Tabulation of Bids (Schedules A and B) - PR ER DOT PRMNT RPR(21).pdf

PDF 494 KB Posted

Attached to
Landslide Repairs in Lares, Puerto Rico
Solicitation number
693C73-24-C-000015
Issued by

About this file

This document is a Tabulation of Bids for a federal contract opportunity to perform landslide and road damage repair work in Lares, Puerto Rico. The contract was awarded to Nieves & Nieves Engineers and Contractors, Inc. for a total of $3,798,000, comprising $1,898,000 for Schedule A and $1,900,000 for Schedule B. The solicitation was issued by the Department of Transportation Federal Highway Administration. Key details include the project scope, bid prices from multiple contractors, the engineer's estimate, bid responsiveness, and contractor locations. The document provides a comprehensive overview of the bidding and award process for this federal contract opportunity.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T A B U L A T I O N O F B I D S Schedule A Eastern Federal Lands Highway Division

Project No : PR ER DOT PRMNT RPR(21) FLMA No:

Project Name : Landslide and Road Damage Repair Lares Solicitation No:

State : Puerto Rico County :

Federal Location : PR-128 (HWY-134 AND HWY-140)

Opened at:

Opened by:

Date:

Ashburn, Virginia Emily McCleary

7/2/2024

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date: 2-Jul-24

Contract Awarded to: Award Date:

Contract Number: Data is Public

Contractor Comment Bid Amount Responsive

Engineer's Estimate 2,160,000.00$

JPI Construction, LLC 2,935,045.00$

Novel Construction, LLC 2,150,475.00$

Construcciones Jose Carro, S.E. 2,728,000.00$

LPC Contractors, Inc. 3,043,410.00$

Nieves & Nieves Engineers and Con 1,898,000.00$

MAGLEZ Engineering & Contractors 2,614,578.00$

693C73-24-B-000011

Emily McCleary

Contract Specialist

Yes

Yes

Yes

Yes

No

1738 Calle Amarillo Suite 205, Box 15 San Juan, PR 00926

1513 Las Marias St. Suite 1-A San Juan, PR 00911

Yes

Road PR-510 Km 0.1 Barrio Capitanejo, Ponce, PR 00731

PR-937 Km. 3.0 Bo. Boqueron Las Piedras, PR 00771

Low Bidder Carr. PR-129, Km 27.9 Sector Miján Lares, PR 00669

PR-140 Km. 59.0 Bo. Puerto Blanco Florida, PR 00650

7/2/2024 FHWA Confidential Page 1 of 1

Nieves & Nieves Engineers and Contractors, Inc.

693C73-24-C-000015

24 July 2024

T A B U L A T I O N O F B I D S T A B U L A T I O N O F B I D S 'Bid Tabs'!$F$9:$S$114 'Bid Tabs'!$H$7:$S$7 'Bid Tabs'!$H$3:$S$3 5 2 4 6 1 3

Schedule A Total of Bid Items: 2,160,000.00$ 35.9% 2,935,045.00$ -0.4% 2,150,475.00$ 26.3% 2,728,000.00$ 40.9% 3,043,410.00$ -12.1% 1,898,000.00$ 21.0% 2,614,578.00$ Project No: PR ER DOT PRMNT RPR(21)

Project Name: Landslide and Road Damage Repair Lares CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

