Tabulation of Bids - NP-GWMP MVT(5).pdf

PDF 775 KB Posted

Attached to
George Washington Memorial Parkway Federal contract opportunity
Solicitation number
693C73-23-C-000002
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains a tabulation of bids report for a federal construction contract opportunity on the George Washington Memorial Parkway. Veterans Kitchen Maintenance Inc. was awarded contract 693C73-23-C-000002 on December 20, 2022 for $3,961,400 to perform work including mobilization, construction surveying and staking, contractor testing, soil erosion control measures, removal of trees, stumps, signs and pavement, roadway excavation and aggregate work, and asphalt paving. Nine contractors submitted bids ranging from $3,961,400 to $7,665,000 for the work. The solicitation was issued by the U.S. Department of Transportation Federal Highway Administration for construction services on the parkway in Fairfax County, Virginia.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 11/29/22

1 out of 13

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Solcitation No: 693C73-23-B-000004

Division: Eastern Federal Lands

State: VA County: Fairfax

Federal Land: George Washington Memorial Parkway Opened at: Ashburn, Virginia

Opened by: Emily McCleary

Date: 11/29/22

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Veterans Kitchen Maintenance Inc. Low bidder $3,961,400.00 7909 Marlboro Pike Forestville Maryland 20747

Milani Construction, LLC $4,261,910.00 2001 Martin Luther King, Jr. Ave SE Washington District of Columbia 20020

Ardent Company, LLC $4,977,900.00 PO Box 879 McClean Virginia 22101

Terra Site Constructors, LLC $5,295,120.00 900 Shenandoah Shores Rd., Suite 100 Front Royal Virginia 22630

Central Southern Construction Corp. $5,324,034.00 119 Sewald Street Jacksonville Florida 32204

Lalini Enterprises, LLC $5,778,598.32 1400 Montague St. NW Washington District of Columbia 20011

Kovilic Construction Company, Inc. $6,357,090.00 3721 N. Carnation Street Franklin Park Illinois 60131

Rising Sun, Inc. $7,632,414.25 11188 Bears Den Road Marshall Virginia 20115

Maverick Construction, LLC $7,665,000.00 401 Greenwood Creek Lane Grasonville Maryland 21638

Emily McCleary

Contract Specialist

29 November 2022

Veterans Kitchen Maintenance, Inc. 20 December 2022

2 out of 13

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Solcitation No: 693C73-23-B-000004

Division: Eastern Federal Lands

State: VA County: Fairfax

Federal Land: George Washington Memorial Parkway Opened at: Ashburn, Virginia

Opened by: Emily McCleary

Date: 11/29/22

Engineer's Estimate $4,500,000.00

3 out of 13

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1000 15101-0000 MOBILIZATION

Veterans Kitchen Maintenance Inc. Lump Sum $390,000.00 Milani Construction, LLC Lump Sum $567,000.00 Ardent Company, LLC Lump Sum $450,000.00 Terra Site Constructors, LLC Lump Sum $150,000.00 Central Southern Construction Corp. Lump Sum $800,000.00 Lalini Enterprises, LLC Lump Sum $416,000.00 Kovilic Construction Company, Inc. Lump Sum $300,000.00 Rising Sun, Inc. Lump Sum $750,000.00 Maverick Construction, LLC Lump Sum $765,000.00 Engineer's Estimate ALL LPSM Lump Sum $216,700.25

A1050 15201-0000 CONSTRUCTION SURVEY AND STAKING

Veterans Kitchen Maintenance Inc. Lump Sum $31,500.00 Milani Construction, LLC Lump Sum $100,000.00 Ardent Company, LLC Lump Sum $15,000.00 Terra Site Constructors, LLC Lump Sum $63,875.00 Central Southern Construction Corp. Lump Sum $150,000.00 Lalini Enterprises, LLC Lump Sum $17,920.00 Kovilic Construction Company, Inc. Lump Sum $20,000.00 Rising Sun, Inc. Lump Sum $20,000.00 Maverick Construction, LLC Lump Sum $115,000.00 Engineer's Estimate ALL LPSM Lump Sum $114,800.00

