Tabulation of Bids - VA ERFO FS 2018-1(2) 2(1).pdf

PDF 906 KB Posted

Attached to
George Washington and Jefferson National Forests
Solicitation number
693C73-23-C-000012
Issued by

About this file

This is a tabulation of bids report for a federal contract opportunity to repair roads in three national forests in Virginia. The solicitation was issued by the Department of Transportation Federal Highway Administration for the George Washington and Jefferson National Forests. A total of eight contractors submitted bids for the base schedule and option years to complete work including road reconditioning, culvert replacement, erosion control, signage and other activities. The responsive low bidder for the base schedule was Howard W. Pence at $1,357,384.50. For the first option year the low bidder was King General Contractors at $1,863,554.48, and for the second option year the low bidder was King General Contractors again at $2,242,207.59. The engineer's estimates for the base schedule and each option year are also included for comparison. Award was made to King General Contractors with a completion date of July 5, 2023.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 06/29/23

1 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Contractor Responsive?

Engineer's Estimate

Allegheny Construction Company, Inc.

Bluegrass Contracting Corporation

Central Southern Construction Corp.

Estes Bros. Const., Inc.

Howard W. Pence, Inc.

King General Contractors, Inc.

Kovilic Construction Company, Inc. no

MC3 Solutions, LLC

Base Schedule A

$1,230,000.00

$1,956,720.00

$1,928,995.00

$3,727,777.00

$1,360,922.71

$1,357,384.50

$1,606,836.47

$2,917,225.00

$1,780,776.56

Option: B

$1,660,000.00

$2,197,575.00

$2,340,685.00

$2,380,765.00

$1,944,078.07

$1,943,852.45

$1,863,554.48

$2,685,875.00

$2,368,145.71

Option: C

$2,280,000.00

$2,965,340.00

$3,296,395.00

$2,797,350.00

$2,544,864.43

$2,574,138.12

$2,242,207.59

$3,471,250.00

$2,927,006.11

Contractor Responsive?

Engineer's Estimate

Allegheny Construction Company, Inc.

Bluegrass Contracting Corporation

Central Southern Construction Corp.

Estes Bros. Const., Inc.

Howard W. Pence, Inc.

2 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

King General Contractors, Inc.

Kovilic Construction Company, Inc. no

MC3 Solutions, LLC

Total Base Schedule A and Option(s): B

$2,890,000.00

$4,154,295.00

$4,269,680.00

$6,108,542.00

$3,305,000.78

$3,301,236.95

3 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

$3,470,390.95

$5,603,100.00

$4,148,922.27

Total Base Schedule A and Option(s): BC

$5,170,000.00

$7,119,635.00

$7,566,075.00

$8,905,892.00

$5,849,865.21

$5,875,375.07

4 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

$5,712,598.54

$9,074,350.00

$7,075,928.38

Total Base Schedule A and Option(s): C

$3,510,000.00

$4,922,060.00

$5,225,390.00

$6,525,127.00

$3,905,787.14

$3,931,522.62

5 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

$3,849,044.06

$6,388,475.00

$4,707,782.67

6 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: A

Schedule Type: Base

Solcitation No: 693C73-23-B-000011

Division: Eastern Federal Lands

State: VA County: Pulaski, Botetourt, Craig

Federal Land: George Washington and Jefferson National Forests Opened at: Ashburn, Virginia

Opened by: Kaitlin Welch

Date: 06/13/23

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Howard W. Pence, Inc. $1,357,384.50 342 East Dixie Avenue Elizabethtown Kentucky 42701

Estes Bros. Const., Inc. $1,360,922.71 126 Sugar Run Road Jonesville Virginia 24263

King General Contractors, Inc. $1,606,836.48 250 Bob Morrison Blvd Bristol Virginia 24201

MC3 Solutions, LLC $1,780,776.56 8772 Roanoke Road Elliston Virginia 24087

Bluegrass Contracting Corporation $1,928,995.00 1075 Red Mile Road Lexington Kentucky 40504

Allegheny Construction Company, Inc. $1,956,720.00 2830 Nicholas Avenue NE Roanoke Virginia 24012

Kovilic Construction Company, Inc. ( $2,917,225.00 ) no 3721 N. Carnation Street Franklin Park Illinois 60131

Central Southern Construction Corp. $3,727,777.00 119 Sewald Street Jacksonville Florida 32204

Engineer's Estimate $1,230,000.00

Kaitlin Welch

Contract Specialist

June 14, 2023

King General Contractors, Inc. 7/05/2023

7 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1000 15101-0000 MOBILIZATION

Howard W. Pence, Inc. Lump Sum $108,000.00 Estes Bros. Const., Inc. Lump Sum $451,000.00 King General Contractors, Inc. Lump Sum $100,925.00 MC3 Solutions, LLC Lump Sum $174,523.00 Bluegrass Contracting Corporation Lump Sum $325,000.00 Allegheny Construction Company, Inc. Lump Sum $150,000.00 Kovilic Construction Company, Inc. Lump Sum $310,000.00 Central Southern Construction Corp. Lump Sum $1,086,077.00 Engineer's Estimate ALL LPSM Lump Sum $165,140.25

A1100 15201-0000 CONSTRUCTION SURVEY AND STAKING

Howard W. Pence, Inc. Lump Sum $24,300.00 Estes Bros. Const., Inc. Lump Sum $66,000.00 King General Contractors, Inc. Lump Sum $24,000.00 MC3 Solutions, LLC Lump Sum $80,832.00 Bluegrass Contracting Corporation Lump Sum $48,500.00 Allegheny Construction Company, Inc. Lump Sum $100,000.00 Kovilic Construction Company, Inc. Lump Sum $100,000.00 Central Southern Construction Corp. Lump Sum $250,000.00 Engineer's Estimate ALL LPSM Lump Sum $29,000.00

A1200 15401-0000 CONTRACTOR TESTING

Howard W. Pence, Inc. Lump Sum $24,300.00 Estes Bros. Const., Inc. Lump Sum $130,000.00 King General Contractors, Inc. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $16,378.00 Bluegrass Contracting Corporation Lump Sum $60,000.00 Allegheny Construction Company, Inc. Lump Sum $100,000.00 Kovilic Construction Company, Inc. Lump Sum $120,000.00 Central Southern Construction Corp. Lump Sum $250,000.00 Engineer's Estimate ALL LPSM Lump Sum $24,000.00

A1300 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Howard W. Pence, Inc. $8.10 $11,542.50 Estes Bros. Const., Inc. $10.11 $14,406.75 King General Contractors, Inc. $8.35 $11,898.75 MC3 Solutions, LLC $7.38 $10,516.50 Bluegrass Contracting Corporation $11.00 $15,675.00 Allegheny Construction Company, Inc. $15.00 $21,375.00 Kovilic Construction Company, Inc. $10.00 $14,250.00 Central Southern Construction Corp. $15.00 $21,375.00 Engineer's Estimate 1,425 LNFT $9.75 $13,893.75

8 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1400 20103-0000 CLEARING AND GRUBBING

