Tabulation of Bids - TN ERFO FS CHRKE804 2020-2(5).pdf
PDF 752 KB Posted
- Solicitation number
- 693C73-26-C-000015
About this file
BID TABULATION REPORT SUMMARY
This is a Bid Tabulation Report for a U.S. Forest Service construction project to repair storm and flood damage on Citico Creek Road (FS 35-1) and Spring Creek Road (FS 27) in Monroe and Polk Counties, Tennessee within the Cherokee National Forest. The solicitation number is 693C73-26-B-000013, with bids opened on June 30, 2026 at Ashburn, Virginia. The project is managed by the Eastern Federal Lands Division under project number TN ERFO FS CHRKE804 2020-2(5). Five contractors submitted bids for two schedules: Schedule A (Base) and Schedule B (Option).
For Schedule A (Base), bid amounts ranged from $2,534,300.09 (Howard W. Pence, Inc., the lowest bidder) to $7,147,399.03 (Randy Kinder Excavating, Inc.), with the Engineer's Estimate at $2,714,000.00. For Schedule B (Option), bids ranged from $3,462,669.45 (Howard W. Pence, Inc., the lowest bidder) to $5,300,371.56 (Randy Kinder Excavating, Inc.), with the Engineer's Estimate at $3,600,000.00. The total combined base and option bid for the lowest bidder is $5,996,969.54. The contract was awarded to Howard W. Pence, Inc. on July 9, 2026. The detailed line items across both schedules include mobilization, clearing and grubbing, pipe culverts of various sizes, riprap placement, embankment construction, roadway reconditioning, erosion control, and temporary traffic control, totaling numerous specific construction tasks required for the restoration project.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION REPORT
Project No. : TN ERFO FS CHRKE804 2020-2(5) Project Name: Repair storm and flood damage on Citico Creek Road (FS 35-1) and Spring Creek Road (FS 27)
Contractor Responsive? Base Schedule A Randy Kinder Excavating, Inc. $7,147,399.03 Road Worx, Inc. $3,753,960.10 Adams Contracting, Co., Inc. $3,010,077.00 Apex Construction Group, LLC $2,732,291.15 Howard W. Pence, Inc. $2,534,300.09 Engineer's Estimate $2,714,000.00
Contractor Responsive? Total Base Schedule A and Option(s): B Randy Kinder Excavating, Inc. $12,447,770.59 Road Worx, Inc. $8,069,042.85 Adams Contracting, Co., Inc. $7,218,626.00 Apex Construction Group, LLC $6,197,724.45 Howard W. Pence, Inc. $5,996,969.54 Engineer's Estimate $6,314,000.00
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Monique Lynch
Contractor Responsive? Option: B Randy Kinder Excavating, Inc. $5,300,371.56 Road Worx, Inc. $4,315,082.75 Adams Contracting, Co., Inc. $4,208,549.00 Apex Construction Group, LLC $3,465,433.30 Howard W. Pence, Inc. $3,462,669.45 Engineer's Estimate $3,600,000.00
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Project No. : TN ERFO FS
CHRKE804 2020-2(5)
Project Name: Repair storm and flood damage on Citico Creek Road (FS 35-1) and Spring Creek Road (FS 27)
Division: Eastern Federal Lands
Schedule: A Schedule Type: Base Lead Designer:
Solicitation No. : 693C73-26-B-000013 Opened at: Ashburn, Virginia Opened by: Monique Lynch State: TN County: Monroe, Polk Federal Land: Cherokee National
Forest Bid Open Date and Time: 06/30/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive Randy Kinder Excavating, Inc., 12965 Carrier Lane, Dexter, MO, 63841
$7,147,399.03
