This is a Bid Tabulation Report for the Parkway Pavement Rehabilitation project (VA NP BLRI 1K1) on the Blue Ridge Parkway in Bedford County, Virginia, managed by the Eastern Federal Lands Division. The solicitation (693C73-26-B-000004) was opened on January 6, 2026, in Ashburn, Virginia, and the contract was awarded to Estes Bros. Const., Inc. on February 3, 2026. Eight contractors submitted bids for Schedule A (Base work), with Phillips C&C LLC submitting the highest bid at $7,806,450,115.38 and Estes Bros. Const., Inc. submitting the lowest at $3,148,228.37, compared to the Engineer's Estimate of $3,135,000. Five contractors bid on Schedule B (Option work), with Phillips C&C LLC at $8,264,934,816.90 and Estes Bros. Const., Inc. at $2,533,618.88, versus the Engineer's Estimate of $2,820,000.
The project encompasses comprehensive pavement rehabilitation including mobilization, construction surveying, soil erosion control (silt fence, fiber roll, check dams, inlet protection), removal of existing infrastructure (signs, curbs, pipes, pavement), placement of riprap and aggregate topsoil, full-depth reclamation with cement, asphalt concrete pavement installation, tack coat application, drainage structure cleaning and repair, culvert lining, guardrails and terminal systems, stone masonry headwall work, turf establishment, erosion control products, pavement markings, temporary traffic control, and field office setup. The bid tabulation provides detailed line-item pricing for all contractors across both schedules, with significant price variations among bidders—notably, Phillips C&C LLC submitted unusually high unit prices on major items such as full-depth reclamation with cement ($292,499.21 per square yard versus $22–$55 from competitors) and pavement markings ($9,220.55 per linear foot versus $1.00–$2.35 from others), resulting in substantially inflated total bids.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION REPORT
Project No. : VA NP BLRI 1K1 Project Name: Parkway Pavement Rehabilitation
Contractor Responsive? Base Schedule A Phillips C&C LLC $7,806,450,115.38 Construction Solutions Group, LLC $7,890,815.05 McKenzie Construction & Site Development, LLC $4,684,659.93
MC3 Solutions, LLC $4,248,979.50 R2Build $3,405,947.00 Central Southern Construction Corp. $3,505,198.00
Yorkshire Industries $3,063,671.56 Estes Bros. Const., Inc. $3,148,228.37 Engineer's Estimate $3,135,000.00
Contractor Responsive? Total Base Schedule A and Option(s): B Phillips C&C LLC $16,071,384,932.27 Construction Solutions Group, LLC $12,967,249.55 McKenzie Construction & Site Development, LLC $8,640,998.22
MC3 Solutions, LLC $7,846,872.30 R2Build $6,499,248.00 Central Southern Construction Corp. $6,102,460.00
Yorkshire Industries $5,841,238.56 Estes Bros. Const., Inc. $5,681,847.25 Engineer's Estimate $5,955,000.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Michael Sun
Contractor Responsive? Option: B Phillips C&C LLC $8,264,934,816.90 Construction Solutions Group, LLC $5,076,434.50 McKenzie Construction & Site Development, LLC $3,956,338.29
MC3 Solutions, LLC $3,597,892.80 R2Build $3,093,301.00 Central Southern Construction Corp. $2,597,262.00
Yorkshire Industries $2,777,567.00 Estes Bros. Const., Inc. $2,533,618.88 Engineer's Estimate $2,820,000.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Project No. : VA NP BLRI 1K1 Project Name: Parkway Pavement Rehabilitation
Division: Eastern Federal Lands
Schedule: A Schedule Type: Base Lead Designer:
Solicitation No. : 693C73-26-B-000004 Opened at: Ashburn, VA Opened by: Michael Sun State: VA County: Bedford Federal Land: Blue Ridge Parkway Bid Open Date and Time: 01/06/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive Phillips C&C LLC, 437 John Weaver DR, Brightwood, VA, 22715-1679
$7,806,450,115.38
Construction Solutions Group, LLC, 425 Highland Ave, St. Louis, MO, 63122
$7,890,815.05
McKenzie Construction & Site Development, LLC, 29162 Chapek Park Drive, #3B, Wesley Chapel, FL, 33543
$4,684,659.93
MC3 Solutions, LLC, 8772 Roanoke Road, Elliston, VA, 24087
$4,248,979.50
Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204
$3,505,198.00
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Michael Sun
Michael Sun
Contract Specialist
1/6/2026
Estes Bros. Const., Inc. 2/3/2026
R2Build, 23441 S. Pointe Dr. Suite 210, Laguna Hills, CA, 92653
$3,405,947.00
Estes Bros. Const., Inc., 126 Sugar Run Road, Jonesville, VA, 24263
$3,148,228.37
Yorkshire Industries, 420 Lexington Ave Suite 300, New York, NY, 10170
$3,063,671.56
Engineer's Estimate $3,135,000.00
Project No. : VA NP BLRI 1K1 Project Name: Parkway Pavement Rehabilitation Schedule: A Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
A0100 15101-0000 MOBILIZATION Construction Solutions Group, LLC $2,394,406.00
McKenzie Construction & Site Development, LLC
$961,578.99
Estes Bros. Const., Inc. $696,040.00
MC3 Solutions, LLC $678,770.00 Central Southern Construction Corp. $575,000.00
R2Build $335,000.00 Yorkshire Industries $216,637.00 Phillips C&C LLC $75,989.39 Engineer's Estimate ALL LPSM LPSM $263,850.50
A0110 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Construction Solutions Group, LLC $260,000.00
McKenzie Construction & Site Development, LLC
$175,892.00
Central Southern Construction Corp. $125,000.00
