000 $81.00 $1,701.00
Rock Supremacy LLC 21.000 $60.00 $1,260.00 Randy Kinder Excavating, Inc. 21.000 $59.57 $1,250.97
Construction Solutions Group, LLC 21.000 $25.74 $540.54
Engineer's Estimate 21.000 LNFT $30.00 $630.00
A0340 20302-1600 REMOVAL OF
PAVED WATERWAY
Triptych Construction, LLC 430.000 $95.00 $40,850.00
Rock Supremacy LLC 430.000 $80.00 $34,400.00 Randy Kinder Excavating, Inc. 430.000 $69.49 $29,880.70
Abrams Group Construction LLC 430.000 $61.01 $26,234.30
Central Southern Construction Corp. 430.000 $60.00 $25,800.00
Xenturis LLC 430.000 $49.28 $21,190.40 Danhill Construction Company 430.000 $36.75 $15,802.50
Eclipse Co., LLC 430.000 $28.00 $12,040.00 Kovilic Construction Company Inc 430.000 $20.00 $8,600.00
Construction Solutions Group, LLC 430.000 $13.46 $5,787.80
Aspen Construction Company 430.000 $12.99 $5,585.70
Orders Construction Company, Inc. 430.000 $12.00 $5,160.00
Engineer's Estimate 430.000 LNFT $55.00 $23,650.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0360 20302-2100 REMOVAL OF PIPE
CULVERT
Triptych Construction, LLC 145.000 $140.00 $20,300.00
Rock Supremacy LLC 145.000 $125.00 $18,125.00 Danhill Construction Company 145.000 $104.27 $15,119.15
Randy Kinder Excavating, Inc. 145.000 $102.11 $14,805.95
Central Southern Construction Corp. 145.000 $100.00 $14,500.00
Xenturis LLC 145.000 $93.08 $13,496.60 Aspen Construction Company 145.000 $62.09 $9,003.05
Kovilic Construction Company Inc 145.000 $50.00 $7,250.00
Construction Solutions Group, LLC 145.000 $35.10 $5,089.50
Eclipse Co., LLC 145.000 $31.00 $4,495.00 Abrams Group Construction LLC 145.000 $30.84 $4,471.80
Orders Construction Company, Inc. 145.000 $28.00 $4,060.00
Engineer's Estimate 145.000 LNFT $220.00 $31,900.00
A0380 20303-1600 REMOVAL OF
PAVEMENT,
ASPHALT
Triptych Construction, LLC 1,080.000 $37.00 $39,960.00
Abrams Group Construction LLC 1,080.000 $31.18 $33,674.40
Central Southern Construction Corp. 1,080.000 $30.00 $32,400.00
Eclipse Co., LLC 1,080.000 $29.50 $31,860.00 Kovilic Construction Company Inc 1,080.000 $27.00 $29,160.00
Rock Supremacy LLC 1,080.000 $25.00 $27,000.00 Randy Kinder Excavating, Inc. 1,080.000 $20.42 $22,053.60
Danhill Construction Company 1,080.000 $19.71 $21,286.80
Xenturis LLC 1,080.000 $19.71 $21,286.80 Aspen Construction Company 1,080.000 $10.94 $11,815.20
Construction Solutions Group, LLC 1,080.000 $10.53 $11,372.40
Orders Construction Company, Inc. 1,080.000 $9.60 $10,368.00
Engineer's Estimate 1,080.000 SQYD $37.00 $39,960.00
A0400 20401-0000 ROADWAY
EXCAVATION
Eclipse Co., LLC 7,470.000 $118.00 $881,460.00 Kovilic Construction Company Inc 7,470.000 $100.00 $747,000.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0400 20401-0000 ROADWAY
EXCAVATION
Randy Kinder Excavating, Inc. 7,470.000 $98.70 $737,289.00
Xenturis LLC 7,470.000 $60.23 $449,918.10 Triptych Construction, LLC 7,470.000 $59.00 $440,730.00
Central Southern Construction Corp. 7,470.000 $55.00 $410,850.00
Construction Solutions Group, LLC 7,470.000 $54.99 $410,775.30
Danhill Construction Company 7,470.000 $54.04 $403,678.80
Abrams Group Construction LLC 7,470.000 $53.55 $400,018.50
Rock Supremacy LLC 7,470.000 $53.00 $395,910.00 Aspen Construction Company 7,470.000 $44.91 $335,477.70
Orders Construction Company, Inc. 7,470.000 $42.00 $313,740.00
Engineer's Estimate 7,470.000 CUYD $34.00 $253,980.00 A0420 20411-0000 SELECT BORROW Eclipse Co., LLC 2,250.000 $116.00 $261,000.00
Central Southern Construction Corp. 2,250.000 $114.00 $256,500.00
Kovilic Construction Company Inc 2,250.000 $100.00 $225,000.00
Randy Kinder Excavating, Inc. 2,250.000 $93.60 $210,600.00
Orders Construction Company, Inc. 2,250.000 $93.00 $209,250.00
Triptych Construction, LLC 2,250.000 $90.00 $202,500.00
Rock Supremacy LLC 2,250.000 $83.00 $186,750.00 Xenturis LLC 2,250.000 $82.13 $184,792.50 Construction Solutions Group, LLC 2,250.000 $80.73 $181,642.50
Danhill Construction Company 2,250.000 $79.34 $178,515.00
Abrams Group Construction LLC 2,250.000 $56.08 $126,180.00
Aspen Construction Company 2,250.000 $36.13 $81,292.50
Engineer's Estimate 2,250.000 TON $65.00 $146,250.00
A0440 20701-1000 SEPARATION
GEOTEXTILE,