A1100 15401-0000 CONTRACTOR TESTING

Veterans Kitchen Maintenance Inc. Lump Sum $35,550.00 Milani Construction, LLC Lump Sum $100,000.00 Ardent Company, LLC Lump Sum $5,000.00 Terra Site Constructors, LLC Lump Sum $77,500.00 Central Southern Construction Corp. Lump Sum $100,000.00 Lalini Enterprises, LLC Lump Sum $15,360.00 Kovilic Construction Company, Inc. Lump Sum $30,000.00 Rising Sun, Inc. Lump Sum $10,000.00 Maverick Construction, LLC Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $102,000.00

A1150 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Veterans Kitchen Maintenance Inc. $15.00 $12,000.00 Milani Construction, LLC $15.00 $12,000.00 Ardent Company, LLC $1.50 $1,200.00 Terra Site Constructors, LLC $9.00 $7,200.00 Central Southern Construction Corp. $10.00 $8,000.00 Lalini Enterprises, LLC $43.39 $34,712.00 Kovilic Construction Company, Inc. $50.00 $40,000.00 Rising Sun, Inc. $18.75 $15,000.00 Maverick Construction, LLC $25.00 $20,000.00 Engineer's Estimate 800 LNFT $14.50 $11,600.00

4 out of 13

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1200 15705-2000 SOIL EROSION CONTROL, FLOATING TURBIDITY CURTAIN

Veterans Kitchen Maintenance Inc. $28.00 $9,240.00 Milani Construction, LLC $60.00 $19,800.00 Ardent Company, LLC $9.00 $2,970.00 Terra Site Constructors, LLC $48.00 $15,840.00 Central Southern Construction Corp. $120.00 $39,600.00 Lalini Enterprises, LLC $154.24 $50,899.20 Kovilic Construction Company, Inc. $150.00 $49,500.00 Rising Sun, Inc. $62.00 $20,460.00 Maverick Construction, LLC $40.00 $13,200.00 Engineer's Estimate 330 LNFT $75.00 $24,750.00

A1250 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

Veterans Kitchen Maintenance Inc. $7,250.00 $21,750.00 Milani Construction, LLC $5,000.00 $15,000.00 Ardent Company, LLC $2,000.00 $6,000.00 Terra Site Constructors, LLC $4,350.00 $13,050.00 Central Southern Construction Corp. $20,000.00 $60,000.00 Lalini Enterprises, LLC $11,400.96 $34,202.88 Kovilic Construction Company, Inc. $5,000.00 $15,000.00 Rising Sun, Inc. $3,000.00 $9,000.00 Maverick Construction, LLC $8,000.00 $24,000.00 Engineer's Estimate 3 EACH $6,100.00 $18,300.00

A1300 20120-1000 REMOVAL, INDIVIDUAL TREE

Veterans Kitchen Maintenance Inc. $650.00 $6,500.00 Milani Construction, LLC $1,800.00 $18,000.00 Ardent Company, LLC $500.00 $5,000.00 Terra Site Constructors, LLC $3,390.00 $33,900.00 Central Southern Construction Corp. $2,000.00 $20,000.00 Lalini Enterprises, LLC $2,832.64 $28,326.40 Kovilic Construction Company, Inc. $2,500.00 $25,000.00 Rising Sun, Inc. $1,000.00 $10,000.00 Maverick Construction, LLC $1,300.00 $13,000.00 Engineer's Estimate 10 EACH $1,700.00 $17,000.00

A1350 20120-2000 REMOVAL, INDIVIDUAL STUMP

Veterans Kitchen Maintenance Inc. $450.00 $2,700.00 Milani Construction, LLC $500.00 $3,000.00 Ardent Company, LLC $200.00 $1,200.00 Terra Site Constructors, LLC $1,360.00 $8,160.00 Central Southern Construction Corp. $1,200.00 $7,200.00 Lalini Enterprises, LLC $1,740.80 $10,444.80 Kovilic Construction Company, Inc. $500.00 $3,000.00 Rising Sun, Inc. $1,000.00 $6,000.00 Maverick Construction, LLC $1,200.00 $7,200.00 Engineer's Estimate 6 EACH $1,100.00 $6,600.00

5 out of 13

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1400 20202-0000 SELECTIVE CLEARING