R2Build $90,000.00 Phillips C&C LLC $77,255.88 Yorkshire Industries $34,500.00 MC3 Solutions, LLC $25,600.00 Estes Bros. Const., Inc. $20,000.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0110 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Engineer's Estimate ALL LPSM LPSM $74,000.00
A0120 15401-0000 CONTRACTOR
TESTING
Construction Solutions Group, LLC $260,000.00
McKenzie Construction & Site Development, LLC
$256,048.00
Central Southern Construction Corp. $150,000.00
MC3 Solutions, LLC $129,420.00 R2Build $65,000.00 Estes Bros. Const., Inc. $40,800.00
Phillips C&C LLC $40,527.67 Yorkshire Industries $14,375.00 Engineer's Estimate ALL LPSM LPSM $69,000.00
A0130 15705-0100 SOIL EROSION
CONTROL, SILT
FENCE
Phillips C&C LLC 285.000 $303.80 $86,583.00 MC3 Solutions, LLC 285.000 $23.00 $6,555.00 R2Build 285.000 $20.00 $5,700.00 McKenzie Construction & Site Development, LLC
285.000 $19.00 $5,415.00
Central Southern Construction Corp. 285.000 $15.00 $4,275.00
Yorkshire Industries 285.000 $8.86 $2,525.10 Construction Solutions Group, LLC 285.000 $8.80 $2,508.00
Estes Bros. Const., Inc. 285.000 $7.96 $2,268.60
Engineer's Estimate 285.000 LNFT $7.00 $1,995.00
A0140 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
Phillips C&C LLC 1,960.000 $2,611.60 $5,118,736.00 R2Build 1,960.000 $25.00 $49,000.00 Central Southern Construction Corp. 1,960.000 $12.50 $24,500.00
Yorkshire Industries 1,960.000 $12.08 $23,676.80 Estes Bros. Const., Inc. 1,960.000 $11.79 $23,108.40
MC3 Solutions, LLC 1,960.000 $9.00 $17,640.00 McKenzie Construction & Site Development, LLC
1,960.000 $7.00 $13,720.00
Construction Solutions Group, LLC 1,960.000 $6.60 $12,936.00
Engineer's Estimate 1,960.000 LNFT $17.50 $34,300.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0150 15706-0200 SOIL EROSION
CONTROL, CHECK
DAM
Construction Solutions Group, LLC 13.000 $825.00 $10,725.00
Phillips C&C LLC 13.000 $692.87 $9,007.31 Yorkshire Industries 13.000 $661.25 $8,596.25 Central Southern Construction Corp. 13.000 $500.00 $6,500.00
Estes Bros. Const., Inc. 13.000 $460.00 $5,980.00
MC3 Solutions, LLC 13.000 $418.00 $5,434.00 McKenzie Construction & Site Development, LLC
13.000 $357.00 $4,641.00
R2Build 13.000 $300.00 $3,900.00 Engineer's Estimate 13.000 EACH $370.00 $4,810.00
A0160 15706-1000 SOIL EROSION
CONTROL, INLET
PROTECTION
MC3 Solutions, LLC 18.000 $575.00 $10,350.00 Construction Solutions Group, LLC 18.000 $550.00 $9,900.00
R2Build 18.000 $540.00 $9,720.00 Central Southern Construction Corp. 18.000 $500.00 $9,000.00
McKenzie Construction & Site Development, LLC
18.000 $493.00 $8,874.00
Phillips C&C LLC 18.000 $479.68 $8,634.24 Estes Bros. Const., Inc. 18.000 $392.53 $7,065.54
Yorkshire Industries 18.000 $379.50 $6,831.00 Engineer's Estimate 18.000 EACH $600.00 $10,800.00
A0170 20301-2400 REMOVAL OF SIGN R2Build 2.000 $1,500.00 $3,000.00 MC3 Solutions, LLC 2.000 $844.00 $1,688.00 McKenzie Construction & Site Development, LLC
2.000 $723.00 $1,446.00
Construction Solutions Group, LLC 2.000 $550.00 $1,100.00
Phillips C&C LLC 2.000 $266.49 $532.98 Estes Bros. Const., Inc. 2.000 $250.00 $500.00
Central Southern Construction Corp. 2.000 $200.00 $400.00
Yorkshire Industries 2.000 $172.50 $345.00 Engineer's Estimate 2.000 EACH $200.00 $400.00
A0180 20302-0400 REMOVAL OF
CURB, ASPHALT
Phillips C&C LLC 570.000 $1,518.99 $865,824.30 Construction Solutions Group, LLC 570.000 $66.28 $37,779.60
R2Build 570.000 $20.00 $11,400.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0180 20302-0400 REMOVAL OF
CURB, ASPHALT
Central Southern Construction Corp. 570.000 $18.00 $10,260.00
Estes Bros. Const., Inc. 570.000 $4.00 $2,280.00
MC3 Solutions, LLC 570.000 $3.00 $1,710.00 Yorkshire Industries 570.000 $2.53 $1,442.10 McKenzie Construction & Site Development, LLC
570.000 $2.00 $1,140.00
Engineer's Estimate 570.000 LNFT $6.05 $3,448.50
A0190 20302-2100 REMOVAL OF PIPE
CULVERT
MC3 Solutions, LLC 20.000 $283.00 $5,660.00 Construction Solutions Group, LLC 20.000 $275.00 $5,500.00
McKenzie Construction & Site Development, LLC
20.000 $242.00 $4,840.00
Central Southern Construction Corp. 20.000 $150.00 $3,000.00
R2Build 20.000 $120.00 $2,400.00 Phillips C&C LLC 20.000 $106.60 $2,132.00 Yorkshire Industries 20.000 $55.78 $1,115.60 Estes Bros. Const., Inc. 20.000 $50.00 $1,000.00
Engineer's Estimate 20.000 LNFT $110.00 $2,200.00
A0200 20303-1600 REMOVAL OF
PAVEMENT,
ASPHALT
Phillips C&C LLC 145.000 $1,738.85 $252,133.25 Construction Solutions Group, LLC 145.000 $101.20 $14,674.00
Central Southern Construction Corp. 145.000 $72.00 $10,440.00
MC3 Solutions, LLC 145.000 $61.00 $8,845.00 R2Build 145.000 $50.00 $7,250.00 Yorkshire Industries 145.000 $33.93 $4,919.85 McKenzie Construction & Site Development, LLC
145.000 $32.00 $4,640.00
Estes Bros. Const., Inc. 145.000 $20.00 $2,900.00
Engineer's Estimate 145.000 SQYD $45.00 $6,525.00
A0210 25102-0200 PLACED RIPRAP,
CLASS 2
Phillips C&C LLC 75.000 $3,997.35 $299,801.25 Construction Solutions Group, LLC 75.000 $495.00 $37,125.00
Estes Bros. Const., Inc. 75.000 $296.20 $22,215.00
MC3 Solutions, LLC 75.000 $295.00 $22,125.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0210 25102-0200 PLACED RIPRAP,
CLASS 2
McKenzie Construction & Site Development, LLC
75.000 $253.00 $18,975.00
