Tabulation of Bids - Schedules A and B and C - PR ST ER PRMNT RPR (8).pdf
PDF 441 KB Posted
- Attached to
- Landslide Repairs - East Region Contract 1
- Solicitation number
- 693C73-21-C-000019
About this file
This document contains bid tabulations for three federal construction contract schedules awarded by the Department of Transportation Federal Highway Administration. Schedule A was for landslide repairs on PR-3 from KM 69.3-70.6 in Naguabo, Puerto Rico and was awarded to JPI Construction, LLC for $1,778,095.80. Schedule B was for repairs on ER-HWY-2 in Cayey, Puerto Rico and was awarded to JPI Construction, LLC for $648,014.17. Schedule C was for repairs on ER-HWY-463 in Humacao, Puerto Rico and was awarded to JPI Construction, LLC for $579,441.55. The total award to JPI Construction, LLC under contract 693C73-21-C-000019 was $3,005,551.52. The bid tabulations provide itemized pricing from six contractors for each schedule, with award dates of July 28, 2021.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T A B U L A T I O N O F B I D S Schedule A Eastern Federal Lands Highway Division
Project No : PR ST ER PRMNT RPR(8) FLMA No:
Project Name : ER-HWY-344 Solcitation No:
State : Puerto Rico County : Naguabo Federal Location : PR-3 (KM 69.3-70.6)
Opened at: Ashburn, VA Opened by: Yuliya Kent Date: 7/1/2021
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
Date: 7/1/2021
Contract Awarded to: Award Date: 7/28/2021
Contract Number: Data is Public
Contractor Comment Bid Amount Responsive
Engineer's Estimate 1,560,000.00$
JPI Construction, LLC 1,778,095.80$
NV Services, LLC 2,190,000.00$
Tamrio, Inc. 1,579,293.00$
Construcciones Jose Ca 3,969,000.00$
Constructora I. Melend 1,650,465.00$
693C73-21-B-000012
Yuliya Kent
JPI Construction, LLC
Contract Specialist
$ 2,100,000.00
$ 1,579,293.00
$ 3,969,000.00
$ 1,650,465.00
693C73-21-C-000019
$ 1,778,095.80
7/26/2021 FHWA Confidential Page 1 of 3
Contractor Comment Bid Amount Responsive
Best Work Construction 1,761,864.00$ $ 1,761,864.00
7/26/2021 FHWA Confidential Page 2 of 3
Schedule A Total of Bid Items: 1,560,000.00$ 14.0% 1,778,095.80$ 40.4% 2,190,000.00$ 1.2% 1,579,293.00$ 154.4% 3,969,000.00$ 5.8% 1,650,465.00$ 12.9% 1,761,864.00$ Project No: PR ST ER PRMNT RPR(8)
Project Name: ER-HWY-344
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15001-0000
Line A0020 ALL LPSM 32,000.00$ 32,000.00$ 68,932.01$ 150,000.00$ 38,000.00$ 132,000.00$ 15,500.00$ 3,270.00$
15101-0000
Line A0040 ALL LPSM 133,259.50$ 133,259.50$ 127,959.13$ 600,000.00$ 150,000.00$ 378,880.00$ 164,025.00$ 176,000.00$
15102-0000
Line A0060 1 CTSM 65,000.00$ 65,000.00$ 65,000.00$ 65,000.00$ 65,000.00$ 65,000.00$ 65,000.00$ 65,000.00$
15401-0000
Line A0080 ALL LPSM 39,000.00$ 39,000.00$ 28,951.44$ 30,000.00$ 20,000.00$ 110,000.00$ 25,000.00$ 4,360.00$
15401-1000
Line A0100 ALL LPSM 70,000.00$ 70,000.00$ 63,825.94$ 30,000.00$ 75,000.00$ 176,000.00$ 50,000.00$ 8,500.00$
15501-0000
Line A0120 ALL LPSM 17,000.00$ 17,000.00$ 22,115.69$ 23,325.00$ 20,000.00$ 44,000.00$ 10,000.00$ 8,720.00$
20100-0000
Line A0140 2.65 Cuerda 5,000.00$ 13,250.00$ 46,947.16$ 22,525.00$ 53,000.00$ 26,500.00$ 26,500.00$ 5,777.00$
20100-2000
Line A0160 8 Each 300.00$ 2,400.00$ 5,763.92$ 4,000.00$ 6,400.00$ 4,000.00$ 16,000.00$ 2,616.00$
20100-3000
Line A0180 12 Each 360.00$ 4,320.00$ 10,637.40$ 6,000.00$ 24,000.00$ 7,800.00$ 36,000.00$ 6,540.00$
20100-4000
Line A0200 3 Each 450.00$ 1,350.00$ 15,443.88$ 1,500.00$ 15,000.00$ 3,600.00$ 12,000.00$ 4,905.00$
20300-0000
Line A0220 1,000 m3 26.00$ 26,000.00$ 26,360.00$ 25,000.00$ 20,000.00$ 80,000.00$ 65,000.00$ 28,000.00$
21000-0000