Howard W. Pence, Inc. $16.20 $33,048.00 Estes Bros. Const., Inc. $13.00 $26,520.00 King General Contractors, Inc. $38.28 $78,091.20 MC3 Solutions, LLC $25.97 $52,978.80 Bluegrass Contracting Corporation $18.00 $36,720.00 Allegheny Construction Company, Inc. $20.00 $40,800.00 Kovilic Construction Company, Inc. $10.00 $20,400.00 Central Southern Construction Corp. $20.00 $40,800.00 Engineer's Estimate 2,040 SQYD $13.00 $26,520.00

A1500 20213-0000 ROADSIDE CLEANUP

Howard W. Pence, Inc. $18,900.00 $52,920.00 Estes Bros. Const., Inc. $11,000.00 $30,800.00 King General Contractors, Inc. $17,400.88 $48,722.46 MC3 Solutions, LLC $45,732.50 $128,051.00 Bluegrass Contracting Corporation $47,500.00 $133,000.00 Allegheny Construction Company, Inc. $25,000.00 $70,000.00 Kovilic Construction Company, Inc. $30,000.00 $84,000.00 Central Southern Construction Corp. $11,000.00 $30,800.00 Engineer's Estimate 2.800 MILE $26,000.00 $72,800.00

A1600 20301-1900 REMOVAL OF PIPE CULVERT

Howard W. Pence, Inc. $2,025.00 $24,300.00 Estes Bros. Const., Inc. $500.00 $6,000.00 King General Contractors, Inc. $2,088.11 $25,057.32 MC3 Solutions, LLC $1,741.00 $20,892.00 Bluegrass Contracting Corporation $7,000.00 $84,000.00 Allegheny Construction Company, Inc. $2,200.00 $26,400.00 Kovilic Construction Company, Inc. $2,500.00 $30,000.00 Central Southern Construction Corp. $10,000.00 $120,000.00 Engineer's Estimate 12 EACH $3,600.00 $43,200.00

A1700 20420-0000 EMBANKMENT CONSTRUCTION

Howard W. Pence, Inc. $148.50 $52,717.50 Estes Bros. Const., Inc. $147.76 $52,454.80 King General Contractors, Inc. $441.91 $156,878.05 MC3 Solutions, LLC $107.03 $37,995.65 Bluegrass Contracting Corporation $160.00 $56,800.00 Allegheny Construction Company, Inc. $200.00 $71,000.00 Kovilic Construction Company, Inc. $100.00 $35,500.00 Central Southern Construction Corp. $300.00 $106,500.00 Engineer's Estimate 355 CUYD $130.00 $46,150.00

9 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1800 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E

Howard W. Pence, Inc. $5.40 $1,080.00 Estes Bros. Const., Inc. $4.21 $842.00 King General Contractors, Inc. $20.88 $4,176.00 MC3 Solutions, LLC $21.93 $4,386.00 Bluegrass Contracting Corporation $12.00 $2,400.00 Allegheny Construction Company, Inc. $10.00 $2,000.00 Kovilic Construction Company, Inc. $10.00 $2,000.00 Central Southern Construction Corp. $50.00 $10,000.00 Engineer's Estimate 200 SQYD $6.60 $1,320.00

A1900 25102-0200 PLACED RIPRAP, METHOD A, CLASS 2 (VDOT CLASS 1 EQUIVALENT)

Howard W. Pence, Inc. $236.25 $41,343.75 Estes Bros. Const., Inc. $158.38 $27,716.50 King General Contractors, Inc. $446.44 $78,127.00 MC3 Solutions, LLC $112.78 $19,736.50 Bluegrass Contracting Corporation $285.00 $49,875.00 Allegheny Construction Company, Inc. $250.00 $43,750.00 Kovilic Construction Company, Inc. $125.00 $21,875.00 Central Southern Construction Corp. $375.00 $65,625.00 Engineer's Estimate 175 TON $170.00 $29,750.00

A2000 30110-0000 AGGREGATE SURFACE COURSE

Howard W. Pence, Inc. $94.50 $198,450.00 Estes Bros. Const., Inc. $58.59 $123,039.00 King General Contractors, Inc. $165.16 $346,836.00 MC3 Solutions, LLC $132.66 $278,586.00 Bluegrass Contracting Corporation $81.00 $170,100.00 Allegheny Construction Company, Inc. $115.00 $241,500.00 Kovilic Construction Company, Inc. $150.00 $315,000.00 Central Southern Construction Corp. $145.00 $304,500.00 Engineer's Estimate 2,100 TON $68.00 $142,800.00

A2100 30301-6000 ROADWAY RECONDITIONING

Howard W. Pence, Inc. $79,650.00 $223,020.00 Estes Bros. Const., Inc. $18,000.00 $50,400.00 King General Contractors, Inc. $25,292.53 $70,819.08 MC3 Solutions, LLC $108,356.43 $303,398.00 Bluegrass Contracting Corporation $51,500.00 $144,200.00 Allegheny Construction Company, Inc. $75,000.00 $210,000.00 Kovilic Construction Company, Inc. $100,000.00 $280,000.00 Central Southern Construction Corp. $33,500.00 $93,800.00 Engineer's Estimate 2.800 MILE $36,000.00 $100,800.00

10 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2200 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (HEADWALLS, WINGWALLS, FOOTINGS, & CURB AT BOX CULVERT)

Howard W. Pence, Inc. $2,430.00 $68,040.00 Estes Bros. Const., Inc. $1,748.97 $48,971.16 King General Contractors, Inc. $2,366.52 $66,262.56 MC3 Solutions, LLC $902.07 $25,257.96 Bluegrass Contracting Corporation $2,900.00 $81,200.00 Allegheny Construction Company, Inc. $5,000.00 $140,000.00 Kovilic Construction Company, Inc. $5,000.00 $140,000.00 Central Southern Construction Corp. $2,500.00 $70,000.00 Engineer's Estimate 28 CUYD $1,700.00 $47,600.00

A2300 60201-0900 30-INCH PIPE CULVERT

Howard W. Pence, Inc. $432.00 $11,232.00 Estes Bros. Const., Inc. $272.20 $7,077.20 King General Contractors, Inc. $208.81 $5,429.06 MC3 Solutions, LLC $336.31 $8,744.06 Bluegrass Contracting Corporation $530.00 $13,780.00 Allegheny Construction Company, Inc. $600.00 $15,600.00 Kovilic Construction Company, Inc. $1,000.00 $26,000.00 Central Southern Construction Corp. $1,100.00 $28,600.00 Engineer's Estimate 26 LNFT $250.00 $6,500.00

A2400 60201-1000 36-INCH PIPE CULVERT

Howard W. Pence, Inc. $472.50 $67,567.50 Estes Bros. Const., Inc. $270.89 $38,737.27 King General Contractors, Inc. $278.41 $39,812.63 MC3 Solutions, LLC $212.51 $30,388.93 Bluegrass Contracting Corporation $560.00 $80,080.00 Allegheny Construction Company, Inc. $615.00 $87,945.00 Kovilic Construction Company, Inc. $1,200.00 $171,600.00 Central Southern Construction Corp. $1,250.00 $178,750.00 Engineer's Estimate 143 LNFT $280.00 $40,040.00