Central Southern Construction Corp. 75.000 $250.00 $18,750.00
Yorkshire Industries 75.000 $188.60 $14,145.00 R2Build 75.000 $120.00 $9,000.00 Engineer's Estimate 75.000 TON $210.00 $15,750.00
A0220 30302-1000 DITCH
RECONDITIONING
Phillips C&C LLC 430.000 $6,875.44 $2,956,439.20 Yorkshire Industries 430.000 $41.40 $17,802.00 R2Build 430.000 $40.00 $17,200.00 MC3 Solutions, LLC 430.000 $31.00 $13,330.00 Construction Solutions Group, LLC 430.000 $27.50 $11,825.00
McKenzie Construction & Site Development, LLC
430.000 $26.00 $11,180.00
Central Southern Construction Corp. 430.000 $25.00 $10,750.00
Estes Bros. Const., Inc. 430.000 $20.00 $8,600.00
Engineer's Estimate 430.000 LNFT $22.00 $9,460.00
A0230 30303-4000 SHOULDER
RECONDITIONING
Phillips C&C LLC 270.000 $2,158.57 $582,813.90 Construction Solutions Group, LLC 270.000 $55.00 $14,850.00
Central Southern Construction Corp. 270.000 $50.00 $13,500.00
R2Build 270.000 $28.00 $7,560.00 Yorkshire Industries 270.000 $25.30 $6,831.00 MC3 Solutions, LLC 270.000 $25.00 $6,750.00 McKenzie Construction & Site Development, LLC
270.000 $21.00 $5,670.00
Estes Bros. Const., Inc. 270.000 $20.00 $5,400.00
Engineer's Estimate 270.000 SQYD $24.00 $6,480.00
A0240 30502-0800 FULL DEPTH
RECLAMATION
WITH CEMENT, 8-
INCH DEPTH
Phillips C&C LLC 22,400.000 $292,499.21 $6,551,982,304.00 Construction Solutions Group, LLC 22,400.000 $55.00 $1,232,000.00
McKenzie Construction & Site Development, LLC
22,400.000 $53.00 $1,187,200.00
Yorkshire Industries 22,400.000 $41.73 $934,752.00 MC3 Solutions, LLC 22,400.000 $35.00 $784,000.00 R2Build 22,400.000 $30.00 $672,000.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0240 30502-0800 FULL DEPTH
RECLAMATION
WITH CEMENT, 8-
INCH DEPTH
Estes Bros. Const., Inc. 22,400.000 $25.83 $578,592.00
Central Southern Construction Corp. 22,400.000 $22.00 $492,800.00
Engineer's Estimate 22,400.000 SQYD $23.00 $515,200.00
A0250 31302-0000 AGGREGATE-
TOPSOIL COURSE
Phillips C&C LLC 9,580.000 $40,847.56 $391,319,624.80 Construction Solutions Group, LLC 9,580.000 $59.40 $569,052.00
MC3 Solutions, LLC 9,580.000 $52.00 $498,160.00 McKenzie Construction & Site Development, LLC
9,580.000 $44.00 $421,520.00
R2Build 9,580.000 $30.40 $291,232.00 Central Southern Construction Corp. 9,580.000 $22.00 $210,760.00
Yorkshire Industries 9,580.000 $15.64 $149,831.20 Estes Bros. Const., Inc. 9,580.000 $9.63 $92,255.40
Engineer's Estimate 9,580.000 SQYD $17.00 $162,860.00
A0260 40101-0200 ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
3/8-INCH
NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL (TYPE III-B
PAVEMENT
ROUGHNESS)
Phillips C&C LLC 1,830.000 $99,973.65 $182,951,779.50 Construction Solutions Group, LLC 1,830.000 $316.80 $579,744.00
MC3 Solutions, LLC 1,830.000 $315.00 $576,450.00 Yorkshire Industries 1,830.000 $280.14 $512,656.20 Central Southern Construction Corp. 1,830.000 $276.00 $505,080.00
Estes Bros. Const., Inc. 1,830.000 $274.40 $502,152.00
McKenzie Construction & Site Development, LLC
1,830.000 $269.00 $492,270.00
R2Build 1,830.000 $268.00 $490,440.00 Engineer's Estimate 1,830.000 TON $240.00 $439,200.00
A0270 40101-1000 ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
3/4-INCH
NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL
Phillips C&C LLC 3,040.000 $155,544.77 $472,856,100.80 Construction Solutions Group, LLC 3,040.000 $310.75 $944,680.00
MC3 Solutions, LLC 3,040.000 $283.00 $860,320.00 Central Southern Construction Corp. 3,040.000 $260.00 $790,400.00
Yorkshire Industries 3,040.000 $251.56 $764,742.40 McKenzie Construction & Site Development, LLC
3,040.000 $242.00 $735,680.00
R2Build 3,040.000 $235.00 $714,400.00 Estes Bros. Const., Inc. 3,040.000 $226.22 $687,708.80
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0270 40101-1000 ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
3/4-INCH
NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL
Engineer's Estimate 3,040.000 TON $210.00 $638,400.00
A0300 41202-0000 TACK COAT Phillips C&C LLC 2,240.000 $2,984.69 $6,685,705.60 Central Southern Construction Corp. 2,240.000 $10.00 $22,400.00
Yorkshire Industries 2,240.000 $8.05 $18,032.00 R2Build 2,240.000 $7.00 $15,680.00 MC3 Solutions, LLC 2,240.000 $5.00 $11,200.00 Estes Bros. Const., Inc. 2,240.000 $3.10 $6,944.00
Construction Solutions Group, LLC 2,240.000 $3.03 $6,787.20
McKenzie Construction & Site Development, LLC
2,240.000 $3.00 $6,720.00
Engineer's Estimate 2,240.000 GAL $10.75 $24,080.00
A0310 60201-0600 18-INCH PIPE
CULVERT
Estes Bros. Const., Inc. 20.000 $668.52 $13,370.40
Central Southern Construction Corp. 20.000 $500.00 $10,000.00
MC3 Solutions, LLC 20.000 $395.00 $7,900.00 McKenzie Construction & Site Development, LLC
20.000 $338.00 $6,760.00
Construction Solutions Group, LLC 20.000 $330.00 $6,600.00
Phillips C&C LLC 20.000 $213.19 $4,263.80 R2Build 20.000 $160.00 $3,200.00 Yorkshire Industries 20.000 $151.23 $3,024.60 Engineer's Estimate 20.000 LNFT $270.00 $5,400.00
A0320 60704-0000 CLEANING
CULVERT IN PLACE
MC3 Solutions, LLC 4.000 $4,913.00 $19,652.00 McKenzie Construction & Site Development, LLC
4.000 $4,210.00 $16,840.00
Central Southern Construction Corp. 4.000 $4,000.00 $16,000.00
Estes Bros. Const., Inc. 4.000 $2,500.00 $10,000.00
Construction Solutions Group, LLC 4.000 $2,200.00 $8,800.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0320 60704-0000 CLEANING
