This is a bid tabulation report for the replacement of Dingmans Falls Access Bridge #1 and rehabilitation of the Vancampens Glen Bridge project at Delaware Water Gap National Recreation Area, solicitation number 693C73-24-B-000014. The project consists of two schedules: Schedule A (Base) and Schedule B (Options).

Kyle Conti Construction, LLC was awarded the contract on December 12, 2024, with a total bid of $4,125,125.00 ($3,222,869.00 for Schedule A and $902,256.00 for Schedule B). The other bidders were Kovilic Construction Company, Inc. ($4,477,945.00 for Schedule A, $715,315.00 for Schedule B) and Central Southern Construction Corp. ($4,540,785.00 for Schedule A, $1,354,075.00 for Schedule B). The engineer's estimate was significantly lower at $2,839,000.00 for Schedule A and $678,000.00 for Schedule B. Major work items include structural concrete, precast prestressed concrete girders, reinforcing steel, bridge railing, guardrail systems, and asphalt concrete pavement. The project is managed by the Federal Highway Administration's Eastern Federal Lands division and spans locations in New Jersey and Pennsylvania.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 08/20/24

1 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp.

Kovilic Construction Company, Inc.

Kyle Conti Construction, LLC

Base Schedule A

$2,839,000.00

$4,540,785.00

$4,477,945.00

$3,222,869.00

Option: B

$678,000.00

$1,354,075.00

$715,315.00

$902,256.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp.

Kovilic Construction Company, Inc.

Kyle Conti Construction, LLC

Total Base Schedule A and Option(s): B

$3,517,000.00

$5,894,860.00

$5,193,260.00

$4,125,125.00

2 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: A

Schedule Type: Base

Solcitation No: 693C73-24-B-000014

Division: Eastern Federal Lands

State: NJ, PA County: Warren, Pike

Federal Land: Delaware Water Gap National Recreation Area Opened at: Ashburn, Virginia

Opened by: Emily McCleary

Date: 08/20/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Kyle Conti Construction, LLC Low bidder. $3,222,869.00 749 Clawson Avenue Hillsborough New Jersey 08844

Kovilic Construction Company, Inc. $4,477,945.00 3721 N. Carnation Street Franklin Park Illinois 60131

Central Southern Construction Corp. $4,540,785.00 119 Sewald Street Jacksonville Florida 32204

Engineer's Estimate $2,839,000.00

Emily McCleary

Contract Specialist 20 August 2024

Kyle Conti Construction, LLC 12 December 2024

3 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Kyle Conti Construction, LLC Lump Sum $549,777.75 Kovilic Construction Company, Inc. Lump Sum $300,000.00 Central Southern Construction Corp. Lump Sum $975,000.00 Engineer's Estimate ALL LPSM Lump Sum $234,867.50

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Kyle Conti Construction, LLC Lump Sum $56,000.00 Kovilic Construction Company, Inc. Lump Sum $100,000.00 Central Southern Construction Corp. Lump Sum $366,500.00 Engineer's Estimate ALL LPSM Lump Sum $68,200.00

A0060 15401-0000 CONTRACTOR TESTING

Kyle Conti Construction, LLC Lump Sum $58,000.00 Kovilic Construction Company, Inc. Lump Sum $100,000.00 Central Southern Construction Corp. Lump Sum $314,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,500.00

A0080 15702-4000 SOIL EROSION CONTROL, FILTER BAG

Kyle Conti Construction, LLC Lump Sum $2,200.00 Kovilic Construction Company, Inc. Lump Sum $50,000.00 Central Southern Construction Corp. Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

A0100 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Kyle Conti Construction, LLC $14.00 $5,040.00 Kovilic Construction Company, Inc. $50.00 $18,000.00 Central Southern Construction Corp. $15.00 $5,400.00 Engineer's Estimate 360 LNFT $10.50 $3,780.00

A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Kyle Conti Construction, LLC $12.50 $4,500.00 Kovilic Construction Company, Inc. $50.00 $18,000.00 Central Southern Construction Corp. $15.00 $5,400.00 Engineer's Estimate 360 LNFT $15.50 $5,580.00

