This is a bid tabulation document for a landslide repair project in Morovis, Puerto Rico (Project No. PR ER DOT PRMNT RPR(17)) administered by the Eastern Federal Lands Highway Division of the Federal Highway Administration. The project consists of three schedules: Schedule A (ER-HWY-483, 258, 262, 263, 264, 265) at PR-155 KM 0.35-56.7, Schedule B (ER-HWY-259) at PR-155 KM 38.65, and Schedule C (ER-HWY-257, 260, 261) at PR-155 KM 36.15-40.30.

The bids were opened on September 5, 2024 in Ashburn, Virginia, with five responsive bidders participating: Design Build LLC, LPC Contractors Inc, Maglez Engineering & Contractors Corp, and Novel Construction LLC. Novel Construction LLC was awarded the contract (693C73-25-C-000005) on December 12, 2024, with the lowest combined bid for Schedule A ($8,061,826.00) and Schedule C ($3,733,410.00), totaling $11,795,236.00. The Engineer's Estimate for these schedules was $10,410,000.00. The detailed bid tabulation includes extensive line items for construction activities including excavation, paving, drainage structures, guardrails, traffic control, and utility work.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T A B U L A T I O N O F B I D S Schedule A Eastern Federal Lands Highway Division

Project No : PR ER DOT PRMNT RPR(17) FLMA No:

Project Name : AC-857579, AC-893579, AC-905579: ER-HWY-483, 258, 262, 263, 264, 265 Solcitation No:

State : PUERTO RICO County : MOROVIS Federal Location : PR-155 (KM 0.35, 0.37, 40.3, 43.25, 45.5, & 56.7)

Opened at: Ashburn, Virginia Opened by: Emily McCleary Date: 9/5/2024

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date: 9/9/2024

Contract Awarded to: Award Date:

Contract Number: Data is Public

Contractor Comment Bid Amount Responsive

Engineer's Estimate 6,925,000.00$

Design Build, LLC 9,163,477.00$

LPC Contractors, Inc 10,799,490.00$

Maglez Engineering & Contractors Corp. 8,351,159.75$

Novel Construction, LLC 8,061,826.00$

P.O. Box 1787 Sabana Seca, PR 00951

YES

PR-140 Km. 59.0 Bo. Puerto Blanco Florida, PR 00650

1738 Calle Amarillo Suite 205, Box 15 San Juan, Puerto Rico 00926

YES

YES

YES

Bo. Boquerón PR-937 Km. 3.0 Las Piedras, PR 00771

693C73-24-B-000015

Emily McCleary

Contract Specialist

9/10/2024 FHWA Confidential Page 1 of 5

693C73-25-C-000005

Novel Construction, LLC 12 December 2024

Schedule Total of Bid Items: 6,925,000.00$ 32.3% 9,163,477.00$ 55.9% 10,799,490.00$ 20.6% 8,351,159.75$ 16.4% 8,061,826.00$ Project No: PR ER DOT PRMNT RPR(17)

Project Name: AC-857579, AC-893579, AC-905579: ER-HWY-483, 258, 262, 263, 264, 265

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

15000-1000

Line 0010 ALL LPSM 140,000.00$ 140,000.00$ 200,000.00$ 800,000.00$ 20,000.00$ 40,000.00$

15100-1000

Line 0020 ALL LPSM 357,922.50$ 357,922.50$ 900,000.00$ 960,000.00$ 748,181.00$ 847,086.00$

15102-0000

Line 0030 1 CTSM 630,000.00$ 630,000.00$ 630,000.00$ 630,000.00$ 630,000.00$ 630,000.00$

15401-0000

Line 0040 ALL LPSM 170,000.00$ 170,000.00$ 50,000.00$ 800,000.00$ 25,000.00$ 100,000.00$

15401-1000

Line 0050 ALL LPSM 240,000.00$ 240,000.00$ 247,104.00$ 400,000.00$ 35,000.00$ 20,000.00$

15401-2000

Line 0060 ALL LPSM 39,000.00$ 39,000.00$ 76,328.00$ 700,000.00$ 40,000.00$ 30,000.00$

15501-0000

Line 0070 ALL LPSM 91,000.00$ 91,000.00$ 42,000.00$ 596,940.00$ 15,000.00$ 20,000.00$

20100-1000

Line 0080 0.80 Cuerda 21,500.00$ 17,200.00$ 9,600.00$ 4,000.00$ 11,296.00$ 42,500.00$

20100-2000

Line 0090 51 Each 1,200.00$ 61,200.00$ 142,800.00$ 10,200.00$ 153,000.00$ 76,500.00$

20100-3000

Line 0100 6 Each 1,800.00$ 10,800.00$ 33,000.00$ 18,000.00$ 60,000.00$ 24,000.00$

20200-1000

Line 0110 ALL LPSM 18,000.00$ 18,000.00$ 30,000.00$ 20,000.00$ 39,600.00$ 40,000.00$

20201-6000

Line 0120 140 M 325.00$ 45,500.00$ 9,100.00$ 28,000.00$ 9,800.00$ 28,000.00$

20300-1000

Line 0130 5,720 m3 35.00$ 200,200.00$ 286,000.00$ 97,240.00$ 348,920.00$ 228,800.00$

20300-4000

Line 0140 1,895 m3 45.00$ 85,275.00$ 113,700.00$ 37,900.00$ 123,175.00$ 75,800.00$

20300-5000

Line 0150 2,950 m3 55.00$ 162,250.00$ 177,000.00$ 59,000.00$ 191,750.00$ 103,250.00$

20600-1000

Line 0160 7,005 m3 45.00$ 315,225.00$ 350,250.00$ 175,125.00$ 455,325.00$ 245,175.00$

20600-5000

Line 0170 ALL LPSM 70,000.00$ 70,000.00$ 30,000.00$ 60,000.00$ 100,000.00$ 15,000.00$

20600-6000

Line 0180 ALL LPSM 65,000.00$ 65,000.00$ 130,000.00$ 60,000.00$ 100,000.00$ 30,000.00$

20600-7000

Line 0190 ALL LPSM 180,000.00$ 180,000.00$ 150,000.00$ 100,000.00$ 100,000.00$ 15,000.00$

20700-1000

Line 0200 500 m3 28.00$ 14,000.00$ 50,000.00$ 35,000.00$ 50,000.00$ 20,000.00$

21000-1000

Line 0210 740 M 10.00$ 7,400.00$ 7,400.00$ 7,400.00$ 7,400.00$ 7,400.00$

21000-2000

Line 0220 774 Each 15.00$ 11,610.00$ 11,610.00$ 11,610.00$ 11,610.00$ 11,610.00$

21000-8000

Line 0230 20 M 105.00$ 2,100.00$ 2,100.00$ 2,100.00$ 2,100.00$ 2,100.00$

21000-9000

Line 0240 490 m2 25.00$ 12,250.00$ 19,600.00$ 14,700.00$ 9,800.00$ 7,350.00$

21001-1000

Line 0250 7 Each 8,500.00$ 59,500.00$ 70,000.00$ 35,000.00$ 45,500.00$ 35,000.00$

21200-1000

Line 0260 145 m2 60.00$ 8,700.00$ 7,250.00$ 5,800.00$ 14,500.00$ 7,250.00$

30400-1000

Contractor Testing

50,000.00$ 800,000.00$ 25,000.00$ 100,000.00$

Construction Survey and Staking

Mobilization

Reimbursement for Municipal Tax Payments

Unclassified Excavation for Structures

Temporary Shoring and Bracing (HWY-263)

Temporary Shoring and Bracing (HWY-265)

Construction Schedule

Clearing and Grubbing

Cutting and Removing Trees, Small

Cutting and Removing Trees, Large

Removal of Structures and Obstructions

Removal of Concrete Barrier

Stabilized Construction Exit

Reconditioning of Shoulders and Ditches

Aggregate Base Course, Grading A

Temporary Shoring and Bracing (HWY-483)

Foundation Fill

Silt Fence

Straw Bales

Floating Turbidity Barrier

Turf Reinforcement Mat

Contractor Testing (Biological Species Monitoring)

Contractor Testing (Cultural Resource Protection and Monitoring)

Unclassified Excavation

Borrow Class A-1

Borrow Class B-1

800,000.00$ 20,000.00$ 40,000.00$

Design Build, LLC LPC Contractors, Inc Maglez Engineering & Contractors Corp Novel Construction, LLC

900,000.00$

200,000.00$

247,104.00$ 400,000.00$ 35,000.00$ 20,000.00$

960,000.00$ 748,181.00$ 847,086.00$

630,000.00$ 630,000.00$ 630,000.00$ 630,000.00$

12,000.00$ 5,000.00$ 14,120.00$ 53,125.00$

42,000.00$ 596,940.00$ 15,000.00$ 20,000.00$

76,328.00$ 700,000.00$ 40,000.00$ 30,000.00$

5,500.00$ 3,000.00$ 10,000.00$ 4,000.00$

2,800.00$ 200.00$ 3,000.00$ 1,500.00$

65.00$ 200.00$ 70.00$ 200.00$

30,000.00$ 20,000.00$ 39,600.00$ 40,000.00$

60.00$ 20.00$ 65.00$ 40.00$

50.00$ 17.00$ 61.00$ 40.00$

50.00$ 25.00$ 65.00$ 35.00$

60.00$ 20.00$ 65.00$ 35.00$

130,000.00$ 60,000.00$ 100,000.00$ 30,000.00$

30,000.00$ 60,000.00$ 100,000.00$ 15,000.00$

100.00$ 70.00$ 100.00$ 40.00$

150,000.00$ 100,000.00$ 100,000.00$ 15,000.00$

15.00$ 15.00$ 15.00$ 15.00$

10.00$ 10.00$ 10.00$ 10.00$

40.00$ 30.00$ 20.00$ 15.00$

105.00$ 105.00$ 105.00$ 105.00$

50.00$ 40.00$ 100.00$ 50.00$

10,000.00$ 5,000.00$ 6,500.00$ 5,000.00$

Engineer's Estimate

9/10/2024 Page 2 of 5

Schedule Total of Bid Items: 6,925,000.00$ 32.3% 9,163,477.00$ 55.9% 10,799,490.00$ 20.6% 8,351,159.75$ 16.4% 8,061,826.00$ Project No: PR ER DOT PRMNT RPR(17)