CULVERT IN PLACE
Phillips C&C LLC 4.000 $1,065.96 $4,263.84 Yorkshire Industries 4.000 $661.25 $2,645.00 R2Build 4.000 $650.00 $2,600.00 Engineer's Estimate 4.000 EACH $2,700.00 $10,800.00
A0330 60705-0000 REPAIRING
DRAINAGE
STRUCTURE
MC3 Solutions, LLC 1.000 $14,998.00 $14,998.00 McKenzie Construction & Site Development, LLC
1.000 $12,852.00 $12,852.00
Construction Solutions Group, LLC 1.000 $8,250.00 $8,250.00
R2Build 1.000 $6,000.00 $6,000.00 Central Southern Construction Corp. 1.000 $5,000.00 $5,000.00
Yorkshire Industries 1.000 $3,450.00 $3,450.00 Estes Bros. Const., Inc. 1.000 $2,500.00 $2,500.00
Phillips C&C LLC 1.000 $532.98 $532.98 Engineer's Estimate 1.000 EACH $7,500.00 $7,500.00
A0340 60707-0300 LINING 18-INCH
PIPE CULVERT
Phillips C&C LLC 125.000 $3,997.35 $499,668.75 McKenzie Construction & Site Development, LLC
125.000 $487.00 $60,875.00
Estes Bros. Const., Inc. 125.000 $279.00 $34,875.00
Construction Solutions Group, LLC 125.000 $275.00 $34,375.00
MC3 Solutions, LLC 125.000 $259.00 $32,375.00 Central Southern Construction Corp. 125.000 $250.00 $31,250.00
Yorkshire Industries 125.000 $180.96 $22,620.00 R2Build 125.000 $85.00 $10,625.00 Engineer's Estimate 125.000 LNFT $390.00 $48,750.00
A0350 60709-0000 CLEANING
DRAINAGE
STRUCTURES IN
PLACE (PAVED
WATERWAY)
Phillips C&C LLC 4,550.000 $3,637.59 $16,551,034.50 Construction Solutions Group, LLC 4,550.000 $27.50 $125,125.00
R2Build 4,550.000 $25.00 $113,750.00 Estes Bros. Const., Inc. 4,550.000 $12.00 $54,600.00
Central Southern Construction Corp. 4,550.000 $10.00 $45,500.00
Yorkshire Industries 4,550.000 $9.41 $42,815.50 MC3 Solutions, LLC 4,550.000 $5.00 $22,750.00 McKenzie Construction & Site Development, LLC
4,550.000 $4.00 $18,200.00
Engineer's Estimate 4,550.000 LNFT $44.00 $200,200.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0360 60801-0500 PAVED
WATERWAY, TYPE
Phillips C&C LLC 155.000 $3,717.53 $576,217.15 Construction Solutions Group, LLC 155.000 $1,139.05 $176,552.75
Estes Bros. Const., Inc. 155.000 $261.00 $40,455.00
Central Southern Construction Corp. 155.000 $131.00 $20,305.00
MC3 Solutions, LLC 155.000 $105.00 $16,275.00 Yorkshire Industries 155.000 $93.04 $14,421.20 McKenzie Construction & Site Development, LLC
155.000 $89.00 $13,795.00
R2Build 155.000 $70.00 $10,850.00 Engineer's Estimate 155.000 SQYD $270.00 $41,850.00
A0370 60815-0500 RECONDITION
PAVED
WATERWAY, TYPE
Phillips C&C LLC 530.000 $12,711.56 $6,737,126.80 Construction Solutions Group, LLC 530.000 $391.05 $207,256.50
Estes Bros. Const., Inc. 530.000 $161.00 $85,330.00
Central Southern Construction Corp. 530.000 $125.00 $66,250.00
MC3 Solutions, LLC 530.000 $69.00 $36,570.00 Yorkshire Industries 530.000 $61.01 $32,335.30 R2Build 530.000 $60.00 $31,800.00 McKenzie Construction & Site Development, LLC
530.000 $58.00 $30,740.00
Engineer's Estimate 530.000 SQYD $230.00 $121,900.00
A0380 60901-2400 CURB, ASPHALT, 7-
INCH DEPTH
Phillips C&C LLC 570.000 $9,873.45 $5,627,866.50 Construction Solutions Group, LLC 570.000 $155.10 $88,407.00
Central Southern Construction Corp. 570.000 $90.00 $51,300.00
R2Build 570.000 $45.00 $25,650.00 Estes Bros. Const., Inc. 570.000 $32.25 $18,382.50
MC3 Solutions, LLC 570.000 $21.00 $11,970.00 Yorkshire Industries 570.000 $18.40 $10,488.00 McKenzie Construction & Site Development, LLC
570.000 $17.00 $9,690.00
Engineer's Estimate 570.000 LNFT $40.00 $22,800.00
A0390 61701-4000 GUARDRAIL
SYSTEM SBTB
MC3 Solutions, LLC 10.000 $1,939.00 $19,390.00 Construction Solutions Group, LLC 10.000 $1,100.00 $11,000.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0390 61701-4000 GUARDRAIL
SYSTEM SBTB
Yorkshire Industries 10.000 $977.50 $9,775.00 Phillips C&C LLC 10.000 $799.47 $7,994.70 Central Southern Construction Corp. 10.000 $500.00 $5,000.00
Estes Bros. Const., Inc. 10.000 $336.00 $3,360.00
McKenzie Construction & Site Development, LLC
10.000 $332.00 $3,320.00
R2Build 10.000 $110.00 $1,100.00 Engineer's Estimate 10.000 LNFT $410.00 $4,100.00
A0400 61702-0510 TERMINAL SYSTEM,
TYPE SBT-FAT
MC3 Solutions, LLC 1.000 $32,323.00 $32,323.00 Construction Solutions Group, LLC 1.000 $11,000.00 $11,000.00
Central Southern Construction Corp. 1.000 $10,000.00 $10,000.00
Estes Bros. Const., Inc. 1.000 $6,120.00 $6,120.00
McKenzie Construction & Site Development, LLC
1.000 $5,761.00 $5,761.00
Yorkshire Industries 1.000 $5,750.00 $5,750.00 R2Build 1.000 $5,500.00 $5,500.00 Phillips C&C LLC 1.000 $479.68 $479.68 Engineer's Estimate 1.000 EACH $9,500.00 $9,500.00
A0410 61707-2000 STRUCTURE
TRANSITION
RAILING, SBT
SYSTEM
Phillips C&C LLC 30.000 $2,398.41 $71,952.30 MC3 Solutions, LLC 30.000 $1,939.00 $58,170.00 Yorkshire Industries 30.000 $862.50 $25,875.00 Estes Bros. Const., Inc. 30.000 $540.00 $16,200.00
McKenzie Construction & Site Development, LLC
30.000 $526.00 $15,780.00
Central Southern Construction Corp. 30.000 $500.00 $15,000.00
Construction Solutions Group, LLC 30.000 $220.00 $6,600.00
R2Build 30.000 $140.00 $4,200.00 Engineer's Estimate 30.000 LNFT $950.00 $28,500.00
A0420 62011-0300 STONE MASONRY
HEADWALL FOR 18
-INCH PIPE
CULVERT
MC3 Solutions, LLC 1.000 $40,045.00 $40,045.00 R2Build 1.000 $22,000.00 $22,000.00 Construction Solutions Group, LLC 1.000 $11,000.00 $11,000.00