Veterans Kitchen Maintenance Inc. $12.00 $10,800.00 Milani Construction, LLC $12.00 $10,800.00 Ardent Company, LLC $5.00 $4,500.00 Terra Site Constructors, LLC $21.00 $18,900.00 Central Southern Construction Corp. $40.00 $36,000.00 Lalini Enterprises, LLC $15.74 $14,166.00 Kovilic Construction Company, Inc. $5.00 $4,500.00 Rising Sun, Inc. $12.00 $10,800.00 Maverick Construction, LLC $10.00 $9,000.00 Engineer's Estimate 900 SQYD $20.00 $18,000.00

A1450 20301-2400 REMOVAL OF SIGN (SALVAGE)

Veterans Kitchen Maintenance Inc. $680.00 $680.00 Milani Construction, LLC $500.00 $500.00 Ardent Company, LLC $200.00 $200.00 Terra Site Constructors, LLC $460.00 $460.00 Central Southern Construction Corp. $500.00 $500.00 Lalini Enterprises, LLC $3,028.48 $3,028.48 Kovilic Construction Company, Inc. $250.00 $250.00 Rising Sun, Inc. $500.00 $500.00 Maverick Construction, LLC $250.00 $250.00 Engineer's Estimate 1 EACH $400.00 $400.00

A1500 20303-2000 REMOVAL OF PAVEMENT, ASPHALT, 4-INCH DEPTH

Veterans Kitchen Maintenance Inc. $48.00 $8,160.00 Milani Construction, LLC $25.00 $4,250.00 Ardent Company, LLC $10.00 $1,700.00 Terra Site Constructors, LLC $45.00 $7,650.00 Central Southern Construction Corp. $150.00 $25,500.00 Lalini Enterprises, LLC $37.25 $6,332.50 Kovilic Construction Company, Inc. $27.00 $4,590.00 Rising Sun, Inc. $29.50 $5,015.00 Maverick Construction, LLC $30.00 $5,100.00 Engineer's Estimate 170 SQYD $36.00 $6,120.00

A1550 20304-2000 REMOVAL OF BRIDGE (BRIDGE 23)

Veterans Kitchen Maintenance Inc. Lump Sum $168,500.00 Milani Construction, LLC Lump Sum $450,000.00 Ardent Company, LLC Lump Sum $615,000.00 Terra Site Constructors, LLC Lump Sum $570,000.00 Central Southern Construction Corp. Lump Sum $160,000.00 Lalini Enterprises, LLC Lump Sum $320,000.00 Kovilic Construction Company, Inc. Lump Sum $213,000.00 Rising Sun, Inc. Lump Sum $10,500.00 Maverick Construction, LLC Lump Sum $1,953,000.00 Engineer's Estimate ALL LPSM Lump Sum $185,000.00

6 out of 13

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1600 20304-2000 REMOVAL OF BRIDGE (BRIDGE 24)

Veterans Kitchen Maintenance Inc. Lump Sum $36,500.00 Milani Construction, LLC Lump Sum $10,000.00 Ardent Company, LLC Lump Sum $15,000.00 Terra Site Constructors, LLC Lump Sum $7,000.00 Central Southern Construction Corp. Lump Sum $10,000.00 Lalini Enterprises, LLC Lump Sum $9,600.00 Kovilic Construction Company, Inc. Lump Sum $4,500.00 Rising Sun, Inc. Lump Sum $70,000.00 Maverick Construction, LLC Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

A1650 20401-0000 ROADWAY EXCAVATION

Veterans Kitchen Maintenance Inc. $85.00 $1,700.00 Milani Construction, LLC $200.00 $4,000.00 Ardent Company, LLC $80.00 $1,600.00 Terra Site Constructors, LLC $64.00 $1,280.00 Central Southern Construction Corp. $375.00 $7,500.00 Lalini Enterprises, LLC $78.98 $1,579.60 Kovilic Construction Company, Inc. $250.00 $5,000.00 Rising Sun, Inc. $100.00 $2,000.00 Maverick Construction, LLC $120.00 $2,400.00 Engineer's Estimate 20 CUYD $130.00 $2,600.00