A2500 60201-1200 48-INCH PIPE CULVERT

Howard W. Pence, Inc. $540.00 $12,960.00 Estes Bros. Const., Inc. $409.20 $9,820.80 King General Contractors, Inc. $368.90 $8,853.60 MC3 Solutions, LLC $544.50 $13,068.00 Bluegrass Contracting Corporation $600.00 $14,400.00 Allegheny Construction Company, Inc. $900.00 $21,600.00 Kovilic Construction Company, Inc. $2,000.00 $48,000.00 Central Southern Construction Corp. $1,500.00 $36,000.00 Engineer's Estimate 24 LNFT $400.00 $9,600.00

11 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2600 60202-0900 54-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Howard W. Pence, Inc. $742.50 $24,502.50 Estes Bros. Const., Inc. $622.75 $20,550.75 King General Contractors, Inc. $438.50 $14,470.50 MC3 Solutions, LLC $552.58 $18,235.14 Bluegrass Contracting Corporation $715.00 $23,595.00 Allegheny Construction Company, Inc. $1,100.00 $36,300.00 Kovilic Construction Company, Inc. $2,500.00 $82,500.00 Central Southern Construction Corp. $1,700.00 $56,100.00 Engineer's Estimate 33 LNFT $700.00 $23,100.00

A2700 60202-1200 72-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Howard W. Pence, Inc. $945.00 $34,020.00 Estes Bros. Const., Inc. $697.29 $25,102.44 King General Contractors, Inc. $535.95 $19,294.20 MC3 Solutions, LLC $578.03 $20,809.08 Bluegrass Contracting Corporation $970.00 $34,920.00 Allegheny Construction Company, Inc. $1,200.00 $43,200.00 Kovilic Construction Company, Inc. $3,000.00 $108,000.00 Central Southern Construction Corp. $2,000.00 $72,000.00 Engineer's Estimate 36 LNFT $850.00 $30,600.00

A2800 60202-1400 84-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Howard W. Pence, Inc. $1,080.00 $41,040.00 Estes Bros. Const., Inc. $669.40 $25,437.20 King General Contractors, Inc. $619.47 $23,539.86 MC3 Solutions, LLC $627.61 $23,849.18 Bluegrass Contracting Corporation $1,000.00 $38,000.00 Allegheny Construction Company, Inc. $1,250.00 $47,500.00 Kovilic Construction Company, Inc. $4,000.00 $152,000.00 Central Southern Construction Corp. $2,200.00 $83,600.00 Engineer's Estimate 38 LNFT $1,100.00 $41,800.00

A2900 60221-0600 5 FEET SPAN, 4 FEET RISE REINFORCED CONCRETE BOX CULVERT, SINGLE BARREL

Howard W. Pence, Inc. $945.00 $21,735.00 Estes Bros. Const., Inc. $1,537.23 $35,356.29 King General Contractors, Inc. $4,524.23 $104,057.29 MC3 Solutions, LLC $4,221.17 $97,086.91 Bluegrass Contracting Corporation $3,300.00 $75,900.00 Allegheny Construction Company, Inc. $3,800.00 $87,400.00 Kovilic Construction Company, Inc. $5,000.00 $115,000.00 Central Southern Construction Corp. $3,300.00 $75,900.00 Engineer's Estimate 23 LNFT $1,800.00 $41,400.00

12 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A3000 62017-0600 DRY STACKED STONE MASONRY HEADWALL FOR 30-INCH PIPE CULVERT

Howard W. Pence, Inc. $9,450.00 $9,450.00 Estes Bros. Const., Inc. $3,027.50 $3,027.50 King General Contractors, Inc. $6,264.32 $6,264.32 MC3 Solutions, LLC $6,639.00 $6,639.00 Bluegrass Contracting Corporation $2,200.00 $2,200.00 Allegheny Construction Company, Inc. $8,000.00 $8,000.00 Kovilic Construction Company, Inc. $5,000.00 $5,000.00 Central Southern Construction Corp. $7,500.00 $7,500.00 Engineer's Estimate 1 EACH $12,000.00 $12,000.00

A3100 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH

Howard W. Pence, Inc. $8.10 $16,524.00 Estes Bros. Const., Inc. $11.90 $24,276.00 King General Contractors, Inc. $22.27 $45,430.80 MC3 Solutions, LLC $15.37 $31,354.80 Bluegrass Contracting Corporation $14.00 $28,560.00 Allegheny Construction Company, Inc. $35.00 $71,400.00 Kovilic Construction Company, Inc. $10.00 $20,400.00 Central Southern Construction Corp. $50.00 $102,000.00 Engineer's Estimate 2,040 SQYD $14.75 $30,090.00

A3200 62502-0000 TURF ESTABLISHMENT

Howard W. Pence, Inc. $8.10 $16,524.00 Estes Bros. Const., Inc. $6.00 $12,240.00 King General Contractors, Inc. $15.31 $31,232.40 MC3 Solutions, LLC $2.80 $5,712.00 Bluegrass Contracting Corporation $5.00 $10,200.00 Allegheny Construction Company, Inc. $4.00 $8,160.00 Kovilic Construction Company, Inc. $10.00 $20,400.00 Central Southern Construction Corp. $20.00 $40,800.00 Engineer's Estimate 2,040 SQYD $9.15 $18,666.00

A3300 62901-0600 ROLLED EROSION CONTROL PRODUCT, TYPE 2.B

Howard W. Pence, Inc. $8.10 $16,524.00 Estes Bros. Const., Inc. $5.21 $10,628.40 King General Contractors, Inc. $4.87 $9,934.80 MC3 Solutions, LLC $5.90 $12,036.00 Bluegrass Contracting Corporation $11.00 $22,440.00 Allegheny Construction Company, Inc. $6.00 $12,240.00 Kovilic Construction Company, Inc. $10.00 $20,400.00 Central Southern Construction Corp. $10.00 $20,400.00 Engineer's Estimate 2,040 SQYD $7.25 $14,790.00

13 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A3400 62903-0000 CELLULAR CONFINEMENT SYSTEM

Howard W. Pence, Inc. $108.00 $21,600.00 Estes Bros. Const., Inc. $89.56 $17,912.00 King General Contractors, Inc. $11.14 $2,228.00 MC3 Solutions, LLC $45.25 $9,050.00 Bluegrass Contracting Corporation $75.00 $15,000.00 Allegheny Construction Company, Inc. $150.00 $30,000.00 Kovilic Construction Company, Inc. $50.00 $10,000.00 Central Southern Construction Corp. $150.00 $30,000.00 Engineer's Estimate 200 SQYD $110.00 $22,000.00

A3500 63308-3000 OBJECT MARKER, TYPE 3

Howard W. Pence, Inc. $675.00 $2,700.00 Estes Bros. Const., Inc. $411.00 $1,644.00 King General Contractors, Inc. $1,948.90 $7,795.60 MC3 Solutions, LLC $1,196.75 $4,787.00 Bluegrass Contracting Corporation $350.00 $1,400.00 Allegheny Construction Company, Inc. $250.00 $1,000.00 Kovilic Construction Company, Inc. $1,000.00 $4,000.00 Central Southern Construction Corp. $250.00 $1,000.00 Engineer's Estimate 4 EACH $600.00 $2,400.00