Project Name: AC-857579, AC-893579, AC-905579: ER-HWY-483, 258, 262, 263, 264, 265

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Design Build, LLC LPC Contractors, Inc Maglez Engineering & Contractors Corp Novel Construction, LLC

Line 0270 180 m3 35.00$ 6,300.00$ 30,600.00$ 16,200.00$ 15,480.00$ 10,800.00$

30500-1000

Line 0280 1,050 m2 95.00$ 99,750.00$ 315,000.00$ 84,000.00$ 126,000.00$ 147,000.00$

40200-1000

Line 0290 95 m3 110.00$ 10,450.00$ 5,700.00$ 9,500.00$ 5,700.00$ 3,800.00$

40300-1000

Line 0300 6,430 m2 60.00$ 385,800.00$ 38,580.00$ 64,300.00$ 260,736.50$ 32,150.00$

42100-3000

Line 0310 790 TON 350.00$ 276,500.00$ 237,000.00$ 248,850.00$ 355,500.00$ 158,000.00$

42100-5000

Line 0320 445 TON 350.00$ 155,750.00$ 133,500.00$ 140,175.00$ 200,250.00$ 111,250.00$

42100-6000

Line 0330 20 TON 350.00$ 7,000.00$ 6,000.00$ 6,300.00$ 16,000.00$ 6,000.00$

60200-1000

Line 0340 17,295 lb 3.00$ 51,885.00$ 51,885.00$ 34,590.00$ 102,905.25$ 51,885.00$

60300-2000

Line 0350 28 M 155.00$ 4,340.00$ 16,800.00$ 4,200.00$ 14,000.00$ 8,400.00$

60302-2000

Line 0360 1 Each 3,500.00$ 3,500.00$ 4,000.00$ 2,000.00$ 2,500.00$ 3,100.00$

60302-5000

Line 0370 1 Each 3,500.00$ 3,500.00$ 6,000.00$ 6,000.00$ 6,000.00$ 5,000.00$

60500-2000

Line 0380 85 M 120.00$ 10,200.00$ 34,000.00$ 2,550.00$ 9,137.50$ 2,975.00$

60600-1000

Line 0390 335 M 275.00$ 92,125.00$ 100,500.00$ 67,000.00$ 105,525.00$ 100,500.00$

60600-4000

Line 0400 110 M 18.00$ 1,980.00$ 3,850.00$ 3,300.00$ 7,700.00$ 5,280.00$

60600-9000

Line 0410 12 Each 8,500.00$ 102,000.00$ 120,000.00$ 60,000.00$ 100,800.00$ 60,000.00$

60700-1000

Line 0420 650 M 115.00$ 74,750.00$ 65,000.00$ 65,000.00$ 73,125.00$ 81,250.00$

60900-2000

Line 0430 85 M 65.00$ 5,525.00$ 17,000.00$ 6,800.00$ 14,875.00$ 12,750.00$

60900-6000

Line 0440 80 M 75.00$ 6,000.00$ 28,000.00$ 16,000.00$ 14,000.00$ 12,000.00$

61000-3000

Line 0450 115 M 515.00$ 59,225.00$ 345,000.00$ 40,250.00$ 64,400.00$ 46,000.00$

61000-4000

Line 0460 25 M 675.00$ 16,875.00$ 137,500.00$ 17,500.00$ 17,500.00$ 18,750.00$

61000-5000

Line 0470 40 M 400.00$ 16,000.00$ 48,000.00$ 10,000.00$ 18,000.00$ 16,000.00$

61101-1000

Line 0480 26 mo 4,850.00$ 126,100.00$ 171,600.00$ 104,000.00$ 169,000.00$ 78,000.00$

61200-2000

Line 0490 8 Each 1,800.00$ 14,400.00$ 160,000.00$ 48,000.00$ 72,000.00$ 32,000.00$

61310-1000

Line 0500 1 Each 350.00$ 350.00$ 550.00$ 530.00$ 681.75$ 600.00$

61310-2000

Line 0510 1 Each 350.00$ 350.00$ 550.00$ 530.00$ 757.50$ 600.00$

61310-3000

Line 0520 1 Each 380.00$ 380.00$ 1,000.00$ 860.00$ 1,325.00$ 1,000.00$

61310-4000

Line 0530 1 Each 380.00$ 380.00$ 1,000.00$ 860.00$ 1,802.00$ 1,000.00$

Cold Milling Bituminous Concrete Pavement, Variable Depth (0.025m to 0.075m)

Inlet, Type V

6 inch Pipe Underdrain, Type Non-Perforated PVC Schedule 40

W-Beam Guardrail, Single Face

Removal, Storage and Delivery of Existing Guardrail

ThrieBeam Transition Section, Type II

Barbed Wire Fence, Type A

Hot Plant Mix Asphalt Concrete, Type S (75)(12)

Hot Plant Mix Asphalt Concrete, Type B (75)(34)

Hot Plant Mix Asphalt Concrete, Type B (75)(1)

Reinforcing Steel

24" Reinforced Concrete Pipe Class-III

24" Reinforced Concrete Pipe, End Section

Lean Concrete Base

Full Depth Removal of Bituminous Concrete Pavement

Temporary Lighting Standard

Traffic Sign Assembly, Code 1

Traffic Sign Assembly, Code 2

Traffic Sign Assembly, Code 3

Traffic Sign Assembly, Code 4

Combination Concrete Curb and Gutter, Type-F

Concrete Gutter

Concrete Barrier, Type C

Concrete Barrier, Type C (Modified)

Concrete Barrier, Bridge Parapet

Field Office

300.00$ 80.00$ 120.00$ 140.00$

170.00$ 90.00$ 86.00$ 60.00$

6.00$ 10.00$ 40.55$ 5.00$

60.00$ 100.00$ 60.00$ 40.00$

300.00$ 315.00$ 450.00$ 250.00$

300.00$ 315.00$ 450.00$ 200.00$

3.00$ 2.00$ 5.95$ 3.00$

300.00$ 315.00$ 800.00$ 300.00$

4,000.00$ 2,000.00$ 2,500.00$ 3,100.00$

600.00$ 150.00$ 500.00$ 300.00$

400.00$ 30.00$ 107.50$ 35.00$

6,000.00$ 6,000.00$ 6,000.00$ 5,000.00$

35.00$ 30.00$ 70.00$ 48.00$

300.00$ 200.00$ 315.00$ 300.00$

100.00$ 100.00$ 112.50$ 125.00$

10,000.00$ 5,000.00$ 8,400.00$ 5,000.00$

350.00$ 200.00$ 175.00$ 150.00$

200.00$ 80.00$ 175.00$ 150.00$

5,500.00$ 700.00$ 700.00$ 750.00$

3,000.00$ 350.00$ 560.00$ 400.00$

6,600.00$ 4,000.00$ 6,500.00$ 3,000.00$

1,200.00$ 250.00$ 450.00$ 400.00$

550.00$ 530.00$ 681.75$ 600.00$

20,000.00$ 6,000.00$ 9,000.00$ 4,000.00$

1,000.00$ 860.00$ 1,325.00$ 1,000.00$

550.00$ 530.00$ 757.50$ 600.00$

1,000.00$ 860.00$ 1,802.00$ 1,000.00$

9/10/2024 Page 3 of 5

Schedule Total of Bid Items: 6,925,000.00$ 32.3% 9,163,477.00$ 55.9% 10,799,490.00$ 20.6% 8,351,159.75$ 16.4% 8,061,826.00$ Project No: PR ER DOT PRMNT RPR(17)

Project Name: AC-857579, AC-893579, AC-905579: ER-HWY-483, 258, 262, 263, 264, 265

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

61310-5000

Line 0540 2 Each 355.00$ 710.00$ 1,500.00$ 1,670.00$ 2,670.00$ 1,600.00$

61310-6000

Line 0550 6 Each 400.00$ 2,400.00$ 4,500.00$ 5,010.00$ 8,544.00$ 4,800.00$

61310-7000

Line 0560 1 Each 350.00$ 350.00$ 550.00$ 530.00$ 757.50$ 600.00$

61310-8000

Line 0570 1 Each 350.00$ 350.00$ 550.00$ 530.00$ 883.75$ 600.00$

61314-1000

Line 0580 3 Each 350.00$ 1,050.00$ 1,650.00$ 1,590.00$ 2,424.00$ 1,800.00$

61314-2000

Line 0590 10 Each 250.00$ 2,500.00$ 3,000.00$ 4,200.00$ 6,106.00$ 5,300.00$

61314-3000

Line 0600 10 Each 250.00$ 2,500.00$ 3,000.00$ 4,200.00$ 6,450.00$ 5,300.00$

61400-1000

Line 0610 580 m3 585.00$ 339,300.00$ 348,000.00$ 580,000.00$ 406,000.00$ 348,000.00$