4 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0140 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM

Kyle Conti Construction, LLC $445.00 $97,900.00 Kovilic Construction Company, Inc. $250.00 $55,000.00 Central Southern Construction Corp. $700.00 $154,000.00 Engineer's Estimate 220 LNFT $440.00 $96,800.00

A0160 15706-0400 SOIL EROSION CONTROL, SEDIMENT TRAP

Kyle Conti Construction, LLC $19,500.00 $19,500.00 Kovilic Construction Company, Inc. $10,000.00 $10,000.00 Central Southern Construction Corp. $15,000.00 $15,000.00 Engineer's Estimate 1 EACH $4,500.00 $4,500.00

A0180 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

Kyle Conti Construction, LLC $2,650.00 $5,300.00 Kovilic Construction Company, Inc. $10,000.00 $20,000.00 Central Southern Construction Corp. $15,000.00 $30,000.00 Engineer's Estimate 2 EACH $13,000.00 $26,000.00

A0200 15706-2300 SOIL EROSION CONTROL, ON-SITE CONCRETE WASHOUT STRUCTURE

Kyle Conti Construction, LLC $4,150.00 $4,150.00 Kovilic Construction Company, Inc. $5,000.00 $5,000.00 Central Southern Construction Corp. $10,000.00 $10,000.00 Engineer's Estimate 1 EACH $6,000.00 $6,000.00

A0220 20103-0000 CLEARING AND GRUBBING

Kyle Conti Construction, LLC $24.25 $13,458.75 Kovilic Construction Company, Inc. $10.00 $5,550.00 Central Southern Construction Corp. $50.00 $27,750.00 Engineer's Estimate 555 SQYD $26.00 $14,430.00

A0240 20220-1000 REMOVAL, INDIVIDUAL TREE

Kyle Conti Construction, LLC $3,000.00 $27,000.00 Kovilic Construction Company, Inc. $2,500.00 $22,500.00 Central Southern Construction Corp. $3,000.00 $27,000.00 Engineer's Estimate 9 EACH $1,900.00 $17,100.00

5 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 20301-2300 REMOVAL OF SIGN/MARKER

Kyle Conti Construction, LLC $80.00 $320.00 Kovilic Construction Company, Inc. $250.00 $1,000.00 Central Southern Construction Corp. $200.00 $800.00 Engineer's Estimate 4 EACH $440.00 $1,760.00

A0280 20302-1200 REMOVAL OF GUARDRAIL

Kyle Conti Construction, LLC $43.00 $6,235.00 Kovilic Construction Company, Inc. $50.00 $7,250.00 Central Southern Construction Corp. $120.00 $17,400.00 Engineer's Estimate 145 LNFT $48.00 $6,960.00

A0300 20303-1600 REMOVAL OF PAVEMENT, ASPHALT

Kyle Conti Construction, LLC $39.00 $13,065.00 Kovilic Construction Company, Inc. $27.00 $9,045.00 Central Southern Construction Corp. $95.00 $31,825.00 Engineer's Estimate 335 SQYD $30.00 $10,050.00

A0320 20304-2000 REMOVAL OF BRIDGE (EXISTING SUPERSTRUCTURE AND SUBSTRUCTURE)

Kyle Conti Construction, LLC Lump Sum $300,000.00 Kovilic Construction Company, Inc. Lump Sum $500,000.00 Central Southern Construction Corp. Lump Sum $480,000.00 Engineer's Estimate ALL LPSM Lump Sum $115,000.00

A0340 20315-0000 SAWCUTTING PAVEMENT

Kyle Conti Construction, LLC $6.00 $270.00 Kovilic Construction Company, Inc. $100.00 $4,500.00 Central Southern Construction Corp. $50.00 $2,250.00 Engineer's Estimate 45 LNFT $21.00 $945.00