Line A0240 3,000 M 10.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$
21000-2000
Line A0260 15 Each 40.00$ 600.00$ 1,597.20$ 750.00$ 6,000.00$ 7,500.00$ 1,500.00$ 1,065.00$
21000-3000
Line A0280 5 Each 12,000.00$ 60,000.00$ 20,184.40$ 15,000.00$ 10,000.00$ 50,000.00$ 17,500.00$ 13,625.00$
21012-0000
Line A0300 4 Each 65.00$ 260.00$ 993.12$ 400.00$ 6,000.00$ 6,400.00$ 2,000.00$ 1,636.00$
30500-1000
Line A0320 20 m3 480.00$ 9,600.00$ 13,872.00$ 4,400.00$ 6,000.00$ 18,000.00$ 7,000.00$ 11,340.00$
40301-0000
Line A0340 420 m3 85.00$ 35,700.00$ 20,105.40$ 42,000.00$ 21,000.00$ 50,400.00$ 21,000.00$ 23,940.00$
42100-1000
Line A0360 1,100 TON 220.00$ 242,000.00$ 219,406.00$ 192,500.00$ 220,000.00$ 220,000.00$ 220,000.00$ 218,900.00$
60600-1000
Line A0380 1,200 M 120.00$ 144,000.00$ 214,452.00$ 240,000.00$ 180,000.00$ 360,000.00$ 180,000.00$ 242,400.00$
60600-7000
Line A0400 2 Each 5,500.00$ 11,000.00$ 20,743.42$ 10,000.00$ 24,000.00$ 28,000.00$ 17,000.00$ 18,420.00$
61101-0000
Line A0420 ALL LPSM 70,000.00$ 70,000.00$ 19,748.54$ 200,000.00$ 70,000.00$ 176,000.00$ 55,000.00$ 105,000.00$
61400-1000
Line A0440 700 m3 420.00$ 294,000.00$ 275,331.00$ 210,000.00$ 175,000.00$ 1,120,000.00$ 437,500.00$ 309,400.00$
61800-1000
Line A0460 390 M 7.25$ 2,827.50$ 3,576.30$ 3,900.00$ 2,028.00$ 3,900.00$ 2,340.00$ 6,240.00$
61800-2000
Line A0480 3,100 M 7.25$ 22,475.00$ 28,427.00$ 31,000.00$ 16,120.00$ 31,000.00$ 18,600.00$ 49,600.00$
61800-3000
Line A0500 800 M 9.65$ 7,720.00$ 9,576.00$ 12,000.00$ 6,400.00$ 11,200.00$ 6,400.00$ 17,600.00$
61800-4000
Line A0520 600 M 22.00$ 13,200.00$ 13,404.00$ 15,000.00$ 6,600.00$ 13,200.00$ 12,000.00$ 25,800.00$
62500-0000
Line A0540 65 m3 24.00$ 1,560.00$ 10,288.85$ 2,600.00$ 4,225.00$ 6,500.00$ 6,500.00$ 3,575.00$
62600-0000
Line A0560 10,000 Each 8.00$ 80,000.00$ 44,500.00$ 100,000.00$ 70,000.00$ 150,000.00$ 60,000.00$ 60,000.00$
63800-1000
Line A0580 ALL LPSM 110,000.00$ 110,000.00$ 322,029.89$ 100,000.00$ 200,000.00$ 583,000.00$ 50,000.00$ 289,000.00$
64000-0000
Line A0600 260 Each 8.30$ 2,158.00$ 2,332.20$ 2,600.00$ 3,120.00$ 3,120.00$ 2,600.00$ 2,860.00$
66100-1000
Line A0620 2 Each 4,000.00$ 8,000.00$ 8,152.16$ 10,000.00$ 20,000.00$ 12,000.00$ 8,000.00$ 6,540.00$
66400-0000
Line A0640 1,600 M 3.95$ 6,320.00$ 8,544.00$ 8,000.00$ 6,400.00$ 16,000.00$ 8,000.00$ 9,600.00$
93501-0000
Line A0660 5 Each 1,000.00$ 5,000.00$ 8,895.75$ 2,500.00$ 10,000.00$ 45,000.00$ 2,500.00$ 1,635.00$
Engineer's Estimate
1,779.15$ 500.00$ 2,000.00$ 9,000.00$ 500.00$ 327.00$
5.34$ 5.00$ 4.00$ 10.00$ 5.00$ 6.00$
4,076.08$ 5,000.00$ 10,000.00$ 6,000.00$ 4,000.00$ 3,270.00$
8.97$ 10.00$ 12.00$ 12.00$ 10.00$ 11.00$
322,029.89$ 100,000.00$ 200,000.00$ 583,000.00$ 50,000.00$ 289,000.00$
4.45$ 10.00$ 7.00$ 15.00$ 6.00$ 6.00$
158.29$ 40.00$ 65.00$ 100.00$ 100.00$ 55.00$
22.34$ 25.00$ 11.00$ 22.00$ 20.00$ 43.00$
11.97$ 15.00$ 8.00$ 14.00$ 8.00$ 22.00$
9.17$ 10.00$ 5.20$ 10.00$ 6.00$ 16.00$
9.17$ 10.00$ 5.20$ 10.00$ 6.00$ 16.00$
393.33$ 300.00$ 250.00$ 1,600.00$ 625.00$ 442.00$
19,748.54$ 200,000.00$ 70,000.00$ 176,000.00$ 55,000.00$ 105,000.00$
10,371.71$ 5,000.00$ 12,000.00$ 14,000.00$ 8,500.00$ 9,210.00$
178.71$ 200.00$ 150.00$ 300.00$ 150.00$ 202.00$
199.46$ 175.00$ 200.00$ 200.00$ 200.00$ 199.00$
47.87$ 100.00$ 50.00$ 120.00$ 50.00$ 57.00$
693.60$ 220.00$ 300.00$ 900.00$ 350.00$ 567.00$
248.28$ 100.00$ 1,500.00$ 1,600.00$ 500.00$ 409.00$
4,036.88$ 3,000.00$ 2,000.00$ 10,000.00$ 3,500.00$ 2,725.00$
106.48$ 50.00$ 400.00$ 500.00$ 100.00$ 71.00$
10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$
26.36$ 25.00$ 20.00$ 80.00$ 65.00$ 28.00$
5,147.96$ 500.00$ 5,000.00$ 1,200.00$ 4,000.00$ 1,635.00$