WOVEN
Randy Kinder Excavating, Inc. 1,080.000 $15.32 $16,545.60
Central Southern Construction Corp. 1,080.000 $15.00 $16,200.00
Danhill Construction Company 1,080.000 $13.97 $15,087.60
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0440 20701-1000 SEPARATION
GEOTEXTILE,
WOVEN
Abrams Group Construction LLC 1,080.000 $10.85 $11,718.00
Kovilic Construction Company Inc 1,080.000 $10.00 $10,800.00
Xenturis LLC 1,080.000 $8.76 $9,460.80 Rock Supremacy LLC 1,080.000 $8.00 $8,640.00 Aspen Construction Company 1,080.000 $7.59 $8,197.20
Triptych Construction, LLC 1,080.000 $7.20 $7,776.00
Eclipse Co., LLC 1,080.000 $6.50 $7,020.00 Construction Solutions Group, LLC 1,080.000 $4.68 $5,054.40
Orders Construction Company, Inc. 1,080.000 $3.40 $3,672.00
Engineer's Estimate 1,080.000 SQYD $7.50 $8,100.00
A0460 20703-1200 GEOTEXTILE
FILTER, CLASS 1,
NON-WOVEN
Kovilic Construction Company Inc 935.000 $20.00 $18,700.00
Danhill Construction Company 935.000 $15.43 $14,427.05
Central Southern Construction Corp. 935.000 $15.00 $14,025.00
Randy Kinder Excavating, Inc. 935.000 $13.62 $12,734.70
Abrams Group Construction LLC 935.000 $13.22 $12,360.70
Rock Supremacy LLC 935.000 $10.00 $9,350.00 Xenturis LLC 935.000 $9.86 $9,219.10 Triptych Construction, LLC 935.000 $9.00 $8,415.00
Orders Construction Company, Inc. 935.000 $7.20 $6,732.00
Eclipse Co., LLC 935.000 $6.50 $6,077.50 Aspen Construction Company 935.000 $4.78 $4,469.30
Construction Solutions Group, LLC 935.000 $4.68 $4,375.80
Engineer's Estimate 935.000 SQYD $6.20 $5,797.00
A0480 25102-0200 PLACED RIPRAP,
CLASS 2
Randy Kinder Excavating, Inc. 365.000 $272.29 $99,385.85
Kovilic Construction Company Inc 365.000 $250.00 $91,250.00
Triptych Construction, LLC 365.000 $198.00 $72,270.00
Central Southern Construction Corp. 365.000 $192.00 $70,080.00
Rock Supremacy LLC 365.000 $185.00 $67,525.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0480 25102-0200 PLACED RIPRAP,
CLASS 2
Abrams Group Construction LLC 365.000 $178.95 $65,316.75
Danhill Construction Company 365.000 $176.18 $64,305.70
Aspen Construction Company 365.000 $166.25 $60,681.25
Eclipse Co., LLC 365.000 $157.00 $57,305.00 Xenturis LLC 365.000 $125.93 $45,964.45 Construction Solutions Group, LLC 365.000 $122.85 $44,840.25
Orders Construction Company, Inc. 365.000 $100.00 $36,500.00
Engineer's Estimate 365.000 TON $200.00 $73,000.00 A0500 25402-1000 LAGGING, TIMBER Construction
Solutions Group, LLC 4,540.000 $52.65 $239,031.00
Abrams Group Construction LLC 4,540.000 $51.86 $235,444.40
Kovilic Construction Company Inc 4,540.000 $50.00 $227,000.00
Danhill Construction Company 4,540.000 $48.88 $221,915.20
Triptych Construction, LLC 4,540.000 $48.00 $217,920.00
Xenturis LLC 4,540.000 $45.99 $208,794.60 Rock Supremacy LLC 4,540.000 $44.00 $199,760.00 Randy Kinder Excavating, Inc. 4,540.000 $42.11 $191,179.40
Eclipse Co., LLC 4,540.000 $33.50 $152,090.00 Central Southern Construction Corp. 4,540.000 $30.00 $136,200.00
Orders Construction Company, Inc. 4,540.000 $30.00 $136,200.00
Aspen Construction Company 4,540.000 $9.12 $41,404.80
Engineer's Estimate 4,540.000 SQFT $55.00 $249,700.00
A0520 25402-2000 LAGGING,
CONCRETE
(PRECAST
CONCRETE PANELS)
Triptych Construction, LLC 4,540.000 $152.00 $690,080.00
Rock Supremacy LLC 4,540.000 $140.00 $635,600.00 Central Southern Construction Corp. 4,540.000 $138.00 $626,520.00
Abrams Group Construction LLC 4,540.000 $132.15 $599,961.00
Xenturis LLC 4,540.000 $120.46 $546,888.40 Aspen Construction Company 4,540.000 $110.05 $499,627.00
Kovilic Construction Company Inc 4,540.000 $100.00 $454,000.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0520 25402-2000 LAGGING,
CONCRETE
(PRECAST
CONCRETE PANELS)
Danhill Construction Company 4,540.000 $89.61 $406,829.40
Eclipse Co., LLC 4,540.000 $76.00 $345,040.00 Randy Kinder Excavating, Inc. 4,540.000 $70.18 $318,617.20
Construction Solutions Group, LLC 4,540.000 $64.35 $292,149.00
Orders Construction Company, Inc. 4,540.000 $43.00 $195,220.00
Engineer's Estimate 4,540.000 SQFT $75.00 $340,500.00
A0540 25411-0000 STRUCTURAL STEEL
SOLDIER PILE
(STEEL H-PILE, 16 X
88, IN PLACE)