Road Worx, Inc., 190 Longfield Road, Rocky Top, TN, 37769
$3,753,960.10
Adams Contracting, Co., Inc., 1225 Sweetwater Road, Robbinsville, NC, 28771
$3,010,077.00
Apex Construction Group, LLC, 201 E Broadway ST,, Suite C, Lenoir, TN, 37771
$2,732,291.15
Howard W. Pence, Inc., 342 East Dixie Avenue, Elizabethtown, KY, 42701
$2,534,300.09
Engineer's Estimate $2,714,000.00
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Monique Lynch
Monique Lynch
Contract Specialist
6/30/26
Howard W. Pence 7/9/2026
Project No. : TN ERFO FS CHRKE804 2020-2(5) Project Name: Repair storm and flood damage on Citico Creek Road (FS 35-1) and Spring Creek Road (FS 27)
Schedule: A Schedule Type: Base
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION Road Worx, Inc. $884,215.00 Randy Kinder Excavating, Inc. $446,173.00
Apex Construction Group, LLC $264,572.00
Adams Contracting, Co., Inc. $250,000.00
Howard W. Pence, Inc. $222,176.00
Engineer's Estimate ALL LPSM LPSM $339,101.75
A0040 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Randy Kinder Excavating, Inc. $87,641.13
Road Worx, Inc. $78,000.00 Adams Contracting, Co., Inc. $65,000.00
Howard W. Pence, Inc. $40,633.00
Apex Construction Group, LLC $18,814.00
Engineer's Estimate ALL LPSM LPSM $61,100.00
A0060 15401-0000 CONTRACTOR
TESTING
Randy Kinder Excavating, Inc. $71,706.38
Adams Contracting, Co., Inc. $60,000.00
Road Worx, Inc. $60,000.00 Howard W. Pence, Inc. $40,633.00
Apex Construction Group, LLC $37,628.00
Engineer's Estimate ALL LPSM LPSM $45,300.00
A0080 15701-0000 SOIL EROSION
CONTROL
Randy Kinder Excavating, Inc. $159,347.50
Adams Contracting, Co., Inc. $75,000.00
Apex Construction Group, LLC $39,980.00
Howard W. Pence, Inc. $29,953.00
Road Worx, Inc. $21,900.00 Engineer's Estimate ALL LPSM LPSM $66,200.00
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0100 20101-0000 CLEARING AND
GRUBBING
Randy Kinder Excavating, Inc. 1.000 $30,594.72 $30,594.72
Road Worx, Inc. 1.000 $22,000.00 $22,000.00 Apex Construction Group, LLC 1.000 $17,638.00 $17,638.00
Howard W. Pence, Inc. 1.000 $14,950.00 $14,950.00
Adams Contracting, Co., Inc. 1.000 $11,500.00 $11,500.00
Engineer's Estimate 1.000 ACRE $17,800.00 $17,800.00 A0120 20104-0000 CLEARING Randy Kinder
Excavating, Inc. 9.000 $24,698.87 $222,289.83
Road Worx, Inc. 9.000 $22,000.00 $198,000.00 Adams Contracting, Co., Inc. 9.000 $20,000.00 $180,000.00
Apex Construction Group, LLC 9.000 $10,583.00 $95,247.00
Howard W. Pence, Inc. 9.000 $6,407.00 $57,663.00
Engineer's Estimate 9.000 ACRE $12,200.00 $109,800.00
A0140 20301-1900 REMOVAL OF PIPE
CULVERT
Randy Kinder Excavating, Inc. 29.000 $4,461.73 $129,390.17
Howard W. Pence, Inc. 29.000 $2,135.00 $61,915.00
Adams Contracting, Co., Inc. 29.000 $2,100.00 $60,900.00
Road Worx, Inc. 29.000 $814.00 $23,606.00 Apex Construction Group, LLC 29.000 $412.00 $11,948.00
Engineer's Estimate 29.000 EACH $3,100.00 $89,900.00
A0160 20420-0000 EMBANKMENT
CONSTRUCTION
Randy Kinder Excavating, Inc. 1,127.000 $119.51 $134,687.77
Road Worx, Inc. 1,127.000 $76.15 $85,821.05 Apex Construction Group, LLC 1,127.000 $76.00 $85,652.00
Howard W. Pence, Inc. 1,127.000 $64.00 $72,128.00
Adams Contracting, Co., Inc. 1,127.000 $60.00 $67,620.00
Engineer's Estimate 1,127.000 CUYD $103.00 $116,081.00
A0180 25101-0200 PLACED RIPRAP,
CLASS 2