Estes Bros. Const., Inc. 1.000 $8,100.00 $8,100.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0420 62011-0300 STONE MASONRY
HEADWALL FOR 18
-INCH PIPE
CULVERT
Central Southern Construction Corp. 1.000 $7,500.00 $7,500.00
McKenzie Construction & Site Development, LLC
1.000 $7,479.00 $7,479.00
Yorkshire Industries 1.000 $5,677.55 $5,677.55 Phillips C&C LLC 1.000 $2,131.92 $2,131.92 Engineer's Estimate 1.000 EACH $8,700.00 $8,700.00
A0430 62030-0000 REPOINT STONE
MASONRY
(HEADWALL)
Phillips C&C LLC 200.000 $1,492.34 $298,468.00 Yorkshire Industries 200.000 $129.95 $25,990.00 R2Build 200.000 $95.00 $19,000.00 MC3 Solutions, LLC 200.000 $80.00 $16,000.00 Central Southern Construction Corp. 200.000 $75.00 $15,000.00
Construction Solutions Group, LLC 200.000 $55.00 $11,000.00
McKenzie Construction & Site Development, LLC
200.000 $31.00 $6,200.00
Estes Bros. Const., Inc. 200.000 $30.00 $6,000.00
Engineer's Estimate 200.000 LNFT $70.00 $14,000.00
A0440 62501-0000 TURF
ESTABLISHMENT
Construction Solutions Group, LLC 1.980 $33,000.00 $65,340.00
Central Southern Construction Corp. 1.980 $12,100.00 $23,958.00
Estes Bros. Const., Inc. 1.980 $11,320.90 $22,415.38
Yorkshire Industries 1.980 $8,816.67 $17,457.01 R2Build 1.980 $8,500.00 $16,830.00 McKenzie Construction & Site Development, LLC
1.980 $4,653.00 $9,212.94
MC3 Solutions, LLC 1.980 $4,525.00 $8,959.50 Phillips C&C LLC 1.980 $844.24 $1,671.60 Engineer's Estimate 1.980 ACRE $9,700.00 $19,206.00
A0450 62901-0700 ROLLED EROSION
CONTROL
PRODUCT, TYPE 2.C
Phillips C&C LLC 240.000 $1,407.07 $337,696.80 Construction Solutions Group, LLC 240.000 $33.00 $7,920.00
Yorkshire Industries 240.000 $21.56 $5,174.40 R2Build 240.000 $18.00 $4,320.00 Central Southern Construction Corp. 240.000 $15.00 $3,600.00
MC3 Solutions, LLC 240.000 $13.00 $3,120.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0450 62901-0700 ROLLED EROSION
CONTROL
PRODUCT, TYPE 2.C
McKenzie Construction & Site Development, LLC
240.000 $11.00 $2,640.00
Estes Bros. Const., Inc. 240.000 $7.59 $1,821.60
Engineer's Estimate 240.000 SQYD $12.00 $2,880.00
A0460 63304-0900 SIGNS, ALUMINUM
PANELS, TYPE 3
SHEETING
Phillips C&C LLC 25.000 $586.28 $14,657.00 Construction Solutions Group, LLC 25.000 $275.00 $6,875.00
Yorkshire Industries 25.000 $172.50 $4,312.50 Central Southern Construction Corp. 25.000 $100.00 $2,500.00
R2Build 25.000 $100.00 $2,500.00 McKenzie Construction & Site Development, LLC
25.000 $94.00 $2,350.00
Estes Bros. Const., Inc. 25.000 $66.75 $1,668.75
MC3 Solutions, LLC 25.000 $17.00 $425.00 Engineer's Estimate 25.000 SQFT $180.00 $4,500.00
A0470 63401-0500 PAVEMENT
MARKINGS, TYPE C,
SOLID
Phillips C&C LLC 17,300.000 $9,220.55 $159,515,515.00 MC3 Solutions, LLC 17,300.000 $2.00 $34,600.00 R2Build 17,300.000 $1.80 $31,140.00 Central Southern Construction Corp. 17,300.000 $1.40 $24,220.00
Estes Bros. Const., Inc. 17,300.000 $1.40 $24,220.00
Yorkshire Industries 17,300.000 $1.35 $23,355.00 Construction Solutions Group, LLC 17,300.000 $1.29 $22,317.00
McKenzie Construction & Site Development, LLC
17,300.000 $1.00 $17,300.00
Engineer's Estimate 17,300.000 LNFT $2.35 $40,655.00
A0480 63501-0000 TEMPORARY
TRAFFIC CONTROL
Construction Solutions Group, LLC $466,805.00
R2Build $260,000.00 MC3 Solutions, LLC $201,693.00 Central Southern Construction Corp. $120,000.00
McKenzie Construction & Site Development, LLC
$99,716.00
Estes Bros. Const., Inc. $92,000.00
Yorkshire Industries $57,500.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0480 63501-0000 TEMPORARY
TRAFFIC CONTROL
Phillips C&C LLC $19,720.25 Engineer's Estimate ALL LPSM LPSM $215,000.00
A0490 63701-0000 FIELD OFFICE Construction Solutions Group, LLC 1.000 $210,000.00 $210,000.00
Central Southern Construction Corp. 1.000 $50,000.00 $50,000.00
R2Build 1.000 $35,000.00 $35,000.00 McKenzie Construction & Site Development, LLC
1.000 $27,699.00 $27,699.00
Yorkshire Industries 1.000 $17,250.00 $17,250.00 MC3 Solutions, LLC 1.000 $7,757.00 $7,757.00 Phillips C&C LLC 1.000 $6,928.74 $6,928.74 Estes Bros. Const., Inc. 1.000 $1,000.00 $1,000.00
Engineer's Estimate 1.000 EACH $46,000.00 $46,000.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Project No. : VA NP BLRI 1K1 Project Name: Parkway Pavement Rehabilitation
Division: Eastern Federal Lands
Schedule: B Schedule Type: Option Lead Designer:
Solicitation No. : 693C73-26-B-000004 Opened at: Ashburn, VA Opened by: Michael Sun State: VA County: Bedford Federal Land: Blue Ridge Parkway Bid Open Date and Time: 01/06/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive Phillips C&C LLC, 437 John Weaver DR, Brightwood, VA, 22715-1679
$8,264,934,816.90
Construction Solutions Group, LLC, 425 Highland Ave, St. Louis, MO, 63122
$5,076,434.50
McKenzie Construction & Site Development, LLC, 29162 Chapek Park Drive, #3B, Wesley Chapel, FL, 33543
$3,956,338.29
MC3 Solutions, LLC, 8772 Roanoke Road, Elliston, VA, 24087
$3,597,892.80
R2Build, 23441 S. Pointe Dr. Suite 210, Laguna Hills, CA, 92653
$3,093,301.00
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Michael Sun
Michael Sun
Contract Specialist
1/6/2026
Estes Bros. Const., Inc. 2/3/2026
Yorkshire Industries, 420 Lexington Ave Suite 300, New York, NY, 10170
$2,777,567.00
Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204
$2,597,262.00