A3600 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Howard W. Pence, Inc. $168.75 $4,050.00 Estes Bros. Const., Inc. $100.00 $2,400.00 King General Contractors, Inc. $2,436.12 $58,466.88 MC3 Solutions, LLC $103.25 $2,478.00 Bluegrass Contracting Corporation $75.00 $1,800.00 Allegheny Construction Company, Inc. $75.00 $1,800.00 Kovilic Construction Company, Inc. $100.00 $2,400.00 Central Southern Construction Corp. $100.00 $2,400.00 Engineer's Estimate 24 LNFT $160.00 $3,840.00

A3700 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Howard W. Pence, Inc. $168.75 $3,375.00 Estes Bros. Const., Inc. $30.83 $616.60 King General Contractors, Inc. $55.68 $1,113.60 MC3 Solutions, LLC $129.20 $2,584.00 Bluegrass Contracting Corporation $50.00 $1,000.00 Allegheny Construction Company, Inc. $30.00 $600.00 Kovilic Construction Company, Inc. $100.00 $2,000.00 Central Southern Construction Corp. $100.00 $2,000.00 Engineer's Estimate 20 SQFT $75.00 $1,500.00

14 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A3800 63701-0000 FIELD OFFICE

Howard W. Pence, Inc. $33,750.00 $33,750.00 Estes Bros. Const., Inc. $36,000.00 $36,000.00 King General Contractors, Inc. $6,960.35 $6,960.35 MC3 Solutions, LLC $155,024.00 $155,024.00 Bluegrass Contracting Corporation $50,000.00 $50,000.00 Allegheny Construction Company, Inc. $50,000.00 $50,000.00 Kovilic Construction Company, Inc. $50,000.00 $50,000.00 Central Southern Construction Corp. $75,000.00 $75,000.00 Engineer's Estimate 1 EACH $50,000.00 $50,000.00

A3900 64702-3500 MITIGATION, STORMWATER MANAGEMENT, DRY SWALE (GRAVEL DIAPHRAGM)

Howard W. Pence, Inc. $168.75 $10,968.75 Estes Bros. Const., Inc. $100.77 $6,550.05 King General Contractors, Inc. $167.05 $10,858.25 MC3 Solutions, LLC $60.97 $3,963.05 Bluegrass Contracting Corporation $50.00 $3,250.00 Allegheny Construction Company, Inc. $110.00 $7,150.00 Kovilic Construction Company, Inc. $100.00 $6,500.00 Central Southern Construction Corp. $250.00 $16,250.00 Engineer's Estimate 65 LNFT $180.00 $11,700.00

A4000 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (POND LICK ROAD - MP 0.01)

Howard W. Pence, Inc. Lump Sum $24,300.00 Estes Bros. Const., Inc. Lump Sum $16,688.00 King General Contractors, Inc. Lump Sum $31,004.88 MC3 Solutions, LLC Lump Sum $40,532.00 Bluegrass Contracting Corporation Lump Sum $85,000.00 Allegheny Construction Company, Inc. Lump Sum $35,000.00 Kovilic Construction Company, Inc. Lump Sum $75,000.00 Central Southern Construction Corp. Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $28,000.00

A4100 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (POND LICK ROAD - MP 0.06)

Howard W. Pence, Inc. Lump Sum $24,300.00 Estes Bros. Const., Inc. Lump Sum $4,755.00 King General Contractors, Inc. Lump Sum $16,740.34 MC3 Solutions, LLC Lump Sum $26,195.00 Bluegrass Contracting Corporation Lump Sum $40,000.00 Allegheny Construction Company, Inc. Lump Sum $35,000.00 Kovilic Construction Company, Inc. Lump Sum $75,000.00 Central Southern Construction Corp. Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $14,000.00

15 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A4200 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (POND LICK ROAD - MP 0.31)

Howard W. Pence, Inc. Lump Sum $24,300.00 Estes Bros. Const., Inc. Lump Sum $6,255.00 King General Contractors, Inc. Lump Sum $33,965.12 MC3 Solutions, LLC Lump Sum $27,698.00 Bluegrass Contracting Corporation Lump Sum $50,000.00 Allegheny Construction Company, Inc. Lump Sum $35,000.00 Kovilic Construction Company, Inc. Lump Sum $75,000.00 Central Southern Construction Corp. Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $28,000.00

A4300 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (POND LICK ROAD - MP 1.13)

Howard W. Pence, Inc. Lump Sum $24,300.00 Estes Bros. Const., Inc. Lump Sum $16,688.00 King General Contractors, Inc. Lump Sum $29,741.58 MC3 Solutions, LLC Lump Sum $35,679.00 Bluegrass Contracting Corporation Lump Sum $50,000.00 Allegheny Construction Company, Inc. Lump Sum $35,000.00 Kovilic Construction Company, Inc. Lump Sum $150,000.00 Central Southern Construction Corp. Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00

A4400 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (POND LICK ROAD - MP 1.79)

Howard W. Pence, Inc. Lump Sum $24,300.00 Estes Bros. Const., Inc. Lump Sum $6,255.00 King General Contractors, Inc. Lump Sum $19,854.40 MC3 Solutions, LLC Lump Sum $25,666.00 Bluegrass Contracting Corporation Lump Sum $40,000.00 Allegheny Construction Company, Inc. Lump Sum $35,000.00 Kovilic Construction Company, Inc. Lump Sum $75,000.00 Central Southern Construction Corp. Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $16,000.00

A4500 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (POND LICK ROAD - MP 2.2)

Howard W. Pence, Inc. Lump Sum $24,300.00 Estes Bros. Const., Inc. Lump Sum $4,755.00 King General Contractors, Inc. Lump Sum $17,994.59 MC3 Solutions, LLC Lump Sum $25,666.00 Bluegrass Contracting Corporation Lump Sum $40,000.00 Allegheny Construction Company, Inc. Lump Sum $35,000.00 Kovilic Construction Company, Inc. Lump Sum $150,000.00 Central Southern Construction Corp. Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $16,000.00

16 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Total Schedule - All Items

Howard W. Pence, Inc. $1,357,384.50 Estes Bros. Const., Inc. $1,360,922.71 King General Contractors, Inc. $1,606,836.48 MC3 Solutions, LLC $1,780,776.56 Bluegrass Contracting Corporation $1,928,995.00 Allegheny Construction Company, Inc. $1,956,720.00 Kovilic Construction Company, Inc. $2,917,225.00 Central Southern Construction Corp. $3,727,777.00 Engineer's Estimate $1,230,000.00

17 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: B

Schedule Type: Options

Solcitation No: 693C73-23-B-000011

Division: Eastern Federal Lands

State: VA County: Pulaski, Botetourt, Craig

Federal Land: George Washington and Jefferson National Forests Opened at: Ashburn, Virginia

Opened by: Kaitlin Welch

Date: 06/13/23

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

King General Contractors, Inc. $1,863,554.48 250 Bob Morrison Blvd Bristol Virginia 24201