886.45$ 500.00$ 2,000.00$ 650.00$ 3,000.00$ 545.00$
720.49$ 500.00$ 800.00$ 500.00$ 2,000.00$ 327.00$
17,715.91$ 8,500.00$ 20,000.00$ 10,000.00$ 10,000.00$ 2,180.00$
22,115.69$ 23,325.00$ 20,000.00$ 44,000.00$ 10,000.00$ 8,720.00$
63,825.94$ 30,000.00$ 75,000.00$ 176,000.00$ 50,000.00$ 8,500.00$
15,500.00$ 3,270.00$
600,000.00$ 150,000.00$ 378,880.00$ 164,025.00$ 176,000.00$
65,000.00$ 65,000.00$ 65,000.00$ 65,000.00$ 65,000.00$ 65,000.00$
Best Work Construction, SEJPI Construction, LLC NV Services, LLC Tamrio, Inc. Construcciones Jose Carro, SE Constructora I. Melendez, LLC
127,959.13$
68,932.01$ 150,000.00$ 38,000.00$ 132,000.00$
Construction survey and staking
Mobilization
Reimbursement for Municipality Tax Payments
Lean Concrete Base (0.15m)
Cold Milling Bituminous Concrete Pavement (0.05m)
Hot Plant-Mix Bituminous Pavement S (75) (38)
Clearing and Grubbing
Cutting and Removing Trees, Small (7" to 12" Diameter)
Cutting and Removing Trees, Small (13" to 24" Diameter)
Cutting and Removing Trees, Large (25" to 46" Diameter)
Unclassified Excavation (Cut to Waste)
Silt Fence
Thermoplastic Pavement Marking Stripes, white (0.20 mts. Width)
Thermoplastic Pavement Marking Stripes, white (0.46 mts. Width)
Furnishing and Placing Loamy Topsoil
Planting Vetiveria zizanioides (Vetiveria Grass)
Maintenance of Traffic (MOT)
W-Beam Guardrail
Crashworthy End Terminal Type 1
Field Office
Gabions (Marine Gabion Mattress)
Thermoplastic Pavement Marking Stripes, yellow (0.15 mts. Width)
Thermoplastic Pavement Marking Stripes, white (0.15 mts. Width)
Contractor testing (Biological Monitoring)
Construction schedule
Fiber Rolls (sediment log)
Stabilized Construction Exit
Erosion Control for Inlet (Bag)
Contractor testing
28,951.44$ 30,000.00$ 20,000.00$ 110,000.00$ 25,000.00$ 4,360.00$
Reflective Raised Pavement Markers (Two way)
Project Funding Sign
Centerline Rumble Strip
Locate Utility, Test Pit
7/26/2021 Page 3 of 3
Schedule B Eastern Federal Lands Highway Division
Project No : PR ST ER PRMNT RPR(8) FLMA No:
Project Name : ER-HWY-2 Solcitation No:
State : Puerto Rico County : Cayey Federal Location : PR-1 KM 61.80
Opened at: Ashburn, VA Opened by: Yuliya Kent Date: 7/1/2021
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
Date: 7/1/2021
Contract Awarded to: Award Date: 7/28/2021
Contract Number: Data is Public
Contractor Comment Bid Amount Responsive
Engineer's Estimate 465,000.00$
JPI Construction, LLC 648,014.17$
NV Services, LLC 1,330,000.00$
Tamrio, Inc. 1,100,641.80$
Construcciones Jose Ca 1,558,000.00$
Constructora I. Melend 968,630.00$
693C73-21-C-000019
$ 648,014.17
$ 1,330,000.00
$ 1,096,681.80
$ 1,558,000.00
$ 968,630.00
693C73-21-B-000012
Yuliya Kent
JPI Construction, LLC
Contract Specialist
7/26/2021 FHWA Confidential Page 1 of 4
Best Work Construction 867,582.00$ $ 867,582.00
7/26/2021 FHWA Confidential Page 2 of 4
Schedule B Total of Bid Items: 465,000.00$ 39.4% 648,014.17$ 186.0% 1,330,000.00$ 136.7% 1,100,641.80$ 235.1% 1,558,000.00$ 108.3% 968,630.00$ 86.6% 867,582.00$ Project No: PR ST ER PRMNT RPR(8)
Project Name: ER-HWY-2
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15001-0000
Line B0020 ALL LPSM 9,500.00$ 9,500.00$ 26,058.49$ 100,000.00$ 30,000.00$ 70,000.00$ 15,000.00$ 3,480.00$
15101-0000
Line B0040 ALL LPSM 39,825.00$ 39,825.00$ 62,173.17$ 300,000.00$ 110,000.00$ 165,230.00$ 96,000.00$ 86,000.00$
15102-0000
Line B0060 1 CTSM 28,000.00$ 28,000.00$ 28,000.00$ 28,000.00$ 28,000.00$ 28,000.00$ 28,000.00$ 28,000.00$
15401-0000
Line B0080 ALL LPSM 11,000.00$ 11,000.00$ 21,341.90$ 30,000.00$ 12,000.00$ 100,000.00$ 30,000.00$ 4,640.00$
15401-1000