Estes Bros. Const., Inc., 126 Sugar Run Road, Jonesville, VA, 24263
$2,533,618.88
Engineer's Estimate $2,820,000.00
Project No. : VA NP BLRI 1K1 Project Name: Parkway Pavement Rehabilitation Schedule: B Schedule Type: Option
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
B0100 15101-0000 MOBILIZATION Construction Solutions Group, LLC $724,670.00
McKenzie Construction & Site Development, LLC
$507,851.44
Estes Bros. Const., Inc. $358,000.00
MC3 Solutions, LLC $329,564.00 R2Build $215,000.00 Yorkshire Industries $130,350.20 Central Southern Construction Corp. $100,000.00
Phillips C&C LLC $10,659.59 Engineer's Estimate ALL LPSM LPSM $257,305.00
B0110 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
McKenzie Construction & Site Development, LLC
$164,065.00
Construction Solutions Group, LLC $110,000.00
R2Build $75,000.00 Central Southern Construction Corp. $50,000.00
Yorkshire Industries $34,500.00 MC3 Solutions, LLC $24,837.00 Estes Bros. Const., Inc. $20,000.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0110 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Phillips C&C LLC $14,123.96
Engineer's Estimate ALL LPSM LPSM $66,000.00
B0120 15401-0000 CONTRACTOR
TESTING
Construction Solutions Group, LLC $110,000.00
R2Build $55,000.00 MC3 Solutions, LLC $53,020.00 Central Southern Construction Corp. $50,000.00
McKenzie Construction & Site Development, LLC
$39,632.00
Estes Bros. Const., Inc. $30,000.00
Yorkshire Industries $14,375.00 Phillips C&C LLC $10,126.61 Engineer's Estimate ALL LPSM LPSM $61,000.00
B0130 15705-0100 SOIL EROSION
CONTROL, SILT
FENCE
Phillips C&C LLC 370.000 $394.40 $145,928.00 R2Build 370.000 $20.00 $7,400.00 MC3 Solutions, LLC 370.000 $16.00 $5,920.00 Central Southern Construction Corp. 370.000 $15.00 $5,550.00
McKenzie Construction & Site Development, LLC
370.000 $14.00 $5,180.00
Yorkshire Industries 370.000 $8.86 $3,278.20 Construction Solutions Group, LLC 370.000 $8.80 $3,256.00
Estes Bros. Const., Inc. 370.000 $7.86 $2,908.20
Engineer's Estimate 370.000 LNFT $7.00 $2,590.00
B0140 15705-1400 SOIL EROSION
CONTROL, FIBER
ROLL
Phillips C&C LLC 1,390.000 $2,222.52 $3,089,302.80 R2Build 1,390.000 $25.00 $34,750.00 Yorkshire Industries 1,390.000 $12.64 $17,569.60 Central Southern Construction Corp. 1,390.000 $12.50 $17,375.00
Estes Bros. Const., Inc. 1,390.000 $10.23 $14,219.70
MC3 Solutions, LLC 1,390.000 $8.00 $11,120.00 Construction Solutions Group, LLC 1,390.000 $6.60 $9,174.00
McKenzie Construction & Site Development, LLC
1,390.000 $6.00 $8,340.00
Engineer's Estimate 1,390.000 LNFT $18.00 $25,020.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0150 15706-0200 SOIL EROSION
CONTROL, CHECK
DAM
MC3 Solutions, LLC 8.000 $925.00 $7,400.00 Construction Solutions Group, LLC 8.000 $825.00 $6,600.00
McKenzie Construction & Site Development, LLC
8.000 $794.00 $6,352.00
Yorkshire Industries 8.000 $661.25 $5,290.00 Central Southern Construction Corp. 8.000 $500.00 $4,000.00
Estes Bros. Const., Inc. 8.000 $460.00 $3,680.00
Phillips C&C LLC 8.000 $426.38 $3,411.04 R2Build 8.000 $300.00 $2,400.00 Engineer's Estimate 8.000 EACH $380.00 $3,040.00
B0160 15706-1000 SOIL EROSION
CONTROL, INLET
PROTECTION
MC3 Solutions, LLC 19.000 $903.00 $17,157.00 McKenzie Construction & Site Development, LLC
19.000 $776.00 $14,744.00
Construction Solutions Group, LLC 19.000 $550.00 $10,450.00
R2Build 19.000 $540.00 $10,260.00 Phillips C&C LLC 19.000 $506.33 $9,620.27 Central Southern Construction Corp. 19.000 $500.00 $9,500.00
Estes Bros. Const., Inc. 19.000 $392.53 $7,458.07
Yorkshire Industries 19.000 $379.50 $7,210.50 Engineer's Estimate 19.000 EACH $600.00 $11,400.00
B0170 20301-2400 REMOVAL OF SIGN R2Build 7.000 $1,500.00 $10,500.00 Phillips C&C LLC 7.000 $1,492.34 $10,446.38 MC3 Solutions, LLC 7.000 $652.00 $4,564.00 McKenzie Construction & Site Development, LLC
7.000 $560.00 $3,920.00
Construction Solutions Group, LLC 7.000 $550.00 $3,850.00
Estes Bros. Const., Inc. 7.000 $250.00 $1,750.00
Central Southern Construction Corp. 7.000 $200.00 $1,400.00
Yorkshire Industries 7.000 $172.50 $1,207.50 Engineer's Estimate 7.000 EACH $200.00 $1,400.00
B0180 20302-0400 REMOVAL OF
CURB, ASPHALT
Phillips C&C LLC 170.000 $456.03 $77,525.10 Construction Solutions Group, LLC 170.000 $148.50 $25,245.00
R2Build 170.000 $20.00 $3,400.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0180 20302-0400 REMOVAL OF
CURB, ASPHALT
MC3 Solutions, LLC 170.000 $19.00 $3,230.00 Central Southern Construction Corp. 170.000 $18.00 $3,060.00
Yorkshire Industries 170.000 $17.25 $2,932.50 McKenzie Construction & Site Development, LLC
170.000 $16.00 $2,720.00
Estes Bros. Const., Inc. 170.000 $4.00 $680.00
Engineer's Estimate 170.000 LNFT $6.75 $1,147.50
B0190 20303-1600 REMOVAL OF
PAVEMENT,
ASPHALT
Phillips C&C LLC 50.000 $599.60 $29,980.00 Construction Solutions Group, LLC 50.000 $293.70 $14,685.00
Central Southern Construction Corp. 50.000 $72.00 $3,600.00
MC3 Solutions, LLC 50.000 $55.00 $2,750.00 R2Build 50.000 $50.00 $2,500.00 Yorkshire Industries 50.000 $48.93 $2,446.50 McKenzie Construction & Site Development, LLC
50.000 $47.00 $2,350.00
Estes Bros. Const., Inc. 50.000 $20.00 $1,000.00
Engineer's Estimate 50.000 SQYD $45.00 $2,250.00
B0200 25102-0200 PLACED RIPRAP,
CLASS 2