A0360 20401-0000 ROADWAY EXCAVATION

Kyle Conti Construction, LLC $68.00 $16,660.00 Kovilic Construction Company, Inc. $100.00 $24,500.00 Central Southern Construction Corp. $175.00 $42,875.00 Engineer's Estimate 245 CUYD $150.00 $36,750.00

6 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0380 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E

Kyle Conti Construction, LLC $13.00 $3,120.00 Kovilic Construction Company, Inc. $10.00 $2,400.00 Central Southern Construction Corp. $20.00 $4,800.00 Engineer's Estimate 240 SQYD $10.00 $2,400.00

A0400 20801-0000 STRUCTURE EXCAVATION

Kyle Conti Construction, LLC $198.00 $287,100.00 Kovilic Construction Company, Inc. $150.00 $217,500.00 Central Southern Construction Corp. $115.00 $166,750.00 Engineer's Estimate 1,450 CUYD $100.00 $145,000.00

A0420 20803-0000 STRUCTURAL BACKFILL

Kyle Conti Construction, LLC $142.00 $88,750.00 Kovilic Construction Company, Inc. $150.00 $93,750.00 Central Southern Construction Corp. $125.00 $78,125.00 Engineer's Estimate 625 CUYD $140.00 $87,500.00

A0440 25102-0300 PLACED RIPRAP, METHOD A, CLASS 3

Kyle Conti Construction, LLC $190.00 $13,300.00 Kovilic Construction Company, Inc. $500.00 $35,000.00 Central Southern Construction Corp. $400.00 $28,000.00 Engineer's Estimate 70 TON $140.00 $9,800.00

A0460 30101-4000 AGGREGATE BASE GRADING C OR D

Kyle Conti Construction, LLC $85.00 $9,350.00 Kovilic Construction Company, Inc. $100.00 $11,000.00 Central Southern Construction Corp. $300.00 $33,000.00 Engineer's Estimate 110 TON $120.00 $13,200.00

A0480 31302-0400 AGGREGATE-TOPSOIL COURSE, 4-INCH DEPTH

Kyle Conti Construction, LLC $18.00 $810.00 Kovilic Construction Company, Inc. $100.00 $4,500.00 Central Southern Construction Corp. $500.00 $22,500.00 Engineer's Estimate 45 SQYD $60.00 $2,700.00

7 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0500 40101-0100 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL MAXIMUM SIZE AGGREGATE, <0.3

MILLION ESAL (TYPE IV ROUGHNESS, PG 58-28)

Kyle Conti Construction, LLC $310.00 $24,800.00 Kovilic Construction Company, Inc. $500.00 $40,000.00 Central Southern Construction Corp. $575.00 $46,000.00 Engineer's Estimate 80 TON $400.00 $32,000.00

A0520 40101-0900 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, <0.3

MILLION ESAL (PG 58-28)

Kyle Conti Construction, LLC $430.00 $21,500.00 Kovilic Construction Company, Inc. $500.00 $25,000.00 Central Southern Construction Corp. $575.00 $28,750.00 Engineer's Estimate 50 TON $420.00 $21,000.00

A0540 41202-0000 TACK COAT

Kyle Conti Construction, LLC $26.00 $1,820.00 Kovilic Construction Company, Inc. $25.00 $1,750.00 Central Southern Construction Corp. $50.00 $3,500.00 Engineer's Estimate 70 GAL $100.00 $7,000.00

A0560 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) (SUBSTRUCTURE AND RETAINING WALL)

Kyle Conti Construction, LLC $1,680.00 $588,000.00 Kovilic Construction Company, Inc. $5,000.00 $1,750,000.00 Central Southern Construction Corp. $1,250.00 $437,500.00 Engineer's Estimate 350 CUYD $1,900.00 $665,000.00

A0580 55201-0800 STRUCTURAL CONCRETE, CLASS D (AE) (BACKWALL AND END DIAPHGRAM)