Howard W. Pence, Inc. $1,943,852.45 342 East Dixie Avenue Elizabethtown Kentucky 42701

Estes Bros. Const., Inc. $1,944,078.07 126 Sugar Run Road Jonesville Virginia 24263

Allegheny Construction Company, Inc. $2,197,575.00 2830 Nicholas Avenue NE Roanoke Virginia 24012

Bluegrass Contracting Corporation $2,340,685.00 1075 Red Mile Road Lexington Kentucky 40504

MC3 Solutions, LLC $2,368,145.70 8772 Roanoke Road Elliston Virginia 24087

Central Southern Construction Corp. $2,380,765.00 119 Sewald Street Jacksonville Florida 32204

Kovilic Construction Company, Inc. ( $2,685,875.00 ) no 3721 N. Carnation Street Franklin Park Illinois 60131

Engineer's Estimate $1,660,000.00

Kaitlin Welch

Contract Specialist

18 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1000 15101-0000 MOBILIZATION

King General Contractors, Inc. Lump Sum $117,230.00 Howard W. Pence, Inc. Lump Sum $137,500.00 Estes Bros. Const., Inc. Lump Sum $681,000.00 Allegheny Construction Company, Inc. Lump Sum $140,000.00 Bluegrass Contracting Corporation Lump Sum $255,000.00 MC3 Solutions, LLC Lump Sum $230,538.00 Central Southern Construction Corp. Lump Sum $150,000.00 Kovilic Construction Company, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $221,052.00

B1100 15201-0000 CONSTRUCTION SURVEY AND STAKING

King General Contractors, Inc. Lump Sum $17,331.00 Howard W. Pence, Inc. Lump Sum $34,060.00 Estes Bros. Const., Inc. Lump Sum $147,000.00 Allegheny Construction Company, Inc. Lump Sum $100,000.00 Bluegrass Contracting Corporation Lump Sum $67,800.00 MC3 Solutions, LLC Lump Sum $81,499.00 Central Southern Construction Corp. Lump Sum $50,000.00 Kovilic Construction Company, Inc. Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $39,000.00

B1200 15401-0000 CONTRACTOR TESTING

King General Contractors, Inc. Lump Sum $30,505.00 Howard W. Pence, Inc. Lump Sum $34,060.00 Estes Bros. Const., Inc. Lump Sum $133,000.00 Allegheny Construction Company, Inc. Lump Sum $100,000.00 Bluegrass Contracting Corporation Lump Sum $84,000.00 MC3 Solutions, LLC Lump Sum $17,548.00 Central Southern Construction Corp. Lump Sum $50,000.00 Kovilic Construction Company, Inc. Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $32,000.00

B1300 15705-0100 SOIL EROSION CONTROL, SILT FENCE

King General Contractors, Inc. $9.25 $13,643.75 Howard W. Pence, Inc. $7.86 $11,593.50 Estes Bros. Const., Inc. $10.11 $14,912.25 Allegheny Construction Company, Inc. $15.00 $22,125.00 Bluegrass Contracting Corporation $11.00 $16,225.00 MC3 Solutions, LLC $7.64 $11,269.00 Central Southern Construction Corp. $15.00 $22,125.00 Kovilic Construction Company, Inc. $10.00 $14,750.00 Engineer's Estimate 1,475 LNFT $9.75 $14,381.25

19 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1400 20103-0000 CLEARING AND GRUBBING

King General Contractors, Inc. $77.38 $148,956.50 Howard W. Pence, Inc. $15.72 $30,261.00 Estes Bros. Const., Inc. $13.00 $25,025.00 Allegheny Construction Company, Inc. $20.00 $38,500.00 Bluegrass Contracting Corporation $18.00 $34,650.00 MC3 Solutions, LLC $29.50 $56,787.50 Central Southern Construction Corp. $20.00 $38,500.00 Kovilic Construction Company, Inc. $10.00 $19,250.00 Engineer's Estimate 1,925 SQYD $13.00 $25,025.00

B1500 20213-0000 ROADSIDE CLEANUP

King General Contractors, Inc. $4,510.36 $36,533.92 Howard W. Pence, Inc. $18,340.00 $148,554.00 Estes Bros. Const., Inc. $12,000.00 $97,200.00 Allegheny Construction Company, Inc. $20,000.00 $162,000.00 Bluegrass Contracting Corporation $30,500.00 $247,050.00 MC3 Solutions, LLC $20,892.96 $169,232.98 Central Southern Construction Corp. $11,000.00 $89,100.00 Kovilic Construction Company, Inc. $30,000.00 $243,000.00 Engineer's Estimate 8.100 MILE $26,000.00 $210,600.00

B1600 20301-1200 REMOVAL OF HEADWALL

King General Contractors, Inc. $1,802.42 $7,209.68 Howard W. Pence, Inc. $2,358.00 $9,432.00 Estes Bros. Const., Inc. $600.00 $2,400.00 Allegheny Construction Company, Inc. $2,000.00 $8,000.00 Bluegrass Contracting Corporation $1,600.00 $6,400.00 MC3 Solutions, LLC $1,619.50 $6,478.00 Central Southern Construction Corp. $5,000.00 $20,000.00 Kovilic Construction Company, Inc. $2,500.00 $10,000.00 Engineer's Estimate 4 EACH $2,100.00 $8,400.00

B1700 20301-1900 REMOVAL OF PIPE CULVERT

King General Contractors, Inc. $1,733.10 $13,864.80 Howard W. Pence, Inc. $1,965.00 $15,720.00 Estes Bros. Const., Inc. $500.00 $4,000.00 Allegheny Construction Company, Inc. $2,000.00 $16,000.00 Bluegrass Contracting Corporation $7,000.00 $56,000.00 MC3 Solutions, LLC $1,619.50 $12,956.00 Central Southern Construction Corp. $10,000.00 $80,000.00 Kovilic Construction Company, Inc. $2,500.00 $20,000.00 Engineer's Estimate 8 EACH $3,600.00 $28,800.00

20 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1800 20420-0000 EMBANKMENT CONSTRUCTION

King General Contractors, Inc. $457.26 $219,484.80 Howard W. Pence, Inc. $144.10 $69,168.00 Estes Bros. Const., Inc. $173.76 $83,404.80 Allegheny Construction Company, Inc. $200.00 $96,000.00 Bluegrass Contracting Corporation $205.00 $98,400.00 MC3 Solutions, LLC $118.73 $56,990.40 Central Southern Construction Corp. $300.00 $144,000.00 Kovilic Construction Company, Inc. $100.00 $48,000.00 Engineer's Estimate 480 CUYD $130.00 $62,400.00

B1900 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E

King General Contractors, Inc. $31.35 $940.50 Howard W. Pence, Inc. $5.24 $157.20 Estes Bros. Const., Inc. $4.21 $126.30 Allegheny Construction Company, Inc. $10.00 $300.00 Bluegrass Contracting Corporation $12.00 $360.00 MC3 Solutions, LLC $28.37 $851.10 Central Southern Construction Corp. $50.00 $1,500.00 Kovilic Construction Company, Inc. $100.00 $3,000.00 Engineer's Estimate 30 SQYD $6.60 $198.00