Line B0100 ALL LPSM 44,000.00$ 44,000.00$ 36,192.35$ 30,000.00$ 40,000.00$ 75,000.00$ 25,000.00$ 9,050.00$
15501-0000
Line B0120 ALL LPSM 10,000.00$ 10,000.00$ 5,472.28$ 26,230.00$ 10,000.00$ 10,000.00$ 10,000.00$ 9,280.00$
20100-0000
Line B0140 0.26 Cuerda 5,000.00$ 1,300.00$ 2,714.43$ 1,300.00$ 5,200.00$ 5,200.00$ 7,800.00$ 5,070.00$
20200-1000
Line B0160 20 M 125.00$ 2,500.00$ 1,266.80$ 100,000.00$ 5,000.00$ 16,000.00$ 4,000.00$ 1,160.00$
20200-5000
Line B0180 ALL LPSM 5,000.00$ 5,000.00$ 11,762.51$ 50,000.00$ 20,000.00$ 40,000.00$ 15,000.00$ 17,400.00$
20200-6000
Line B0200 7 M 420.00$ 2,940.00$ 633.36$ 35,000.00$ 1,400.00$ 7,000.00$ 2,800.00$ 406.00$
20200-7000
Line B0220 7 M 700.00$ 4,900.00$ 633.36$ 35,000.00$ 1,400.00$ 7,000.00$ 3,500.00$ 406.00$
20300-0000
Line B0240 1,620 m3 26.00$ 42,120.00$ 49,831.20$ 40,500.00$ 48,600.00$ 129,600.00$ 105,300.00$ 76,140.00$
21000-0000
Line B0260 110 M 10.00$ 1,100.00$ 1,100.00$ 1,100.00$ 1,100.00$ 1,100.00$ 1,100.00$ 1,100.00$
21000-1000
Line B0280 60 Each 15.00$ 900.00$ 900.00$ 900.00$ 900.00$ 900.00$ 900.00$ 900.00$
21000-2000
Line B0300 5 Each 40.00$ 200.00$ 724.55$ 250.00$ 1,000.00$ 2,500.00$ 500.00$ 375.00$
21000-3000
Line B0320 1 Each 12,000.00$ 12,000.00$ 3,619.23$ 3,000.00$ 4,000.00$ 15,000.00$ 3,500.00$ 2,900.00$
30400-1000
Line B0340 30 m3 65.00$ 1,950.00$ 2,171.40$ 1,500.00$ 2,700.00$ 6,000.00$ 1,950.00$ 1,740.00$
30400-2000
Line B0360 120 m3 55.00$ 6,600.00$ 8,685.60$ 6,000.00$ 9,600.00$ 24,000.00$ 9,000.00$ 6,960.00$
40301-0000
Line B0380 34 m3 85.00$ 2,890.00$ 8,143.34$ 3,400.00$ 4,148.00$ 4,080.00$ 6,800.00$ 7,888.00$
42100-1000
Line B0400 105 TON 220.00$ 23,100.00$ 26,872.65$ 18,375.00$ 18,585.00$ 26,250.00$ 21,000.00$ 23,730.00$
42100-3000
Line B0420 40 TON 220.00$ 8,800.00$ 14,115.20$ 7,000.00$ 7,080.00$ 10,000.00$ 8,000.00$ 9,040.00$
60600-1000
Line B0440 130 M 120.00$ 15,600.00$ 30,111.90$ 26,000.00$ 18,720.00$ 45,500.00$ 26,000.00$ 31,200.00$
60600-7000
Line B0460 2 Each 5,500.00$ 11,000.00$ 23,525.02$ 10,000.00$ 24,000.00$ 28,000.00$ 17,000.00$ 19,600.00$
60900-0000
Line B0480 10 M 70.00$ 700.00$ 1,500.00$ 350.00$ 1,500.00$ 2,500.00$ 1,000.00$ 1,500.00$
60900-1000
Line B0500 32 M 55.00$ 1,760.00$ 3,200.00$ 1,120.00$ 3,200.00$ 7,040.00$ 3,200.00$ 2,784.00$
60900-4000
Line B0520 65 M 145.00$ 9,425.00$ 9,750.00$ 2,275.00$ 7,800.00$ 18,200.00$ 9,750.00$ 5,655.00$
61312-4000
Line B0540 31 SQFT 95.00$ 2,945.00$ 4,843.44$ 1,550.00$ 17,360.00$ 4,650.00$ 3,100.00$ 2,790.00$
61312-5000
Line B0560 13 SQFT 95.00$ 1,235.00$ 1,933.62$ 650.00$ 7,540.00$ 1,950.00$ 1,300.00$ 1,118.00$
61312-6000
Line B0580 9 SQFT 95.00$ 855.00$ 1,921.50$ 450.00$ 4,950.00$ 1,800.00$ 900.00$ 522.00$
61312-7000
Line B0600 4 SQFT 95.00$ 380.00$ 960.76$ 200.00$ 2,122.80$ 1,200.00$ 800.00$ 664.00$
61800-1000
Line B0620 190 M 7.25$ 1,377.50$ 2,578.30$ 1,900.00$ 2,318.00$ 2,850.00$ 1,140.00$ 4,560.00$
61800-2000
Line B0640 190 M 7.25$ 1,377.50$ 2,578.30$ 1,900.00$ 2,318.00$ 2,850.00$ 1,140.00$ 4,560.00$
62600-0000
Line B0660 900 Each 8.00$ 7,200.00$ 4,536.00$ 9,000.00$ 7,200.00$ 18,000.00$ 5,850.00$ 6,300.00$
63800-1000
Line B0680 ALL LPSM 55,000.00$ 55,000.00$ 22,943.91$ 75,000.00$ 180,000.00$ 240,000.00$ 39,900.00$ 208,000.00$
66100-1000
Line B0700 2 Each 4,000.00$ 8,000.00$ 9,325.34$ 10,000.00$ 16,000.00$ 12,000.00$ 8,000.00$ 6,960.00$
91300-4000
Line B0720 3 Each 120.00$ 360.00$ 957.66$ 300.00$ 1,500.00$ 1,500.00$ 900.00$ 1,044.00$
Contractor testing
21,341.90$ 30,000.00$ 12,000.00$ 100,000.00$ 30,000.00$ 4,640.00$
Traffic Sign Assembly, D10-2A (10"x36") h ll S b l d h ll
Thermoplastic Pavement Marking Stripes, yellow (0.15 mts. Width)
Thermoplastic Pavement Marking Stripes, white (0.15 mts. Width)