Kyle Conti Construction, LLC $1,865.00 $18,650.00 Kovilic Construction Company, Inc. $5,000.00 $50,000.00 Central Southern Construction Corp. $3,450.00 $34,500.00 Engineer's Estimate 10 CUYD $1,900.00 $19,000.00

A0600 55202-2000 STRUCTURAL CONCRETE, CLASS D (AE), FOR APPROACH SLABS, TYPE 2

Kyle Conti Construction, LLC $1,020.00 $102,000.00 Kovilic Construction Company, Inc. $500.00 $50,000.00 Central Southern Construction Corp. $800.00 $80,000.00 Engineer's Estimate 100 SQYD $600.00 $60,000.00

8 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0620 55235-0000 EXPANSION JOINTS (BACKER ROD AND HOT APPLIED JOINT SEALANT)

Kyle Conti Construction, LLC $65.00 $5,200.00 Kovilic Construction Company, Inc. $50.00 $4,000.00 Central Southern Construction Corp. $75.00 $6,000.00 Engineer's Estimate 80 LNFT $75.00 $6,000.00

A0640 55302-3200 PRECAST, PRESTRESSED CONCRETE GIRDER (ADJACENT BOX BEAM 48-INCH)

Kyle Conti Construction, LLC $870.00 $395,850.00 Kovilic Construction Company, Inc. $750.00 $341,250.00 Central Southern Construction Corp. $800.00 $364,000.00 Engineer's Estimate 455 LNFT $850.00 $386,750.00

A0660 55401-2000 REINFORCING STEEL, EPOXY COATED

Kyle Conti Construction, LLC $2.30 $141,450.00 Kovilic Construction Company, Inc. $5.00 $307,500.00 Central Southern Construction Corp. $4.15 $255,225.00 Engineer's Estimate 61,500 LB $3.40 $209,100.00

A0680 55601-1300 BRIDGE RAILING, TIMBER (27-INCH, TUBULAR STEEL-BACKED)

Kyle Conti Construction, LLC $590.00 $118,000.00 Kovilic Construction Company, Inc. $300.00 $60,000.00 Central Southern Construction Corp. $300.00 $60,000.00 Engineer's Estimate 200 LNFT $260.00 $52,000.00

A0700 55901-0000 MEMBRANE WATERPROOFING (SPRAY-APPLIED)

Kyle Conti Construction, LLC $115.00 $23,575.00 Kovilic Construction Company, Inc. $90.00 $18,450.00 Central Southern Construction Corp. $47.00 $9,635.00 Engineer's Estimate 205 SQYD $230.00 $47,150.00

A0720 56401-1000 BEARING DEVICE, ELASTOMERIC (STEEL REINFORCED)

Kyle Conti Construction, LLC $1,350.00 $18,900.00 Kovilic Construction Company, Inc. $2,500.00 $35,000.00 Central Southern Construction Corp. $600.00 $8,400.00 Engineer's Estimate 14 EACH $750.00 $10,500.00

9 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0740 58501-0000 ULTRA HIGH PERFORMANCE CONCRETE (GIRDER KEYWAY)

Kyle Conti Construction, LLC $2,110.00 $10,550.00 Kovilic Construction Company, Inc. $10,000.00 $50,000.00 Central Southern Construction Corp. $5,200.00 $26,000.00 Engineer's Estimate 5 CUYD $27,000.00 $135,000.00

A0760 61701-4010 GUARDRAIL SYSTEM SBTB, MERRITT PARKWAY GUIDERAIL

Kyle Conti Construction, LLC $190.00 $24,700.00 Kovilic Construction Company, Inc. $125.00 $16,250.00 Central Southern Construction Corp. $375.00 $48,750.00 Engineer's Estimate 130 LNFT $160.00 $20,800.00

A0780 61702-0900 TERMINAL SECTION, TYPE BAT-MERRITT PARKWAY GUIDERAIL (TYPE II)

Kyle Conti Construction, LLC $7,100.00 $7,100.00 Kovilic Construction Company, Inc. $5,000.00 $5,000.00 Central Southern Construction Corp. $10,000.00 $10,000.00 Engineer's Estimate 1 EACH $7,500.00 $7,500.00