61600-1000

Line 0620 ALL LPSM 30,000.00$ 30,000.00$ 25,000.00$ 51,000.00$ 88,000.00$ 30,000.00$

61700-1000

Line 0630 120 m2 150.00$ 18,000.00$ 30,000.00$ 10,800.00$ 30,000.00$ 24,000.00$

61701-1000

Line 0640 195 m2 175.00$ 34,125.00$ 41,925.00$ 17,550.00$ 48,750.00$ 39,000.00$

61701-2000

Line 0650 70 m3 125.00$ 8,750.00$ 7,000.00$ 6,300.00$ 8,400.00$ 3,500.00$

61701-3000

Line 0660 40 m2 225.00$ 9,000.00$ 12,000.00$ 3,600.00$ 10,000.00$ 12,000.00$

61701-4000

Line 0670 100 m2 275.00$ 27,500.00$ 20,000.00$ 9,000.00$ 25,000.00$ 30,000.00$

61800-2000

Line 0680 1,845 M 18.00$ 33,210.00$ 18,450.00$ 22,140.00$ 36,900.00$ 27,675.00$

61800-3000

Line 0690 1,005 M 18.00$ 18,090.00$ 10,050.00$ 12,060.00$ 20,100.00$ 15,075.00$

62100-2000

Line 0700 2 Each 170.00$ 340.00$ 1,300.00$ 900.00$ 1,400.00$ 1,200.00$

62101-2000

Line 0710 51 Each 175.00$ 8,925.00$ 33,150.00$ 5,100.00$ 2,550.00$ 25,500.00$

62200-1000

Line 0720 5 m3 275.00$ 1,375.00$ 1,750.00$ 600.00$ 2,500.00$ 1,250.00$

62200-7000

Line 0730 15 m3 350.00$ 5,250.00$ 9,000.00$ 3,000.00$ 8,250.00$ 9,300.00$

62201-1000

Line 0740 5 m3 175.00$ 875.00$ 1,750.00$ 600.00$ 2,500.00$ 700.00$

62201-2000

Line 0750 5 m3 235.00$ 1,175.00$ 1,750.00$ 600.00$ 2,500.00$ 700.00$

62300-1000

Line 0760 270 m3 52.00$ 14,040.00$ 47,250.00$ 54,000.00$ 94,500.00$ 108,000.00$

62300-2000

Line 0770 90 m3 36.00$ 3,240.00$ 9,900.00$ 13,500.00$ 10,557.00$ 18,000.00$

62400-1000

Line 0780 660 M 5.00$ 3,300.00$ 19,800.00$ 13,200.00$ 3,960.00$ 27,060.00$

62500-1000

Line 0790 270 m3 85.00$ 22,950.00$ 110,700.00$ 21,600.00$ 26,460.00$ 27,000.00$

62600-6000

410.00$ 80.00$ 98.00$ 100.00$

30.00$ 20.00$ 6.00$ 41.00$

110.00$ 150.00$ 117.30$ 200.00$

175.00$ 200.00$ 350.00$ 400.00$

350.00$ 120.00$ 500.00$ 140.00$

350.00$ 120.00$ 500.00$ 140.00$

600.00$ 200.00$ 550.00$ 620.00$

350.00$ 120.00$ 500.00$ 250.00$

650.00$ 100.00$ 50.00$ 500.00$

650.00$ 450.00$ 700.00$ 600.00$

10.00$ 12.00$ 20.00$ 15.00$

10.00$ 12.00$ 20.00$ 15.00$

200.00$ 90.00$ 250.00$ 300.00$

300.00$ 90.00$ 250.00$ 300.00$

100.00$ 90.00$ 120.00$ 50.00$

215.00$ 90.00$ 250.00$ 200.00$

250.00$ 90.00$ 250.00$ 200.00$

25,000.00$ 51,000.00$ 88,000.00$ 30,000.00$

Traffic Sign Assembly, Code 5

Gabions

Structural Steel, Furnished, Fabricated and Erected

Concrete Paved Waterway, Type I

Concrete Paved Waterway, Type II

Bed Course Material

Concrete Paved Waterway, Type III

Traffic Sign Assembly, Code 6

Traffic Sign Assembly, Code 7

Traffic Sign Assembly, Code 8

Traffic Sign Assembly, Code 11

Traffic Sign Assembly, Code 14

Traffic Sign Assembly, Code 15

Grouted Riprap, Class II

Filter Blanket, Type A

Filter Blanket, Type B

Stone Revetment, Type V

Filter Stone, Type D

Vertical Wick Drains

Concrete Paved Waterway, Type IV

Thermoplastic Pavement Marking Stripes, White

Thermoplastic Pavement Marking Stripes, Yellow

Hectometer Marker

Right-of-Way Marker

Dumped Riprap, Class I

Furnishing and Placing Loamy Topsoil

Protection to Existing Trees

750.00$ 835.00$ 1,335.00$ 800.00$

550.00$ 530.00$ 757.50$ 600.00$

750.00$ 835.00$ 1,424.00$ 800.00$

550.00$ 530.00$ 808.00$ 600.00$

550.00$ 530.00$ 883.75$ 600.00$

600.00$ 1,000.00$ 700.00$ 600.00$

300.00$ 420.00$ 645.00$ 530.00$

300.00$ 420.00$ 610.60$ 530.00$

9/10/2024 Page 4 of 5

Schedule Total of Bid Items: 6,925,000.00$ 32.3% 9,163,477.00$ 55.9% 10,799,490.00$ 20.6% 8,351,159.75$ 16.4% 8,061,826.00$ Project No: PR ER DOT PRMNT RPR(17)

Project Name: AC-857579, AC-893579, AC-905579: ER-HWY-483, 258, 262, 263, 264, 265

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Line 0800 11 Each 500.00$ 5,500.00$ 7,920.00$ 440.00$ 825.00$ 3,300.00$

62700-1000

Line 0810 810 m2 5.50$ 4,455.00$ 32,400.00$ 4,050.00$ 137,700.00$ 5,670.00$

62700-3000

Line 0820 515 m2 8.50$ 4,377.50$ 2,575.00$ 5,150.00$ 10,300.00$ 7,725.00$

62700-4000

Line 0830 600 m2 12.00$ 7,200.00$ 1,800.00$ 9,000.00$ 15,000.00$ 4,200.00$

62800-1000

Line 0840 340 m2 15.00$ 5,100.00$ 15,300.00$ 3,400.00$ 6,800.00$ 8,500.00$

63100-1000

Line 0850 1,660 m2 130.00$ 215,800.00$ 531,200.00$ 149,400.00$ 456,500.00$ 581,000.00$

63200-2000

Line 0860 20 M 175.00$ 3,500.00$ 10,000.00$ 6,000.00$ 5,200.00$ 6,000.00$

63200-3000

Line 0870 4 Each 625.00$ 2,500.00$ 28,000.00$ 4,000.00$ 10,000.00$ 8,000.00$

63802-1000

Line 0880 ALL LPSM 345,000.00$ 345,000.00$ 622,000.00$ 500,000.00$ 42,000.00$ 905,165.00$

64000-3000

Line 0890 15 Each 7.00$ 105.00$ 300.00$ 120.00$ 750.00$ 225.00$

64000-6000

Line 0900 130 Each 8.00$ 1,040.00$ 2,600.00$ 1,040.00$ 2,600.00$ 1,950.00$

64000-7000

Line 0910 100 Each 8.00$ 800.00$ 2,000.00$ 800.00$ 2,000.00$ 1,500.00$

66100-1000

Line 0920 2 Each 2,000.00$ 4,000.00$ 7,000.00$ 6,000.00$ 13,000.00$ 10,000.00$

91001-4000

Line 0930 4 Each 6,300.00$ 25,200.00$ 40,000.00$ 20,000.00$ 28,800.00$ 24,000.00$

91001-5000

Line 0940 8 Each 4,900.00$ 39,200.00$ 80,000.00$ 40,000.00$ 57,600.00$ 48,000.00$

91200-1000

Line 0950 770 m2 22.00$ 16,940.00$ 30,800.00$ 15,400.00$ 23,100.00$ 10,780.00$

91300-4000

Line 0960 1 Each 330.00$ 330.00$ 100.00$ 100.00$ 1,800.00$ 440.00$

92600-1000

Line 0970 65 m2 1,600.00$ 104,000.00$ 130,000.00$ 65,000.00$ 118,495.00$ 195,000.00$

93101-1000

Line 0980 60 M 110.00$ 6,600.00$ 30,000.00$ 30,000.00$ 17,160.00$ 18,000.00$

93101-4000

Line 0990 45 SQM 750.00$ 33,750.00$ 45,000.00$ 22,500.00$ 21,600.00$ 9,000.00$

93400-1000

Line 1000 5 m3 1,350.00$ 6,750.00$ 45,000.00$ 5,000.00$ 7,500.00$ 15,000.00$

93400-3000

Line 1010 85 m3 1,500.00$ 127,500.00$ 127,500.00$ 76,500.00$ 93,500.00$ 212,500.00$