Adams Contracting, Co., Inc. 166.000 $300.00 $49,800.00
Randy Kinder Excavating, Inc. 166.000 $270.89 $44,967.74
Road Worx, Inc. 166.000 $162.30 $26,941.80 Apex Construction Group, LLC 166.000 $147.00 $24,402.00
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0180 25101-0200 PLACED RIPRAP,
CLASS 2
Howard W. Pence, Inc. 166.000 $138.00 $22,908.00
Engineer's Estimate 166.000 CUYD $177.00 $29,382.00
A0200 25101-0300 PLACED RIPRAP,
CLASS 3
Randy Kinder Excavating, Inc. 103.000 $326.66 $33,645.98
Adams Contracting, Co., Inc. 103.000 $325.00 $33,475.00
Road Worx, Inc. 103.000 $201.40 $20,744.20 Apex Construction Group, LLC 103.000 $147.00 $15,141.00
Howard W. Pence, Inc. 103.000 $138.00 $14,214.00
Engineer's Estimate 103.000 CUYD $200.00 $20,600.00
A0220 25101-0400 PLACED RIPRAP,
CLASS 4
Adams Contracting, Co., Inc. 416.000 $400.00 $166,400.00
Randy Kinder Excavating, Inc. 416.000 $374.46 $155,775.36
Road Worx, Inc. 416.000 $161.25 $67,080.00 Howard W. Pence, Inc. 416.000 $160.00 $66,560.00
Apex Construction Group, LLC 416.000 $147.00 $61,152.00
Engineer's Estimate 416.000 CUYD $215.00 $89,440.00
A0240 25101-0500 PLACED RIPRAP,
CLASS 5
Randy Kinder Excavating, Inc. 131.000 $454.14 $59,492.34
Adams Contracting, Co., Inc. 131.000 $425.00 $55,675.00
Road Worx, Inc. 131.000 $344.00 $45,064.00 Howard W. Pence, Inc. 131.000 $160.00 $20,960.00
Apex Construction Group, LLC 131.000 $159.00 $20,829.00
Engineer's Estimate 131.000 CUYD $375.00 $49,125.00
A0260 30101-2000 AGGREGATE BASE
GRADING D
Randy Kinder Excavating, Inc. 15,066.000 $95.61 $1,440,460.26
Road Worx, Inc. 15,066.000 $67.45 $1,016,201.70 Howard W. Pence, Inc. 15,066.000 $64.50 $971,757.00
Adams Contracting, Co., Inc. 15,066.000 $62.00 $934,092.00
Apex Construction Group, LLC 15,066.000 $61.00 $919,026.00
Engineer's Estimate 15,066.000 TON $46.00 $693,036.00
A0300 30301-6000 ROADWAY
RECONDITIONING
Randy Kinder Excavating, Inc. 5.090 $51,787.93 $263,600.56
Howard W. Pence, Inc. 5.090 $29,901.00 $152,196.09
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0300 30301-6000 ROADWAY
RECONDITIONING
Apex Construction Group, LLC 5.090 $12,935.00 $65,839.15
Adams Contracting, Co., Inc. 5.090 $11,500.00 $58,535.00
Road Worx, Inc. 5.090 $10,850.00 $55,226.50 Engineer's Estimate 5.090 MILE $10,825.00 $55,099.25
A0320 30302-1000 DITCH
RECONDITIONING
Apex Construction Group, LLC 26.000 $159.00 $4,134.00
Randy Kinder Excavating, Inc. 26.000 $135.44 $3,521.44
Howard W. Pence, Inc. 26.000 $128.00 $3,328.00
Adams Contracting, Co., Inc. 26.000 $25.00 $650.00
Road Worx, Inc. 26.000 $17.50 $455.00 Engineer's Estimate 26.000 LNFT $23.00 $598.00
A0340 31302-0600 AGGREGATE-
TOPSOIL COURSE, 6
-INCH DEPTH
Apex Construction Group, LLC 127.000 $129.00 $16,383.00
Howard W. Pence, Inc. 127.000 $107.00 $13,589.00
Road Worx, Inc. 127.000 $58.60 $7,442.20 Randy Kinder Excavating, Inc. 127.000 $55.77 $7,082.79
Adams Contracting, Co., Inc. 127.000 $40.00 $5,080.00
Engineer's Estimate 127.000 SQYD $31.00 $3,937.00
A0360 60201-0800 24-INCH PIPE
CULVERT
Randy Kinder Excavating, Inc. 787.000 $334.63 $263,353.81
Adams Contracting, Co., Inc. 787.000 $200.00 $157,400.00
Apex Construction Group, LLC 787.000 $182.00 $143,234.00
Howard W. Pence, Inc. 787.000 $160.00 $125,920.00
Road Worx, Inc. 787.000 $157.25 $123,755.75 Engineer's Estimate 787.000 LNFT $240.00 $188,880.00