Planting Vetiveria zizanioides (Vetiveria Grass)
Maintenance of Traffic (MOT)
Project Funding Sign
Removal of Existing Traffic Signs
Construction survey and staking
Mobilization
Reimbursement for Municipality Tax Payments
Stabilized Construction Exit
Aggregate Base Course Class, A, (0.15m)
Aggregate Base Course Class, A-1-a (AASHTO Soil Classification System), (0.63m)
Clearing and Grubbing
Removal of Concrete Barrier
Removal of Structures and Obstructions (Concrete Retaining Wall)
Removal of Structures and Obstructions (Water line)
Removal of Structures and Obstructions (Telephone line)
Unclassified Excavation (Cut to Waste)
Concrete Curb, Type-D
Combination Concrete Curb and Gutter, Type West
Traffic Sign Assembly, W1-8R (24"x30")
Traffic Sign Assembly, W1-2R, 2L (30"x30")
Traffic Sign Assembly, W13-1P (24"x24")
Cold Milling Bituminous Concrete Pavement (0.05m)
Hot Plant-Mix Bituminous Pavement S (75) (38)
Hot Plant-Mix Bituminous Pavement B (75) (1)
W-Beam Guardrail
Crashworthy End Terminal Type 1
Combination Concrete Curb and Gutter, Type-F
Contractor testing (Biological Monitoring)
Construction schedule
Silt Fence
Straw Bale (Dikes)
Fiber Rolls (sediment log)
100,000.00$ 30,000.00$ 70,000.00$
Best Work Construction, SEJPI Construction, LLC NV Services, LLC Tamrio, Inc. Construcciones Jose Carro, SE Constructora I. Melendez, LLC
62,173.17$
26,058.49$
36,192.35$ 30,000.00$ 40,000.00$ 75,000.00$ 25,000.00$ 9,050.00$
15,000.00$ 3,480.00$
300,000.00$ 110,000.00$ 165,230.00$ 96,000.00$ 86,000.00$
28,000.00$ 28,000.00$ 28,000.00$ 28,000.00$ 28,000.00$ 28,000.00$
63.34$ 5,000.00$ 250.00$ 800.00$ 200.00$ 58.00$
10,440.10$ 5,000.00$ 20,000.00$ 20,000.00$ 30,000.00$ 19,500.00$
5,472.28$ 26,230.00$ 10,000.00$ 10,000.00$ 10,000.00$ 9,280.00$
90.48$ 5,000.00$ 200.00$ 1,000.00$ 400.00$ 58.00$
11,762.51$ 50,000.00$ 20,000.00$ 40,000.00$ 15,000.00$ 17,400.00$
30.76$ 25.00$ 30.00$ 80.00$ 65.00$ 47.00$
90.48$ 5,000.00$ 200.00$ 1,000.00$ 500.00$ 58.00$
15.00$ 15.00$ 15.00$ 15.00$ 15.00$ 15.00$
10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$
3,619.23$ 3,000.00$ 4,000.00$ 15,000.00$ 3,500.00$ 2,900.00$
144.91$ 50.00$ 200.00$ 500.00$ 100.00$ 75.00$
72.38$ 50.00$ 80.00$ 200.00$ 75.00$ 58.00$
72.38$ 50.00$ 90.00$ 200.00$ 65.00$ 58.00$
255.93$ 175.00$ 177.00$ 250.00$ 200.00$ 226.00$
239.51$ 100.00$ 122.00$ 120.00$ 200.00$ 232.00$
231.63$ 200.00$ 144.00$ 350.00$ 200.00$ 240.00$
352.88$ 175.00$ 177.00$ 250.00$ 200.00$ 226.00$
150.00$ 35.00$ 150.00$ 250.00$ 100.00$ 150.00$
11,762.51$ 5,000.00$ 12,000.00$ 14,000.00$ 8,500.00$ 9,800.00$
150.00$ 35.00$ 120.00$ 280.00$ 150.00$ 87.00$
100.00$ 35.00$ 100.00$ 220.00$ 100.00$ 87.00$
148.74$ 50.00$ 580.00$ 150.00$ 100.00$ 86.00$
156.24$ 50.00$ 560.00$ 150.00$ 100.00$ 90.00$
240.19$ 50.00$ 530.70$ 300.00$ 200.00$ 166.00$
213.50$ 50.00$ 550.00$ 200.00$ 100.00$ 58.00$
13.57$ 10.00$ 12.20$ 15.00$ 6.00$ 24.00$
13.57$ 10.00$ 12.20$ 15.00$ 6.00$ 24.00$
22,943.91$ 75,000.00$ 180,000.00$ 240,000.00$ 39,900.00$ 208,000.00$
5.04$ 10.00$ 8.00$ 20.00$ 6.50$ 7.00$
319.22$ 100.00$ 500.00$ 500.00$ 300.00$ 348.00$
4,662.67$ 5,000.00$ 8,000.00$ 6,000.00$ 4,000.00$ 3,480.00$
Engineer's Estimate
7/26/2021 Page 3 of 4
Schedule B Total of Bid Items: 465,000.00$ 39.4% 648,014.17$ 186.0% 1,330,000.00$ 136.7% 1,100,641.80$ 235.1% 1,558,000.00$ 108.3% 968,630.00$ 86.6% 867,582.00$ Project No: PR ST ER PRMNT RPR(8)
Project Name: ER-HWY-2
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
C d k
Best Work Construction, SEJPI Construction, LLC NV Services, LLC Tamrio, Inc. Construcciones Jose Carro, SE Constructora I. Melendez, LLC
92500-0000