1 15001-0000

1 Line A0020 ALL LPSM 45,000.00$ 45,000.00$ 55,000.00$ 20,000.00$ 120,000.00$ 200,000.00$ 20,000.00$ 25,000.00$

2 15100-1000

2 Line A0040 ALL LPSM 117,055.00$ 117,055.00$ 270,000.00$ 230,000.00$ 270,250.00$ 270,000.00$ 156,745.00$ 230,000.00$

3 15102-0000

3 Line A0060 ALL LPSM 170,000.00$ 170,000.00$ 170,000.00$ 170,000.00$ 170,000.00$ 170,000.00$ 170,000.00$ 170,000.00$

4 15401-0000

4 Line A0080 ALL LPSM 42,000.00$ 42,000.00$ 70,000.00$ 40,000.00$ 80,000.00$ 200,000.00$ 50,000.00$ 67,000.00$

5 15401-2000

5 Line A0100 ALL LPSM 110,000.00$ 110,000.00$ 200,000.00$ 25,000.00$ 20,000.00$ 200,000.00$ 1,000.00$ 120,000.00$

6 15501-0000

6 Line A0120 ALL LPSM 25,000.00$ 25,000.00$ 75,000.00$ 40,000.00$ 20,000.00$ 100,000.00$ 16,000.00$ 25,000.00$

7 20100-0000

7 Line A0140 0.50 CUERDA 3,500.00$ 1,750.00$ 12,500.00$ 5,000.00$ 25,000.00$ 15,000.00$ 15,000.00$ 5,000.00$

8 20100-2000

8 Line A0160 5 EACH 400.00$ 2,000.00$ 6,000.00$ 10,000.00$ 2,500.00$ 5,000.00$ 5,000.00$ 17,500.00$

9 20200-0000

9 Line A0180 ALL LPSM 40,000.00$ 40,000.00$ 25,000.00$ 40,000.00$ 57,000.00$ 500,000.00$ 4,000.00$ 37,000.00$

10 20300-0000

10 Line A0200 270 M3 45.00$ 12,150.00$ 16,200.00$ 6,750.00$ 32,400.00$ 2,700.00$ 13,500.00$ 20,250.00$

11 20301-0000

11 Line A0220 950 M3 65.00$ 61,750.00$ 71,250.00$ 61,750.00$ 66,500.00$ 57,000.00$ 61,750.00$ 61,750.00$

12 20500-1000

12 Line A0240 80 M3 60.00$ 4,800.00$ 4,800.00$ 2,400.00$ 12,000.00$ 12,000.00$ 4,000.00$ 6,000.00$

13 20600-1000

13 Line A0260 1,500 M3 30.00$ 45,000.00$ 97,500.00$ 45,000.00$ 105,000.00$ 90,000.00$ 82,500.00$ 142,500.00$

14 20600-7000

14 Line A0280 ALL LPSM 95,000.00$ 95,000.00$ 100,000.00$ 6,000.00$ 40,000.00$ 150,000.00$ 25,000.00$ 300,000.00$

15 21000-2000

15 Line A0300 200 M 10.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$

16 21000-5000

16 Line A0320 40 EACH 15.00$ 600.00$ 600.00$ 600.00$ 600.00$ 600.00$ 600.00$ 600.00$

17 30101-0000

17 Line A0340 105 M3 50.00$ 5,250.00$ 7,875.00$ 6,825.00$ 8,400.00$ 10,500.00$ 6,825.00$ 6,825.00$

18 30500-2000

18 Line A0360 355 M2 250.00$ 88,750.00$ 195,250.00$ 159,750.00$ 248,500.00$ 21,300.00$ 40,825.00$ 212,290.00$

19 40300-2000

19 Line A0380 650 M2 40.00$ 26,000.00$ 35,750.00$ 13,000.00$ 32,500.00$ 6,500.00$ 16,250.00$ 48,750.00$

20 42101-3000

20 Line A0400 145 TON 350.00$ 50,750.00$ 58,000.00$ 50,750.00$ 50,750.00$ 43,500.00$ 47,850.00$ 58,725.00$

21 42101-4000

21 Line A0420 80 TON 350.00$ 28,000.00$ 32,000.00$ 32,000.00$ 28,000.00$ 24,000.00$ 26,400.00$ 33,600.00$

22 60200-0000

22 Line A0440 26,600 LBS 2.50$ 66,500.00$ 79,800.00$ 79,800.00$ 79,800.00$ 79,800.00$ 66,500.00$ 100,548.00$

23 60302-4000

23 Line A0460 30 M 450.00$ 13,500.00$ 15,000.00$ 9,000.00$ 24,000.00$ 15,000.00$ 24,000.00$ 8,700.00$

24 60400-9000

24 Line A0480 2 EACH 7,000.00$ 14,000.00$ 17,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 20,000.00$ 11,700.00$

25 60401-1000

25 Line A0500 2 EACH 7,000.00$ 14,000.00$ 17,000.00$ 20,000.00$ 20,000.00$ 20,000.00$ 19,000.00$ 8,400.00$

26 60402-4000

26 Line A0520 2 EACH 5,000.00$ 10,000.00$ 17,000.00$ 12,000.00$ 20,000.00$ 10,000.00$ 13,000.00$ 6,000.00$

27 60501-2000

27 Line A0540 115 M 32.00$ 3,680.00$ 9,200.00$ 5,750.00$ 13,800.00$ 3,450.00$ 4,600.00$ 11,270.00$

28 60501-3000

28 Line A0560 2 M 150.00$ 300.00$ 160.00$ 100.00$ 300.00$ 60.00$ 80.00$ 196.00$

29 60600-4000

29 Line A0580 85 M 20.00$ 1,700.00$ 5,100.00$ 4,250.00$ 6,800.00$ 2,550.00$ 2,975.00$ 4,250.00$

30 60700-0000

30 Line A0600 55 M 85.00$ 4,675.00$ 9,625.00$ 5,500.00$ 11,000.00$ 6,600.00$ 8,250.00$ 5,500.00$

31 60900-6000

31 Line A0620 20 M 60.00$ 1,200.00$ 4,000.00$ 3,000.00$ 8,000.00$ 1,600.00$ 4,500.00$ 5,000.00$

32 61000-2000

32 Line A0640 75 M 500.00$ 37,500.00$ 60,000.00$ 22,500.00$ 60,000.00$ 37,500.00$ 52,500.00$ 39,375.00$

33 61000-5000

33 Line A0660 90 M 150.00$ 13,500.00$ 72,000.00$ 27,000.00$ 108,000.00$ 18,000.00$ 54,000.00$ 51,750.00$

34 61101-0000

34 Line A0680 15 MO 4,500.00$ 67,500.00$ 75,000.00$ 67,500.00$ 90,000.00$ 15,000.00$ 82,500.00$ 82,500.00$

35 61300-1000