A0380 60201-0900 30-INCH PIPE
CULVERT
Randy Kinder Excavating, Inc. 46.000 $430.24 $19,791.04
Adams Contracting, Co., Inc. 46.000 $300.00 $13,800.00
Howard W. Pence, Inc. 46.000 $235.00 $10,810.00
Apex Construction Group, LLC 46.000 $218.00 $10,028.00
Road Worx, Inc. 46.000 $196.60 $9,043.60 Engineer's Estimate 46.000 LNFT $290.00 $13,340.00
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0400 60201-1000 36-INCH PIPE
CULVERT
Randy Kinder Excavating, Inc. 30.000 $478.04 $14,341.20
Adams Contracting, Co., Inc. 30.000 $375.00 $11,250.00
Road Worx, Inc. 30.000 $281.70 $8,451.00 Apex Construction Group, LLC 30.000 $270.00 $8,100.00
Howard W. Pence, Inc. 30.000 $267.00 $8,010.00
Engineer's Estimate 30.000 LNFT $255.00 $7,650.00
A0420 60201-1100 42-INCH PIPE
CULVERT
Randy Kinder Excavating, Inc. 76.000 $589.58 $44,808.08
Adams Contracting, Co., Inc. 76.000 $500.00 $38,000.00
Howard W. Pence, Inc. 76.000 $299.00 $22,724.00
Apex Construction Group, LLC 76.000 $288.00 $21,888.00
Road Worx, Inc. 76.000 $241.95 $18,388.20 Engineer's Estimate 76.000 LNFT $410.00 $31,160.00
A0440 60202-0900 54-INCH
EQUIVALENT
DIAMETER ARCH
OR ELLIPTICAL PIPE
CULVERT
Randy Kinder Excavating, Inc. 30.000 $1,673.15 $50,194.50
Adams Contracting, Co., Inc. 30.000 $600.00 $18,000.00
Road Worx, Inc. 30.000 $552.55 $16,576.50 Apex Construction Group, LLC 30.000 $482.00 $14,460.00
Howard W. Pence, Inc. 30.000 $480.00 $14,400.00
Engineer's Estimate 30.000 LNFT $609.00 $18,270.00
A0460 60220-1800 8 FEET SPAN, 4
FEET RISE PRECAST
REINFORCED
CONCRETE BOX
CULVERT
Randy Kinder Excavating, Inc. 52.000 $6,373.90 $331,442.80
Road Worx, Inc. 52.000 $3,844.30 $199,903.60 Adams Contracting, Co., Inc. 52.000 $3,000.00 $156,000.00
Howard W. Pence, Inc. 52.000 $2,777.00 $144,404.00
Apex Construction Group, LLC 52.000 $2,705.00 $140,660.00
Engineer's Estimate 52.000 LNFT $4,245.00 $220,740.00
A0480 60220-1850 8 FEET SPAN, 5
FEET RISE PRECAST
REINFORCED
CONCRETE BOX
CULVERT
Randy Kinder Excavating, Inc. 64.000 $7,569.01 $484,416.64
Road Worx, Inc. 64.000 $4,518.70 $289,196.80 Adams Contracting, Co., Inc. 64.000 $3,200.00 $204,800.00
Howard W. Pence, Inc. 64.000 $2,777.00 $177,728.00
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0480 60220-1850 8 FEET SPAN, 5
FEET RISE PRECAST
REINFORCED
CONCRETE BOX
CULVERT
Apex Construction Group, LLC 64.000 $2,587.00 $165,568.00
Engineer's Estimate 64.000 LNFT $2,860.00 $183,040.00
A0500 60302-0000 STRUCTURAL
PLATE PIPE ARCH
(12 FEET & 3
INCHES SPAN, 4
FEET & 5 INCHES
RISE)
Randy Kinder Excavating, Inc. 24.000 $84,254.99 $2,022,119.76
Apex Construction Group, LLC 24.000 $7,643.00 $183,432.00
Road Worx, Inc. 24.000 $5,981.60 $143,558.40 Howard W. Pence, Inc. 24.000 $2,990.00 $71,760.00
Adams Contracting, Co., Inc. 24.000 $2,750.00 $66,000.00
Engineer's Estimate 24.000 LNFT $3,500.00 $84,000.00
A0520 60302-0000 STRUCTURAL
PLATE PIPE ARCH
(18 FEET & 3
INCHES SPAN, 4
FEET & 7 INCHES
RISE)
Randy Kinder Excavating, Inc. 26.000 $10,357.58 $269,297.08
Apex Construction Group, LLC 26.000 $9,113.00 $236,938.00
Road Worx, Inc. 26.000 $7,041.10 $183,068.60 Howard W. Pence, Inc. 26.000 $3,631.00 $94,406.00
Adams Contracting, Co., Inc. 26.000 $3,100.00 $80,600.00
Engineer's Estimate 26.000 LNFT $4,000.00 $104,000.00
A0540 60704-0000 CLEANING
CULVERT IN PLACE