Line B0740 115 m2 220.00$ 25,300.00$ 131,921.10$ 287,500.00$ 368,000.00$ 299,000.00$ 287,500.00$ 196,075.00$
93501-0000
Line B0760 5 Each 1,000.00$ 5,000.00$ 9,048.10$ 2,500.00$ 10,000.00$ 30,000.00$ 2,500.00$ 1,740.00$
94000-1000
Line B0780 1,635 m3 36.00$ 58,860.00$ 73,967.40$ 81,750.00$ 65,400.00$ 98,100.00$ 163,500.00$ 76,845.00$
Mechanically Stabilized Earth Retaining Wall
Locate Utility, Test Pit
Select Granular Backfill 1,809.62$ 500.00$ 2,000.00$ 6,000.00$ 500.00$ 348.00$
1,147.14$ 2,500.00$ 3,200.00$ 2,600.00$ 2,500.00$ 1,705.00$
45.24$ 50.00$ 40.00$ 60.00$ 100.00$ 47.00$
7/26/2021 Page 4 of 4
Schedule C Eastern Federal Lands Highway Division
Project No : PR ST ER PRMNT RPR(8) FLMA No:
Project Name : ER-HWY-463 Solcitation No:
State : Puerto Rico County : Humacao Federal Location : PR-909 (KM 5.55)
Opened at: Ashburn, VA Opened by: Yuliya Kent Date: 7/1/2021
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
Date: 7/1/2021
Contract Awarded to: Award Date: 7/28/2021
Contract Number: Data is Public
Contractor Comment Bid Amount Responsive
Engineer's Estimate 320,000.00$
JPI Construction, LLC 579,441.55$
NV Services, LLC 1,100,000.00$
Tamrio, Inc. 793,838.00$
Construcciones Jose Ca 1,451,000.00$
Constructora I. Melend 705,500.00$
693C73-21-C-000019
$ 579,441.55
$ 1,100,000.00
$ 793,838.00
$ 1,451,000.00
$ 795,500.00
693C73-21-B-000012
Yuliya Kent
JPI Construction, LLC
Contract Specialist
7/26/2021 FHWA Confidential Page 1 of 4
Best Work Construction 663,568.00$ $ 663,568.00
7/26/2021 FHWA Confidential Page 2 of 4
Schedule C Total of Bid Items: 320,000.00$ 81.1% 579,441.55$ 243.8% 1,100,000.00$ 148.1% 793,838.00$ 353.4% 1,451,000.00$ 120.5% 705,500.00$ 107.4% 663,568.00$ Project No: PR ST ER PRMNT RPR(8)
Project Name: ER-HWY-463
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
15001-0000
Line C0020 ALL LPSM 6,500.00$ 6,500.00$ 27,065.59$ 100,000.00$ 20,000.00$ 80,000.00$ 10,000.00$ 3,900.00$
15101-0000
Line C0040 ALL LPSM 26,449.30$ 26,449.30$ 58,476.41$ 406,000.00$ 80,000.00$ 143,990.00$ 70,500.00$ 66,000.00$
15102-0000
Line C0060 1 CTSM 17,000.00$ 17,000.00$ 17,000.00$ 17,000.00$ 17,000.00$ 17,000.00$ 17,000.00$ 17,000.00$
15401-0000
Line C0080 ALL LPSM 8,000.00$ 8,000.00$ 30,102.95$ 30,000.00$ 20,000.00$ 100,000.00$ 30,000.00$ 5,200.00$
15401-1000
Line C0100 ALL LPSM 37,000.00$ 37,000.00$ 39,470.65$ 30,000.00$ 50,000.00$ 60,000.00$ 30,000.00$ 10,140.00$
15501-0000
Line C0120 ALL LPSM 9,000.00$ 9,000.00$ 5,683.77$ 24,785.00$ 8,000.00$ 10,000.00$ 10,000.00$ 10,400.00$
20100-0000
Line C0140 0.11 Cuerda 5,000.00$ 550.00$ 3,759.11$ 550.00$ 2,200.00$ 2,200.00$ 1,650.00$ 2,145.00$
20200-8000
Line C0160 60 M 22.00$ 1,320.00$ 1,879.80$ 6,000.00$ 1,200.00$ 6,000.00$ 3,000.00$ 1,980.00$
20200-9000
Line C0180 35 M 122.00$ 4,270.00$ 1,315.65$ 3,500.00$ 875.00$ 17,500.00$ 2,100.00$ 1,155.00$
20300-0000
Line C0200 780 m3 26.00$ 20,280.00$ 23,454.60$ 19,500.00$ 19,500.00$ 62,400.00$ 39,000.00$ 40,560.00$
20500-0000
Line C0220 22 m3 550.00$ 12,100.00$ 879.56$ 550.00$ 968.00$ 4,400.00$ 2,200.00$ 2,134.00$
21000-0000
Line C0240 11 M 10.00$ 110.00$ 110.00$ 110.00$ 110.00$ 110.00$ 110.00$ 110.00$
21000-2000
Line C0260 13 Each 40.00$ 520.00$ 1,125.15$ 650.00$ 6,500.00$ 6,500.00$ 1,300.00$ 1,092.00$
21000-3000
Line C0280 1 Each 12,000.00$ 12,000.00$ 960.62$ 3,000.00$ 5,000.00$ 15,000.00$ 3,500.00$ 3,250.00$
21000-4000
Line C0300 75 M 30.00$ 2,250.00$ 4,652.25$ 3,750.00$ 4,500.00$ 11,250.00$ 3,750.00$ 1,950.00$
21000-5000
Line C0320 120 m2 11.00$ 1,320.00$ 1,320.00$ 1,320.00$ 1,320.00$ 1,320.00$ 1,320.00$ 1,320.00$
30400-1000
Line C0340 11 m3 65.00$ 715.00$ 1,033.78$ 660.00$ 1,320.00$ 2,420.00$ 1,100.00$ 715.00$
30400-2000