35 Line A0700 2 EACH 920.00$ 1,840.00$ 1,800.00$ 1,600.00$ 1,000.00$ 6,000.00$ 2,600.00$ 1,334.00$

36 61700-6000

36 Line A0720 90 M2 150.00$ 13,500.00$ 18,000.00$ 18,000.00$ 27,000.00$ 5,400.00$ 11,250.00$ 22,500.00$

37 61700-8000

37 Line A0740 125 M2 120.00$ 15,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 7,500.00$ 15,625.00$ 31,250.00$

38 61700-9000

38 Line A0760 25 M3 160.00$ 4,000.00$ 2,500.00$ 1,500.00$ 2,500.00$ 3,750.00$ 1,375.00$ 3,125.00$

39 61800-2000

39 Line A0780 310 M 10.00$ 3,100.00$ 6,820.00$ 4,650.00$ 7,750.00$ 6,200.00$ 6,200.00$ 5,580.00$

40 62100-2000

40 Line A0800 2 EACH 200.00$ 400.00$ 1,800.00$ 500.00$ 1,000.00$ 1,000.00$ 1,500.00$ 1,000.00$

41 62100-3000

41 Line A0820 4 EACH 350.00$ 1,400.00$ 920.00$ 1,200.00$ 400.00$ 400.00$ 400.00$ 200.00$

42 62200-5000

42 Line A0840 15 M3 120.00$ 1,800.00$ 1,875.00$ 3,000.00$ 3,750.00$ 3,000.00$ 750.00$ 1,875.00$

43 62201-7000

43 Line A0860 10 M3 350.00$ 3,500.00$ 5,000.00$ 2,500.00$ 8,000.00$ 10,000.00$ 8,500.00$ 4,750.00$

44 62202-1000

44 Line A0880 15 M3 250.00$ 3,750.00$ 7,500.00$ 3,750.00$ 15,000.00$ 15,000.00$ 12,750.00$ 7,125.00$

45 62500-1000

45 Line A0900 40 M3 60.00$ 2,400.00$ 2,400.00$ 2,400.00$ 400.00$ 3,200.00$ 400.00$ 3,800.00$

46 62600-0000

46 Line A0920 4,500 EACH 8.00$ 36,000.00$ 40,500.00$ 54,000.00$ 45,000.00$ 45,000.00$ 15,750.00$ 67,500.00$

47 63800-1000

47 Line A0940 ALL LPSM 300,000.00$ 300,000.00$ 350,000.00$ 300,000.00$ 250,000.00$ 240,000.00$ 160,000.00$ 30,000.00$

48 66100-1000

48 Line A0960 4 EACH 4,000.00$ 16,000.00$ 14,000.00$ 20,000.00$ 20,000.00$ 4,000.00$ 16,000.00$ 20,000.00$

49 91200-0000

49 Line A0980 210 M2 50.00$ 10,500.00$ 42,000.00$ 3,150.00$ 10,500.00$ 6,300.00$ 5,250.00$ 9,450.00$

50 92400-1000

50 Line A1000 380 M2 5.00$ 1,900.00$ 5,320.00$ 22,800.00$ 7,600.00$ 19,000.00$ 5,700.00$ 11,400.00$

51 93400-5000

51 Line A1020 160 M3 1,200.00$ 192,000.00$ 192,000.00$ 160,000.00$ 192,000.00$ 128,000.00$ 192,000.00$ 159,520.00$

52 93400-7000

52 Line A1040 270 M3 1,200.00$ 324,000.00$ 324,000.00$ 270,000.00$ 216,000.00$ 216,000.00$ 324,000.00$ 269,190.00$

53 93501-0000

53 Line A1060 8 EACH 1,000.00$ 8,000.00$ 8,000.00$ 3,200.00$ 32,000.00$ 4,000.00$ 800.00$ 40,000.00$

Contractor testing

70,000.00$ 40,000.00$ 80,000.00$ 200,000.00$ 50,000.00$ 67,000.00$

Barbed Wire Fence, Type A

Concrete Paved Waterway, Type VII

Bed Course Material

Thermoplastic Pavement Markings Stripes, White

Hectometer Marker

Right-of-way Marker

Filter Blanket, Type A

Concrete Paved Gutter

Concrete Barrier, Type C

Concrete Barrier, F Shape (Modified)

Field Office

Traffic Sign Assembly, Code 1

Concrete Paved Waterway, Type V

Construction survey and staking

Mobilization

Reimbursement for Municipality

Soil Erosion Control, Straw Bales

Subbase Course

Lean Concrete Base

Clearing and Grubbing

Cutting and Removing Trees, Small

Removal Structures and Obstructions

Unclassified Excavation

Borrow Class B

Trench Excavation, Unclassified

Inlet, Type 5

Headwall, Type D

3" Pipe Underdrain, Perforated Pipe

3" Pipe Underdrain, Non-Perforated Pipe

Removal, Storage and Delivery of Guardrail

Cold Milling Bituminous Concrete Pavement (0.05 M Depth)

Warm Mix Asphalt (WMA) Concrete, Type S (75)(38)

Warm Mix Asphalt (WMA) Concrete, Type B (75)(34)

Reinforcing Steel

30" RCP Pipe Class III

Inlet, Type 4

Contractor Testing (Cultural Resources Protection and Monitoring)

Construction schedule

Unclassified Excavation for Structure

Temporary Shoring and Bracing (HWY-140)

Soil Erosion Control, Silt Fence

Prefabricated Drainage Composite

Erosion Control Blanket, Type 4

Structural Concrete, Class III (General Use)

Structural Concrete, Class II (General Use)

Locate Utility, Test Pit

Grouted Riprap, Class III

Grouted Riprap, Class IV

Furnishing and placing loamy topsoil

Planting Vetiver Grass

Maintenance of Traffic

Project Funding Sign

20,000.00$ 120,000.00$ 200,000.00$

AGLEZ Engineering & Contractors, CorJPI Construction, LLC Novel Construction, LLC Construcciones Jose Carro, S.E. LPC Contractors, Inc. es & Nieves Engineers and Contractors