99100-1000

Line 1020 755 m2 1,100.00$ 830,500.00$ 755,000.00$ 2,265,000.00$ 1,300,110.00$ 1,510,000.00$ 1,000.00$ 3,000.00$ 1,722.00$ 2,000.00$

1,500.00$ 900.00$ 1,100.00$ 2,500.00$

9,000.00$ 1,000.00$ 1,500.00$ 3,000.00$

1,000.00$ 500.00$ 480.00$ 200.00$

500.00$ 500.00$ 286.00$ 300.00$

2,000.00$ 1,000.00$ 1,823.00$ 3,000.00$

100.00$ 100.00$ 1,800.00$ 440.00$

40.00$ 20.00$ 30.00$ 14.00$

10,000.00$ 5,000.00$ 7,200.00$ 6,000.00$

10,000.00$ 5,000.00$ 7,200.00$ 6,000.00$

3,500.00$ 3,000.00$ 6,500.00$ 5,000.00$

20.00$ 8.00$ 20.00$ 15.00$

20.00$ 8.00$ 20.00$ 15.00$

20.00$ 8.00$ 50.00$ 15.00$

622,000.00$ 500,000.00$ 42,000.00$ 905,165.00$

7,000.00$ 1,000.00$ 2,500.00$ 2,000.00$

500.00$ 300.00$ 260.00$ 300.00$

320.00$ 90.00$ 275.00$ 350.00$

45.00$ 10.00$ 20.00$ 25.00$

3.00$ 15.00$ 25.00$ 7.00$

5.00$ 10.00$ 20.00$ 15.00$

40.00$ 5.00$ 170.00$ 7.00$

720.00$ 40.00$ 75.00$ 300.00$

Pneumatically Applied Mortar

Cleaning and Repair of Storm Sewer

Cleaning and Repair of Manholes, Inlets and Catch Basins

Maintenance of Traffic (MOT)

Reflective Raised Pavement Markers, One way, Clear

Reflective Raised Pavement Markers, Two way, Clear-Red

Seeding, (without mulch)

Jute Mesh

Erosion Control Blanket

Sodding

Mechanically Stabilized Earth (MSE) Retaining Wall

Removal and Disposal of Lead Based Paint (Guardrail)

Removal and Disposal of Lead Based Paint (Concrete Barrier, Parapet)

Structural Concrete, Class III (General Use)

Structural Concrete, Class V (General Use)

Mechanically Stabilized Earth (MSE) Slopes

Reflective Raised Pavement Markers, Two way, Yellow-Yellow

Project Funding Sign

New Transition Module (Cast-In-Place)

New Transition Module, < 45mph

Pre-fabricated Drainage Composite

Removal of Existing Traffic Signs

9/10/2024 Page 5 of 5

Schedule B Eastern Federal Lands Highway Division

Project No : PR ER DOT PRMNT RPR(17) FLMA No:

Project Name : AC-919579: ER-HWY-259 Solcitation No:

State : PUERTO RICO County : MOROVIS Federal Location : PR-155 (KM 38.65)

Opened at: Ashburn, Virginia Opened by: Emily McCleary Date: 9/5/2024

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date: 9/9/2024

Contract Awarded to: Award Date:

Contract Number: Data is Public

Contractor Comment Bid Amount Responsive

Engineer's Estimate 615,000.00$

Design Build, LLC 1,372,560.00$

LPC Contractors, Inc. 700,000.00$

Maglez Engineering & Contractors Corp. 941,690.00$

Novel Construction, LLC 661,964.00$

693C73-24-B-000015

Emily McCleary

Contract Specialist

YES

YES

YES

Bo. Boquerón PR-937 Km. 3.0 Las Piedras, PR 00771

P.O. Box 1787 Sabana Seca, PR 00951

YES

PR-140 Km. 59.0 Bo. Puerto Blanco Florida, PR 00650

1738 Calle Amarillo Suite 205, Box 15 San Juan, Puerto Rico 00926

9/10/2024 FHWA Confidential Page 1 of 3

Novel Construction, LLC

12 December 2024

Schedule Total of Bid Items: 615,000.00$ 123.2% 1,372,560.00$ 13.8% 700,000.00$ 53.1% 941,690.00$ 7.6% 661,964.00$ Project No: PR ER DOT PRMNT RPR(17)

Project Name: AC-919579: ER-HWY-259

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

15000-1000

Line 0010 ALL LPSM 12,000.00$ 12,000.00$ 50,000.00$ 100,000.00$ 10,000.00$ 20,000.00$

15100-1000

Line 0020 ALL LPSM 46,035.00$ 46,035.00$ 120,000.00$ 60,000.00$ 85,748.00$ 66,196.00$

15102-0000

Line 0030 1 CTSM 55,000.00$ 55,000.00$ 55,000.00$ 55,000.00$ 55,000.00$ 55,000.00$

15401-0000

Line 0040 ALL LPSM 15,000.00$ 15,000.00$ 50,000.00$ 50,000.00$ 22,500.00$ 15,000.00$

15401-1000

Line 0050 ALL LPSM 28,000.00$ 28,000.00$ 37,000.00$ 42,650.00$ 35,000.00$ 3,100.00$

15501-0000

Line 0060 ALL LPSM 14,000.00$ 14,000.00$ 6,600.00$ 4,000.00$ 13,500.00$ 6,000.00$

20100-1000

Line 0070 0.15 Cuerda 21,500.00$ 3,225.00$ 3,000.00$ 750.00$ 3,000.00$ 6,000.00$

20100-2000

Line 0080 4 Each 1,200.00$ 4,800.00$ 11,200.00$ 800.00$ 12,400.00$ 6,000.00$

20100-3000

Line 0090 1 Each 1,800.00$ 1,800.00$ 5,500.00$ 3,000.00$ 6,800.00$ 2,500.00$

20200-1000

Line 0100 ALL LPSM 9,200.00$ 9,200.00$ 25,500.00$ 10,000.00$ 29,000.00$ 10,000.00$

20201-6000

Line 0110 15 M 325.00$ 4,875.00$ 2,400.00$ 3,000.00$ 1,275.00$ 1,500.00$

20300-1000

Line 0120 50 m3 35.00$ 1,750.00$ 3,500.00$ 850.00$ 3,000.00$ 1,750.00$

20300-7000

Line 0130 10 m3 65.00$ 650.00$ 2,400.00$ 200.00$ 1,000.00$ 800.00$

20600-1000

Line 0140 235 m3 45.00$ 10,575.00$ 14,100.00$ 5,875.00$ 19,975.00$ 9,400.00$

20600-5000

Line 0150 ALL LPSM 50,000.00$ 50,000.00$ 50,000.00$ 60,000.00$ 100,000.00$ 15,000.00$

21000-1000

Line 0160 65 M 10.00$ 650.00$ 650.00$ 650.00$ 650.00$ 650.00$

21000-2000

Line 0170 200 Each 15.00$ 3,000.00$ 3,000.00$ 3,000.00$ 3,000.00$ 3,000.00$

21001-1000

Line 0180 1 Each 8,500.00$ 8,500.00$ 10,000.00$ 5,000.00$ 8,500.00$ 4,000.00$

21200-1000

Line 0190 95 m2 60.00$ 5,700.00$ 4,750.00$ 4,750.00$ 7,125.00$ 4,750.00$

30400-1000

Line 0200 30 m3 35.00$ 1,050.00$ 6,450.00$ 2,700.00$ 2,700.00$ 1,800.00$

30500-1000

Line 0210 155 m2 95.00$ 14,725.00$ 46,500.00$ 12,400.00$ 23,250.00$ 18,600.00$

40200-1000

Line 0220 5 m3 110.00$ 550.00$ 300.00$ 500.00$ 2,500.00$ 250.00$

40300-1000

Line 0230 530 m2 60.00$ 31,800.00$ 2,650.00$ 5,300.00$ 20,140.00$ 4,240.00$

42100-3000

Line 0240 105 TON 350.00$ 36,750.00$ 31,500.00$ 33,075.00$ 47,250.00$ 23,100.00$

42100-5000

Line 0250 70 TON 350.00$ 24,500.00$ 21,000.00$ 22,050.00$ 35,000.00$ 28,000.00$

60200-1000

Line 0260 235 lb 3.00$ 705.00$ 940.00$ 470.00$ 1,410.00$ 1,175.00$

4.00$ 2.00$ 6.00$ 5.00$

300.00$ 315.00$ 500.00$ 400.00$

300.00$ 315.00$ 450.00$ 220.00$

5.00$ 10.00$ 38.00$ 8.00$

60.00$ 100.00$ 500.00$ 50.00$

300.00$ 80.00$ 150.00$ 120.00$

215.00$ 90.00$ 90.00$ 60.00$

50.00$ 50.00$ 75.00$ 50.00$

10,000.00$ 5,000.00$ 8,500.00$ 4,000.00$

15.00$ 15.00$ 15.00$ 15.00$

10.00$ 10.00$ 10.00$ 10.00$

50,000.00$ 60,000.00$ 100,000.00$ 15,000.00$

60.00$ 25.00$ 85.00$ 40.00$

240.00$ 20.00$ 100.00$ 80.00$

70.00$ 17.00$ 60.00$ 35.00$

160.00$ 200.00$ 85.00$ 100.00$

25,500.00$ 10,000.00$ 29,000.00$ 10,000.00$

5,500.00$ 3,000.00$ 6,800.00$ 2,500.00$

2,800.00$ 200.00$ 3,100.00$ 1,500.00$

20,000.00$ 5,000.00$ 20,000.00$ 40,000.00$

6,600.00$ 4,000.00$ 13,500.00$ 6,000.00$

37,000.00$ 42,650.00$ 35,000.00$ 3,100.00$

60,000.00$ 85,748.00$ 66,196.00$

55,000.00$ 55,000.00$ 55,000.00$ 55,000.00$

Design Build, LLC LPC Contractors, Inc. Maglez Engineering & Contractors Corp Novel Construction, LLC