Line C0360 45 m3 55.00$ 2,475.00$ 4,229.10$ 4,500.00$ 9,000.00$ 9,900.00$ 4,500.00$ 2,925.00$
30500-1000
Line C0380 6 m3 480.00$ 2,880.00$ 6,807.06$ 1,800.00$ 2,220.00$ 5,400.00$ 3,000.00$ 4,056.00$
40301-0000
Line C0400 18 m3 85.00$ 1,530.00$ 8,458.02$ 1,800.00$ 2,196.00$ 2,160.00$ 9,000.00$ 7,020.00$
42100-1000
Line C0420 56 TON 220.00$ 12,320.00$ 39,200.00$ 9,800.00$ 13,440.00$ 16,800.00$ 28,000.00$ 18,536.00$
42100-2000
Line C0440 45 TON 220.00$ 9,900.00$ 54,000.00$ 7,875.00$ 10,800.00$ 13,500.00$ 22,500.00$ 14,895.00$
60600-1000
Line C0460 80 M 120.00$ 9,600.00$ 23,136.80$ 16,000.00$ 12,000.00$ 28,000.00$ 16,000.00$ 22,880.00$
60600-7000
Line C0480 1 Each 5,500.00$ 5,500.00$ 13,622.07$ 5,000.00$ 8,000.00$ 14,000.00$ 8,500.00$ 10,985.00$
60900-0000
Line C0500 55 M 70.00$ 3,850.00$ 7,753.35$ 2,750.00$ 3,850.00$ 13,750.00$ 8,250.00$ 5,335.00$
60900-3000
Line C0520 40 M 70.00$ 2,800.00$ 4,135.20$ 2,000.00$ 4,400.00$ 10,000.00$ 6,000.00$ 3,880.00$
61400-0000
Line C0540 2 m3 420.00$ 840.00$ 767.12$ 2,000.00$ 16,000.00$ 400.00$ 2,000.00$ 1,300.00$
61400-2000
Line C0560 17 m2 1.10$ 18.70$ 2,349.74$ 1,700.00$ 2,040.00$ 3,400.00$ 8,500.00$ 2,210.00$
61700-0000
Line C0580 30 m2 70.00$ 2,100.00$ 7,863.30$ 1,500.00$ 3,000.00$ 60,000.00$ 15,000.00$ 4,080.00$
61800-1000
Line C0600 160 M 7.25$ 1,160.00$ 2,481.60$ 1,600.00$ 1,952.00$ 2,400.00$ 3,200.00$ 2,880.00$
61800-2000
Line C0620 160 M 7.25$ 1,160.00$ 2,481.60$ 1,600.00$ 1,952.00$ 2,400.00$ 3,200.00$ 2,880.00$
62200-0000
Line C0640 3 m3 110.00$ 330.00$ 882.72$ 450.00$ 1,065.00$ 900.00$ 3,000.00$ 1,950.00$
62600-0000
Line C0660 900 Each 8.00$ 7,200.00$ 4,716.00$ 9,000.00$ 7,200.00$ 18,000.00$ 6,300.00$ 7,200.00$
63600-0000
Line C0680 24 M 18.00$ 432.00$ 7,113.84$ 6,000.00$ 1,680.00$ 7,200.00$ 9,600.00$ 1,872.00$
63600-1000
Line C0700 1 Each 110.00$ 110.00$ 896.29$ 1,000.00$ 400.00$ 400.00$ 500.00$ 559.00$
63600-2000
Line C0720 2 Each 115.00$ 230.00$ 1,125.66$ 2,000.00$ 800.00$ 800.00$ 1,000.00$ 1,118.00$
Contractor testing
30,102.95$ 30,000.00$ 20,000.00$ 100,000.00$ 30,000.00$ 5,200.00$
Thermoplastic Pavement Marking Stripes, yellow (0.15 mts. Width)
" G l
Thermoplastic Pavement Marking Stripes, white (0.15 mts. Width)
Dumped Riprap, Class 1
Planting Vetiveria zizanioides (Vetiveria Grass)
4" PVC Pipe, SDR 14
4" SD Cast Iron Elbow (22.5° Bend)
4" SD Cast Iron Elbow (45° Bend)
Construction survey and staking
Mobilization
Reimbursement for Municipality Tax Payments
Plastic Liner
Aggregate Base Course Class, A, (0.15m)
Aggregate Base Course Class, A-1-a (AASHTO Soil Classification System), (0.63m)
Clearing and Grubbing
Removal of Guard Rail
Removal of Structures and Obstructions (Gutter)
Unclassified Excavation (Cut to Waste)
Trench Excavation, Unclassified (4" PVC Pipe, SDR 14)
Silt Fence
Combination Concrete Curb and Gutter, Type-F
Concrete Gutter (Shallow)
Gabions (Riprap/ Revetment)
Filter Blanket (Riprap/ Revetment)
Concrete Chute
Lean Concrete Base (0.15m)
Cold Milling Bituminous Concrete Pavement (0.05m)
Hot Plant-Mix Bituminous Pavement Mix S (75) (38)
Hot Plant-Mix Bituminous Pavement Mix B (75) (1)
W-Beam Guardrail
Crashworthy End Terminal Type 1
Contractor testing (Biological Monitoring)
Construction schedule
Fiber Rolls (sediment log)
Stabilized Construction Exit
Silt Fence (Wire Backing)
100,000.00$ 20,000.00$ 80,000.00$
Best Work Construction, SEJPI Construction, LLC NV Services, LLC Tamrio, Inc. Construcciones Jose Carro, SE Constructora I. Melendez, LLC
58,476.41$
27,065.59$
39,470.65$ 30,000.00$ 50,000.00$ 60,000.00$ 30,000.00$ 10,140.00$
10,000.00$ 3,900.00$
406,000.00$ 80,000.00$ 143,990.00$ 70,500.00$ 66,000.00$