B2000 25102-0200 PLACED RIPRAP, METHOD A, CLASS 2 (VDOT CLASS 1 EQUIVALENT)

King General Contractors, Inc. $465.44 $6,050.72 Howard W. Pence, Inc. $229.25 $2,980.25 Estes Bros. Const., Inc. $264.69 $3,440.97 Allegheny Construction Company, Inc. $375.00 $4,875.00 Bluegrass Contracting Corporation $285.00 $3,705.00 MC3 Solutions, LLC $392.85 $5,107.05 Central Southern Construction Corp. $375.00 $4,875.00 Kovilic Construction Company, Inc. $125.00 $1,625.00 Engineer's Estimate 13 TON $170.00 $2,210.00

B2100 25102-0300 PLACED RIPRAP, METHOD A, CLASS 3 (VDOT CLASS 2 EQUIVALENT)

King General Contractors, Inc. $490.95 $10,800.90 Howard W. Pence, Inc. $229.25 $5,043.50 Estes Bros. Const., Inc. $280.64 $6,174.08 Allegheny Construction Company, Inc. $400.00 $8,800.00 Bluegrass Contracting Corporation $285.00 $6,270.00 MC3 Solutions, LLC $243.50 $5,357.00 Central Southern Construction Corp. $375.00 $8,250.00 Kovilic Construction Company, Inc. $150.00 $3,300.00 Engineer's Estimate 22 TON $190.00 $4,180.00

21 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B2200 30110-0000 AGGREGATE SURFACE COURSE

King General Contractors, Inc. $124.80 $449,280.00 Howard W. Pence, Inc. $91.70 $330,120.00 Estes Bros. Const., Inc. $47.21 $169,956.00 Allegheny Construction Company, Inc. $110.00 $396,000.00 Bluegrass Contracting Corporation $122.00 $439,200.00 MC3 Solutions, LLC $112.44 $404,784.00 Central Southern Construction Corp. $145.00 $522,000.00 Kovilic Construction Company, Inc. $150.00 $540,000.00 Engineer's Estimate 3,600 TON $68.00 $244,800.00

B2400 30301-6000 ROADWAY RECONDITIONING

King General Contractors, Inc. $25,474.44 $207,361.94 Howard W. Pence, Inc. $77,290.00 $629,140.60 Estes Bros. Const., Inc. $18,000.00 $146,520.00 Allegheny Construction Company, Inc. $50,000.00 $407,000.00 Bluegrass Contracting Corporation $45,750.00 $372,405.00 MC3 Solutions, LLC $103,801.11 $844,941.04 Central Southern Construction Corp. $33,500.00 $272,690.00 Kovilic Construction Company, Inc. $30,000.00 $244,200.00 Engineer's Estimate 8.140 MILE $36,000.00 $293,040.00

B2500 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (HEADWALLS, WINGWALLS, & FOOTINGS)

King General Contractors, Inc. $2,863.08 $85,892.40 Howard W. Pence, Inc. $2,358.00 $70,740.00 Estes Bros. Const., Inc. $2,865.63 $85,968.90 Allegheny Construction Company, Inc. $4,000.00 $120,000.00 Bluegrass Contracting Corporation $5,000.00 $150,000.00 MC3 Solutions, LLC $1,903.43 $57,102.90 Central Southern Construction Corp. $2,500.00 $75,000.00 Kovilic Construction Company, Inc. $5,000.00 $150,000.00 Engineer's Estimate 30 CUYD $1,700.00 $51,000.00

B2600 55201-1200 STRUCTURAL CONCRETE, CLASS S (SEAL)

King General Contractors, Inc. $4,353.55 $43,535.50 Howard W. Pence, Inc. $2,358.00 $23,580.00 Estes Bros. Const., Inc. $893.50 $8,935.00 Allegheny Construction Company, Inc. $2,000.00 $20,000.00 Bluegrass Contracting Corporation $1,500.00 $15,000.00 MC3 Solutions, LLC $680.80 $6,808.00 Central Southern Construction Corp. $2,500.00 $25,000.00 Kovilic Construction Company, Inc. $5,000.00 $50,000.00 Engineer's Estimate 10 CUYD $1,500.00 $15,000.00

22 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B2700 60201-0800 24-INCH PIPE CULVERT

King General Contractors, Inc. $200.87 $24,506.14 Howard W. Pence, Inc. $373.35 $45,548.70 Estes Bros. Const., Inc. $255.59 $31,181.98 Allegheny Construction Company, Inc. $600.00 $73,200.00 Bluegrass Contracting Corporation $515.00 $62,830.00 MC3 Solutions, LLC $360.79 $44,016.38 Central Southern Construction Corp. $1,000.00 $122,000.00 Kovilic Construction Company, Inc. $1,000.00 $122,000.00 Engineer's Estimate 122 LNFT $230.00 $28,060.00

B2800 60201-1200 48-INCH PIPE CULVERT

King General Contractors, Inc. $262.11 $11,532.84 Howard W. Pence, Inc. $524.00 $23,056.00 Estes Bros. Const., Inc. $364.82 $16,052.08 Allegheny Construction Company, Inc. $735.00 $32,340.00 Bluegrass Contracting Corporation $610.00 $26,840.00 MC3 Solutions, LLC $515.16 $22,667.04 Central Southern Construction Corp. $1,500.00 $66,000.00 Kovilic Construction Company, Inc. $2,000.00 $88,000.00 Engineer's Estimate 44 LNFT $400.00 $17,600.00

B2900 60202-0500 30-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

King General Contractors, Inc. $442.44 $11,503.44 Howard W. Pence, Inc. $550.20 $14,305.20 Estes Bros. Const., Inc. $489.70 $12,732.20 Allegheny Construction Company, Inc. $850.00 $22,100.00 Bluegrass Contracting Corporation $550.00 $14,300.00 MC3 Solutions, LLC $409.08 $10,636.08 Central Southern Construction Corp. $1,100.00 $28,600.00 Kovilic Construction Company, Inc. $1,500.00 $39,000.00 Engineer's Estimate 26 LNFT $260.00 $6,760.00

B3000 60304-0000 STRUCTURAL PLATE ARCH (8 FEET SPAN X 4 FEET RISE ARCH OPEN BOTTOM CMP CULVERT)

King General Contractors, Inc. $1,989.85 $63,675.20 Howard W. Pence, Inc. $1,048.00 $33,536.00 Estes Bros. Const., Inc. $2,304.63 $73,748.16 Allegheny Construction Company, Inc. $3,000.00 $96,000.00 Bluegrass Contracting Corporation $2,600.00 $83,200.00 MC3 Solutions, LLC $1,997.41 $63,917.12 Central Southern Construction Corp. $2,200.00 $70,400.00 Kovilic Construction Company, Inc. $5,000.00 $160,000.00 Engineer's Estimate 32 LNFT $1,400.00 $44,800.00

23 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B3100 60315-0000 STRUCTURAL PLATE HEADWALL