A0800 61702-1000 TERMINAL SECTION, TYPE FAT-MERRITT PARKWAY GUIDERAIL (TYPE I)

Kyle Conti Construction, LLC $7,350.00 $14,700.00 Kovilic Construction Company, Inc. $5,000.00 $10,000.00 Central Southern Construction Corp. $10,000.00 $20,000.00 Engineer's Estimate 2 EACH $6,000.00 $12,000.00

A0820 61707-2000 STRUCTURE TRANSITION RAILING, SBT SYSTEM

Kyle Conti Construction, LLC $300.00 $24,000.00 Kovilic Construction Company, Inc. $200.00 $16,000.00 Central Southern Construction Corp. $350.00 $28,000.00 Engineer's Estimate 80 LNFT $550.00 $44,000.00

A0840 61901-0000 FENCE (TREE PROTECTION)

Kyle Conti Construction, LLC $12.00 $600.00 Kovilic Construction Company, Inc. $10.00 $500.00 Central Southern Construction Corp. $25.00 $1,250.00 Engineer's Estimate 50 LNFT $16.25 $812.50

10 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0860 62401-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH

Kyle Conti Construction, LLC $11.00 $16,610.00 Kovilic Construction Company, Inc. $10.00 $15,100.00 Central Southern Construction Corp. $30.00 $45,300.00 Engineer's Estimate 1,510 SQYD $25.00 $37,750.00

A0880 62501-0000 TURF ESTABLISHMENT

Kyle Conti Construction, LLC $9,750.00 $3,412.50 Kovilic Construction Company, Inc. $25,000.00 $8,750.00 Central Southern Construction Corp. $40,000.00 $14,000.00 Engineer's Estimate 0.35 ACRE $36,000.00 $12,600.00

A0900 62901-0800 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D

Kyle Conti Construction, LLC $7.50 $11,175.00 Kovilic Construction Company, Inc. $5.00 $7,450.00 Central Southern Construction Corp. $10.00 $14,900.00 Engineer's Estimate 1,490 SQYD $4.85 $7,226.50

A0920 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID

Kyle Conti Construction, LLC $3.00 $2,670.00 Kovilic Construction Company, Inc. $5.00 $4,450.00 Central Southern Construction Corp. $10.00 $8,900.00 Engineer's Estimate 890 LNFT $4.65 $4,138.50

A0940 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Kyle Conti Construction, LLC $48.00 $2,400.00 Kovilic Construction Company, Inc. $100.00 $5,000.00 Central Southern Construction Corp. $100.00 $5,000.00 Engineer's Estimate 50 LNFT $150.00 $7,500.00

A0960 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Kyle Conti Construction, LLC $20.00 $3,400.00 Kovilic Construction Company, Inc. $100.00 $17,000.00 Central Southern Construction Corp. $40.00 $6,800.00 Engineer's Estimate 170 SQFT $55.00 $9,350.00

11 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0980 63701-0000 FIELD OFFICE

Kyle Conti Construction, LLC $60,000.00 $60,000.00 Kovilic Construction Company, Inc. $25,000.00 $25,000.00 Central Southern Construction Corp. $90,000.00 $90,000.00 Engineer's Estimate 1 EACH $55,000.00 $55,000.00

Total Schedule - All Items

Kyle Conti Construction, LLC $3,222,869.00 Kovilic Construction Company, Inc. $4,477,945.00 Central Southern Construction Corp. $4,540,785.00 Engineer's Estimate $2,839,000.00

12 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: B

Schedule Type: Options

Solcitation No: 693C73-24-B-000014

Division: Eastern Federal Lands

State: NJ, PA County: Warren, Pike

Federal Land: Delaware Water Gap National Recreation Area Opened at: Ashburn, Virginia

Opened by: Emily McCleary

Date: 08/20/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Kovilic Construction Company, Inc. $715,315.00 3721 N. Carnation Street Franklin Park Illinois 60131