17,000.00$ 17,000.00$ 17,000.00$ 17,000.00$ 17,000.00$ 17,000.00$
31.33$ 100.00$ 20.00$ 100.00$ 50.00$ 33.00$
34,173.72$ 5,000.00$ 20,000.00$ 20,000.00$ 15,000.00$ 19,500.00$
5,683.77$ 24,785.00$ 8,000.00$ 10,000.00$ 10,000.00$ 10,400.00$
30.07$ 25.00$ 25.00$ 80.00$ 50.00$ 52.00$
37.59$ 100.00$ 25.00$ 500.00$ 60.00$ 33.00$
10.00$ 10.00$ 10.00$ 10.00$ 10.00$ 10.00$
39.98$ 25.00$ 44.00$ 200.00$ 100.00$ 97.00$
960.62$ 3,000.00$ 5,000.00$ 15,000.00$ 3,500.00$ 3,250.00$
86.55$ 50.00$ 500.00$ 500.00$ 100.00$ 84.00$
11.00$ 11.00$ 11.00$ 11.00$ 11.00$ 11.00$
62.03$ 50.00$ 60.00$ 150.00$ 50.00$ 26.00$
93.98$ 100.00$ 200.00$ 220.00$ 100.00$ 65.00$
93.98$ 60.00$ 120.00$ 220.00$ 100.00$ 65.00$
469.89$ 100.00$ 122.00$ 120.00$ 500.00$ 390.00$
1,134.51$ 300.00$ 370.00$ 900.00$ 500.00$ 676.00$
1,200.00$ 175.00$ 240.00$ 300.00$ 500.00$ 331.00$
700.00$ 175.00$ 240.00$ 300.00$ 500.00$ 331.00$
13,622.07$ 5,000.00$ 8,000.00$ 14,000.00$ 8,500.00$ 10,985.00$
289.21$ 200.00$ 150.00$ 350.00$ 200.00$ 286.00$
103.38$ 50.00$ 110.00$ 250.00$ 150.00$ 97.00$
140.97$ 50.00$ 70.00$ 250.00$ 150.00$ 97.00$
138.22$ 100.00$ 120.00$ 200.00$ 500.00$ 130.00$
383.56$ 1,000.00$ 8,000.00$ 200.00$ 1,000.00$ 650.00$
15.51$ 10.00$ 12.20$ 15.00$ 20.00$ 18.00$
262.11$ 50.00$ 100.00$ 2,000.00$ 500.00$ 136.00$
294.24$ 150.00$ 355.00$ 300.00$ 1,000.00$ 650.00$
15.51$ 10.00$ 12.20$ 15.00$ 20.00$ 18.00$
296.41$ 250.00$ 70.00$ 300.00$ 400.00$ 78.00$
5.24$ 10.00$ 8.00$ 20.00$ 7.00$ 8.00$
562.83$ 1,000.00$ 400.00$ 400.00$ 500.00$ 559.00$
896.29$ 1,000.00$ 400.00$ 400.00$ 500.00$ 559.00$
7/26/2021 Page 3 of 4
Schedule C Total of Bid Items: 320,000.00$ 81.1% 579,441.55$ 243.8% 1,100,000.00$ 148.1% 793,838.00$ 353.4% 1,451,000.00$ 120.5% 705,500.00$ 107.4% 663,568.00$ Project No: PR ST ER PRMNT RPR(8)
Project Name: ER-HWY-463
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
C d k
Best Work Construction, SEJPI Construction, LLC NV Services, LLC Tamrio, Inc. Construcciones Jose Carro, SE Constructora I. Melendez, LLC
63600-3000
Line C0740 1 Each 500.00$ 500.00$ 1,829.56$ 1,000.00$ 800.00$ 3,000.00$ 1,000.00$ 2,086.00$
63600-5000
Line C0760 1 CTSM 12,000.00$ 12,000.00$ 12,000.00$ 12,000.00$ 12,000.00$ 12,000.00$ 12,000.00$ 12,000.00$
63800-1000
Line C0780 ALL LPSM 46,000.00$ 46,000.00$ 23,830.64$ 100,000.00$ 150,000.00$ 350,000.00$ 60,420.00$ 208,000.00$
65000-0000
Line C0800 65 m2 70.00$ 4,550.00$ 7,495.15$ 3,250.00$ 4,550.00$ 32,500.00$ 13,000.00$ 7,150.00$
66100-1000
Line C0820 2 Each 4,000.00$ 8,000.00$ 9,602.64$ 10,000.00$ 16,000.00$ 12,000.00$ 10,000.00$ 7,800.00$
92500-0000
Line C0840 65 m2 210.00$ 13,650.00$ 88,060.05$ 227,500.00$ 247,000.00$ 208,000.00$ 195,000.00$ 129,610.00$
93501-0000
Line C0860 5 Each 1,000.00$ 5,000.00$ 9,397.75$ 2,500.00$ 5,000.00$ 30,000.00$ 2,500.00$ 1,950.00$
94000-1000
Line C0880 180 m3 36.00$ 6,480.00$ 16,916.40$ 18,000.00$ 18,000.00$ 54,000.00$ 27,000.00$ 9,360.00$
4" Gate Valve
Utility Company Compensation (PRASA)
Maintenance of Traffic (MOT)
Concrete Slope Paving (Embankment Protection)
Project Funding Sign
Mechanically Stabilized Earth Retaining Wall
Locate Utility, Test Pit
Select Granular Backfill
12,000.00$ 12,000.00$ 12,000.00$ 12,000.00$ 12,000.00$ 12,000.00$
1,829.56$ 1,000.00$ 800.00$ 3,000.00$ 1,000.00$ 2,086.00$
115.31$ 50.00$ 70.00$ 500.00$ 200.00$ 110.00$
23,830.64$ 100,000.00$ 150,000.00$ 350,000.00$ 60,420.00$ 208,000.00$
1,354.77$ 3,500.00$ 3,800.00$ 3,200.00$ 3,000.00$ 1,994.00$
4,801.32$ 5,000.00$ 8,000.00$ 6,000.00$ 5,000.00$ 3,900.00$
93.98$ 100.00$ 100.00$ 300.00$ 150.00$ 52.00$
1,879.55$ 500.00$ 1,000.00$ 6,000.00$ 500.00$ 390.00$
7/26/2021 Page 4 of 4
| Schedule A |
| Schedule B |
| Schedule C |