120,000.00$

50,000.00$ 100,000.00$ 10,000.00$ 20,000.00$

Construction Survey and Staking

Mobilization

Reimbursement for Municipal Tax Payments

Silt Fence

Straw Bales

Stabilized Construction Exit

Clearing and Grubbing

Cutting and Removing Trees, Small

Cutting and Removing Trees, Large

Removal of Structures and Obstructions

Removal of Concrete Barrier

Unclassified Excavation

Hot Plant Mix Asphalt Concrete, Type B (75)(34)

Reinforcing Steel

Reconditioning of Shoulders and Ditches

Aggregate Base Course, Grading A

Lean Concrete Base

Full Depth Removal of Bituminous Concrete Pavement

Cold Milling Bituminous Concrete Pavement, Variable Depth (0.025m to 0.075m)

Hot Plant Mix Asphalt Concrete, Type S (75)(12)

Contractor Testing (Biological Species Monitoring)

Construction Schedule

Borrow Class D-1

Unclassified Excavation for Structures

Temporary Shoring and Bracing (HWY-259)

Contractor Testing

50,000.00$ 50,000.00$ 22,500.00$ 15,000.00$

9/10/2024 Page 2 of 3

Schedule Total of Bid Items: 615,000.00$ 123.2% 1,372,560.00$ 13.8% 700,000.00$ 53.1% 941,690.00$ 7.6% 661,964.00$ Project No: PR ER DOT PRMNT RPR(17)

Project Name: AC-919579: ER-HWY-259

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Engineer's Estimate Design Build, LLC LPC Contractors, Inc. Maglez Engineering & Contractors Corp Novel Construction, LLC

60600-1000

Line 0270 40 M 275.00$ 11,000.00$ 14,000.00$ 8,000.00$ 15,000.00$ 12,000.00$

60600-9000

Line 0280 2 Each 8,500.00$ 17,000.00$ 20,000.00$ 10,000.00$ 17,000.00$ 12,000.00$

60700-1000

Line 0290 40 M 115.00$ 4,600.00$ 4,000.00$ 4,000.00$ 4,400.00$ 4,800.00$

61000-4000

Line 0300 20 M 675.00$ 13,500.00$ 70,000.00$ 14,000.00$ 14,500.00$ 12,000.00$

61101-1000

Line 0310 4 mo 4,850.00$ 19,400.00$ 26,400.00$ 20,000.00$ 20,000.00$ 12,000.00$

61200-2000

Line 0320 2 Each 1,800.00$ 3,600.00$ 50,000.00$ 12,000.00$ 21,000.00$ 8,000.00$

61400-1000

Line 0330 5 m3 585.00$ 2,925.00$ 8,000.00$ 5,000.00$ 4,500.00$ 5,000.00$

61800-2000

Line 0340 220 M 18.00$ 3,960.00$ 7,700.00$ 2,640.00$ 4,400.00$ 2,200.00$

61800-3000

Line 0350 30 M 18.00$ 540.00$ 1,050.00$ 360.00$ 900.00$ 300.00$

62101-2000

Line 0360 10 Each 175.00$ 1,750.00$ 6,300.00$ 1,000.00$ 500.00$ 5,000.00$

62200-1000

Line 0370 3 m3 275.00$ 825.00$ 1,500.00$ 360.00$ 1,950.00$ 2,400.00$

62201-1000

Line 0380 1 m3 175.00$ 175.00$ 1,300.00$ 120.00$ 500.00$ 800.00$

62500-1000

Line 0390 10 m3 85.00$ 850.00$ 4,000.00$ 800.00$ 1,100.00$ 1,000.00$

62800-1000

Line 0400 75 m2 15.00$ 1,125.00$ 3,375.00$ 750.00$ 2,625.00$ 3,000.00$

63200-2000

Line 0410 25 M 175.00$ 4,375.00$ 9,375.00$ 7,500.00$ 5,000.00$ 7,500.00$

63200-3000

Line 0420 1 Each 625.00$ 625.00$ 4,400.00$ 1,000.00$ 3,700.00$ 3,000.00$

63802-1000

Line 0430 ALL LPSM 35,000.00$ 35,000.00$ 240,200.00$ 50,000.00$ 163,242.00$ 80,753.00$

64000-6000

Line 0440 30 Each 8.00$ 240.00$ 480.00$ 300.00$ 1,500.00$ 600.00$

64000-7000

Line 0450 15 Each 8.00$ 120.00$ 240.00$ 150.00$ 750.00$ 300.00$

66100-1000

Line 0460 2 Each 2,000.00$ 4,000.00$ 7,400.00$ 6,000.00$ 16,000.00$ 12,000.00$

91001-5000

Line 0470 2 Each 4,900.00$ 9,800.00$ 18,400.00$ 10,000.00$ 14,400.00$ 12,000.00$

92600-1000

Line 0480 55 m2 1,600.00$ 88,000.00$ 275,000.00$ 55,000.00$ 71,500.00$ 137,500.00$

93400-1000

Line 0490 5 m3 1,350.00$ 6,750.00$ 35,500.00$ 5,000.00$ 7,500.00$ 20,000.00$ 7,100.00$ 1,000.00$ 1,500.00$ 4,000.00$

5,000.00$ 1,000.00$ 1,300.00$ 2,500.00$

9,200.00$ 5,000.00$ 7,200.00$ 6,000.00$

3,700.00$ 3,000.00$ 8,000.00$ 6,000.00$

16.00$ 10.00$ 50.00$ 20.00$

16.00$ 10.00$ 50.00$ 20.00$

240,200.00$ 50,000.00$ 163,242.00$ 80,753.00$

4,400.00$ 1,000.00$ 3,700.00$ 3,000.00$

375.00$ 300.00$ 200.00$ 300.00$

45.00$ 10.00$ 35.00$ 40.00$

400.00$ 80.00$ 110.00$ 100.00$

1,300.00$ 120.00$ 500.00$ 800.00$

500.00$ 120.00$ 650.00$ 800.00$

630.00$ 100.00$ 50.00$ 500.00$

35.00$ 12.00$ 30.00$ 10.00$

35.00$ 12.00$ 20.00$ 10.00$

1,600.00$ 1,000.00$ 900.00$ 1,000.00$

25,000.00$ 6,000.00$ 10,500.00$ 4,000.00$

6,600.00$ 5,000.00$ 5,000.00$ 3,000.00$

3,500.00$ 700.00$ 725.00$ 600.00$

100.00$ 100.00$ 110.00$ 120.00$

10,000.00$ 5,000.00$ 8,500.00$ 6,000.00$

350.00$ 200.00$ 375.00$ 300.00$

Structural Concrete, Class III (General Use)

Maintenance of Traffic (MOT)

Reflective Raised Pavement Markers, Two way, Clear-Red

Reflective Raised Pavement Markers, Two way, Yellow-Yellow

Project Funding Sign

New Transition Module, < 45mph

Mechanically Stabilized Earth (MSE) Retaining Wall

W-Beam Guardrail, Single Face

ThrieBeam Transition Section, Type II

Barbed Wire Fence, Type A

Concrete Barrier, Type C (Modified)

Dumped Riprap, Class I

Filter Blanket, Type A

Furnishing and Placing Loamy Topsoil

Sodding

Cleaning and Repair of Storm Sewer

Cleaning and Repair of Manholes, Inlets and Catch Basins

Field Office

Temporary Lighting Standard

Gabions

Thermoplastic Pavement Marking Stripes, White

Thermoplastic Pavement Marking Stripes, Yellow

Right-of-Way Marker

9/10/2024 Page 3 of 3

Schedule C Eastern Federal Lands Highway Division

Project No : PR ER DOT PRMNT RPR(17) FLMA No:

Project Name : AC-908579, ER-HWY-257; AC-857579, ER-HWY-260 & 261 Solcitation No:

State : PUERTO RICO County : MOROVIS Federal Location : PR-155 (KM 36.15, 39.1, & 40.30)

Opened at: Ashburn, Virginia Opened by: Emily McCleary Date: 9/5/2024

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Title:

Date: 9/9/2024

Contract Awarded to: Award Date:

Contract Number: Data is Public

Contractor Comment Bid Amount Responsive

Engineer's Estimate 3,485,000.00$

Design Build, LLC 5,716,162.50$

LPC Contractors, Inc. 5,700,000.00$

Maglez Engineering & Contractors Corp. 4,391,781.00$

Novel Construction, LLC 3,733,410.00$

P.O. Box 1787 Sabana Seca, PR 00951

YES

PR-140 Km. 59.0 Bo. Puerto Blanco Florida, PR 00650

1738 Calle Amarillo Suite 205, Box 15 San Juan, Puerto Rico 00926

YES

YES

YES

Bo. Boquerón PR-937 Km. 3.0 Las Piedras, PR 00771

693C73-24-B-000015

Signed: Emily McCleary

Contract Specialist

9/10/2024 FHWA Confidential Page 1 of 5

Novel Construction, LLC 12 December 2024

Schedule Total of Bid Items: 3,485,000.00$ 64.0% 5,716,162.50$ 63.6% 5,700,000.00$ 26.0% 4,391,781.00$ 7.1% 3,733,410.00$ Project No: PR ER DOT PRMNT RPR(17)