Randy Kinder Excavating, Inc. 12.000 $3,744.67 $44,936.04
Howard W. Pence, Inc. 12.000 $1,922.00 $23,064.00
Adams Contracting, Co., Inc. 12.000 $1,500.00 $18,000.00
Road Worx, Inc. 12.000 $667.10 $8,005.20 Apex Construction Group, LLC 12.000 $412.00 $4,944.00
Engineer's Estimate 12.000 EACH $2,475.00 $29,700.00
A0560 62501-0000 TURF
ESTABLISHMENT
Randy Kinder Excavating, Inc. 0.500 $35,056.45 $17,528.23
Road Worx, Inc. 0.500 $31,450.00 $15,725.00 Apex Construction Group, LLC 0.500 $21,166.00 $10,583.00
Howard W. Pence, Inc. 0.500 $6,942.00 $3,471.00
Adams Contracting, Co., Inc. 0.500 $5,000.00 $2,500.00
Engineer's Estimate 0.500 ACRE $10,740.00 $5,370.00
A0580 63501-0000 TEMPORARY
TRAFFIC CONTROL
Randy Kinder Excavating, Inc. $191,217.00
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0580 63501-0000 TEMPORARY
TRAFFIC CONTROL
Adams Contracting, Co., Inc. $120,000.00
Road Worx, Inc. $33,400.00 Apex Construction Group, LLC $23,518.00
Howard W. Pence, Inc. $16,020.00
Engineer's Estimate ALL LPSM LPSM $38,700.00 A0600 63701-0000 FIELD OFFICE Randy Kinder
Excavating, Inc. 1.000 $103,575.88 $103,575.88
Road Worx, Inc. 1.000 $92,190.00 $92,190.00 Apex Construction Group, LLC 1.000 $70,553.00 $70,553.00
Adams Contracting, Co., Inc. 1.000 $50,000.00 $50,000.00
Howard W. Pence, Inc. 1.000 $16,020.00 $16,020.00
Engineer's Estimate 1.000 EACH $2,650.00 $2,650.00
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Project No. : TN ERFO FS
CHRKE804 2020-2(5)
Project Name: Repair storm and flood damage on Citico Creek Road (FS 35-1) and Spring Creek Road (FS 27)
Division: Eastern Federal Lands
Schedule: B Schedule Type: Option Lead Designer:
Solicitation No. : 693C73-26-B-000013 Opened at: Ashburn, Virginia Opened by: Monique Lynch State: TN County: Monroe, Polk Federal Land: Cherokee National
Forest Bid Open Date and Time: 06/30/2026
Contract Awarded to: Award Date:
Contractor Comment Bid Amount Responsive Randy Kinder Excavating, Inc., 12965 Carrier Lane, Dexter, MO, 63841
$5,300,371.56
Road Worx, Inc., 190 Longfield Road, Rocky Top, TN, 37769
$4,315,082.75
Adams Contracting, Co., Inc., 1225 Sweetwater Road, Robbinsville, NC, 28771
$4,208,549.00
Apex Construction Group, LLC, 201 E Broadway ST,, Suite C, Lenoir, TN, 37771
$3,465,433.30
Howard W. Pence, Inc., 342 East Dixie Avenue, Elizabethtown, KY, 42701
$3,462,669.45
Engineer's Estimate $3,600,000.00
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Date:
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Monique Lynch
Monique Lynch
Contract Specialist
6/30/26
Howard W. Pence 7/9/2026
Project No. : TN ERFO FS CHRKE804 2020-2(5) Project Name: Repair storm and flood damage on Citico Creek Road (FS 35-1) and Spring Creek Road (FS 27)
Schedule: B Schedule Type: Option
Line Item Number
Pay Item Number Description Contractor Quantity Unit Unit Price Amount
B0020 15101-0000 MOBILIZATION Road Worx, Inc. $494,535.00 Randy Kinder Excavating, Inc. $399,807.77
Adams Contracting, Co., Inc. $295,000.00
Howard W. Pence, Inc. $215,580.00
Apex Construction Group, LLC $192,931.00
Engineer's Estimate ALL LPSM LPSM $449,395.50
B0040 15201-0000 CONSTRUCTION
SURVEY AND
STAKING
Adams Contracting, Co., Inc. $200,000.00
Randy Kinder Excavating, Inc. $88,192.89
Road Worx, Inc. $78,000.00 Howard W. Pence, Inc. $32,037.00
Apex Construction Group, LLC $23,386.00