Aspen Construction Company 2,260.000 $663.74 $1,500,052.40
Abrams Group Construction LLC 2,260.000 $653.44 $1,476,774.40
Randy Kinder Excavating, Inc. 2,260.000 $629.15 $1,421,879.00
Kovilic Construction Company Inc 2,260.000 $600.00 $1,356,000.00
Construction Solutions Group, LLC 2,260.000 $585.00 $1,322,100.00
Central Southern Construction Corp. 2,260.000 $564.00 $1,274,640.00
Xenturis LLC 2,260.000 $558.49 $1,262,187.40 Eclipse Co., LLC 2,260.000 $520.00 $1,175,200.00 Orders Construction Company, Inc. 2,260.000 $330.00 $745,800.00
Triptych Construction, LLC 2,260.000 $271.00 $612,460.00
Rock Supremacy LLC 2,260.000 $250.00 $565,000.00 Danhill Construction Company 2,260.000 $249.55 $563,983.00
Engineer's Estimate 2,260.000 LNFT $420.00 $949,200.00 A0560 25602-0000 GROUND ANCHOR Xenturis LLC 7,350.000 $328.52 $2,414,622.00
Aspen Construction Company 7,350.000 $231.29 $1,699,981.50
Orders Construction Company, Inc. 7,350.000 $220.00 $1,617,000.00
Randy Kinder Excavating, Inc. 7,350.000 $211.46 $1,554,231.00
Abrams Group Construction LLC 7,350.000 $206.06 $1,514,541.00
Kovilic Construction Company Inc 7,350.000 $200.00 $1,470,000.00
Triptych Construction, LLC 7,350.000 $190.00 $1,396,500.00
Construction Solutions Group, LLC 7,350.000 $181.35 $1,332,922.50
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0560 25602-0000 GROUND ANCHOR Eclipse Co., LLC 7,350.000 $177.00 $1,300,950.00 Rock Supremacy LLC 7,350.000 $176.00 $1,293,600.00 Central Southern Construction Corp. 7,350.000 $142.20 $1,045,170.00
Danhill Construction Company 7,350.000 $103.50 $760,725.00
Engineer's Estimate 7,350.000 LNFT $190.00 $1,396,500.00
A0580 25605-0000 PERFORMANCE
TEST
Randy Kinder Excavating, Inc. 8.000 $14,035.03 $112,280.24
Construction Solutions Group, LLC 8.000 $11,524.50 $92,196.00
Abrams Group Construction LLC 8.000 $11,523.34 $92,186.72
Eclipse Co., LLC 8.000 $11,111.00 $88,888.00 Central Southern Construction Corp. 8.000 $10,000.00 $80,000.00
Xenturis LLC 8.000 $8,213.04 $65,704.32 Triptych Construction, LLC 8.000 $6,000.00 $48,000.00
Rock Supremacy LLC 8.000 $4,900.00 $39,200.00 Danhill Construction Company 8.000 $4,888.50 $39,108.00
Kovilic Construction Company Inc 8.000 $2,500.00 $20,000.00
Aspen Construction Company 8.000 $2,457.54 $19,660.32
Orders Construction Company, Inc. 8.000 $2,200.00 $17,600.00
Engineer's Estimate 8.000 EACH $6,500.00 $52,000.00
A0600 30202-2000 ROADWAY
AGGREGATE,
METHOD 2
Randy Kinder Excavating, Inc. 340.000 $153.17 $52,077.80
Triptych Construction, LLC 340.000 $142.00 $48,280.00
Rock Supremacy LLC 340.000 $135.00 $45,900.00 Aspen Construction Company 340.000 $125.91 $42,809.40
Kovilic Construction Company Inc 340.000 $125.00 $42,500.00
Central Southern Construction Corp. 340.000 $100.00 $34,000.00
Abrams Group Construction LLC 340.000 $97.61 $33,187.40
Xenturis LLC 340.000 $93.08 $31,647.20 Eclipse Co., LLC 340.000 $89.00 $30,260.00 Construction Solutions Group, LLC 340.000 $87.75 $29,835.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0600 30202-2000 ROADWAY
AGGREGATE,
METHOD 2
Danhill Construction Company 340.000 $86.25 $29,325.00
Orders Construction Company, Inc. 340.000 $82.00 $27,880.00
Engineer's Estimate 340.000 TON $95.00 $32,300.00
A0620 31302-0400 AGGREGATE-
TOPSOIL COURSE, 4
-INCH DEPTH
Central Southern Construction Corp. 155.000 $100.00 $15,500.00
Eclipse Co., LLC 155.000 $95.00 $14,725.00 Danhill Construction Company 155.000 $84.83 $13,148.65
Aspen Construction Company 155.000 $78.79 $12,212.45
Abrams Group Construction LLC 155.000 $37.96 $5,883.80
Randy Kinder Excavating, Inc. 155.000 $37.44 $5,803.20
Rock Supremacy LLC 155.000 $30.00 $4,650.00 Orders Construction Company, Inc. 155.000 $22.00 $3,410.00
Triptych Construction, LLC 155.000 $22.00 $3,410.00
Kovilic Construction Company Inc 155.000 $20.00 $3,100.00
Construction Solutions Group, LLC 155.000 $19.89 $3,082.95
Xenturis LLC 155.000 $16.43 $2,546.65 Engineer's Estimate 155.000 SQYD $55.00 $8,525.00
A0640 40301-0100 ASPHALT
CONCRETE
PAVEMENT, TYPE 1
(1/2-INCH
NOMINAL
MAXIMUM SIZE
AGGREGATE)
Abrams Group Construction LLC 620.000 $416.20 $258,044.00
Randy Kinder Excavating, Inc. 620.000 $368.30 $228,346.00