Kyle Conti Construction, LLC Low bidder. $902,256.00 749 Clawson Avenue Hillsborough New Jersey 08844

Central Southern Construction Corp. $1,354,075.00 119 Sewald Street Jacksonville Florida 32204

Engineer's Estimate $678,000.00

20 August 2024

Contract Specialist

Emily McCleary

Kyle Conti Construction, LLC 12 December 2024

13 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0020 15101-0000 MOBILIZATION

Kovilic Construction Company, Inc. Lump Sum $100,000.00 Kyle Conti Construction, LLC Lump Sum $200,000.00 Central Southern Construction Corp. Lump Sum $250,000.00 Engineer's Estimate ALL LPSM Lump Sum $53,585.75

B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Kovilic Construction Company, Inc. Lump Sum $20,000.00 Kyle Conti Construction, LLC Lump Sum $7,650.00 Central Southern Construction Corp. Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $16,000.00

B0060 15401-0000 CONTRACTOR TESTING

Kovilic Construction Company, Inc. Lump Sum $20,000.00 Kyle Conti Construction, LLC Lump Sum $15,200.00 Central Southern Construction Corp. Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $14,900.00

B0070 15401-0000 CONTRACTOR TESTING (BIOLOGICAL MONITOR)

Kovilic Construction Company, Inc. Lump Sum $25,000.00 Kyle Conti Construction, LLC Lump Sum $55,500.00 Central Southern Construction Corp. Lump Sum $125,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00

B0080 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Kovilic Construction Company, Inc. $10.00 $1,300.00 Kyle Conti Construction, LLC $18.50 $2,405.00 Central Southern Construction Corp. $15.00 $1,950.00 Engineer's Estimate 130 LNFT $15.75 $2,047.50

B0100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Kovilic Construction Company, Inc. $25.00 $3,250.00 Kyle Conti Construction, LLC $15.50 $2,015.00 Central Southern Construction Corp. $15.00 $1,950.00 Engineer's Estimate 130 LNFT $46.00 $5,980.00

14 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0120 15706-2300 SOIL EROSION CONTROL, ON-SITE CONCRETE WASHOUT STRUCTURE

Kovilic Construction Company, Inc. $5,000.00 $5,000.00 Kyle Conti Construction, LLC $3,200.00 $3,200.00 Central Southern Construction Corp. $10,000.00 $10,000.00 Engineer's Estimate 1 EACH $6,500.00 $6,500.00

B0140 20103-0000 CLEARING AND GRUBBING

Kovilic Construction Company, Inc. $10.00 $2,100.00 Kyle Conti Construction, LLC $42.00 $8,820.00 Central Southern Construction Corp. $50.00 $10,500.00 Engineer's Estimate 210 SQYD $37.00 $7,770.00

B0160 20220-1000 REMOVAL, INDIVIDUAL TREE

Kovilic Construction Company, Inc. $2,500.00 $25,000.00 Kyle Conti Construction, LLC $1,400.00 $14,000.00 Central Southern Construction Corp. $3,000.00 $30,000.00 Engineer's Estimate 10 EACH $2,000.00 $20,000.00

B0180 20315-0000 SAWCUTTING PAVEMENT

Kovilic Construction Company, Inc. $25.00 $1,125.00 Kyle Conti Construction, LLC $6.00 $270.00 Central Southern Construction Corp. $25.00 $1,125.00 Engineer's Estimate 45 LNFT $22.00 $990.00

B0200 20410-0000 SELECT BORROW (#57 STONE)

Kovilic Construction Company, Inc. $150.00 $9,000.00 Kyle Conti Construction, LLC $150.00 $9,000.00 Central Southern Construction Corp. $300.00 $18,000.00 Engineer's Estimate 60 CUYD $150.00 $9,000.00

B0220 25102-0400 PLACED RIPRAP, METHOD A, CLASS 4

Kovilic Construction Company, Inc. $500.00 $27,500.00 Kyle Conti Construction, LLC $178.00 $9,790.00 Central Southern Construction Corp. $400.00 $22,000.00 Engineer's Estimate 55 TON $220.00 $12,100.00