Engineer's Estimate ALL LPSM LPSM $81,000.00
B0060 15401-0000 CONTRACTOR
TESTING
Randy Kinder Excavating, Inc. $76,433.84
Adams Contracting, Co., Inc. $75,000.00
Road Worx, Inc. $60,000.00 Apex Construction Group, LLC $43,263.00
Howard W. Pence, Inc. $32,037.00
Engineer's Estimate ALL LPSM LPSM $60,000.00
B0080 15701-0000 SOIL EROSION
CONTROL
Randy Kinder Excavating, Inc. $182,265.31
Adams Contracting, Co., Inc. $125,000.00
Apex Construction Group, LLC $39,756.00
Howard W. Pence, Inc. $21,358.00
Road Worx, Inc. $17,970.40 Engineer's Estimate ALL LPSM LPSM $62,200.00
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0100 20101-0000 CLEARING AND
GRUBBING
Randy Kinder Excavating, Inc. 1.100 $22,577.38 $24,835.12
Road Worx, Inc. 1.100 $22,000.00 $24,200.00 Apex Construction Group, LLC 1.100 $17,539.00 $19,292.90
Howard W. Pence, Inc. 1.100 $14,950.00 $16,445.00
Adams Contracting, Co., Inc. 1.100 $12,000.00 $13,200.00
Engineer's Estimate 1.100 ACRE $17,730.00 $19,503.00 B0120 20104-0000 CLEARING Adams Contracting, Co., Inc. 16.200 $25,000.00 $405,000.00
Road Worx, Inc. 16.200 $22,000.00 $356,400.00 Randy Kinder Excavating, Inc. 16.200 $18,226.53 $295,269.79
Apex Construction Group, LLC 16.200 $10,524.00 $170,488.80
Howard W. Pence, Inc. 16.200 $6,407.00 $103,793.40
Engineer's Estimate 16.200 ACRE $12,170.00 $197,154.00
B0140 20301-1900 REMOVAL OF PIPE
CULVERT
Randy Kinder Excavating, Inc. 21.000 $3,292.54 $69,143.34
Howard W. Pence, Inc. 21.000 $2,136.00 $44,856.00
Adams Contracting, Co., Inc. 21.000 $2,100.00 $44,100.00
Road Worx, Inc. 21.000 $1,405.25 $29,510.25 Apex Construction Group, LLC 21.000 $409.00 $8,589.00
Engineer's Estimate 21.000 EACH $3,100.00 $65,100.00
B0160 20420-0000 EMBANKMENT
CONSTRUCTION
Randy Kinder Excavating, Inc. 602.000 $88.19 $53,090.38
Apex Construction Group, LLC 602.000 $76.00 $45,752.00
Road Worx, Inc. 602.000 $68.85 $41,447.70 Adams Contracting, Co., Inc. 602.000 $60.00 $36,120.00
Howard W. Pence, Inc. 602.000 $54.00 $32,508.00
Engineer's Estimate 602.000 CUYD $103.00 $62,006.00 B0180 20443-0000 BERMS Randy Kinder
Excavating, Inc. 6.000 $235.18 $1,411.08
Apex Construction Group, LLC 6.000 $146.00 $876.00
Road Worx, Inc. 6.000 $131.30 $787.80 Howard W. Pence, Inc. 6.000 $107.00 $642.00
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0180 20443-0000 BERMS Adams Contracting, Co., Inc. 6.000 $100.00 $600.00
Engineer's Estimate 6.000 LNFT $116.00 $696.00
B0200 25101-0200 PLACED RIPRAP,
CLASS 2
Adams Contracting, Co., Inc. 181.000 $300.00 $54,300.00
Randy Kinder Excavating, Inc. 181.000 $199.90 $36,181.90
Road Worx, Inc. 181.000 $183.20 $33,159.20 Apex Construction Group, LLC 181.000 $146.00 $26,426.00
Howard W. Pence, Inc. 181.000 $128.00 $23,168.00
Engineer's Estimate 181.000 CUYD $176.00 $31,856.00
B0220 25101-0300 PLACED RIPRAP,
CLASS 3
Adams Contracting, Co., Inc. 38.000 $325.00 $12,350.00
Randy Kinder Excavating, Inc. 38.000 $241.06 $9,160.28
Road Worx, Inc. 38.000 $231.80 $8,808.40 Apex Construction Group, LLC 38.000 $146.00 $5,548.00
Howard W. Pence, Inc. 38.000 $128.00 $4,864.00
Engineer's Estimate 38.000 CUYD $200.00 $7,600.00
B0240 25101-0400 PLACED RIPRAP,
CLASS 4
Adams Contracting, Co., Inc. 65.000 $400.00 $26,000.00
Randy Kinder Excavating, Inc. 65.000 $276.34 $17,962.10