A1700 30201-2000 ROADWAY AGGREGATE, METHOD 2

Veterans Kitchen Maintenance Inc. $145.00 $2,900.00 Milani Construction, LLC $200.00 $4,000.00 Ardent Company, LLC $65.00 $1,300.00 Terra Site Constructors, LLC $415.00 $8,300.00 Central Southern Construction Corp. $300.00 $6,000.00 Lalini Enterprises, LLC $222.72 $4,454.40 Kovilic Construction Company, Inc. $250.00 $5,000.00 Rising Sun, Inc. $215.00 $4,300.00 Maverick Construction, LLC $180.00 $3,600.00 Engineer's Estimate 20 CUYD $110.00 $2,200.00

A1750 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 , 3/8-INCH NMSA, <0.3 MILLION ESAL, TYPE IV PAVEMENT

ROUGHNESS

Veterans Kitchen Maintenance Inc. $380.00 $45,600.00 Milani Construction, LLC $300.00 $36,000.00 Ardent Company, LLC $250.00 $30,000.00 Terra Site Constructors, LLC $550.00 $66,000.00 Central Southern Construction Corp. $300.00 $36,000.00 Lalini Enterprises, LLC $351.36 $42,163.20 Kovilic Construction Company, Inc. $300.00 $36,000.00 Rising Sun, Inc. $480.00 $57,600.00 Maverick Construction, LLC $330.00 $39,600.00 Engineer's Estimate 120 TON $430.00 $51,600.00

7 out of 13

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1800 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH

Veterans Kitchen Maintenance Inc. $6.00 $4,200.00 Milani Construction, LLC $20.00 $14,000.00 Ardent Company, LLC $5.00 $3,500.00 Terra Site Constructors, LLC $54.00 $37,800.00 Central Southern Construction Corp. $40.00 $28,000.00 Lalini Enterprises, LLC $17.02 $11,914.00 Kovilic Construction Company, Inc. $18.00 $12,600.00 Rising Sun, Inc. $12.00 $8,400.00 Maverick Construction, LLC $17.00 $11,900.00 Engineer's Estimate 700 SQYD $45.00 $31,500.00

A1850 55601-1300 BRIDGE RAILING, TIMBER (BRIDGE 23)

Veterans Kitchen Maintenance Inc. $150.00 $330,000.00 Milani Construction, LLC $125.00 $275,000.00 Ardent Company, LLC $170.00 $374,000.00 Terra Site Constructors, LLC $166.00 $365,200.00 Central Southern Construction Corp. $159.00 $349,800.00 Lalini Enterprises, LLC $325.76 $716,672.00 Kovilic Construction Company, Inc. $300.00 $660,000.00 Rising Sun, Inc. $741.00 $1,630,200.00 Maverick Construction, LLC $450.00 $990,000.00 Engineer's Estimate 2,200 LNFT $160.00 $352,000.00

A1900 55601-1300 BRIDGE RAILING, TIMBER (BRIDGE 24)

Veterans Kitchen Maintenance Inc. $180.00 $14,400.00 Milani Construction, LLC $125.00 $10,000.00 Ardent Company, LLC $170.00 $13,600.00 Terra Site Constructors, LLC $166.00 $13,280.00 Central Southern Construction Corp. $159.00 $12,720.00 Lalini Enterprises, LLC $343.04 $27,443.20 Kovilic Construction Company, Inc. $400.00 $32,000.00 Rising Sun, Inc. $741.00 $59,280.00 Maverick Construction, LLC $480.00 $38,400.00 Engineer's Estimate 80 LNFT $160.00 $12,800.00

A1950 55701-2000 STRUCTURAL TIMBER AND LUMBER, TREATED (BRIDGE 23)

Veterans Kitchen Maintenance Inc. $6,560.00 $918,400.00 Milani Construction, LLC $5,200.00 $728,000.00 Ardent Company, LLC $5,500.00 $770,000.00 Terra Site Constructors, LLC $13,500.00 $1,890,000.00 Central Southern Construction Corp. $11,000.00 $1,540,000.00 Lalini Enterprises, LLC $14,080.00 $1,971,200.00 Kovilic Construction Company, Inc. $17,050.00 $2,387,000.00 Rising Sun, Inc. $23,462.80 $3,284,792.00 Maverick Construction, LLC $11,500.00 $1,610,000.00 Engineer's Estimate 140 MFBM $15,000.00 $2,100,000.00