Phillips C&C LLC 20.000 $1,598.94 $31,978.80 MC3 Solutions, LLC 20.000 $558.00 $11,160.00 Construction Solutions Group, LLC 20.000 $495.00 $9,900.00
McKenzie Construction & Site Development, LLC
20.000 $479.00 $9,580.00
Estes Bros. Const., Inc. 20.000 $296.20 $5,924.00
Central Southern Construction Corp. 20.000 $250.00 $5,000.00
Yorkshire Industries 20.000 $188.60 $3,772.00 R2Build 20.000 $120.00 $2,400.00 Engineer's Estimate 20.000 TON $290.00 $5,800.00
B0210 30302-1000 DITCH
RECONDITIONING
Phillips C&C LLC 380.000 $2,227.85 $846,583.00 Yorkshire Industries 380.000 $41.40 $15,732.00 R2Build 380.000 $40.00 $15,200.00 Construction Solutions Group, LLC 380.000 $27.50 $10,450.00
Central Southern Construction Corp. 380.000 $25.00 $9,500.00
MC3 Solutions, LLC 380.000 $24.00 $9,120.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0210 30302-1000 DITCH
RECONDITIONING
Estes Bros. Const., Inc. 380.000 $20.00 $7,600.00
McKenzie Construction & Site Development, LLC
380.000 $20.00 $7,600.00
Engineer's Estimate 380.000 LNFT $22.00 $8,360.00
B0220 30303-4000 SHOULDER
RECONDITIONING
Phillips C&C LLC 545.000 $4,066.63 $2,216,313.35 Construction Solutions Group, LLC 545.000 $55.00 $29,975.00
Central Southern Construction Corp. 545.000 $50.00 $27,250.00
Yorkshire Industries 545.000 $41.72 $22,737.40 MC3 Solutions, LLC 545.000 $33.00 $17,985.00 McKenzie Construction & Site Development, LLC
545.000 $28.00 $15,260.00
R2Build 545.000 $28.00 $15,260.00 Estes Bros. Const., Inc. 545.000 $20.00 $10,900.00
Engineer's Estimate 545.000 SQYD $24.00 $13,080.00
B0230 30502-0800 FULL DEPTH
RECLAMATION
WITH CEMENT, 8-
INCH DEPTH
Phillips C&C LLC 23,100.000 $301,639.81 $6,967,879,611.00 Construction Solutions Group, LLC 23,100.000 $55.00 $1,270,500.00
McKenzie Construction & Site Development, LLC
23,100.000 $53.00 $1,224,300.00
Yorkshire Industries 23,100.000 $35.70 $824,670.00 MC3 Solutions, LLC 23,100.000 $34.00 $785,400.00 R2Build 23,100.000 $30.00 $693,000.00 Estes Bros. Const., Inc. 23,100.000 $25.83 $596,673.00
Central Southern Construction Corp. 23,100.000 $22.00 $508,200.00
Engineer's Estimate 23,100.000 SQYD $23.00 $531,300.00
B0240 31302-0000 AGGREGATE-
TOPSOIL COURSE
Phillips C&C LLC 9,390.000 $40,037.43 $375,951,467.70 Construction Solutions Group, LLC 9,390.000 $60.50 $568,095.00
MC3 Solutions, LLC 9,390.000 $51.00 $478,890.00 McKenzie Construction & Site Development, LLC
9,390.000 $44.00 $413,160.00
R2Build 9,390.000 $30.40 $285,456.00 Central Southern Construction Corp. 9,390.000 $22.00 $206,580.00
Yorkshire Industries 9,390.000 $15.64 $146,859.60
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0240 31302-0000 AGGREGATE-
TOPSOIL COURSE
Estes Bros. Const., Inc. 9,390.000 $9.63 $90,425.70
Engineer's Estimate 9,390.000 SQYD $16.00 $150,240.00
B0250 40101-0200 ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
3/8-INCH
NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL (TYPE III-B
PAVEMENT
ROUGHNESS)
Phillips C&C LLC 1,880.000 $102,705.17 $193,085,719.60 Construction Solutions Group, LLC 1,880.000 $313.50 $589,380.00
MC3 Solutions, LLC 1,880.000 $312.00 $586,560.00 Yorkshire Industries 1,880.000 $278.93 $524,388.40 Central Southern Construction Corp. 1,880.000 $276.00 $518,880.00
McKenzie Construction & Site Development, LLC
1,880.000 $268.00 $503,840.00
R2Build 1,880.000 $268.00 $503,840.00 Estes Bros. Const., Inc. 1,880.000 $258.00 $485,040.00
Engineer's Estimate 1,880.000 TON $240.00 $451,200.00
B0260 40101-1000 ASPHALT
CONCRETE
PAVEMENT,
GYRATORY MIX,
3/4-INCH
NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3
TO <3 MILLION
ESAL
Phillips C&C LLC 3,140.000 $160,661.38 $504,476,733.20 Construction Solutions Group, LLC 3,140.000 $306.90 $963,666.00
MC3 Solutions, LLC 3,140.000 $280.00 $879,200.00 Central Southern Construction Corp. 3,140.000 $260.00 $816,400.00
Yorkshire Industries 3,140.000 $250.30 $785,942.00 McKenzie Construction & Site Development, LLC
3,140.000 $240.00 $753,600.00
R2Build 3,140.000 $235.00 $737,900.00 Estes Bros. Const., Inc. 3,140.000 $216.35 $679,339.00
Engineer's Estimate 3,140.000 TON $210.00 $659,400.00 B0290 41202-0000 TACK COAT Phillips C&C LLC 2,310.000 $3,077.96 $7,110,087.60
Central Southern Construction Corp. 2,310.000 $10.00 $23,100.00
Yorkshire Industries 2,310.000 $8.05 $18,595.50 R2Build 2,310.000 $7.00 $16,170.00 MC3 Solutions, LLC 2,310.000 $5.00 $11,550.00 Estes Bros. Const., Inc. 2,310.000 $3.10 $7,161.00
Construction Solutions Group, LLC 2,310.000 $3.03 $6,999.30
McKenzie Construction & Site Development, LLC
2,310.000 $3.00 $6,930.00
Engineer's Estimate 2,310.000 GAL $10.75 $24,832.50
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0300 60704-0000 CLEANING
CULVERT IN PLACE
MC3 Solutions, LLC 12.000 $4,890.00 $58,680.00 McKenzie Construction & Site Development, LLC
12.000 $4,200.00 $50,400.00
Central Southern Construction Corp. 12.000 $4,000.00 $48,000.00
Construction Solutions Group, LLC 12.000 $3,850.00 $46,200.00
Estes Bros. Const., Inc. 12.000 $2,500.00 $30,000.00
R2Build 12.000 $650.00 $7,800.00 Yorkshire Industries 12.000 $649.75 $7,797.00 Phillips C&C LLC 12.000 $639.58 $7,674.96 Engineer's Estimate 12.000 EACH $2,700.00 $32,400.00
B0310 60709-0000 CLEANING
DRAINAGE
STRUCTURES IN
PLACE (PAVED
WATERWAY)
Phillips C&C LLC 4,640.000 $9,892.10 $45,899,344.00 Construction Solutions Group, LLC 4,640.000 $27.50 $127,600.00