Kovilic Construction Company Inc 620.000 $315.00 $195,300.00
Triptych Construction, LLC 620.000 $268.00 $166,160.00
Aspen Construction Company 620.000 $267.43 $165,806.60
Construction Solutions Group, LLC 620.000 $263.25 $163,215.00
Orders Construction Company, Inc. 620.000 $260.00 $161,200.00
Danhill Construction Company 620.000 $258.75 $160,425.00
Central Southern Construction Corp. 620.000 $250.00 $155,000.00
Rock Supremacy LLC 620.000 $250.00 $155,000.00 Eclipse Co., LLC 620.000 $247.50 $153,450.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0640 40301-0100 ASPHALT
CONCRETE
PAVEMENT, TYPE 1
(1/2-INCH
NOMINAL
MAXIMUM SIZE
AGGREGATE)
Xenturis LLC 620.000 $229.97 $142,581.40
Engineer's Estimate 620.000 TON $270.00 $167,400.00
A0660 40301-0100 ASPHALT
CONCRETE
PAVEMENT, TYPE 1
(3/4-INCH
NOMINAL
MAXIMUM SIZE
AGGREGATE)
Abrams Group Construction LLC 535.000 $409.42 $219,039.70
Randy Kinder Excavating, Inc. 535.000 $368.30 $197,040.50
Kovilic Construction Company Inc 535.000 $315.00 $168,525.00
Aspen Construction Company 535.000 $281.89 $150,811.15
Triptych Construction, LLC 535.000 $268.00 $143,380.00
Construction Solutions Group, LLC 535.000 $263.25 $140,838.75
Orders Construction Company, Inc. 535.000 $260.00 $139,100.00
Danhill Construction Company 535.000 $258.74 $138,425.90
Central Southern Construction Corp. 535.000 $250.00 $133,750.00
Rock Supremacy LLC 535.000 $250.00 $133,750.00 Eclipse Co., LLC 535.000 $247.50 $132,412.50 Xenturis LLC 535.000 $229.97 $123,033.95 Engineer's Estimate 535.000 TON $310.00 $165,850.00
A0680 41202-0000 TACK COAT Randy Kinder Excavating, Inc. 860.000 $13.62 $11,713.20
Abrams Group Construction LLC 860.000 $11.52 $9,907.20
Central Southern Construction Corp. 860.000 $10.00 $8,600.00
Kovilic Construction Company Inc 860.000 $10.00 $8,600.00
Xenturis LLC 860.000 $7.67 $6,596.20 Rock Supremacy LLC 860.000 $7.00 $6,020.00 Aspen Construction Company 860.000 $6.51 $5,598.60
Triptych Construction, LLC 860.000 $6.50 $5,590.00
Construction Solutions Group, LLC 860.000 $5.85 $5,031.00
Orders Construction Company, Inc. 860.000 $5.80 $4,988.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0680 41202-0000 TACK COAT Danhill Construction Company 860.000 $5.75 $4,945.00
Eclipse Co., LLC 860.000 $5.50 $4,730.00 Engineer's Estimate 860.000 GAL $4.90 $4,214.00
A0700 41301-0600 ASPHALT
PAVEMENT
MILLING, 2-INCH
DEPTH
Kovilic Construction Company Inc 2,300.000 $27.00 $62,100.00
Triptych Construction, LLC 2,300.000 $24.00 $55,200.00
Randy Kinder Excavating, Inc. 2,300.000 $23.82 $54,786.00
Rock Supremacy LLC 2,300.000 $22.00 $50,600.00 Central Southern Construction Corp. 2,300.000 $15.00 $34,500.00
Xenturis LLC 2,300.000 $13.14 $30,222.00 Aspen Construction Company 2,300.000 $12.14 $27,922.00
Orders Construction Company, Inc. 2,300.000 $8.10 $18,630.00
Abrams Group Construction LLC 2,300.000 $7.12 $16,376.00
Eclipse Co., LLC 2,300.000 $6.00 $13,800.00 Danhill Construction Company 2,300.000 $5.75 $13,225.00
Construction Solutions Group, LLC 2,300.000 $3.51 $8,073.00
Engineer's Estimate 2,300.000 SQYD $14.50 $33,350.00
A0720 56501-0300 DRILLED SHAFT, 30-
INCH DIAMETER
(FLOWABLE
BACKFILL DRILLED
SHAFT)
Triptych Construction, LLC 120.000 $1,625.00 $195,000.00
Rock Supremacy LLC 120.000 $1,500.00 $180,000.00 Kovilic Construction Company Inc 120.000 $750.00 $90,000.00
Eclipse Co., LLC 120.000 $580.00 $69,600.00 Abrams Group Construction LLC 120.000 $508.38 $61,005.60
Central Southern Construction Corp. 120.000 $480.00 $57,600.00
Construction Solutions Group, LLC 120.000 $374.40 $44,928.00
Orders Construction Company, Inc. 120.000 $340.00 $40,800.00
Xenturis LLC 120.000 $328.52 $39,422.40 Danhill Construction Company 120.000 $260.72 $31,286.40
Aspen Construction Company 120.000 $179.25 $21,510.00
Randy Kinder Excavating, Inc. 120.000 $68.46 $8,215.20
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0720 56501-0300 DRILLED SHAFT, 30-
INCH DIAMETER
(FLOWABLE
BACKFILL DRILLED
SHAFT)
Engineer's Estimate 120.000 LNFT $750.00 $90,000.00
A0740 56501-0300 DRILLED SHAFT, 30-
INCH DIAMETER
(ROCK
EMBEDMENT)
Abrams Group Construction LLC 505.000 $1,694.61 $855,778.05