270,000.00$

55,000.00$

200,000.00$ 25,000.00$ 20,000.00$ 200,000.00$ 1,000.00$ 120,000.00$

20,000.00$ 25,000.00$

230,000.00$ 270,250.00$ 270,000.00$ 156,745.00$ 230,000.00$

170,000.00$ 170,000.00$ 170,000.00$ 170,000.00$ 170,000.00$ 170,000.00$

1,200.00$ 2,000.00$ 500.00$ 1,000.00$ 1,000.00$ 3,500.00$

25,000.00$ 10,000.00$ 50,000.00$ 30,000.00$ 30,000.00$ 10,000.00$

75,000.00$ 40,000.00$ 20,000.00$ 100,000.00$ 16,000.00$ 25,000.00$

60.00$ 25.00$ 120.00$ 10.00$ 50.00$ 75.00$

25,000.00$ 40,000.00$ 57,000.00$ 500,000.00$ 4,000.00$ 37,000.00$

60.00$ 30.00$ 150.00$ 150.00$ 50.00$ 75.00$

75.00$ 65.00$ 70.00$ 60.00$ 65.00$ 65.00$

100,000.00$ 6,000.00$ 40,000.00$ 150,000.00$ 25,000.00$ 300,000.00$

65.00$ 30.00$ 70.00$ 60.00$ 55.00$ 95.00$

15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$

10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$

550.00$ 450.00$ 700.00$ 60.00$ 115.00$ 598.00$

75.00$ 65.00$ 80.00$ 100.00$ 65.00$ 65.00$

400.00$ 350.00$ 350.00$ 300.00$ 330.00$ 405.00$

55.00$ 20.00$ 50.00$ 10.00$ 25.00$ 75.00$

3.00$ 3.00$ 3.00$ 3.00$ 2.50$ 3.78$

400.00$ 400.00$ 350.00$ 300.00$ 330.00$ 420.00$

8,500.00$ 15,000.00$ 15,000.00$ 15,000.00$ 10,000.00$ 5,850.00$

500.00$ 300.00$ 800.00$ 500.00$ 800.00$ 290.00$

8,500.00$ 6,000.00$ 10,000.00$ 5,000.00$ 6,500.00$ 3,000.00$

8,500.00$ 10,000.00$ 10,000.00$ 10,000.00$ 9,500.00$ 4,200.00$

80.00$ 50.00$ 150.00$ 30.00$ 40.00$ 98.00$

80.00$ 50.00$ 120.00$ 30.00$ 40.00$ 98.00$

175.00$ 100.00$ 200.00$ 120.00$ 150.00$ 100.00$

60.00$ 50.00$ 80.00$ 30.00$ 35.00$ 50.00$

800.00$ 300.00$ 800.00$ 500.00$ 700.00$ 525.00$

200.00$ 150.00$ 400.00$ 80.00$ 225.00$ 250.00$

5,000.00$ 4,500.00$ 6,000.00$ 1,000.00$ 5,500.00$ 5,500.00$

800.00$ 300.00$ 1,200.00$ 200.00$ 600.00$ 575.00$

200.00$ 200.00$ 300.00$ 60.00$ 125.00$ 250.00$

900.00$ 800.00$ 500.00$ 3,000.00$ 1,300.00$ 667.00$

100.00$ 60.00$ 100.00$ 150.00$ 55.00$ 125.00$

200.00$ 200.00$ 200.00$ 60.00$ 125.00$ 250.00$

900.00$ 250.00$ 500.00$ 500.00$ 750.00$ 500.00$

22.00$ 15.00$ 25.00$ 20.00$ 20.00$ 18.00$

125.00$ 200.00$ 250.00$ 200.00$ 50.00$ 125.00$

230.00$ 300.00$ 100.00$ 100.00$ 100.00$ 50.00$

500.00$ 250.00$ 1,000.00$ 1,000.00$ 850.00$ 475.00$

500.00$ 250.00$ 800.00$ 1,000.00$ 850.00$ 475.00$

9.00$ 12.00$ 10.00$ 10.00$ 3.50$ 15.00$

60.00$ 60.00$ 10.00$ 80.00$ 10.00$ 95.00$

3,500.00$ 5,000.00$ 5,000.00$ 1,000.00$ 4,000.00$ 5,000.00$

350,000.00$ 300,000.00$ 250,000.00$ 240,000.00$ 160,000.00$ 30,000.00$

14.00$ 60.00$ 20.00$ 50.00$ 15.00$ 30.00$

200.00$ 15.00$ 50.00$ 30.00$ 25.00$ 45.00$

1,200.00$ 1,000.00$ 800.00$ 800.00$ 1,200.00$ 997.00$

1,200.00$ 1,000.00$ 1,200.00$ 800.00$ 1,200.00$ 997.00$

1,000.00$ 400.00$ 4,000.00$ 500.00$ 100.00$ 5,000.00$

Engineer's Estimate

7/2/2024 Page 1 of 1

Schedule B Eastern Federal Lands Highway Division

Project No : PR ER DOT PRMNT RPR(21) FLMA No:

Project Name : Landslide and Road Damage Repair Lares Solicitation No:

State : Puerto Rico County :

Federal Location : PR-124 (HWY-106, HWY-107, AND HWY-108)

Opened at: Ashburn, Virginia Opened by: Emily McCleary Date: 7/2/2024

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date: 7/2/2024

Contract Awarded to: Award Date:

Contract Number: Data is Public

Contractor Comment Bid Amount Responsive

Engineer's Estimate 2,300,000.00$

JPI Construction, LLC 3,127,016.00$

Novel Construction, LLC 1,918,525.00$

Construcciones Jose Carro, S.E. 2,872,000.00$

LPC Contractors, Inc. 2,835,590.00$

Nieves & Nieves Engineers and Co 1,900,000.00$

MAGLEZ Engineering & Contractor 2,783,645.00$

1513 Las Marias St. Suite 1-A San Juan, PR 00911

Yes

Road PR-510 Km 0.1 Barrio Capitanejo, Ponce, PR 00731

PR-937 Km. 3.0 Bo. Boqueron Las Piedras, PR 00771

Yes

Yes

Yes

Yes

No

Low Bidder Carr. PR-129, Km 27.9 Sector Miján, Lares Puerto Rico 00669

PR-140 Km. 59.0 Bo. Puerto Blanco Florida, PR 00650

1738 Calle Amarillo Suite 205, Box 15 San Juan, PR 00926

693C73-24-B-000011

Emily McCleary

Contract Specialist

7/2/2024 FHWA Confidential Page 1 of 1

Nieves & Nieves Engineers and Contractors, Inc.

693C73-24-C-000015

24 July 2024

T A B U L A T I O N O F B I D S T A B U L A T I O N O F B I D S 'Bid Tabs'!$F$9:$S$170 'Bid Tabs'!$H$7:$S$7 'Bid Tabs'!$H$3:$S$3 6 2 5 4 1 3

Schedule B Total of Bid Items: 2,300,000.00$ 36.0% 3,127,016.00$ -16.6% 1,918,525.00$ 24.9% 2,872,000.00$ 23.3% 2,835,590.00$ -17.4% 1,900,000.00$ 21.0% 2,783,645.00$ Project No: PR ER DOT PRMNT RPR(21)