8 out of 13

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2000 55701-2000 STRUCTURAL TIMBER AND LUMBER, TREATED (BRIDGE 24)

Veterans Kitchen Maintenance Inc. $6,560.00 $26,240.00 Milani Construction, LLC $5,200.00 $20,800.00 Ardent Company, LLC $5,500.00 $22,000.00 Terra Site Constructors, LLC $16,950.00 $67,800.00 Central Southern Construction Corp. $12,000.00 $48,000.00 Lalini Enterprises, LLC $13,440.00 $53,760.00 Kovilic Construction Company, Inc. $25,000.00 $100,000.00 Rising Sun, Inc. $23,462.80 $93,851.20 Maverick Construction, LLC $10,000.00 $40,000.00 Engineer's Estimate 4 MFBM $10,900.00 $43,600.00

A2050 57502-0000 TEMPORARY BRIDGE

Veterans Kitchen Maintenance Inc. Lump Sum $23,500.00 Milani Construction, LLC Lump Sum $4,000.00 Ardent Company, LLC Lump Sum $11,255.00 Terra Site Constructors, LLC Lump Sum $8,500.00 Central Southern Construction Corp. Lump Sum $14,500.00 Lalini Enterprises, LLC Lump Sum $21,414.40 Kovilic Construction Company, Inc. Lump Sum $10,000.00 Rising Sun, Inc. Lump Sum $10,000.00 Maverick Construction, LLC Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $13,600.00

A2100 58202-0000 HELICAL PILE, IN PLACE (BRIDGE 24)

Veterans Kitchen Maintenance Inc. $5,500.00 $22,000.00 Milani Construction, LLC $7,000.00 $28,000.00 Ardent Company, LLC $11,000.00 $44,000.00 Terra Site Constructors, LLC $7,125.00 $28,500.00 Central Southern Construction Corp. $5,648.00 $22,592.00 Lalini Enterprises, LLC $6,012.16 $24,048.64 Kovilic Construction Company, Inc. $10,000.00 $40,000.00 Rising Sun, Inc. $3,440.00 $13,760.00 Maverick Construction, LLC $7,000.00 $28,000.00 Engineer's Estimate 4 EACH $1,900.00 $7,600.00

A2150 58202-0000 HELICAL PILE, IN PLACE (BRIDGE 23)

Veterans Kitchen Maintenance Inc. $5,500.00 $1,177,000.00 Milani Construction, LLC $6,400.00 $1,369,600.00 Ardent Company, LLC $11,000.00 $2,354,000.00 Terra Site Constructors, LLC $5,650.00 $1,209,100.00 Central Southern Construction Corp. $5,648.00 $1,208,672.00 Lalini Enterprises, LLC $6,012.16 $1,286,602.24 Kovilic Construction Company, Inc. $8,300.00 $1,776,200.00 Rising Sun, Inc. $3,440.00 $736,160.00 Maverick Construction, LLC $7,000.00 $1,498,000.00 Engineer's Estimate 214 EACH $3,200.00 $684,800.00

9 out of 13

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2200 62502-0000 TURF ESTABLISHMENT

Veterans Kitchen Maintenance Inc. $6.00 $4,200.00 Milani Construction, LLC $12.00 $8,400.00 Ardent Company, LLC $0.50 $350.00 Terra Site Constructors, LLC $15.00 $10,500.00 Central Southern Construction Corp. $40.00 $28,000.00 Lalini Enterprises, LLC $45.31 $31,717.00 Kovilic Construction Company, Inc. $20.00 $14,000.00 Rising Sun, Inc. $10.00 $7,000.00 Maverick Construction, LLC $12.00 $8,400.00 Engineer's Estimate 700 SQYD $16.75 $11,725.00

A2250 63316-1000 REMOVE AND RESET SIGN

Veterans Kitchen Maintenance Inc. $850.00 $1,700.00 Milani Construction, LLC $500.00 $1,000.00 Ardent Company, LLC $200.00 $400.00 Terra Site Constructors, LLC $500.00 $1,000.00 Central Southern Construction Corp. $500.00 $1,000.00 Lalini Enterprises, LLC $429.44 $858.88 Kovilic Construction Company, Inc. $350.00 $700.00 Rising Sun, Inc. $1,500.00 $3,000.00 Maverick Construction, LLC $500.00 $1,000.00 Engineer's Estimate 2 EACH $960.00 $1,920.00