Kovilic Construction Company Inc 505.000 $1,500.00 $757,500.00
Triptych Construction, LLC 505.000 $1,255.00 $633,775.00
Construction Solutions Group, LLC 505.000 $1,170.00 $590,850.00
Rock Supremacy LLC 505.000 $1,160.00 $585,800.00 Orders Construction Company, Inc. 505.000 $1,000.00 $505,000.00
Xenturis LLC 505.000 $876.06 $442,410.30 Danhill Construction Company 505.000 $521.45 $263,332.25
Central Southern Construction Corp. 505.000 $366.00 $184,830.00
Eclipse Co., LLC 505.000 $274.50 $138,622.50 Aspen Construction Company 505.000 $181.86 $91,839.30
Randy Kinder Excavating, Inc. 505.000 $68.46 $34,572.30
Engineer's Estimate 505.000 LNFT $3,000.00 $1,515,000.00
A0760 56501-0300 DRILLED SHAFT, 30-
INCH DIAMETER
(SOIL
EMBEDMENT)
Orders Construction Company, Inc. 825.000 $810.00 $668,250.00
Triptych Construction, LLC 825.000 $710.00 $585,750.00
Rock Supremacy LLC 825.000 $655.00 $540,375.00 Abrams Group Construction LLC 825.000 $610.06 $503,299.50
Kovilic Construction Company Inc 825.000 $600.00 $495,000.00
Xenturis LLC 825.000 $465.41 $383,963.25 Randy Kinder Excavating, Inc. 825.000 $410.78 $338,893.50
Danhill Construction Company 825.000 $293.31 $241,980.75
Construction Solutions Group, LLC 825.000 $234.00 $193,050.00
Eclipse Co., LLC 825.000 $232.50 $191,812.50 Aspen Construction Company 825.000 $179.25 $147,881.25
Central Southern Construction Corp. 825.000 $120.00 $99,000.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0760 56501-0300 DRILLED SHAFT, 30-
INCH DIAMETER
(SOIL
EMBEDMENT)
Engineer's Estimate 825.000 LNFT $750.00 $618,750.00
A0780 60201-0800 24-INCH PIPE
CULVERT
Eclipse Co., LLC 75.000 $566.50 $42,487.50 Randy Kinder Excavating, Inc. 75.000 $468.01 $35,100.75
Triptych Construction, LLC 75.000 $435.00 $32,625.00
Rock Supremacy LLC 75.000 $400.00 $30,000.00 Xenturis LLC 75.000 $328.52 $24,639.00 Orders Construction Company, Inc. 75.000 $270.00 $20,250.00
Aspen Construction Company 75.000 $265.92 $19,944.00
Central Southern Construction Corp. 75.000 $250.00 $18,750.00
Kovilic Construction Company Inc 75.000 $250.00 $18,750.00
Danhill Construction Company 75.000 $244.42 $18,331.50
Abrams Group Construction LLC 75.000 $223.69 $16,776.75
Construction Solutions Group, LLC 75.000 $193.05 $14,478.75
Engineer's Estimate 75.000 LNFT $220.00 $16,500.00
A0800 60210-0800 END SECTION FOR
24-INCH PIPE
CULVERT
Eclipse Co., LLC 2.000 $10,898.50 $21,797.00 Triptych Construction, LLC 2.000 $7,500.00 $15,000.00
Xenturis LLC 2.000 $5,475.36 $10,950.72 Danhill Construction Company 2.000 $5,462.50 $10,925.00
Randy Kinder Excavating, Inc. 2.000 $5,105.55 $10,211.10
Central Southern Construction Corp. 2.000 $5,000.00 $10,000.00
Kovilic Construction Company Inc 2.000 $5,000.00 $10,000.00
Rock Supremacy LLC 2.000 $4,000.00 $8,000.00 Abrams Group Construction LLC 2.000 $3,389.22 $6,778.44
Aspen Construction Company 2.000 $2,688.51 $5,377.02
Construction Solutions Group, LLC 2.000 $1,638.00 $3,276.00
Orders Construction Company, Inc. 2.000 $1,400.00 $2,800.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0800 60210-0800 END SECTION FOR
24-INCH PIPE
CULVERT
Engineer's Estimate 2.000 EACH $2,500.00 $5,000.00
A0820 60403-1100 INLET, FLH TYPE 4D Randy Kinder Excavating, Inc. 1.000 $25,527.75 $25,527.75
Triptych Construction, LLC 1.000 $19,000.00 $19,000.00
Orders Construction Company, Inc. 1.000 $16,000.00 $16,000.00
Eclipse Co., LLC 1.000 $15,772.00 $15,772.00 Rock Supremacy LLC 1.000 $14,000.00 $14,000.00 Central Southern Construction Corp. 1.000 $12,000.00 $12,000.00
Abrams Group Construction LLC 1.000 $11,658.91 $11,658.91
Aspen Construction Company 1.000 $11,142.07 $11,142.07
Kovilic Construction Company Inc 1.000 $10,000.00 $10,000.00
Danhill Construction Company 1.000 $9,862.40 $9,862.40
Construction Solutions Group, LLC 1.000 $9,711.00 $9,711.00
Xenturis LLC 1.000 $9,308.11 $9,308.11 Engineer's Estimate 1.000 EACH $8,500.00 $8,500.00
A0840 60403-1100 INLET, FLH TYPE 4D
(MODIFIED)
Triptych Construction, LLC 1.000 $31,800.00 $31,800.00
Randy Kinder Excavating, Inc. 1.000 $30,633.30 $30,633.30
Rock Supremacy LLC 1.000 $27,000.00 $27,000.00 Orders Construction Company, Inc. 1.000 $23,000.00 $23,000.00