Project Name: Landslide and Road Damage Repair Lares

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

1 15001-0000

1 Line B0020 ALL LPSM 42,000.00$ 42,000.00$ 60,000.00$ 20,000.00$ 120,000.00$ 150,000.00$ 30,000.00$ 25,000.00$

2 15100-1000

2 Line B0040 ALL LPSM 128,214.00$ 128,214.00$ 270,000.00$ 150,000.00$ 284,910.00$ 250,000.00$ 170,696.00$ 247,000.00$

3 15102-0000

3 Line B0060 ALL LPSM 160,000.00$ 160,000.00$ 160,000.00$ 160,000.00$ 160,000.00$ 160,000.00$ 160,000.00$ 160,000.00$

4 15401-0000

4 Line B0080 ALL LPSM 39,000.00$ 39,000.00$ 70,000.00$ 30,000.00$ 80,000.00$ 100,000.00$ 75,000.00$ 67,000.00$

5 15401-1000

5 Line B0100 ALL LPSM 75,000.00$ 75,000.00$ 120,000.00$ 57,897.00$ 20,000.00$ 100,000.00$ 24,000.00$ 90,000.00$

6 15401-2000

6 Line B0120 ALL LPSM 280,000.00$ 280,000.00$ 200,000.00$ 20,000.00$ 20,000.00$ 100,000.00$ 10,000.00$ 90,000.00$

7 15501-0000

7 Line B0140 ALL LPSM 24,000.00$ 24,000.00$ 75,000.00$ 5,000.00$ 20,000.00$ 100,000.00$ 24,000.00$ 25,000.00$

8 20100-0000

8 Line B0160 0.23 CUERDA 3,500.00$ 805.00$ 5,750.00$ 3,450.00$ 11,500.00$ 6,900.00$ 9,200.00$ 5,750.00$

9 20100-1000

9 Line B0180 5 EACH 1,000.00$ 5,000.00$ 8,000.00$ 15,000.00$ 15,000.00$ 25,000.00$ 17,000.00$ 40,000.00$

10 20100-2000

10 Line B0200 1 EACH 400.00$ 400.00$ 1,200.00$ 2,000.00$ 500.00$ 1,000.00$ 1,000.00$ 3,500.00$

11 20200-0000

11 Line B0220 ALL LPSM 20,000.00$ 20,000.00$ 25,000.00$ 20,000.00$ 75,000.00$ 200,000.00$ 9,000.00$ 35,000.00$

12 20300-0000

12 Line B0240 1,020 M3 39.00$ 39,780.00$ 61,200.00$ 25,500.00$ 61,200.00$ 10,200.00$ 20,400.00$ 76,500.00$

13 20301-0000

13 Line B0260 620 M3 65.00$ 40,300.00$ 46,500.00$ 40,300.00$ 43,400.00$ 37,200.00$ 40,300.00$ 40,300.00$

14 20500-1000

14 Line B0280 70 M3 60.00$ 4,200.00$ 4,200.00$ 2,100.00$ 14,000.00$ 10,500.00$ 2,100.00$ 5,250.00$

15 20600-1000

15 Line B0300 1,090 M3 30.00$ 32,700.00$ 70,850.00$ 32,700.00$ 109,000.00$ 65,400.00$ 27,250.00$ 103,550.00$

16 20600-5000

16 Line B0320 ALL LPSM 100,000.00$ 100,000.00$ 100,000.00$ 6,000.00$ 40,000.00$ 150,000.00$ 15,000.00$ 300,000.00$

17 20700-1000

17 Line B0340 55 M3 100.00$ 5,500.00$ 4,125.00$ 5,500.00$ 3,300.00$ 8,250.00$ 5,500.00$ 4,125.00$

18 21000-2000

18 Line B0360 320 M 10.00$ 3,200.00$ 3,200.00$ 3,200.00$ 3,200.00$ 3,200.00$ 3,200.00$ 3,200.00$

19 21000-5000

19 Line B0380 70 EACH 15.00$ 1,050.00$ 1,050.00$ 1,050.00$ 1,050.00$ 1,050.00$ 1,050.00$ 1,050.00$

20 21001-3000

20 Line B0400 1 EACH 2,500.00$ 2,500.00$ 9,000.00$ 5,000.00$ 20,000.00$ 3,000.00$ 2,000.00$ 10,000.00$

21 30101-0000

21 Line B0420 80 M3 75.00$ 6,000.00$ 6,000.00$ 5,200.00$ 6,400.00$ 8,000.00$ 5,200.00$ 6,000.00$

22 30400-1000

22 Line B0440 45 M3 200.00$ 9,000.00$ 7,875.00$ 3,150.00$ 4,500.00$ 6,750.00$ 3,375.00$ 5,625.00$

23 30500-2000

23 Line B0460 155 M2 450.00$ 69,750.00$ 85,250.00$ 69,750.00$ 77,500.00$ 9,300.00$ 17,825.00$ 92,535.00$

24 40300-2000

24 Line B0480 970 M2 40.00$ 38,800.00$ 53,350.00$ 19,400.00$ 97,000.00$ 9,700.00$ 24,250.00$ 72,750.00$

25 42101-3000

25 Line B0500 170 TON 350.00$ 59,500.00$ 68,000.00$ 51,000.00$ 59,500.00$ 51,000.00$ 56,100.00$ 76,500.00$

26 42101-4000

26 Line B0520 55 TON 350.00$ 19,250.00$ 22,000.00$ 16,500.00$ 19,250.00$ 16,500.00$ 18,150.00$ 24,750.00$

27 42101-5000

27 Line B0540 50 TON 350.00$ 17,500.00$ 20,000.00$ 15,000.00$ 17,500.00$ 15,000.00$ 16,500.00$ 22,500.00$

28 60200-0000

28 Line B0560 6,200 LBS 3.50$ 21,700.00$ 18,600.00$ 18,600.00$ 18,600.00$ 18,600.00$ 15,500.00$ 24,800.00$

29 60302-4000

29 Line B0580 8 M 900.00$ 7,200.00$ 4,000.00$ 2,400.00$ 6,400.00$ 4,000.00$ 21,600.00$ 2,400.00$

30 60400-9000

30 Line B0600 1 EACH 7,000.00$ 7,000.00$ 8,500.00$ 15,000.00$ 15,000.00$ 15,000.00$ 6,800.00$ 5,850.00$

31 60401-7000

31 Line B0620 2 EACH 7,000.00$ 14,000.00$ 17,000.00$ 30,000.00$ 20,000.00$ 30,000.00$ 6,800.00$ 14,000.00$

32 60402-2000

32 Line B0640 2 EACH 5,000.00$ 10,000.00$ 17,000.00$ 12,000.00$ 20,000.00$ 10,000.00$ 15,000.00$ 10,000.00$

33 60402-5000

33 Line B0660 1 EACH 1,800.00$ 1,800.00$ 8,500.00$ 5,000.00$ 10,000.00$ 5,000.00$ 2,500.00$ 6,000.00$

34 60500-4000

34 Line B0680 70 M 75.00$ 5,250.00$ 5,600.00$ 3,500.00$ 21,000.00$ 3,500.00$ 3,500.00$ 6,650.00$

35 60501-2000

35 Line B0700 27 M 32.00$ 864.00$ 2,160.00$ 1,350.00$ 4,050.00$ 810.00$ 810.00$ 2,430.00$

36 60501-3000

36 Line B0720 5 M 55.00$ 275.00$ 400.00$ 250.00$ 1,000.00$ 150.00$ 150.00$ 450.00$

37 60600-1000

37 Line B0740 170 M 180.00$ 30,600.00$ 76,500.00$ 34,000.00$ 51,000.00$ 51,000.00$ 46,750.00$ 51,000.00$

38 60600-4000

38 Line B0760 90 M 30.00$ 2,700.00$ 5,400.00$ 4,500.00$ 18,000.00$ 2,700.00$ 2,250.00$ 4,500.00$

39 60604-4000

39 Line B0780 4 EACH 4,000.00$ 16,000.00$ 42,000.00$ 24,000.00$ 32,000.00$ 40,000.00$ 32,000.00$ 48,000.00$

40 60700-0000

40 Line B0800 65 M 85.00$ 5,525.00$ 11,375.00$ 6,500.00$ 9,750.00$ 7,800.00$ 9,750.00$ 8,125.00$

41 60900-1000

41 Line B0820 150 M 110.00$ 16,500.00$ 21,000.00$ 30,000.00$ 37,500.00$ 13,500.00$ 22,500.00$ 33,750.00$

42 60900-6000

42 Line B0840 30 M 60.00$ 1,800.00$ 6,000.00$ 6,000.00$ 7,500.00$ 2,400.00$ 6,000.00$ 6,000.00$

Contractor testing

70,000.00$ 30,000.00$ 80,000.00$ 100,000.00$ 75,000.00$ 67,000.00$

Inlet, Type 4

W-beam Guardrail, Single Face

Removal, Storage and Delivery of Guardrail

Thrie-Beam Transition Section, Type II

Barbed Wire Fence, Type A

Combination Concrete Curb and Gutter, Type F

Concrete Paved Gutter

Inlet, Type I

Headwall, Type B

Conversions of Inlets to Type 4

6" Pipe Underdrain, Perforated PVC

3" Pipe Underdrain, Perforated PVC

3" Pipe Underdrain

Construction survey and staking

Mobilization

Reimbursement for Municipality

Temporary Shoring and Bracing (HWY-107)