15 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0240 25102-0700 PLACED RIPRAP, METHOD A, CLASS 7

Kovilic Construction Company, Inc. $500.00 $25,000.00 Kyle Conti Construction, LLC $190.00 $9,500.00 Central Southern Construction Corp. $400.00 $20,000.00 Engineer's Estimate 50 TON $240.00 $12,000.00

B0260 40101-0100 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL MAXIMUM SIZE AGGREGATE, <0.3

MILLION ESAL (TYPE IV ROUGHNESS, PG 58-28)

Kovilic Construction Company, Inc. $500.00 $11,000.00 Kyle Conti Construction, LLC $768.00 $16,896.00 Central Southern Construction Corp. $575.00 $12,650.00 Engineer's Estimate 22 TON $430.00 $9,460.00

B0280 40102-0100 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL MAXIMUM SIZE AGGREGATE, WEDGE

AND LEVELING COURSE (PG 58-28)

Kovilic Construction Company, Inc. $500.00 $7,500.00 Kyle Conti Construction, LLC $600.00 $9,000.00 Central Southern Construction Corp. $575.00 $8,625.00 Engineer's Estimate 15 TON $290.00 $4,350.00

B0300 41202-0000 TACK COAT

Kovilic Construction Company, Inc. $25.00 $1,625.00 Kyle Conti Construction, LLC $27.00 $1,755.00 Central Southern Construction Corp. $50.00 $3,250.00 Engineer's Estimate 65 GAL $100.00 $6,500.00

B0320 41301-0400 ASPHALT PAVEMENT MILLING, 1 1/2-INCH DEPTH

Kovilic Construction Company, Inc. $27.00 $7,290.00 Kyle Conti Construction, LLC $61.50 $16,605.00 Central Southern Construction Corp. $50.00 $13,500.00 Engineer's Estimate 270 SQYD $31.00 $8,370.00

B0340 55220-0000 REPAIR CONCRETE (CURB AND RAILING)

Kovilic Construction Company, Inc. $900.00 $9,000.00 Kyle Conti Construction, LLC $7,655.00 $76,550.00 Central Southern Construction Corp. $2,450.00 $24,500.00 Engineer's Estimate 10 SQYD $3,000.00 $30,000.00

16 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0360 55220-0000 REPAIR CONCRETE (TOP OF DECK)

Kovilic Construction Company, Inc. $900.00 $9,000.00 Kyle Conti Construction, LLC $4,110.00 $41,100.00 Central Southern Construction Corp. $2,450.00 $24,500.00 Engineer's Estimate 10 SQYD $1,900.00 $19,000.00

B0380 55220-0000 REPAIR CONCRETE (BOTTOM OF DECK)

Kovilic Construction Company, Inc. $5,000.00 $150,000.00 Kyle Conti Construction, LLC $7,270.00 $218,100.00 Central Southern Construction Corp. $5,100.00 $153,000.00 Engineer's Estimate 30 SQYD $3,000.00 $90,000.00

B0400 55224-0000 SEAL CONCRETE SURFACE

Kovilic Construction Company, Inc. $150.00 $12,000.00 Kyle Conti Construction, LLC $260.00 $20,800.00 Central Southern Construction Corp. $50.00 $4,000.00 Engineer's Estimate 80 SQYD $130.00 $10,400.00

B0420 56302-2000 PAINTING, STEEL STRUCTURE

Kovilic Construction Company, Inc. $50.00 $12,000.00 Kyle Conti Construction, LLC $135.00 $32,400.00 Central Southern Construction Corp. $500.00 $120,000.00 Engineer's Estimate 240 SQFT $380.00 $91,200.00

B0440 56320-0000 CONTAINMENT SYSTEM AND WORKER PROTECTION PLAN

Kovilic Construction Company, Inc. Lump Sum $50,000.00 Kyle Conti Construction, LLC Lump Sum $28,000.00 Central Southern Construction Corp. Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00