Construction Solutions Group, LLC 1.000 $21,323.25 $21,323.25
Eclipse Co., LLC 1.000 $20,566.00 $20,566.00 Central Southern Construction Corp. 1.000 $15,000.00 $15,000.00
Xenturis LLC 1.000 $13,140.87 $13,140.87 Abrams Group Construction LLC 1.000 $12,472.32 $12,472.32
Danhill Construction Company 1.000 $11,980.70 $11,980.70
Aspen Construction Company 1.000 $11,142.07 $11,142.07
Kovilic Construction Company Inc 1.000 $10,000.00 $10,000.00
Engineer's Estimate 1.000 EACH $13,000.00 $13,000.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0860 60510-0700 6-INCH COLLECTOR
PIPE (PERFORATED)
Randy Kinder Excavating, Inc. 300.000 $110.62 $33,186.00
Kovilic Construction Company Inc 300.000 $100.00 $30,000.00
Xenturis LLC 300.000 $71.18 $21,354.00 Triptych Construction, LLC 300.000 $70.00 $21,000.00
Rock Supremacy LLC 300.000 $65.00 $19,500.00 Aspen Construction Company 300.000 $54.94 $16,482.00
Eclipse Co., LLC 300.000 $51.00 $15,300.00 Construction Solutions Group, LLC 300.000 $35.10 $10,530.00
Abrams Group Construction LLC 300.000 $34.91 $10,473.00
Danhill Construction Company 300.000 $29.33 $8,799.00
Central Southern Construction Corp. 300.000 $24.00 $7,200.00
Orders Construction Company, Inc. 300.000 $23.00 $6,900.00
Engineer's Estimate 300.000 LNFT $33.00 $9,900.00
A0880 60510-0800 6-INCH OUTLET
PIPE
Aspen Construction Company 110.000 $120.19 $13,220.90
Kovilic Construction Company Inc 110.000 $100.00 $11,000.00
Randy Kinder Excavating, Inc. 110.000 $93.60 $10,296.00
Abrams Group Construction LLC 110.000 $61.01 $6,711.10
Xenturis LLC 110.000 $60.23 $6,625.30 Rock Supremacy LLC 110.000 $54.00 $5,940.00 Orders Construction Company, Inc. 110.000 $50.00 $5,500.00
Triptych Construction, LLC 110.000 $49.00 $5,390.00
Eclipse Co., LLC 110.000 $46.50 $5,115.00 Construction Solutions Group, LLC 110.000 $29.25 $3,217.50
Danhill Construction Company 110.000 $26.06 $2,866.60
Central Southern Construction Corp. 110.000 $24.00 $2,640.00
Engineer's Estimate 110.000 LNFT $65.00 $7,150.00
A0900 60520-0000 UNDERDRAIN
BACKFILL (AASHTO
NO. 67 STONE)
Orders Construction Company, Inc. 125.000 $300.00 $37,500.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0900 60520-0000 UNDERDRAIN
BACKFILL (AASHTO
NO. 67 STONE)
Aspen Construction Company 125.000 $232.62 $29,077.50
Triptych Construction, LLC 125.000 $211.00 $26,375.00
Central Southern Construction Corp. 125.000 $200.00 $25,000.00
Kovilic Construction Company Inc 125.000 $200.00 $25,000.00
Rock Supremacy LLC 125.000 $180.00 $22,500.00 Eclipse Co., LLC 125.000 $179.50 $22,437.50 Randy Kinder Excavating, Inc. 125.000 $178.69 $22,336.25
Danhill Construction Company 125.000 $162.95 $20,368.75
Construction Solutions Group, LLC 125.000 $128.70 $16,087.50
Abrams Group Construction LLC 125.000 $116.59 $14,573.75
Xenturis LLC 125.000 $98.56 $12,320.00 Engineer's Estimate 125.000 CUYD $160.00 $20,000.00
A0920 60703-0000 CLEANING
CULVERTS IN PLACE
Danhill Construction Company 25.000 $510.60 $12,765.00
Eclipse Co., LLC 25.000 $237.00 $5,925.00 Central Southern Construction Corp. 25.000 $200.00 $5,000.00
Randy Kinder Excavating, Inc. 25.000 $132.03 $3,300.75
Rock Supremacy LLC 25.000 $120.00 $3,000.00 Xenturis LLC 25.000 $109.51 $2,737.75 Construction Solutions Group, LLC 25.000 $107.64 $2,691.00
Kovilic Construction Company Inc 25.000 $100.00 $2,500.00
Triptych Construction, LLC 25.000 $95.00 $2,375.00
Abrams Group Construction LLC 25.000 $88.12 $2,203.00
Aspen Construction Company 25.000 $85.71 $2,142.75
Orders Construction Company, Inc. 25.000 $83.00 $2,075.00
Engineer's Estimate 25.000 LNFT $90.00 $2,250.00
A0940 60802-0500 PAVED
WATERWAY, TYPE
5 (MODIFIED)
Aspen Construction Company 420.000 $310.80 $130,536.00
Randy Kinder Excavating, Inc. 420.000 $291.86 $122,581.20
Eclipse Co., LLC 420.000 $205.50 $86,310.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0940 60802-0500 PAVED
WATERWAY, TYPE
5 (MODIFIED)
Orders Construction Company, Inc. 420.000 $170.00 $71,400.00
Abrams Group Construction LLC 420.000 $155.90 $65,478.00
Central Southern Construction Corp. 420.000 $150.00 $63,000.00
Kovilic Construction Company Inc 420.000 $150.00 $63,000.00