Road Worx, Inc. 65.000 $188.05 $12,223.25 Howard W. Pence, Inc. 65.000 $161.00 $10,465.00
Apex Construction Group, LLC 65.000 $146.00 $9,490.00
Engineer's Estimate 65.000 CUYD $213.00 $13,845.00 B0260 25110-0000 GROUTED RIPRAP Howard W. Pence, Inc. 78.000 $855.00 $66,690.00
Road Worx, Inc. 78.000 $660.65 $51,530.70 Adams Contracting, Co., Inc. 78.000 $500.00 $39,000.00
Randy Kinder Excavating, Inc. 78.000 $470.36 $36,688.08
Apex Construction Group, LLC 78.000 $468.00 $36,504.00
Engineer's Estimate 78.000 CUYD $385.00 $30,030.00
B0280 25201-0000 SPECIAL ROCK
EMBANKMENT
Road Worx, Inc. 121.000 $625.65 $75,703.65 Randy Kinder Excavating, Inc. 121.000 $376.29 $45,531.09
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0280 25201-0000 SPECIAL ROCK
EMBANKMENT
Apex Construction Group, LLC 121.000 $351.00 $42,471.00
Howard W. Pence, Inc. 121.000 $320.00 $38,720.00
Adams Contracting, Co., Inc. 121.000 $250.00 $30,250.00
Engineer's Estimate 121.000 CUYD $475.00 $57,475.00
B0300 25201-0000 SPECIAL ROCK
EMBANKMENT
(WITH GEOGRID)
Road Worx, Inc. 560.000 $520.90 $291,704.00 Randy Kinder Excavating, Inc. 560.000 $505.64 $283,158.40
Howard W. Pence, Inc. 560.000 $374.00 $209,440.00
Adams Contracting, Co., Inc. 560.000 $300.00 $168,000.00
Apex Construction Group, LLC 560.000 $292.00 $163,520.00
Engineer's Estimate 560.000 CUYD $636.00 $356,160.00
B0320 25501-1000 MECHANICALLY
STABILIZED EARTH
WALL, WELDED
WIRE FACE
Adams Contracting, Co., Inc. 288.000 $275.00 $79,200.00
Apex Construction Group, LLC 288.000 $234.00 $67,392.00
Randy Kinder Excavating, Inc. 288.000 $217.54 $62,651.52
Road Worx, Inc. 288.000 $195.30 $56,246.40 Howard W. Pence, Inc. 288.000 $129.00 $37,152.00
Engineer's Estimate 288.000 SQFT $148.00 $42,624.00
B0340 25701-0000 CONTRACTOR
PROVIDED
RETAINING
STRUCTURE
DESIGN
Randy Kinder Excavating, Inc. $52,915.73
Howard W. Pence, Inc. $35,000.00
Adams Contracting, Co., Inc. $25,000.00
Road Worx, Inc. $8,000.00 Apex Construction Group, LLC $5,846.00
Engineer's Estimate ALL LPSM LPSM $8,000.00
B0360 26101-0000 REINFORCED SOIL
SLOPE
Randy Kinder Excavating, Inc. 2,726.000 $170.51 $464,810.26
Road Worx, Inc. 2,726.000 $149.55 $407,673.30 Apex Construction Group, LLC 2,726.000 $70.00 $190,820.00
Adams Contracting, Co., Inc. 2,726.000 $38.00 $103,588.00
Howard W. Pence, Inc. 2,726.000 $21.50 $58,609.00
Engineer's Estimate 2,726.000 SQFT $50.00 $136,300.00
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0380 30101-2000 AGGREGATE BASE
GRADING D
Randy Kinder Excavating, Inc. 26,837.000 $70.55 $1,893,350.35
Adams Contracting, Co., Inc. 26,837.000 $68.00 $1,824,916.00
Road Worx, Inc. 26,837.000 $66.50 $1,784,660.50 Howard W. Pence, Inc. 26,837.000 $65.00 $1,744,405.00
Apex Construction Group, LLC 26,837.000 $64.00 $1,717,568.00
Engineer's Estimate 26,837.000 TON $46.00 $1,234,502.00
B0420 30301-6000 ROADWAY
RECONDITIONING
Randy Kinder Excavating, Inc. 9.350 $38,216.91 $357,328.11
Howard W. Pence, Inc. 9.350 $29,901.00 $279,574.35
Apex Construction Group, LLC 9.350 $12,862.00 $120,259.70
Adams Contracting, Co., Inc. 9.350 $11,500.00 $107,525.00
Road Worx, Inc. 9.350 $10,335.00 $96,632.25 Engineer's Estimate 9.350 MILE $10,820.00 $101,167.00
B0440 31302-0600 AGGREGATE-
TOPSOIL COURSE, 6
-INCH DEPTH
Apex Construction Group, LLC 47.000 $158.00 $7,426.00
Howard W. Pence, Inc. 47.000 $107.00 $5,029.00