King General Contractors, Inc. $8,603.11 $8,603.11 Howard W. Pence, Inc. $15,720.00 $15,720.00 Estes Bros. Const., Inc. $13,575.00 $13,575.00 Allegheny Construction Company, Inc. $5,000.00 $5,000.00 Bluegrass Contracting Corporation $9,400.00 $9,400.00 MC3 Solutions, LLC $9,857.00 $9,857.00 Central Southern Construction Corp. $10,000.00 $10,000.00 Kovilic Construction Company, Inc. $50,000.00 $50,000.00 Engineer's Estimate 1 EACH $23,000.00 $23,000.00

B3200 60704-0000 CLEANING CULVERT IN PLACE

King General Contractors, Inc. $1,193.76 $2,387.52 Howard W. Pence, Inc. $1,965.00 $3,930.00 Estes Bros. Const., Inc. $4,000.00 $8,000.00 Allegheny Construction Company, Inc. $7,000.00 $14,000.00 Bluegrass Contracting Corporation $5,500.00 $11,000.00 MC3 Solutions, LLC $5,247.50 $10,495.00 Central Southern Construction Corp. $5,000.00 $10,000.00 Kovilic Construction Company, Inc. $2,500.00 $5,000.00 Engineer's Estimate 2 EACH $1,200.00 $2,400.00

B3300 62017-0500 DRY STACKED STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT

King General Contractors, Inc. $3,535.52 $10,606.56 Howard W. Pence, Inc. $9,170.00 $27,510.00 Estes Bros. Const., Inc. $3,027.50 $9,082.50 Allegheny Construction Company, Inc. $7,000.00 $21,000.00 Bluegrass Contracting Corporation $2,250.00 $6,750.00 MC3 Solutions, LLC $6,639.67 $19,919.01 Central Southern Construction Corp. $7,500.00 $22,500.00 Kovilic Construction Company, Inc. $5,000.00 $15,000.00 Engineer's Estimate 3 EACH $7,500.00 $22,500.00

B3400 62017-0600 DRY STACKED STONE MASONRY HEADWALL FOR 30-INCH PIPE CULVERT

King General Contractors, Inc. $3,757.36 $3,757.36 Howard W. Pence, Inc. $11,135.00 $11,135.00 Estes Bros. Const., Inc. $3,027.50 $3,027.50 Allegheny Construction Company, Inc. $8,000.00 $8,000.00 Bluegrass Contracting Corporation $2,250.00 $2,250.00 MC3 Solutions, LLC $6,639.00 $6,639.00 Central Southern Construction Corp. $7,500.00 $7,500.00 Kovilic Construction Company, Inc. $6,000.00 $6,000.00 Engineer's Estimate 1 EACH $12,000.00 $12,000.00

24 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B3500 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH

King General Contractors, Inc. $57.89 $111,438.25 Howard W. Pence, Inc. $7.86 $15,130.50 Estes Bros. Const., Inc. $12.40 $23,870.00 Allegheny Construction Company, Inc. $35.00 $67,375.00 Bluegrass Contracting Corporation $14.00 $26,950.00 MC3 Solutions, LLC $15.86 $30,530.50 Central Southern Construction Corp. $50.00 $96,250.00 Kovilic Construction Company, Inc. $10.00 $19,250.00 Engineer's Estimate 1,925 SQYD $14.75 $28,393.75

B3600 62502-0000 TURF ESTABLISHMENT

King General Contractors, Inc. $15.94 $30,684.50 Howard W. Pence, Inc. $7.86 $15,130.50 Estes Bros. Const., Inc. $6.40 $12,320.00 Allegheny Construction Company, Inc. $4.00 $7,700.00 Bluegrass Contracting Corporation $5.00 $9,625.00 MC3 Solutions, LLC $2.97 $5,717.25 Central Southern Construction Corp. $25.00 $48,125.00 Kovilic Construction Company, Inc. $10.00 $19,250.00 Engineer's Estimate 1,925 SQYD $9.15 $17,613.75

B3700 62901-0600 ROLLED EROSION CONTROL PRODUCT, TYPE 2.B

King General Contractors, Inc. $9.08 $17,479.00 Howard W. Pence, Inc. $7.86 $15,130.50 Estes Bros. Const., Inc. $5.21 $10,029.25 Allegheny Construction Company, Inc. $6.00 $11,550.00 Bluegrass Contracting Corporation $11.00 $21,175.00 MC3 Solutions, LLC $5.90 $11,357.50 Central Southern Construction Corp. $10.00 $19,250.00 Kovilic Construction Company, Inc. $10.00 $19,250.00 Engineer's Estimate 1,925 SQYD $7.25 $13,956.25

B3800 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

King General Contractors, Inc. $112.30 $4,042.80 Howard W. Pence, Inc. $163.75 $5,895.00 Estes Bros. Const., Inc. $100.00 $3,600.00 Allegheny Construction Company, Inc. $75.00 $2,700.00 Bluegrass Contracting Corporation $75.00 $2,700.00 MC3 Solutions, LLC $103.25 $3,717.00 Central Southern Construction Corp. $100.00 $3,600.00 Kovilic Construction Company, Inc. $100.00 $3,600.00 Engineer's Estimate 36 LNFT $160.00 $5,760.00

25 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B3900 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

King General Contractors, Inc. $235.01 $11,750.50 Howard W. Pence, Inc. $163.75 $8,187.50 Estes Bros. Const., Inc. $30.83 $1,541.50 Allegheny Construction Company, Inc. $30.00 $1,500.00 Bluegrass Contracting Corporation $50.00 $2,500.00 MC3 Solutions, LLC $127.10 $6,355.00 Central Southern Construction Corp. $100.00 $5,000.00 Kovilic Construction Company, Inc. $100.00 $5,000.00 Engineer's Estimate 50 SQFT $75.00 $3,750.00

B4000 63701-0000 FIELD OFFICE

King General Contractors, Inc. $15,251.28 $15,251.28 Howard W. Pence, Inc. $32,750.00 $32,750.00 Estes Bros. Const., Inc. $36,000.00 $36,000.00 Allegheny Construction Company, Inc. $75,000.00 $75,000.00 Bluegrass Contracting Corporation $50,000.00 $50,000.00 MC3 Solutions, LLC $83,647.00 $83,647.00 Central Southern Construction Corp. $50,000.00 $50,000.00 Kovilic Construction Company, Inc. $40,000.00 $40,000.00 Engineer's Estimate 1 EACH $50,000.00 $50,000.00

B4100 64702-3500 MITIGATION, STORMWATER MANAGEMENT, DRY SWALE (GRAVEL DIAPHRAGM)

King General Contractors, Inc. $189.09 $89,628.66 Howard W. Pence, Inc. $163.75 $77,617.50 Estes Bros. Const., Inc. $98.90 $46,878.60 Allegheny Construction Company, Inc. $115.00 $54,510.00 Bluegrass Contracting Corporation $50.00 $23,700.00 MC3 Solutions, LLC $69.89 $33,127.86 Central Southern Construction Corp. $250.00 $118,500.00 Kovilic Construction Company, Inc. $100.00 $47,400.00 Engineer's Estimate 474 LNFT $180.00 $85,320.00