Triptych Construction, LLC 420.000 $148.00 $62,160.00
Construction Solutions Group, LLC 420.000 $139.29 $58,501.80
Danhill Construction Company 420.000 $136.90 $57,498.00
Rock Supremacy LLC 420.000 $130.00 $54,600.00 Xenturis LLC 420.000 $120.46 $50,593.20 Engineer's Estimate 420.000 LNFT $130.00 $54,600.00
A0960 60902-1100 CURB AND
GUTTER,
CONCRETE, 13-
INCH DEPTH
Danhill Construction Company 50.000 $660.10 $33,005.00
Eclipse Co., LLC 50.000 $198.50 $9,925.00 Triptych Construction, LLC 50.000 $192.00 $9,600.00
Orders Construction Company, Inc. 50.000 $190.00 $9,500.00
Randy Kinder Excavating, Inc. 50.000 $178.69 $8,934.50
Xenturis LLC 50.000 $175.21 $8,760.50 Rock Supremacy LLC 50.000 $160.00 $8,000.00 Central Southern Construction Corp. 50.000 $150.00 $7,500.00
Abrams Group Construction LLC 50.000 $128.79 $6,439.50
Construction Solutions Group, LLC 50.000 $128.70 $6,435.00
Aspen Construction Company 50.000 $121.70 $6,085.00
Kovilic Construction Company Inc 50.000 $100.00 $5,000.00
Engineer's Estimate 50.000 LNFT $130.00 $6,500.00
A0980 60915-1000 WHEELSTOP,
CONCRETE
Danhill Construction Company 9.000 $980.95 $8,828.55
Orders Construction Company, Inc. 9.000 $880.00 $7,920.00
Eclipse Co., LLC 9.000 $724.50 $6,520.50 Randy Kinder Excavating, Inc. 9.000 $723.29 $6,509.61
Xenturis LLC 9.000 $657.04 $5,913.36
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0980 60915-1000 WHEELSTOP,
CONCRETE
Rock Supremacy LLC 9.000 $600.00 $5,400.00 Abrams Group Construction LLC 9.000 $542.27 $4,880.43
Triptych Construction, LLC 9.000 $480.00 $4,320.00
Construction Solutions Group, LLC 9.000 $427.05 $3,843.45
Aspen Construction Company 9.000 $375.06 $3,375.54
Kovilic Construction Company Inc 9.000 $250.00 $2,250.00
Central Southern Construction Corp. 9.000 $200.00 $1,800.00
Engineer's Estimate 9.000 EACH $290.00 $2,610.00
A1000 61701-4500 GUARDRAIL
SYSTEM MGS, TYPE
2, CLASS A, STEEL
POSTS (NATINA
STAINED)
Xenturis LLC 350.000 $164.26 $57,491.00 Aspen Construction Company 350.000 $164.07 $57,424.50
Triptych Construction, LLC 350.000 $161.00 $56,350.00
Abrams Group Construction LLC 350.000 $155.90 $54,565.00
Randy Kinder Excavating, Inc. 350.000 $155.41 $54,393.50
Central Southern Construction Corp. 350.000 $150.00 $52,500.00
Kovilic Construction Company Inc 350.000 $150.00 $52,500.00
Rock Supremacy LLC 350.000 $140.00 $49,000.00 Danhill Construction Company 350.000 $130.50 $45,675.00
Orders Construction Company, Inc. 350.000 $130.00 $45,500.00
Eclipse Co., LLC 350.000 $125.00 $43,750.00 Construction Solutions Group, LLC 350.000 $107.64 $37,674.00
Engineer's Estimate 350.000 LNFT $170.00 $59,500.00
A1020 61702-1500 TERMINAL SYSTEM,
TYPE MGS
TANGENT (NATINA
STAINED)
Triptych Construction, LLC 2.000 $14,600.00 $29,200.00
Rock Supremacy LLC 2.000 $13,000.00 $26,000.00 Danhill Construction Company 2.000 $12,075.00 $24,150.00
Aspen Construction Company 2.000 $10,408.41 $20,816.82
Central Southern Construction Corp. 2.000 $10,000.00 $20,000.00
Kovilic Construction Company Inc 2.000 $10,000.00 $20,000.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A1020 61702-1500 TERMINAL SYSTEM,
TYPE MGS
TANGENT (NATINA
STAINED)
Randy Kinder Excavating, Inc. 2.000 $9,858.75 $19,717.50
Xenturis LLC 2.000 $8,760.58 $17,521.16 Orders Construction Company, Inc. 2.000 $8,200.00 $16,400.00
Eclipse Co., LLC 2.000 $7,920.00 $15,840.00 Abrams Group Construction LLC 2.000 $4,338.20 $8,676.40
Construction Solutions Group, LLC 2.000 $3,042.00 $6,084.00
Engineer's Estimate 2.000 EACH $9,000.00 $18,000.00
A1040 62401-0300 PROVIDING AND
PLACING TOPSOIL,
4-INCH DEPTH
Eclipse Co., LLC 3,240.000 $83.00 $268,920.00 Danhill Construction Company 3,240.000 $25.95 $84,078.00
Orders Construction Company, Inc. 3,240.000 $24.00 $77,760.00
Randy Kinder Excavating, Inc. 3,240.000 $23.63 $76,561.20
Construction Solutions Group, LLC 3,240.000 $21.65 $70,146.00
Triptych Construction, LLC 3,240.000 $21.50 $69,660.00
Rock Supremacy LLC 3,240.000 $20.00 $64,800.00 Central Southern Construction Corp. 3,240.000 $15.00 $48,600.00
Kovilic Construction Company Inc 3,240.000 $15.00 $48,600.00