R2Build 4,640.000 $25.00 $116,000.00 Estes Bros. Const., Inc. 4,640.000 $12.00 $55,680.00
Central Southern Construction Corp. 4,640.000 $10.00 $46,400.00
Yorkshire Industries 4,640.000 $9.41 $43,662.40 MC3 Solutions, LLC 4,640.000 $5.00 $23,200.00 McKenzie Construction & Site Development, LLC
4,640.000 $4.00 $18,560.00
Engineer's Estimate 4,640.000 LNFT $44.00 $204,160.00
B0320 60801-0500 PAVED
WATERWAY, TYPE
Phillips C&C LLC 50.000 $1,199.20 $59,960.00 Construction Solutions Group, LLC 50.000 $1,067.00 $53,350.00
MC3 Solutions, LLC 50.000 $386.00 $19,300.00 Yorkshire Industries 50.000 $345.00 $17,250.00 McKenzie Construction & Site Development, LLC
50.000 $331.00 $16,550.00
Estes Bros. Const., Inc. 50.000 $261.00 $13,050.00
Central Southern Construction Corp. 50.000 $131.00 $6,550.00
R2Build 50.000 $70.00 $3,500.00 Engineer's Estimate 50.000 SQYD $300.00 $15,000.00
B0330 60901-2400 CURB, ASPHALT, 7-
INCH DEPTH
Phillips C&C LLC 170.000 $2,944.71 $500,600.70 Construction Solutions Group, LLC 170.000 $324.50 $55,165.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0330 60901-2400 CURB, ASPHALT, 7-
INCH DEPTH
Central Southern Construction Corp. 170.000 $90.00 $15,300.00
MC3 Solutions, LLC 170.000 $64.00 $10,880.00 Yorkshire Industries 170.000 $56.93 $9,678.10 McKenzie Construction & Site Development, LLC
170.000 $54.00 $9,180.00
R2Build 170.000 $45.00 $7,650.00 Estes Bros. Const., Inc. 170.000 $32.25 $5,482.50
Engineer's Estimate 170.000 LNFT $40.00 $6,800.00
B0340 62030-0000 REPOINT STONE
MASONRY
(HEADWALL)
Phillips C&C LLC 200.000 $2,025.32 $405,064.00 Yorkshire Industries 200.000 $129.95 $25,990.00 R2Build 200.000 $95.00 $19,000.00 MC3 Solutions, LLC 200.000 $79.00 $15,800.00 Central Southern Construction Corp. 200.000 $75.00 $15,000.00
Construction Solutions Group, LLC 200.000 $55.00 $11,000.00
Estes Bros. Const., Inc. 200.000 $30.00 $6,000.00
McKenzie Construction & Site Development, LLC
200.000 $30.00 $6,000.00
Engineer's Estimate 200.000 LNFT $70.00 $14,000.00
B0350 62501-0000 TURF
ESTABLISHMENT
Construction Solutions Group, LLC 1.950 $33,000.00 $64,350.00
Central Southern Construction Corp. 1.950 $12,100.00 $23,595.00
Estes Bros. Const., Inc. 1.950 $11,044.62 $21,537.01
Yorkshire Industries 1.950 $8,952.31 $17,457.00 R2Build 1.950 $8,500.00 $16,575.00 McKenzie Construction & Site Development, LLC
1.950 $4,643.00 $9,053.85
MC3 Solutions, LLC 1.950 $4,504.00 $8,782.80 Phillips C&C LLC 1.950 $831.45 $1,621.33 Engineer's Estimate 1.950 ACRE $9,500.00 $18,525.00
B0360 62901-0700 ROLLED EROSION
CONTROL
PRODUCT, TYPE 2.C
Phillips C&C LLC 210.000 $3,357.77 $705,131.70 Construction Solutions Group, LLC 210.000 $33.00 $6,930.00
Yorkshire Industries 210.000 $21.56 $4,527.60 R2Build 210.000 $18.00 $3,780.00 Central Southern Construction Corp. 210.000 $15.00 $3,150.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0360 62901-0700 ROLLED EROSION
CONTROL
PRODUCT, TYPE 2.C
MC3 Solutions, LLC 210.000 $13.00 $2,730.00 McKenzie Construction & Site Development, LLC
210.000 $11.00 $2,310.00
Estes Bros. Const., Inc. 210.000 $7.47 $1,568.70
Engineer's Estimate 210.000 SQYD $12.00 $2,520.00
B0370 63304-0900 SIGNS, ALUMINUM
PANELS, TYPE 3
SHEETING
Phillips C&C LLC 40.000 $938.04 $37,521.60 Yorkshire Industries 40.000 $172.50 $6,900.00 Central Southern Construction Corp. 40.000 $100.00 $4,000.00
R2Build 40.000 $100.00 $4,000.00 McKenzie Construction & Site Development, LLC
40.000 $93.00 $3,720.00
Estes Bros. Const., Inc. 40.000 $66.75 $2,670.00
Construction Solutions Group, LLC 40.000 $33.00 $1,320.00
MC3 Solutions, LLC 40.000 $17.00 $680.00 Engineer's Estimate 40.000 SQFT $180.00 $7,200.00
B0380 63401-0500 PAVEMENT
MARKINGS, TYPE C,
SOLID
Phillips C&C LLC 17,400.000 $9,273.85 $161,364,990.00 MC3 Solutions, LLC 17,400.000 $2.00 $34,800.00 R2Build 17,400.000 $1.80 $31,320.00 Central Southern Construction Corp. 17,400.000 $1.40 $24,360.00
Estes Bros. Const., Inc. 17,400.000 $1.40 $24,360.00
Yorkshire Industries 17,400.000 $1.35 $23,490.00 Construction Solutions Group, LLC 17,400.000 $1.29 $22,446.00
McKenzie Construction & Site Development, LLC
17,400.000 $1.00 $17,400.00
Engineer's Estimate 17,400.000 LNFT $2.15 $37,410.00
B0390 63401-0600 PAVEMENT
MARKINGS, TYPE C,
BROKEN
Phillips C&C LLC 1,080.000 $863.43 $932,504.40 R2Build 1,080.000 $3.00 $3,240.00 MC3 Solutions, LLC 1,080.000 $2.00 $2,160.00 Central Southern Construction Corp. 1,080.000 $1.40 $1,512.00
Estes Bros. Const., Inc. 1,080.000 $1.40 $1,512.00
Yorkshire Industries 1,080.000 $1.35 $1,458.00 Construction Solutions Group, LLC 1,080.000 $1.29 $1,393.20
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0390 63401-0600 PAVEMENT
MARKINGS, TYPE C,
BROKEN
McKenzie Construction & Site Development, LLC
1,080.000 $1.00 $1,080.00
Engineer's Estimate 1,080.000 LNFT $1.50 $1,620.00
B0400 63501-0000 TEMPORARY
TRAFFIC CONTROL
Construction Solutions Group, LLC $219,785.00
R2Build $195,000.00 MC3 Solutions, LLC $181,453.00 McKenzie Construction & Site Development, LLC
$132,660.00
Yorkshire Industries $57,500.00 Central Southern Construction Corp. $50,000.00
Estes Bros. Const., Inc. $49,000.00
Phillips C&C LLC $20,786.21 Engineer's Estimate ALL LPSM LPSM $205,000.00
Report Generated on 01/06/2026 4:22 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]