B4200 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (LIGNITE MINES ROAD - MP 0.6)

King General Contractors, Inc. Lump Sum $22,569.81 Howard W. Pence, Inc. Lump Sum $23,580.00 Estes Bros. Const., Inc. Lump Sum $16,688.00 Allegheny Construction Company, Inc. Lump Sum $33,000.00 Bluegrass Contracting Corporation Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $20,339.00 Central Southern Construction Corp. Lump Sum $75,000.00 Kovilic Construction Company, Inc. Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $21,000.00

26 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B4300 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (LIGNITE MINES ROAD - MP 6.7)

King General Contractors, Inc. Lump Sum $15,516.10 Howard W. Pence, Inc. Lump Sum $23,580.00 Estes Bros. Const., Inc. Lump Sum $16,688.00 Allegheny Construction Company, Inc. Lump Sum $33,000.00 Bluegrass Contracting Corporation Lump Sum $85,000.00 MC3 Solutions, LLC Lump Sum $16,958.00 Central Southern Construction Corp. Lump Sum $75,000.00 Kovilic Construction Company, Inc. Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00

Total Schedule - All Items

King General Contractors, Inc. $1,863,554.48 Howard W. Pence, Inc. $1,943,852.45 Estes Bros. Const., Inc. $1,944,078.07 Allegheny Construction Company, Inc. $2,197,575.00 Bluegrass Contracting Corporation $2,340,685.00 MC3 Solutions, LLC $2,368,145.70 Central Southern Construction Corp. $2,380,765.00 Kovilic Construction Company, Inc. $2,685,875.00 Engineer's Estimate $1,660,000.00

27 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: C

Schedule Type: Options

Solcitation No: 693C73-23-B-000011

Division: Eastern Federal Lands

State: VA County: Pulaski, Botetourt, Craig

Federal Land: George Washington and Jefferson National Forests Opened at: Ashburn, Virginia

Opened by: Kaitlin Welch

Date: 06/13/23

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

King General Contractors, Inc. $2,242,207.59 250 Bob Morrison Blvd Bristol Virginia 24201

Estes Bros. Const., Inc. $2,544,864.43 126 Sugar Run Road Jonesville Virginia 24263

Howard W. Pence, Inc. $2,574,138.12 342 East Dixie Avenue Elizabethtown Kentucky 42701

Central Southern Construction Corp. $2,797,350.00 119 Sewald Street Jacksonville Florida 32204

MC3 Solutions, LLC $2,927,006.11 8772 Roanoke Road Elliston Virginia 24087

Allegheny Construction Company, Inc. $2,965,340.00 2830 Nicholas Avenue NE Roanoke Virginia 24012

Bluegrass Contracting Corporation $3,296,395.00 1075 Red Mile Road Lexington Kentucky 40504

Kovilic Construction Company, Inc. ( $3,471,250.00 ) no 3721 N. Carnation Street Franklin Park Illinois 60131

Engineer's Estimate $2,280,000.00

Kaitlin Welch

Contract Specialist

King General Contractors, Inc. 7/05/2023

28 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C1000 15101-0000 MOBILIZATION

King General Contractors, Inc. Lump Sum $137,582.00 Estes Bros. Const., Inc. Lump Sum $829,000.00 Howard W. Pence, Inc. Lump Sum $185,250.00 Central Southern Construction Corp. Lump Sum $150,000.00 MC3 Solutions, LLC Lump Sum $284,939.00 Allegheny Construction Company, Inc. Lump Sum $210,000.00 Bluegrass Contracting Corporation Lump Sum $330,000.00 Kovilic Construction Company, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $296,579.50

C1100 15201-0000 CONSTRUCTION SURVEY AND STAKING

King General Contractors, Inc. Lump Sum $28,071.32 Estes Bros. Const., Inc. Lump Sum $238,000.00 Howard W. Pence, Inc. Lump Sum $43,225.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $42,860.00 Allegheny Construction Company, Inc. Lump Sum $100,000.00 Bluegrass Contracting Corporation Lump Sum $68,000.00 Kovilic Construction Company, Inc. Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $55,000.00

C1200 15401-0000 CONTRACTOR TESTING

King General Contractors, Inc. Lump Sum $35,623.50 Estes Bros. Const., Inc. Lump Sum $238,000.00 Howard W. Pence, Inc. Lump Sum $43,225.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $17,548.00 Allegheny Construction Company, Inc. Lump Sum $125,000.00 Bluegrass Contracting Corporation Lump Sum $84,000.00 Kovilic Construction Company, Inc. Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $45,000.00

C1300 15705-0100 SOIL EROSION CONTROL, SILT FENCE

King General Contractors, Inc. $9.48 $8,295.00 Estes Bros. Const., Inc. $10.11 $8,846.25 Howard W. Pence, Inc. $7.41 $6,483.75 Central Southern Construction Corp. $15.00 $13,125.00 MC3 Solutions, LLC $8.35 $7,306.25 Allegheny Construction Company, Inc. $15.00 $13,125.00 Bluegrass Contracting Corporation $11.00 $9,625.00 Kovilic Construction Company, Inc. $10.00 $8,750.00 Engineer's Estimate 875 LNFT $9.75 $8,531.25

29 out of 37

Project No: VA ERFO FS 2018-1(2), 2(1)

Project Name: Lignite Mines Road, Pond Lick Road, and Tub Run Road Repairs

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C1400 20103-0000 CLEARING AND GRUBBING

King General Contractors, Inc. $85.97 $131,534.10 Estes Bros. Const., Inc. $13.00 $19,890.00 Howard W. Pence, Inc. $14.82 $22,674.60 Central Southern Construction Corp. $20.00 $30,600.00 MC3 Solutions, LLC $29.54 $45,196.20 Allegheny Construction Company, Inc. $28.00 $42,840.00 Bluegrass Contracting Corporation $18.00 $27,540.00 Kovilic Construction Company, Inc. $10.00 $15,300.00 Engineer's Estimate 1,530 SQYD $13.00 $19,890.00

C1500 20213-0000 ROADSIDE CLEANUP

King General Contractors, Inc. $4,365.47 $61,989.67 Estes Bros. Const., Inc. $6,000.00 $85,200.00 Howard W. Pence, Inc. $17,290.00 $245,518.00 Central Southern Construction Corp. $11,000.00 $156,200.00 MC3 Solutions, LLC $19,148.87 $271,913.95 Allegheny Construction Company, Inc. $18,000.00 $255,600.00 Bluegrass Contracting Corporation $30,500.00 $433,100.00 Kovilic Construction Company, Inc. $15,000.00 $213,000.00 Engineer's Estimate 14.200 MILE $26,000.00 $369,200.00

C1600 20301-1200 REMOVAL OF HEADWALL

King General Contractors, Inc. $1,852.42 $3,704.84 Estes Bros. Const., Inc. $1,000.00 $2,000.00 Howard W. Pence, Inc. $2,223.00 $4,446.00 Central Southern Construction Corp. $5,000.00 $10,000.00 MC3 Solutions, LLC $1,801.50 $3,603.00 Allegheny Construction Company, Inc.