Foundation Fill

Soil Erosion Control, Silt Fence

Construction schedule

Clearing and Grubbing

Cutting and Removing Trees, Large

Cutting and Removing Trees, Small

Removal Structures and Obstructions

Unclassified Excavation

Warm Mix Asphalt (WMA) Concrete, Type S (75)(38)

Warm Mix Asphalt (WMA) Concrete, Type B (75)(34)

Warm Mix Asphalt (WMA) Concrete, Type S (75)(12)

Reinforcing Steel

30" RC Pipe Class III

Soil Erosion Control, Straw Bales

Stabilized construction exit

Subbase Course

Aggregate Base Course, Grading Class "A"

Lean Concrete Base

Cold Milling Bituminous Concrete Pavement (0.05 M Depth)

Contractor Testing (Biological Species Monitoring)

Contractor Testing (Cultural Resources Protection and Monitoring)

Borrow Class B

Trench Excavation, Unclassified

Unclassified Excavation for Structure

20,000.00$ 120,000.00$ 150,000.00$

MAGLEZ Engineering & Contractors, CorJPI Construction, LLC Novel Construction, LLC Construcciones Jose Carro, S.E. LPC Contractors, Inc. es & Nieves Engineers and Contractors

270,000.00$

60,000.00$

120,000.00$ 57,897.00$ 20,000.00$ 100,000.00$ 24,000.00$ 90,000.00$

30,000.00$ 25,000.00$

150,000.00$ 284,910.00$ 250,000.00$ 170,696.00$ 247,000.00$

160,000.00$ 160,000.00$ 160,000.00$ 160,000.00$ 160,000.00$ 160,000.00$

25,000.00$ 15,000.00$ 50,000.00$ 30,000.00$ 40,000.00$ 25,000.00$

75,000.00$ 5,000.00$ 20,000.00$ 100,000.00$ 24,000.00$ 25,000.00$

200,000.00$ 20,000.00$ 20,000.00$ 100,000.00$ 10,000.00$ 90,000.00$

1,200.00$ 2,000.00$ 500.00$ 1,000.00$ 1,000.00$ 3,500.00$

1,600.00$ 3,000.00$ 3,000.00$ 5,000.00$ 3,400.00$ 8,000.00$

60.00$ 25.00$ 60.00$ 10.00$ 20.00$ 75.00$

25,000.00$ 20,000.00$ 75,000.00$ 200,000.00$ 9,000.00$ 35,000.00$

60.00$ 30.00$ 200.00$ 150.00$ 30.00$ 75.00$

75.00$ 65.00$ 70.00$ 60.00$ 65.00$ 65.00$

100,000.00$ 6,000.00$ 40,000.00$ 150,000.00$ 15,000.00$ 300,000.00$

65.00$ 30.00$ 100.00$ 60.00$ 25.00$ 95.00$

10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$

75.00$ 100.00$ 60.00$ 150.00$ 100.00$ 75.00$

9,000.00$ 5,000.00$ 20,000.00$ 3,000.00$ 2,000.00$ 10,000.00$

15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$

175.00$ 70.00$ 100.00$ 150.00$ 75.00$ 125.00$

75.00$ 65.00$ 80.00$ 100.00$ 65.00$ 75.00$

55.00$ 20.00$ 100.00$ 10.00$ 25.00$ 75.00$

550.00$ 450.00$ 500.00$ 60.00$ 115.00$ 597.00$

400.00$ 300.00$ 350.00$ 300.00$ 330.00$ 450.00$

400.00$ 300.00$ 350.00$ 300.00$ 330.00$ 450.00$

3.00$ 3.00$ 3.00$ 3.00$ 2.50$ 4.00$

400.00$ 300.00$ 350.00$ 300.00$ 330.00$ 450.00$

8,500.00$ 15,000.00$ 15,000.00$ 15,000.00$ 6,800.00$ 5,850.00$

500.00$ 300.00$ 800.00$ 500.00$ 2,700.00$ 300.00$

8,500.00$ 6,000.00$ 10,000.00$ 5,000.00$ 7,500.00$ 5,000.00$

8,500.00$ 15,000.00$ 10,000.00$ 15,000.00$ 3,400.00$ 7,000.00$

80.00$ 50.00$ 300.00$ 50.00$ 50.00$ 95.00$

8,500.00$ 5,000.00$ 10,000.00$ 5,000.00$ 2,500.00$ 6,000.00$

80.00$ 50.00$ 200.00$ 30.00$ 30.00$ 90.00$

80.00$ 50.00$ 150.00$ 30.00$ 30.00$ 90.00$

60.00$ 50.00$ 200.00$ 30.00$ 25.00$ 50.00$

450.00$ 200.00$ 300.00$ 300.00$ 275.00$ 300.00$

175.00$ 100.00$ 150.00$ 120.00$ 150.00$ 125.00$

10,500.00$ 6,000.00$ 8,000.00$ 10,000.00$ 8,000.00$ 12,000.00$

200.00$ 200.00$ 250.00$ 80.00$ 200.00$ 200.00$

140.00$ 200.00$ 250.00$ 90.00$ 150.00$ 225.00$

7/2/2024 Page 1 of 2

Schedule B Total of Bid Items: 2,300,000.00$ 36.0% 3,127,016.00$ -16.6% 1,918,525.00$ 24.9% 2,872,000.00$ 23.3% 2,835,590.00$ -17.4% 1,900,000.00$ 21.0% 2,783,645.00$ Project No: PR ER DOT PRMNT RPR(21)

Project Name: Landslide and Road Damage Repair Lares

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

C t ti d t ki

MAGLEZ Engineering & Contractors, CorJPI Construction, LLC Novel Construction, LLC Construcciones Jose Carro, S.E. LPC Contractors, Inc. es & Nieves Engineers and Contractors