Project Name: AC-908579, ER-HWY-257; AC-857579, ER-HWY-260 & 261

CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

15000-1000

Line 0010 ALL LPSM 70,000.00$ 70,000.00$ 124,000.00$ 500,000.00$ 9,000.00$ 30,000.00$

15100-1000

Line 0020 ALL LPSM 171,541.50$ 171,541.50$ 550,000.00$ 55,000.00$ 399,284.00$ 280,000.00$

15102-0000

Line 0030 1 CTSM 315,000.00$ 315,000.00$ 315,000.00$ 315,000.00$ 315,000.00$ 315,000.00$

15401-0000

Line 0040 ALL LPSM 85,000.00$ 85,000.00$ 50,000.00$ 500,000.00$ 32,000.00$ 30,000.00$

15401-1000

Line 0050 ALL LPSM 100,000.00$ 100,000.00$ 108,000.00$ 500,000.00$ 60,000.00$ 10,000.00$

15501-0000

Line 0060 ALL LPSM 42,000.00$ 42,000.00$ 20,000.00$ 189,656.00$ 15,000.00$ 10,000.00$

20100-1000

Line 0070 0.30 Cuerda 21,500.00$ 6,450.00$ 1,800.00$ 1,500.00$ 3,600.00$ 12,000.00$

20100-2000

Line 0080 19 Each 1,200.00$ 22,800.00$ 51,300.00$ 3,800.00$ 55,081.00$ 20,900.00$

20200-1000

Line 0090 ALL LPSM 5,300.00$ 5,300.00$ 15,000.00$ 50,000.00$ 37,500.00$ 20,000.00$

20200-9000

Line 0100 1 Each 250.00$ 250.00$ 150.00$ 100.00$ 1,500.00$ 5,000.00$

20201-6000

Line 0110 115 M 325.00$ 37,375.00$ 8,050.00$ 17,250.00$ 7,475.00$ 11,500.00$

20300-1000

Line 0120 1,020 m3 35.00$ 35,700.00$ 69,360.00$ 16,728.00$ 61,200.00$ 35,700.00$

20300-2000

Line 0130 30 m3 370.00$ 11,100.00$ 19,050.00$ 6,000.00$ 3,750.00$ 7,500.00$

20300-5000

Line 0140 2,760 m3 55.00$ 151,800.00$ 165,600.00$ 55,200.00$ 110,400.00$ 82,800.00$

20500-1000

Line 0150 145 m3 40.00$ 5,800.00$ 10,150.00$ 2,900.00$ 10,440.00$ 5,800.00$

20600-1000

Line 0160 1,780 m3 45.00$ 80,100.00$ 80,100.00$ 44,500.00$ 106,800.00$ 71,200.00$

20600-5000

Line 0170 ALL LPSM 90,000.00$ 90,000.00$ 30,000.00$ 100,000.00$ 100,000.00$ 30,000.00$

20600-6000

Line 0180 ALL LPSM 35,000.00$ 35,000.00$ 30,000.00$ 100,000.00$ 85,000.00$ 10,000.00$

20600-7000

Line 0190 ALL LPSM 105,000.00$ 105,000.00$ 120,000.00$ 300,000.00$ 100,000.00$ 30,000.00$

21000-1000

Line 0200 620 M 10.00$ 6,200.00$ 6,200.00$ 6,200.00$ 6,200.00$ 6,200.00$

21000-2000

Line 0210 550 Each 15.00$ 8,250.00$ 8,250.00$ 8,250.00$ 8,250.00$ 8,250.00$

21000-6000

Line 0220 1 Each 5,800.00$ 5,800.00$ 35,000.00$ 10,000.00$ 7,500.00$ 10,000.00$

21001-1000

Line 0230 3 Each 8,500.00$ 25,500.00$ 45,000.00$ 15,000.00$ 22,500.00$ 18,000.00$

30400-1000

Line 0240 145 m3 35.00$ 5,075.00$ 24,650.00$ 13,050.00$ 14,500.00$ 8,700.00$

30500-1000

Line 0250 875 m2 95.00$ 83,125.00$ 262,500.00$ 70,000.00$ 105,000.00$ 105,000.00$

40200-1000

Line 0260 90 m3 110.00$ 9,900.00$ 5,400.00$ 9,000.00$ 5,400.00$ 3,600.00$

Contractor Testing

50,000.00$ 500,000.00$ 32,000.00$ 30,000.00$

Construction Survey and Staking

Mobilization

Reimbursement for Municipal Tax Payments

Unclassified Excavation for Structures

Temporary Shoring and Bracing (HWY-257)

Temporary Shoring and Bracing (HWY-260)

Clearing and Grubbing

Cutting and Removing Trees, Small

Removal of Structures and Obstructions

Removal of Traffic Sign

Removal of Concrete Barrier

Unclassified Excavation

Lean Concrete Base

Full Depth Removal of Bituminous Concrete Pavement

Temporary Shoring and Bracing (HWY-261)

Silt Fence

Straw Bales

Temporary Rock Barrier Sediment Trap

Stabilized Construction Exit

Aggregate Base Course, Grading A

Contractor Testing (Biological Species Monitoring)

Construction Schedule

Rock Excavation

Borrow Class B-1

Trench Excavation, Unclassified

500,000.00$ 9,000.00$ 30,000.00$

Design Build, LLC LPC Contractors, Inc. Maglez Engineering & Contractors Corp Novel Construction, LLC

550,000.00$

124,000.00$

108,000.00$ 500,000.00$ 60,000.00$ 10,000.00$

55,000.00$ 399,284.00$ 280,000.00$

315,000.00$ 315,000.00$ 315,000.00$ 315,000.00$

2,700.00$ 200.00$ 2,899.00$ 1,100.00$

6,000.00$ 5,000.00$ 12,000.00$ 40,000.00$

20,000.00$ 189,656.00$ 15,000.00$ 10,000.00$

150.00$ 100.00$ 1,500.00$ 5,000.00$

15,000.00$ 50,000.00$ 37,500.00$ 20,000.00$

68.00$ 16.40$ 60.00$ 35.00$

70.00$ 150.00$ 65.00$ 100.00$

60.00$ 20.00$ 40.00$ 30.00$

635.00$ 200.00$ 125.00$ 250.00$

45.00$ 25.00$ 60.00$ 40.00$

70.00$ 20.00$ 72.00$ 40.00$

30,000.00$ 100,000.00$ 85,000.00$ 10,000.00$

30,000.00$ 100,000.00$ 100,000.00$ 30,000.00$

10.00$ 10.00$ 10.00$ 10.00$

120,000.00$ 300,000.00$ 100,000.00$ 30,000.00$

35,000.00$ 10,000.00$ 7,500.00$ 10,000.00$

15.00$ 15.00$ 15.00$ 15.00$

170.00$ 90.00$ 100.00$ 60.00$

15,000.00$ 5,000.00$ 7,500.00$ 6,000.00$

60.00$ 100.00$ 60.00$ 40.00$

300.00$ 80.00$ 120.00$ 120.00$

9/10/2024 Page 2 of 5

Schedule Total of Bid Items: 3,485,000.00$ 64.0% 5,716,162.50$ 63.6% 5,700,000.00$ 26.0% 4,391,781.00$ 7.1% 3,733,410.00$ Project No: PR ER DOT PRMNT RPR(17)

Project Name: AC-908579, ER-HWY-257; AC-857579, ER-HWY-260 & 261

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Design Build, LLC LPC Contractors, Inc. Maglez Engineering & Contractors Corp Novel Construction, LLC

40300-1000

Line 0270 2,010 m2 60.00$ 120,600.00$ 30,150.00$ 20,100.00$ 76,380.00$ 20,100.00$

42100-1000

Line 0280 30 TON 350.00$ 10,500.00$ 7,500.00$ 9,450.00$ 15,300.00$ 9,000.00$

42100-2000

Line 0290 15 TON 350.00$ 5,250.00$ 3,750.00$ 4,725.00$ 10,500.00$ 4,500.00$

42100-3000

Line 0300 300 TON 350.00$ 105,000.00$ 75,000.00$ 94,500.00$ 135,000.00$ 90,000.00$

42100-5000

Line 0310 395 TON 350.00$ 138,250.00$ 98,750.00$ 98,750.00$ 187,625.00$ 118,500.00$

60200-1000

Line 0320 700 lb 3.00$ 2,100.00$ 3,500.00$ 1,400.00$ 4,200.00$ 3,500.00$

60300-3000

Line 0330 20 M 875.00$ 17,500.00$ 10,000.00$ 5,000.00$ 14,500.00$ 8,000.00$

60300-8000

Line 0340 5 M 1,800.00$ 9,000.00$ 147,500.00$ 2,000.00$ 10,500.00$ 100,000.00$

60301-1000

Line 0350 1 Each 8,000.00$ 8,000.00$ 5,000.00$ 4,000.00$ 7,500.00$ 6,000.00$

60301-2000

Line 0360 1 Each 13,000.00$ 13,000.00$ 21,500.00$ 20,000.00$ 9,000.00$ 30,000.00$