A2300 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Veterans Kitchen Maintenance Inc. $15.00 $975.00 Milani Construction, LLC $10.00 $650.00 Ardent Company, LLC $5.00 $325.00 Terra Site Constructors, LLC $8.00 $520.00 Central Southern Construction Corp. $10.00 $650.00 Lalini Enterprises, LLC $85.89 $5,582.85 Kovilic Construction Company, Inc. $20.00 $1,300.00 Rising Sun, Inc. $76.92 $4,999.80 Maverick Construction, LLC $10.00 $650.00 Engineer's Estimate 65 LNFT $2.15 $139.75

A2350 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

Veterans Kitchen Maintenance Inc. $15.00 $10,875.00 Milani Construction, LLC $10.00 $7,250.00 Ardent Company, LLC $5.00 $3,625.00 Terra Site Constructors, LLC $8.00 $5,800.00 Central Southern Construction Corp. $10.00 $7,250.00 Lalini Enterprises, LLC $43.01 $31,182.25 Kovilic Construction Company, Inc. $10.00 $7,250.00 Rising Sun, Inc. $9.65 $6,996.25 Maverick Construction, LLC $5.00 $3,625.00 Engineer's Estimate 725 LNFT $2.10 $1,522.50

10 out of 13

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2400 63502-0300 TEMPORARY TRAFFIC CONTROL, ARROW BOARD, TYPE C

Veterans Kitchen Maintenance Inc. $9,280.00 $18,560.00 Milani Construction, LLC $5,000.00 $10,000.00 Ardent Company, LLC $1,000.00 $2,000.00 Terra Site Constructors, LLC $8,400.00 $16,800.00 Central Southern Construction Corp. $6,000.00 $12,000.00 Lalini Enterprises, LLC $6,012.16 $12,024.32 Kovilic Construction Company, Inc. $25,000.00 $50,000.00 Rising Sun, Inc. $8,000.00 $16,000.00 Maverick Construction, LLC $16,000.00 $32,000.00 Engineer's Estimate 2 EACH $4,550.00 $9,100.00

A2450 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Veterans Kitchen Maintenance Inc. $110.00 $3,300.00 Milani Construction, LLC $125.00 $3,750.00 Ardent Company, LLC $70.00 $2,100.00 Terra Site Constructors, LLC $200.00 $6,000.00 Central Southern Construction Corp. $200.00 $6,000.00 Lalini Enterprises, LLC $8.58 $257.40 Kovilic Construction Company, Inc. $250.00 $7,500.00 Rising Sun, Inc. $150.00 $4,500.00 Maverick Construction, LLC $80.00 $2,400.00 Engineer's Estimate 30 EACH $145.00 $4,350.00

A2500 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A

Veterans Kitchen Maintenance Inc. $600.00 $4,800.00 Milani Construction, LLC $100.00 $800.00 Ardent Company, LLC $50.00 $400.00 Terra Site Constructors, LLC $215.00 $1,720.00 Central Southern Construction Corp. $100.00 $800.00 Lalini Enterprises, LLC $8.58 $68.64 Kovilic Construction Company, Inc. $150.00 $1,200.00 Rising Sun, Inc. $250.00 $2,000.00 Maverick Construction, LLC $50.00 $400.00 Engineer's Estimate 8 EACH $85.00 $680.00

A2550 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Veterans Kitchen Maintenance Inc. $26,500.00 $53,000.00 Milani Construction, LLC $5,000.00 $10,000.00 Ardent Company, LLC $10,000.00 $20,000.00 Terra Site Constructors, LLC $15,750.00 $31,500.00 Central Southern Construction Corp. $12,000.00 $24,000.00 Lalini Enterprises, LLC $24,320.00 $48,640.00 Kovilic Construction Company, Inc. $25,000.00 $50,000.00 Rising Sun, Inc. $30,000.00 $60,000.00 Maverick Construction, LLC $7,000.00 $14,000.00 Engineer's Estimate 2 EACH $11,800.00 $23,600.00

11 out of 13

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2600 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION

Veterans Kitchen Maintenance Inc. $15,800.00 $31,600.00 Milani Construction, LLC $6,000.00 $12,000.00 Ardent Company, LLC $9,000.00 $18,000.00 Terra Site Constructors, LLC $9,350.00 $18,700.00 Central Southern Construction Corp. $8,500.00 $17,000.00 Lalini Enterprises, LLC $10,649.60 $21,299.20 Kovilic Construction Company, Inc. $5,000.00 $10,000.00 Rising Sun, Inc. $40,000.00 $80,000.00 Maverick Construction, LLC $10,000.00 $20,000.00 Engineer's Estimate 2 EACH $7,600.00 $15,200.00

A2650 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Veterans Kitchen Maintenance Inc. $110.00 $4,950.00 Milani Construction, LLC $40.00 $1,800.00 Ardent Company, LLC $40.00 $1,800.00 Terra Site Constructors, LLC $95.00 $4,275.00 Central Southern Construction Corp. $250.00 $11,250.00 Lalini Enterprises, LLC $180.48 $8,121.60 Kovilic Construction Company, Inc. $100.00 $4,500.00 Rising Sun, Inc. $200.00 $9,000.00 Maverick Construction, LLC $60.00 $2,700.00 Engineer's Estimate 45 LNFT $105.00 $4,725.00

A2700 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER

Veterans Kitchen Maintenance Inc. $95.00 $247,000.00 Milani Construction, LLC $10.00 $26,000.00 Ardent Company, LLC $30.00 $78,000.00 Terra Site Constructors, LLC $46.50 $120,900.00 Central Southern Construction Corp. $60.00 $156,000.00 Lalini Enterprises, LLC $83.20 $216,320.00 Kovilic Construction Company, Inc. $60.00 $156,000.00 Rising Sun, Inc. $150.00 $390,000.00 Maverick Construction, LLC $45.00 $117,000.00 Engineer's Estimate 2,600 LNFT $85.00 $221,000.00

A2750 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

Veterans Kitchen Maintenance Inc. $6.00 $19,500.00 Milani Construction, LLC $10.00 $32,500.00 Ardent Company, LLC $1.20 $3,900.00 Terra Site Constructors, LLC $5.00 $16,250.00 Central Southern Construction Corp. $2.00 $6,500.00 Lalini Enterprises, LLC $3.46 $11,245.00 Kovilic Construction Company, Inc. $5.00 $16,250.00 Rising Sun, Inc. $5.00 $16,250.00 Maverick Construction, LLC $3.00 $9,750.00 Engineer's Estimate 3,250 LNFT $1.80 $5,850.00

12 out of 13

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2800 63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL

Veterans Kitchen Maintenance Inc. $4.00 $13,000.00 Milani Construction, LLC $5.00 $16,250.00 Ardent Company, LLC $0.10 $325.00 Terra Site Constructors, LLC $3.00 $9,750.00 Central Southern Construction Corp. $10.00 $32,500.00 Lalini Enterprises, LLC $7.30 $23,725.00 Kovilic Construction Company, Inc. $5.00 $16,250.00 Rising Sun, Inc. $5.00 $16,250.00 Maverick Construction, LLC $7.00 $22,750.00 Engineer's Estimate 3,250 LNFT $3.35 $10,887.50

A2850 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Veterans Kitchen Maintenance Inc. $38.00 $8,360.00 Milani Construction, LLC $70.00 $15,400.00 Ardent Company, LLC $20.00 $4,400.00 Terra Site Constructors, LLC $45.50 $10,010.00 Central Southern Construction Corp. $75.00 $16,500.00 Lalini Enterprises, LLC $13.70 $3,014.00 Kovilic Construction Company, Inc. $50.00 $11,000.00 Rising Sun, Inc. $100.00 $22,000.00 Maverick Construction, LLC $60.00 $13,200.00 Engineer's Estimate 220 SQFT $39.00 $8,580.00