43 60900-7000

43 Line B0860 60 M 85.00$ 5,100.00$ 12,000.00$ 12,000.00$ 21,000.00$ 3,600.00$ 12,000.00$ 12,000.00$

44 61000-4000

44 Line B0880 15 M 550.00$ 8,250.00$ 6,750.00$ 15,000.00$ 12,000.00$ 4,500.00$ 22,500.00$ 7,875.00$

45 61101-0000

45 Line B0900 13 MO 4,500.00$ 58,500.00$ 65,000.00$ 13,000.00$ 78,000.00$ 13,000.00$ 71,500.00$ 65,000.00$

46 61303-0000

46 Line B0920 4 EACH 1,150.00$ 4,600.00$ 3,600.00$ 4,000.00$ 2,000.00$ 12,000.00$ 6,000.00$ 3,400.00$

47 61303-1000

47 Line B0940 3 EACH 1,150.00$ 3,450.00$ 2,700.00$ 3,000.00$ 1,500.00$ 9,000.00$ 4,500.00$ 2,550.00$

48 61400-2000

48 Line B0960 420 M3 450.00$ 189,000.00$ 262,500.00$ 210,000.00$ 420,000.00$ 420,000.00$ 220,500.00$ 262,500.00$

49 61700-4000

49 Line B0980 8 M2 160.00$ 1,280.00$ 1,600.00$ 1,600.00$ 4,000.00$ 480.00$ 4,000.00$ 2,000.00$

50 61700-6000

50 Line B1000 205 M2 140.00$ 28,700.00$ 41,000.00$ 41,000.00$ 61,500.00$ 12,300.00$ 20,500.00$ 51,250.00$

51 61700-9000

51 Line B1020 23 M3 160.00$ 3,680.00$ 2,300.00$ 1,380.00$ 2,300.00$ 3,450.00$ 1,380.00$ 2,300.00$

52 61800-2000

52 Line B1040 480 M 10.00$ 4,800.00$ 10,560.00$ 9,600.00$ 12,000.00$ 9,600.00$ 9,600.00$ 7,680.00$

53 62100-2000

53 Line B1060 2 EACH 200.00$ 400.00$ 1,800.00$ 500.00$ 1,000.00$ 1,000.00$ 1,500.00$ 1,000.00$

54 62100-3000

54 Line B1080 21 EACH 350.00$ 7,350.00$ 4,830.00$ 6,300.00$ 2,100.00$ 2,100.00$ 5,250.00$ 1,575.00$

55 62200-2000

55 Line B1100 3 M3 120.00$ 360.00$ 375.00$ 600.00$ 750.00$ 600.00$ 150.00$ 600.00$

56 62200-5000

56 Line B1120 15 M3 120.00$ 1,800.00$ 1,875.00$ 3,000.00$ 3,750.00$ 3,000.00$ 750.00$ 6,000.00$

57 62201-1000

57 Line B1140 3 M3 350.00$ 1,050.00$ 900.00$ 900.00$ 2,100.00$ 1,500.00$ 1,800.00$ 2,700.00$

58 62201-7000

58 Line B1160 65 M3 250.00$ 16,250.00$ 32,500.00$ 19,500.00$ 52,000.00$ 65,000.00$ 16,250.00$ 29,250.00$

59 62400-0000

59 Line B1180 30 M2 19.50$ 585.00$ 1,500.00$ 600.00$ 750.00$ 2,700.00$ 1,200.00$ 3,750.00$

60 62500-1000

60 Line B1200 50 M3 60.00$ 3,000.00$ 4,000.00$ 3,000.00$ 500.00$ 4,000.00$ 250.00$ 4,750.00$

61 62600-0000

61 Line B1220 4,254 EACH 8.00$ 34,032.00$ 38,286.00$ 51,048.00$ 42,540.00$ 42,540.00$ 14,889.00$ 63,810.00$

62 62700-1000

62 Line B1240 110 M2 145.00$ 15,950.00$ 1,650.00$ 550.00$ 2,750.00$ 1,100.00$ 1,100.00$ 2,200.00$

63 62700-3000

63 Line B1260 200 M2 90.00$ 18,000.00$ 12,000.00$ 6,000.00$ 20,000.00$ 16,000.00$ 10,000.00$ 6,000.00$

64 63200-2000

64 Line B1280 25 M 110.00$ 2,750.00$ 15,000.00$ 7,500.00$ 5,000.00$ 12,500.00$ 4,375.00$ 2,500.00$

65 63200-3000

65 Line B1300 3 EACH 2,200.00$ 6,600.00$ 7,500.00$ 6,000.00$ 15,000.00$ 3,000.00$ 6,000.00$ 2,565.00$

66 63600-5000

66 Line B1320 ALL LPSM 2,500.00$ 2,500.00$ 10,000.00$ 5,000.00$ 10,000.00$ 20,000.00$ 2,000.00$ 25,000.00$

67 63601-6000

67 Line B1340 1 EACH 1,700.00$ 1,700.00$ 25,000.00$ 1,000.00$ 5,000.00$ 3,000.00$ 3,600.00$ 5,000.00$

68 63601-9000

68 Line B1360 45 M 310.00$ 13,950.00$ 67,500.00$ 22,500.00$ 36,000.00$ 22,500.00$ 40,500.00$ 29,250.00$

69 63602-1000

69 Line B1380 1 CTSM 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$

70 63602-6000

70 Line B1400 45 M 60.00$ 2,700.00$ 10,125.00$ 1,350.00$ 6,750.00$ 4,500.00$ 13,500.00$ 3,375.00$

71 63602-7000

71 Line B1420 2 EACH 1,500.00$ 3,000.00$ 10,000.00$ 1,000.00$ 4,000.00$ 2,000.00$ 27,000.00$ 14,000.00$

72 63602-8000

72 Line B1440 2 EACH 3,500.00$ 7,000.00$ 30,000.00$ 20,000.00$ 20,000.00$ 2,000.00$ 80,000.00$ 31,000.00$

73 63800-1000

73 Line B1460 ALL LPSM 300,000.00$ 300,000.00$ 400,000.00$ 300,000.00$ 150,000.00$ 183,810.00$ 160,000.00$ 30,000.00$

74 66100-1000

74 Line B1480 6 EACH 4,000.00$ 24,000.00$ 21,000.00$ 30,000.00$ 30,000.00$ 6,000.00$ 24,000.00$ 30,000.00$

75 91001-5000

75 Line B1500 4 EACH 7,500.00$ 30,000.00$ 40,000.00$ 24,000.00$ 40,000.00$ 28,000.00$ 24,000.00$ 24,000.00$

76 92400-1000

76 Line B1520 420 M2 5.00$ 2,100.00$ 5,880.00$ 12,600.00$ 21,000.00$ 21,000.00$ 4,200.00$ 12,600.00$

77 93400-5000

77 Line B1540 1 M3 1,800.00$ 1,800.00$ 1,200.00$ 1,000.00$ 1,200.00$ 800.00$ 1,200.00$ 1,500.00$

78 93400-8000

78 Line B1560 40 M3 1,000.00$ 40,000.00$ 48,000.00$ 40,000.00$ 32,000.00$ 32,000.00$ 48,000.00$ 39,880.00$

79 93501-0000

79 Line B1580 10 EACH 1,000.00$ 10,000.00$ 10,000.00$ 5,000.00$ 40,000.00$ 5,000.00$ 1,000.00$ 7,000.00$

80 99100-0000

80 Line B1600 35 M2 1,800.00$ 63,000.00$ 52,500.00$ 35,000.00$ 21,000.00$ 28,000.00$ 31,500.00$ 100,695.00$

81 99200-1000

81 Line B1620 270 M3 30.00$ 8,100.00$ 54,000.00$ 16,200.00$ 27,000.00$ 21,600.00$ 13,500.00$ 20,250.00$ 200.00$ 60.00$ 100.00$ 80.00$ 50.00$ 75.00$