60400-1000

Line 0370 1 Each 5,500.00$ 5,500.00$ 18,000.00$ 15,000.00$ 12,300.00$ 25,000.00$

60401-1000

Line 0380 1 Each 4,000.00$ 4,000.00$ 17,000.00$ 15,000.00$ 7,850.00$ 25,000.00$

60401-2000

Line 0390 1 Each 7,500.00$ 7,500.00$ 13,000.00$ 10,000.00$ 10,000.00$ 15,000.00$

60500-1000

Line 0400 40 M 100.00$ 4,000.00$ 10,000.00$ 1,600.00$ 2,880.00$ 1,200.00$

60600-1000

Line 0410 185 M 275.00$ 50,875.00$ 55,500.00$ 37,000.00$ 60,125.00$ 40,700.00$

60600-4000

Line 0420 30 M 18.00$ 540.00$ 990.00$ 900.00$ 2,160.00$ 1,500.00$

60600-5000

Line 0430 2 Each 10,000.00$ 20,000.00$ 12,600.00$ 20,000.00$ 16,800.00$ 12,000.00$

60600-9000

Line 0440 4 Each 8,500.00$ 34,000.00$ 39,600.00$ 20,000.00$ 34,500.00$ 24,000.00$

60601-1000

Line 0450 60 M 350.00$ 21,000.00$ 24,000.00$ 18,000.00$ 19,200.00$ 18,000.00$

60700-1000

Line 0460 235 M 115.00$ 27,025.00$ 23,265.00$ 23,500.00$ 23,500.00$ 23,500.00$

60700-3000

Line 0470 22 M 175.00$ 3,850.00$ 5,500.00$ 4,400.00$ 7,150.00$ 4,620.00$

61000-3000

Line 0480 70 M 515.00$ 36,050.00$ 196,000.00$ 35,000.00$ 42,000.00$ 28,000.00$

61000-4000

Line 0490 22 M 675.00$ 14,850.00$ 121,000.00$ 15,400.00$ 19,800.00$ 17,600.00$

61101-1000

Line 0500 12 mo 4,850.00$ 58,200.00$ 79,200.00$ 60,000.00$ 86,400.00$ 36,000.00$

61200-2000

Line 0510 4 Each 1,800.00$ 7,200.00$ 44,000.00$ 24,000.00$ 36,000.00$ 16,000.00$

61400-1000

Line 0520 1,520 m3 585.00$ 889,200.00$ 760,000.00$ 1,520,000.00$ 1,086,800.00$ 912,000.00$

Hot Plant Mix Asphalt Concrete, Type S (75)(12)

Manhole, No. 1: Model B (Depth 3.50 m)

Inlet, No. 1: Model B (Depth 2.33 m)

Inlet, No. 2: Model A (Depth 3.39 m)

4 inch Pipe Underdrain, Type Non-Perforated PVC Schedule 40

W-Beam Guardrail, Single Face

Removal, Storage and Delivery of Existing Guardrail

Hot Plant Mix Asphalt Concrete, Type B (75)(34)

Reinforcing Steel

30" Reinforced Concrete Pipe Class-III

60" Reinforced Concrete Pipe Class III

30-inch Headwall, Type B

60-inch (Double) Headwall, Type B

Cold Milling Bituminous Concrete Pavement, Variable Depth (0.025m to 0.075m)

Hot Plant Mix Asphalt Concrete, Type S (50)(38)

Hot Plant Mix Asphalt Concrete, Type B (50)(12)

Concrete Barrier, Type C (Modified)

Field Office

Temporary Lighting Standard

Gabions

Crashworthy End Terminal Type II, TL-2

ThrieBeam Transition Section, Type II

W-Beam Guardrail, Single Face (Strong Post)

Barbed Wire Fence, Type A

Chain-Link Fence, Type A

Concrete Barrier, Type C

250.00$ 315.00$ 510.00$ 300.00$

15.00$ 10.00$ 38.00$ 10.00$

250.00$ 315.00$ 450.00$ 300.00$

250.00$ 315.00$ 700.00$ 300.00$

5.00$ 2.00$ 6.00$ 5.00$

250.00$ 250.00$ 475.00$ 300.00$

29,500.00$ 400.00$ 2,100.00$ 20,000.00$

500.00$ 250.00$ 725.00$ 400.00$

21,500.00$ 20,000.00$ 9,000.00$ 30,000.00$

5,000.00$ 4,000.00$ 7,500.00$ 6,000.00$

17,000.00$ 15,000.00$ 7,850.00$ 25,000.00$

18,000.00$ 15,000.00$ 12,300.00$ 25,000.00$

250.00$ 40.00$ 72.00$ 30.00$

13,000.00$ 10,000.00$ 10,000.00$ 15,000.00$

33.00$ 30.00$ 72.00$ 50.00$

300.00$ 200.00$ 325.00$ 220.00$

9,900.00$ 5,000.00$ 8,625.00$ 6,000.00$

6,300.00$ 10,000.00$ 8,400.00$ 6,000.00$

99.00$ 100.00$ 100.00$ 100.00$

400.00$ 300.00$ 320.00$ 300.00$

2,800.00$ 500.00$ 600.00$ 400.00$

250.00$ 200.00$ 325.00$ 210.00$

6,600.00$ 5,000.00$ 7,200.00$ 3,000.00$

5,500.00$ 700.00$ 900.00$ 800.00$

500.00$ 1,000.00$ 715.00$ 600.00$

11,000.00$ 6,000.00$ 9,000.00$ 4,000.00$

9/10/2024 Page 3 of 5

Schedule Total of Bid Items: 3,485,000.00$ 64.0% 5,716,162.50$ 63.6% 5,700,000.00$ 26.0% 4,391,781.00$ 7.1% 3,733,410.00$ Project No: PR ER DOT PRMNT RPR(17)

Project Name: AC-908579, ER-HWY-257; AC-857579, ER-HWY-260 & 261

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Design Build, LLC LPC Contractors, Inc. Maglez Engineering & Contractors Corp Novel Construction, LLC

61700-1000

Line 0530 60 m2 150.00$ 9,000.00$ 37,800.00$ 5,400.00$ 15,000.00$ 9,000.00$

61701-1000

Line 0540 95 m2 175.00$ 16,625.00$ 60,800.00$ 8,550.00$ 23,750.00$ 14,250.00$

61701-2000

Line 0550 20 m3 125.00$ 2,500.00$ 2,900.00$ 1,800.00$ 2,200.00$ 1,000.00$

61800-2000

Line 0560 775 M 18.00$ 13,950.00$ 10,075.00$ 9,300.00$ 16,275.00$ 7,750.00$

61800-3000

Line 0570 105 M 18.00$ 1,890.00$ 1,365.00$ 1,260.00$ 2,205.00$ 1,050.00$

62101-2000

Line 0580 25 Each 175.00$ 4,375.00$ 15,750.00$ 2,500.00$ 1,000.00$ 15,000.00$

62200-1000

Line 0590 10 m3 275.00$ 2,750.00$ 3,200.00$ 1,200.00$ 5,000.00$ 2,500.00$

62200-3000

Line 0600 5 m3 350.00$ 1,750.00$ 1,765.00$ 600.00$ 2,500.00$ 1,500.00$

62201-1000

Line 0610 10 m3 175.00$ 1,750.00$ 5,550.00$ 1,200.00$ 5,000.00$ 1,500.00$

62500-1000

Line 0620 70 m3 85.00$ 5,950.00$ 18,200.00$ 5,600.00$ 7,000.00$ 7,000.00$

62700-1000

Line 0630 110 m2 5.50$ 605.00$ 3,960.00$ 550.00$ 29,700.00$ 3,850.00$

62700-3000

Line 0640 375 m2 8.50$ 3,187.50$ 1,687.50$ 3,750.00$ 8,250.00$ 37,500.00$

62800-1000

Line 0650 270 m2 15.00$ 4,050.00$ 10,800.00$ 2,700.00$ 6,750.00$ 6,750.00$

63200-2000

Line 0660 20 M 175.00$ 3,500.00$ 9,200.00$ 6,000.00$ 4,500.00$ 4,000.00$

63200-3000

Line 0670 2 Each 625.00$ 1,250.00$ 8,400.00$ 2,000.00$ 5,120.00$ 4,000.00$

63500-6000

Line 0680 2 Each 4,800.00$ 9,600.00$ 11,200.00$ 6,000.00$ 28,800.00$ 28,000.00$

63500-7000

Line 0690 130 M 5.25$ 682.50$ 3,120.00$ 260.00$ 10,400.00$ 5,200.00$

63500-8000

Line 0700 175 M 12.50$ 2,187.50$ 4,725.00$ 875.00$ 6,314.00$ 2,625.00$

63504-1000

Line 0710 ALL LPSM 2,800.00$ 2,800.00$ 20,600.00$ 50,000.00$ 37,200.00$ 30,000.00$

63504-2000

Line 0720 1 CTSM 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$

63505-1000

Line 0730 3 Each 760.00$ 2,280.00$ 6,600.00$ 3,000.00$ 2,544.00$ 10,500.00$

63505-2000

Line 0740 1 Each 300.00$ 300.00$ 480.00$ 1,000.00$ 580.00$ 800.00$

63505-3000

Line 0750 1 Each 225.00$ 225.00$ 480.00$ 1,000.00$ 600.00$ 1,500.00$

63505-4000

Line 0760 2 Each 375.00$ 750.00$ 810.00$ 2,000.00$ 3,000.00$ 3,000.00$

63505-5000

Line 0770 2 Each 150.00$ 300.00$ 690.00$ 2,000.00$ 1,380.00$ 3,000.00$

63505-6000

Line 0780 2 Each 230.00$ 460.00$ 824.00$ 2,000.00$ 1,620.00$ 4,000.00$ 412.00$ 1,000.00$ 810.00$ 2,000.00$