Xenturis LLC 3,240.000 $13.14 $42,573.60 Abrams Group Construction LLC 3,240.000 $11.12 $36,028.80
Aspen Construction Company 3,240.000 $7.31 $23,684.40
Engineer's Estimate 3,240.000 SQYD $26.00 $84,240.00
A1060 62501-0000 TURF
ESTABLISHMENT
Eclipse Co., LLC 0.700 $28,762.50 $20,133.75 Randy Kinder Excavating, Inc. 0.700 $27,229.60 $19,060.72
Kovilic Construction Company Inc 0.700 $25,000.00 $17,500.00
Triptych Construction, LLC 0.700 $24,200.00 $16,940.00
Central Southern Construction Corp. 0.700 $20,000.00 $14,000.00
Rock Supremacy LLC 0.700 $20,000.00 $14,000.00 Abrams Group Construction LLC 0.700 $17,623.94 $12,336.76
Aspen Construction Company 0.700 $14,033.89 $9,823.72
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A1060 62501-0000 TURF
ESTABLISHMENT
Xenturis LLC 0.700 $10,950.72 $7,665.50 Orders Construction Company, Inc. 0.700 $8,200.00 $5,740.00
Construction Solutions Group, LLC 0.700 $8,190.00 $5,733.00
Danhill Construction Company 0.700 $8,050.00 $5,635.00
Engineer's Estimate 0.700 ACRE $28,000.00 $19,600.00
A1080 62901-1100 ROLLED EROSION
CONTROL
PRODUCT, TYPE 4.B
Danhill Construction Company 845.000 $19.44 $16,426.80
Central Southern Construction Corp. 845.000 $15.00 $12,675.00
Orders Construction Company, Inc. 845.000 $14.00 $11,830.00
Triptych Construction, LLC 845.000 $13.00 $10,985.00
Randy Kinder Excavating, Inc. 845.000 $12.76 $10,782.20
Rock Supremacy LLC 845.000 $12.00 $10,140.00 Eclipse Co., LLC 845.000 $11.50 $9,717.50 Xenturis LLC 845.000 $10.95 $9,252.75 Abrams Group Construction LLC 845.000 $10.17 $8,593.65
Kovilic Construction Company Inc 845.000 $10.00 $8,450.00
Aspen Construction Company 845.000 $8.38 $7,081.10
Construction Solutions Group, LLC 845.000 $7.61 $6,430.45
Engineer's Estimate 845.000 SQYD $8.80 $7,436.00
A1100 63401-1500 PAVEMENT
MARKINGS, TYPE H,
SOLID
Danhill Construction Company 8,980.000 $7.99 $71,750.20
Central Southern Construction Corp. 8,980.000 $5.00 $44,900.00
Construction Solutions Group, LLC 8,980.000 $3.51 $31,519.80
Eclipse Co., LLC 8,980.000 $3.50 $31,430.00 Kovilic Construction Company Inc 8,980.000 $3.00 $26,940.00
Rock Supremacy LLC 8,980.000 $3.00 $26,940.00 Xenturis LLC 8,980.000 $2.74 $24,605.20 Triptych Construction, LLC 8,980.000 $2.60 $23,348.00
Abrams Group Construction LLC 8,980.000 $1.69 $15,176.20
Randy Kinder Excavating, Inc. 8,980.000 $0.94 $8,441.20
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A1100 63401-1500 PAVEMENT
MARKINGS, TYPE H,
SOLID
Orders Construction Company, Inc. 8,980.000 $0.41 $3,681.80
Aspen Construction Company 8,980.000 $0.36 $3,232.80
Engineer's Estimate 8,980.000 LNFT $2.35 $21,103.00
A1120 63501-0000 TEMPORARY
TRAFFIC CONTROL
Construction Solutions Group, LLC $308,050.00
Xenturis LLC $301,144.83 Rock Supremacy LLC $269,000.00 Triptych Construction, LLC $231,000.00
Eclipse Co., LLC $190,244.50 Randy Kinder Excavating, Inc. $180,675.26
Orders Construction Company, Inc. $180,000.00
Abrams Group Construction LLC $169,460.92
Aspen Construction Company $131,620.88
Central Southern Construction Corp. $100,000.00
Kovilic Construction Company Inc $100,000.00
Danhill Construction Company $88,550.00
Engineer's Estimate ALL LPSM LPSM $155,000.00 A1140 63701-0000 FIELD OFFICE Rock Supremacy LLC 1.000 $194,000.00 $194,000.00
Randy Kinder Excavating, Inc. 1.000 $177,249.19 $177,249.19
Triptych Construction, LLC 1.000 $113,000.00 $113,000.00
Aspen Construction Company 1.000 $86,554.57 $86,554.57
Xenturis LLC 1.000 $82,130.41 $82,130.41 Construction Solutions Group, LLC 1.000 $66,800.00 $66,800.00
Kovilic Construction Company Inc 1.000 $50,000.00 $50,000.00
Abrams Group Construction LLC 1.000 $47,449.06 $47,449.06
Orders Construction Company, Inc. 1.000 $43,000.00 $43,000.00
Central Southern Construction Corp. 1.000 $42,000.00 $42,000.00
Eclipse Co., LLC 1.000 $22,050.00 $22,050.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A1140 63701-0000 FIELD OFFICE Danhill Construction Company 1.000 $5,135.00 $5,135.00
Engineer's Estimate 1.000 EACH $55,000.00 $55,000.00
Report Generated on 08/14/2026 11:20 AM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
File details come from the government source that posted it. Updated .