A2900 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Veterans Kitchen Maintenance Inc. $65.00 $79,950.00 Milani Construction, LLC $32.00 $39,360.00 Ardent Company, LLC $25.00 $30,750.00 Terra Site Constructors, LLC $60.00 $73,800.00 Central Southern Construction Corp. $50.00 $61,500.00 Lalini Enterprises, LLC $32.00 $39,360.00 Kovilic Construction Company, Inc. $100.00 $123,000.00 Rising Sun, Inc. $60.00 $73,800.00 Maverick Construction, LLC $40.00 $49,200.00 Engineer's Estimate 1,230 HOUR $35.00 $43,050.00

A2950 63701-0000 FIELD OFFICE

Veterans Kitchen Maintenance Inc. $62,560.00 $62,560.00 Milani Construction, LLC $90,000.00 $90,000.00 Ardent Company, LLC $35,000.00 $35,000.00 Terra Site Constructors, LLC $210,000.00 $210,000.00 Central Southern Construction Corp. $100,000.00 $100,000.00 Lalini Enterprises, LLC $50,000.00 $50,000.00 Kovilic Construction Company, Inc. $50,000.00 $50,000.00 Rising Sun, Inc. $30,000.00 $30,000.00 Maverick Construction, LLC $40,000.00 $40,000.00 Engineer's Estimate 1 EACH $50,000.00 $50,000.00

13 out of 13

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A3000 64603-0300 FIXTURE, BENCH (TIMBER)

Veterans Kitchen Maintenance Inc. $6,850.00 $6,850.00 Milani Construction, LLC $3,000.00 $3,000.00 Ardent Company, LLC $3,500.00 $3,500.00 Terra Site Constructors, LLC $3,300.00 $3,300.00 Central Southern Construction Corp. $2,500.00 $2,500.00 Lalini Enterprises, LLC $3,498.24 $3,498.24 Kovilic Construction Company, Inc. $5,000.00 $5,000.00 Rising Sun, Inc. $3,000.00 $3,000.00 Maverick Construction, LLC $6,275.00 $6,275.00 Engineer's Estimate 1 EACH $4,100.00 $4,100.00

A3050 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION (TEMPORARY ASPHALT TRAIL)

Veterans Kitchen Maintenance Inc. Lump Sum $90,400.00 Milani Construction, LLC Lump Sum $180,000.00 Ardent Company, LLC Lump Sum $25,000.00 Terra Site Constructors, LLC Lump Sum $85,000.00 Central Southern Construction Corp. Lump Sum $150,000.00 Lalini Enterprises, LLC Lump Sum $149,440.00 Kovilic Construction Company, Inc. Lump Sum $60,000.00 Rising Sun, Inc. Lump Sum $50,000.00 Maverick Construction, LLC Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

Total Schedule - All Items

Veterans Kitchen Maintenance Inc. $3,961,400.00 Milani Construction, LLC $4,261,910.00 Ardent Company, LLC $4,977,900.00 Terra Site Constructors, LLC $5,295,120.00 Central Southern Construction Corp. $5,324,034.00 Lalini Enterprises, LLC $5,778,598.32 Kovilic Construction Company, Inc. $6,357,090.00 Rising Sun, Inc. $7,632,414.25 Maverick Construction, LLC $7,665,000.00 Engineer's Estimate $4,500,000.00

Bid Error Report

1 out of 2

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Bid Item Check Pass

Bidder Line Item Number Bidder's Extension Computed Extension

No Line Item Errors Found

Bid Error Report

2 out of 2

Project No: NP-GWMP MVT (5)

Project Name: George Washington Memorial Parkway

Schedule: A

Schedule Type: Base

Bid Total Check Pass

Bidder Bidder's Bid Amount Computed Bid Amount Error

Lalini Enterprises, LLC $5,778,578.69 $5,778,598.32 X

Kovilic Construction Company, Inc. $6,357,090.00 $6,357,090.00

Veterans Kitchen Maintenance Inc. $3,961,400.00 $3,961,400.00

Terra Site Constructors, LLC $5,295,120.00 $5,295,120.00

Central Southern Construction Corp. $5,324,034.00 $5,324,034.00

Rising Sun, Inc. $7,659,414.45 $7,632,414.25 X

Maverick Construction, LLC $7,665,000.00 $7,665,000.00

Milani Construction, LLC $4,261,910.00 $4,261,910.00

Ardent Company, LLC $4,977,900.00 $4,977,900.00

The apparent low bidder is 11.97% below the engineer's estimate.