345.00$ 1,000.00$ 690.00$ 1,500.00$

405.00$ 1,000.00$ 1,500.00$ 1,500.00$

480.00$ 1,000.00$ 600.00$ 1,500.00$

480.00$ 1,000.00$ 580.00$ 800.00$

2,200.00$ 1,000.00$ 848.00$ 3,500.00$

10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$

20,600.00$ 50,000.00$ 37,200.00$ 30,000.00$

27.00$ 5.00$ 36.08$ 15.00$

24.00$ 2.00$ 80.00$ 40.00$

5,600.00$ 3,000.00$ 14,400.00$ 14,000.00$

4,200.00$ 1,000.00$ 2,560.00$ 2,000.00$

460.00$ 300.00$ 225.00$ 200.00$

40.00$ 10.00$ 25.00$ 25.00$

4.50$ 10.00$ 22.00$ 100.00$

36.00$ 5.00$ 270.00$ 35.00$

260.00$ 80.00$ 100.00$ 100.00$

Concrete Paved Waterway, Type I

Concrete Paved Waterway, Type II

Filter Blanket, Type A

Furnishing and Placing Loamy Topsoil

Seeding, (without mulch)

Jute Mesh

Sodding

Cleaning and Repair of Storm Sewer

Bed Course Material

Thermoplastic Pavement Marking Stripes, White

Thermoplastic Pavement Marking Stripes, Yellow

Right-of-Way Marker

Dumped Riprap, Class I

Dumped Riprap, Class III

PREPA Distribution, Standard AC-A6

PREPA Distribution, Standard E1-2-3

PREPA Distribution, Standard E1-2

PREPA Distribution, Standard F1-1

PREPA Distribution, Standard K-5

PREPA Distribution, Standard K-6

Cleaning and Repair of Manholes, Inlets and Catch Basins

Utility Concrete Pole, Class H-6, 45' Size

Conductor Wire, ACSR, 1/0 AWG

Conductor Wire, ACSR Triplex 600V, No. 2 AWG

Removal of Existing PREPA Facilities

Utility Company Compensation (PREPA)

640.00$ 90.00$ 250.00$ 150.00$

630.00$ 90.00$ 250.00$ 150.00$

13.00$ 12.00$ 21.00$ 10.00$

145.00$ 90.00$ 110.00$ 50.00$

630.00$ 100.00$ 40.00$ 600.00$

13.00$ 12.00$ 21.00$ 10.00$

555.00$ 120.00$ 500.00$ 150.00$

353.00$ 120.00$ 500.00$ 300.00$

320.00$ 120.00$ 500.00$ 250.00$

9/10/2024 Page 4 of 5

Schedule Total of Bid Items: 3,485,000.00$ 64.0% 5,716,162.50$ 63.6% 5,700,000.00$ 26.0% 4,391,781.00$ 7.1% 3,733,410.00$ Project No: PR ER DOT PRMNT RPR(17)

Project Name: AC-908579, ER-HWY-257; AC-857579, ER-HWY-260 & 261

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Design Build, LLC LPC Contractors, Inc. Maglez Engineering & Contractors Corp Novel Construction, LLC

63505-7000

Line 0790 2 Each 490.00$ 980.00$ 280.00$ 2,000.00$ 600.00$ 1,000.00$

63505-8000

Line 0800 2 Each 1,100.00$ 2,200.00$ 2,400.00$ 2,000.00$ 1,300.00$ 3,000.00$

63505-9000

Line 0810 2 Each 1,200.00$ 2,400.00$ 23,200.00$ 2,000.00$ 21,800.00$ 12,000.00$

63506-1000

Line 0820 2 Each 1,980.00$ 3,960.00$ 344.00$ 2,000.00$ 900.00$ 6,000.00$

63600-2000

Line 0830 140 M 120.00$ 16,800.00$ 57,400.00$ 11,200.00$ 22,400.00$ 14,000.00$

63600-5000

Line 0840 4 Each 1,500.00$ 6,000.00$ 19,200.00$ 4,000.00$ 4,000.00$ 12,000.00$

63602-1000

Line 0850 40 M 80.00$ 3,200.00$ 40,000.00$ 6,000.00$ 9,000.00$ 12,000.00$

63602-5000

Line 0860 2 Each 550.00$ 1,100.00$ 4,800.00$ 4,000.00$ 2,400.00$ 8,000.00$

63603-9000

Line 0870 4 Each 1,400.00$ 5,600.00$ 30,400.00$ 2,000.00$ 16,000.00$ 16,000.00$

63604-1000

Line 0880 ALL LPSM 5,400.00$ 5,400.00$ 153,000.00$ 50,000.00$ 30,000.00$ 8,000.00$

63604-4000

Line 0890 1 Each 1,800.00$ 1,800.00$ 2,500.00$ 1,000.00$ 2,000.00$ 5,000.00$

63604-8000

Line 0900 1 CTSM 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$

63802-1000

Line 0910 ALL LPSM 100,000.00$ 100,000.00$ 440,000.00$ 50,000.00$ 37,000.00$ 220,860.00$

64000-6000

Line 0920 108 Each 8.00$ 864.00$ 1,728.00$ 864.00$ 2,322.00$ 1,620.00$

64000-7000

Line 0930 54 Each 8.00$ 432.00$ 864.00$ 432.00$ 1,296.00$ 810.00$

66100-1000

Line 0940 2 Each 2,000.00$ 4,000.00$ 5,600.00$ 6,000.00$ 12,000.00$ 12,000.00$

91001-5000

Line 0950 4 Each 4,900.00$ 19,600.00$ 41,200.00$ 20,000.00$ 30,000.00$ 24,000.00$

91200-1000

Line 0960 135 m2 22.00$ 2,970.00$ 5,400.00$ 2,700.00$ 3,645.00$ 3,375.00$

93400-1000

Line 0970 12 m3 1,350.00$ 16,200.00$ 102,000.00$ 12,000.00$ 18,000.00$ 36,000.00$

93501-0000

Line 0980 8 Each 1,300.00$ 10,400.00$ 8,000.00$ 2,400.00$ 28,000.00$ 24,000.00$

96300-1000

Line 0990 130 m2 164.00$ 21,320.00$ 520,000.00$ 390,000.00$ 262,080.00$ 301,600.00$ 4,000.00$ 3,000.00$ 2,016.00$ 2,320.00$

1,000.00$ 300.00$ 3,500.00$ 3,000.00$

8,500.00$ 1,000.00$ 1,500.00$ 3,000.00$

40.00$ 20.00$ 27.00$ 25.00$

10,300.00$ 5,000.00$ 7,500.00$ 6,000.00$

2,800.00$ 3,000.00$ 6,000.00$ 6,000.00$

16.00$ 8.00$ 24.00$ 15.00$

16.00$ 8.00$ 21.50$ 15.00$

440,000.00$ 50,000.00$ 37,000.00$ 220,860.00$

30,000.00$ 30,000.00$ 30,000.00$ 30,000.00$

2,500.00$ 1,000.00$ 2,000.00$ 5,000.00$

153,000.00$ 50,000.00$ 30,000.00$ 8,000.00$

7,600.00$ 500.00$ 4,000.00$ 4,000.00$

2,400.00$ 2,000.00$ 1,200.00$ 4,000.00$

1,000.00$ 150.00$ 225.00$ 300.00$

4,800.00$ 1,000.00$ 1,000.00$ 3,000.00$

410.00$ 80.00$ 160.00$ 100.00$

172.00$ 1,000.00$ 450.00$ 3,000.00$

11,600.00$ 1,000.00$ 10,900.00$ 6,000.00$

1,200.00$ 1,000.00$ 650.00$ 1,500.00$

140.00$ 1,000.00$ 300.00$ 500.00$

4" Ductile Iron Pipe, Class 350

4" Ductile Iron Pipe, Gate Valve

4 inch Tapping Valve and Sleeve

Removal of Existing PRASA Facilities

4 inch Drain Valve

Utility Company Compensation (PRASA)

PREPA Distribution, Standard M16-2

PREPA Distribution, Standard M16-3

PREPA Distribution, Standard M16-4

PREPA Distribution, Standard M2-1

4" PVC Pipe, DR 14, Class 200

4" Gate Valve

Structural Concrete, Class III (General Use)

Locate Utility, Test Pit

Soil Nail Wall System

Maintenance of Traffic (MOT)

Reflective Raised Pavement Markers, Two way, Clear-Red

Reflective Raised Pavement Markers, Two way, Yellow-Yellow

Project Funding Sign

New Transition Module, < 45mph

Pre-fabricated Drainage Composite

9/10/2024 Page 5 of 5

Bid Tabs Summary
Bid Tabs
Schedule B Tabulation of Bids - PR ER DOT PRMNT RPR(17).pdf
Bid Tabs Summary
Bid Tabs
Schedule C Tabulation of Bids - PR ER DOT PRMNT RPR(17).pdf
Bid Tabs Summary
Bid Tabs

File details come from the government source that posted it. Updated .