Road Worx, Inc. 47.000 $82.70 $3,886.90 Randy Kinder Excavating, Inc. 47.000 $41.16 $1,934.52
Adams Contracting, Co., Inc. 47.000 $40.00 $1,880.00
Engineer's Estimate 47.000 SQYD $31.00 $1,457.00
B0460 60201-0800 24-INCH PIPE
CULVERT
Randy Kinder Excavating, Inc. 589.000 $246.94 $145,447.66
Adams Contracting, Co., Inc. 589.000 $200.00 $117,800.00
Apex Construction Group, LLC 589.000 $175.00 $103,075.00
Howard W. Pence, Inc. 589.000 $160.00 $94,240.00
Road Worx, Inc. 589.000 $152.10 $89,586.90 Engineer's Estimate 589.000 LNFT $215.00 $126,635.00
B0480 60201-0900 30-INCH PIPE
CULVERT
Randy Kinder Excavating, Inc. 35.000 $317.49 $11,112.15
Adams Contracting, Co., Inc. 35.000 $300.00 $10,500.00
Howard W. Pence, Inc. 35.000 $235.00 $8,225.00
Road Worx, Inc. 35.000 $232.00 $8,120.00
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0480 60201-0900 30-INCH PIPE
CULVERT
Apex Construction Group, LLC 35.000 $210.00 $7,350.00
Engineer's Estimate 35.000 LNFT $246.00 $8,610.00
B0500 60201-1000 36-INCH PIPE
CULVERT
Adams Contracting, Co., Inc. 35.000 $375.00 $13,125.00
Randy Kinder Excavating, Inc. 35.000 $352.77 $12,346.95
Apex Construction Group, LLC 35.000 $281.00 $9,835.00
Howard W. Pence, Inc. 35.000 $267.00 $9,345.00
Road Worx, Inc. 35.000 $241.45 $8,450.75 Engineer's Estimate 35.000 LNFT $254.00 $8,890.00
B0520 60220-1800 8 FEET SPAN, 4
FEET RISE PRECAST
REINFORCED
CONCRETE BOX
CULVERT
Randy Kinder Excavating, Inc. 24.000 $4,703.62 $112,886.88
Road Worx, Inc. 24.000 $4,397.65 $105,543.60 Apex Construction Group, LLC 24.000 $3,040.00 $72,960.00
Adams Contracting, Co., Inc. 24.000 $3,000.00 $72,000.00
Howard W. Pence, Inc. 24.000 $2,990.00 $71,760.00
Engineer's Estimate 24.000 LNFT $4,243.00 $101,832.00
B0540 60704-0000 CLEANING
CULVERT IN PLACE
Randy Kinder Excavating, Inc. 113.000 $2,763.37 $312,260.81
Howard W. Pence, Inc. 113.000 $2,136.00 $241,368.00
Adams Contracting, Co., Inc. 113.000 $1,500.00 $169,500.00
Road Worx, Inc. 113.000 $708.40 $80,049.20 Apex Construction Group, LLC 113.000 $409.00 $46,217.00
Engineer's Estimate 113.000 EACH $2,472.00 $279,336.00
B0560 62501-0000 TURF
ESTABLISHMENT
Road Worx, Inc. 0.700 $35,277.50 $24,694.25 Randy Kinder Excavating, Inc. 0.700 $25,869.91 $18,108.94
Apex Construction Group, LLC 0.700 $21,047.00 $14,732.90
Howard W. Pence, Inc. 0.700 $6,941.00 $4,858.70
Adams Contracting, Co., Inc. 0.700 $6,000.00 $4,200.00
Engineer's Estimate 0.700 ACRE $10,735.00 $7,514.50
B0580 62903-0000 CELLULAR
CONFINEMENT
SYSTEM
Apex Construction Group, LLC 83.000 $526.00 $43,658.00
Road Worx, Inc. 83.000 $387.45 $32,158.35
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
B0580 62903-0000 CELLULAR
CONFINEMENT
SYSTEM
Randy Kinder Excavating, Inc. 83.000 $223.42 $18,543.86
Adams Contracting, Co., Inc. 83.000 $65.00 $5,395.00
Howard W. Pence, Inc. 83.000 $54.00 $4,482.00
Engineer's Estimate 83.000 SQYD $84.00 $6,972.00
B0600 63501-0000 TEMPORARY
TRAFFIC CONTROL
Apex Construction Group, LLC $230,000.00
Randy Kinder Excavating, Inc. $217,542.46
Adams Contracting, Co., Inc. $150,000.00
Road Worx, Inc. $33,400.00 Howard W. Pence, Inc. $16,018.00
Engineer's Estimate ALL LPSM LPSM $42,140.00
Report Generated on 06/30/2026 3:36 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
File details come from the government source that posted it. Updated .