1,500.00$ 1,000.00$ 600.00$ 800.00$ 900.00$ 2,877.00$

1,000.00$ 500.00$ 4,000.00$ 500.00$ 100.00$ 700.00$

1,200.00$ 1,000.00$ 800.00$ 800.00$ 1,200.00$ 997.00$

1,200.00$ 1,000.00$ 1,200.00$ 800.00$ 1,200.00$ 1,500.00$

14.00$ 30.00$ 50.00$ 50.00$ 10.00$ 30.00$

10,000.00$ 6,000.00$ 10,000.00$ 7,000.00$ 6,000.00$ 6,000.00$

3,500.00$ 5,000.00$ 5,000.00$ 1,000.00$ 4,000.00$ 5,000.00$

400,000.00$ 300,000.00$ 150,000.00$ 183,810.00$ 160,000.00$ 30,000.00$

15,000.00$ 10,000.00$ 10,000.00$ 1,000.00$ 40,000.00$ 15,500.00$

5,000.00$ 500.00$ 2,000.00$ 1,000.00$ 13,500.00$ 7,000.00$

225.00$ 30.00$ 150.00$ 100.00$ 300.00$ 75.00$

10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$

1,500.00$ 500.00$ 800.00$ 500.00$ 900.00$ 650.00$

25,000.00$ 1,000.00$ 5,000.00$ 3,000.00$ 3,600.00$ 5,000.00$

10,000.00$ 5,000.00$ 10,000.00$ 20,000.00$ 2,000.00$ 25,000.00$

2,500.00$ 2,000.00$ 5,000.00$ 1,000.00$ 2,000.00$ 855.00$

600.00$ 300.00$ 200.00$ 500.00$ 175.00$ 100.00$

60.00$ 30.00$ 100.00$ 80.00$ 50.00$ 30.00$

15.00$ 5.00$ 25.00$ 10.00$ 10.00$ 20.00$

Concrete Paved Waterway, Type A

Concrete Paved Waterway, Type V

Bed Course Material

Thermoplastic Pavement Markings Stripes, White

Hectometer Marker

Right-of-way Marker

Concrete Gutter, Type Shallow

Concrete Barrier, Type C (Modified)

Field Office

Traffic Sign Assembly, Code 1 (HWY-106 and HWY-108)

Traffic Sign Assembly, Code 1, 2 (HWY-107)

Gabions

Planting Vetiver Grass

Seeding, (with mulch)

Permanent Cellular Erosion Control Blanket

Cleaning and Repair of Storm Sewers

Cleaning and Repair of Manholes, Inlets, and Catch Basins

Removal of exis. PRASA facilities

Filter Blanket

Filter Blanket, Type A

Dumped Riprap, Class I

Grouted Riprap, Class III

Geotextile Filter Fabric

Furnishing and placing loamy topsoil

Maintenance of Traffic

Project Funding Sign

New Transition Module (Less than 45 mph)

Erosion Control Blanket, Type 4

Structural Concrete, Class III (General Use)

Structural Concrete, Class II (General Use)

Water Service Connection

16" Ductile Iron Pipe, Class 250

Utility Company Compensation (PRASA)

2" PVC, SDR-14

2" Tapping Sleeve and Valve

16" Tapping Sleeve and Valve

Locate Utility, Test Pit

Mechanically Stabilized Earth Slope (RSS)

Special Borrow Embankment

450.00$ 1,000.00$ 800.00$ 300.00$ 1,500.00$ 525.00$

200.00$ 200.00$ 350.00$ 60.00$ 200.00$ 200.00$

900.00$ 1,000.00$ 500.00$ 3,000.00$ 1,500.00$ 850.00$

5,000.00$ 1,000.00$ 6,000.00$ 1,000.00$ 5,500.00$ 5,000.00$

625.00$ 500.00$ 1,000.00$ 1,000.00$ 525.00$ 625.00$

900.00$ 1,000.00$ 500.00$ 3,000.00$ 1,500.00$ 850.00$

200.00$ 200.00$ 300.00$ 60.00$ 100.00$ 250.00$

200.00$ 200.00$ 500.00$ 60.00$ 500.00$ 250.00$

22.00$ 20.00$ 25.00$ 20.00$ 20.00$ 16.00$

100.00$ 60.00$ 100.00$ 150.00$ 60.00$ 100.00$

230.00$ 300.00$ 100.00$ 100.00$ 250.00$ 75.00$

900.00$ 250.00$ 500.00$ 500.00$ 750.00$ 500.00$

125.00$ 200.00$ 250.00$ 200.00$ 50.00$ 400.00$

125.00$ 200.00$ 250.00$ 200.00$ 50.00$ 200.00$

500.00$ 300.00$ 800.00$ 1,000.00$ 250.00$ 450.00$

300.00$ 300.00$ 700.00$ 500.00$ 600.00$ 900.00$

9.00$ 12.00$ 10.00$ 10.00$ 3.50$ 15.00$

80.00$ 60.00$ 10.00$ 80.00$ 5.00$ 95.00$

50.00$ 20.00$ 25.00$ 90.00$ 40.00$ 125.00$

7/2/2024 Page 2 of 2

Bid Tabs Summary
Tabulation of Bids (Schedule B) - PR ER DOT PRMNT RPR(21).pdf
Bid Tabs
Tabulation of Bids (Schedule A) - PR ER DOT PRMNT RPR(21).pdf
Bid Tabs Summary
Tabulation of Bids (Schedule A) - PR ER DOT PRMNT RPR(21).pdf
Bid Tabs

File details come from the government source that posted it. Updated .