B0460 57501-0000 MINOR BRIDGE WORK (REMOVE ASPHALT)

Kovilic Construction Company, Inc. Lump Sum $25,000.00 Kyle Conti Construction, LLC Lump Sum $5,050.00 Central Southern Construction Corp. Lump Sum $15,300.00 Engineer's Estimate ALL LPSM Lump Sum $7,000.00

17 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0480 61708-1000 REMOVE AND RESET, GUARDRAIL

Kovilic Construction Company, Inc. $50.00 $11,000.00 Kyle Conti Construction, LLC $64.00 $14,080.00 Central Southern Construction Corp. $325.00 $71,500.00 Engineer's Estimate 220 LNFT $190.00 $41,800.00

B0500 61901-0000 FENCE (TREE PROTECTION)

Kovilic Construction Company, Inc. $10.00 $500.00 Kyle Conti Construction, LLC $12.50 $625.00 Central Southern Construction Corp. $20.00 $1,000.00 Engineer's Estimate 50 LNFT $16.50 $825.00

B0520 62632-0000 PLANTINGS

Kovilic Construction Company, Inc. Lump Sum $25,000.00 Kyle Conti Construction, LLC Lump Sum $5,650.00 Central Southern Construction Corp. Lump Sum $55,000.00 Engineer's Estimate ALL LPSM Lump Sum $9,500.00

B0540 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING (WOOD POSTS)

Kovilic Construction Company, Inc. $100.00 $1,200.00 Kyle Conti Construction, LLC $100.00 $1,200.00 Central Southern Construction Corp. $50.00 $600.00 Engineer's Estimate 12 SQFT $120.00 $1,440.00

B0560 63316-1000 REMOVE AND RESET SIGN

Kovilic Construction Company, Inc. $500.00 $500.00 Kyle Conti Construction, LLC $365.00 $365.00 Central Southern Construction Corp. $400.00 $400.00 Engineer's Estimate 1 EACH $700.00 $700.00

B0580 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID

Kovilic Construction Company, Inc. $5.00 $3,300.00 Kyle Conti Construction, LLC $3.50 $2,310.00 Central Southern Construction Corp. $10.00 $6,600.00 Engineer's Estimate 660 LNFT $5.30 $3,498.00

18 out of 18

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0600 63502-2100 TEMPORARY TRAFFIC CONTROL, CRASH CUSHION

Kovilic Construction Company, Inc. $10,000.00 $20,000.00 Kyle Conti Construction, LLC $4,290.00 $8,580.00 Central Southern Construction Corp. $8,000.00 $16,000.00 Engineer's Estimate 2 EACH $11,000.00 $22,000.00

B0620 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM

Kovilic Construction Company, Inc. $50,000.00 $50,000.00 Kyle Conti Construction, LLC $28,600.00 $28,600.00 Central Southern Construction Corp. $40,000.00 $40,000.00 Engineer's Estimate 1 EACH $29,000.00 $29,000.00

B0640 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER

Kovilic Construction Company, Inc. $100.00 $27,500.00 Kyle Conti Construction, LLC $120.00 $33,000.00 Central Southern Construction Corp. $110.00 $30,250.00 Engineer's Estimate 275 LNFT $80.00 $22,000.00

B0660 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

Kovilic Construction Company, Inc. $25.00 $1,625.00 Kyle Conti Construction, LLC $16.00 $1,040.00 Central Southern Construction Corp. $75.00 $4,875.00 Engineer's Estimate 65 LNFT $19.75 $1,283.75

B0680 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Kovilic Construction Company, Inc. $100.00 $16,000.00 Kyle Conti Construction, LLC $20.00 $3,200.00 Central Southern Construction Corp. $50.00 $8,000.00 Engineer's Estimate 160 SQFT $55.00 $8,800.00

Total Schedule - All Items

Kovilic Construction Company, Inc. $715,315.00 Kyle Conti Construction, LLC $902,256.00 Central Southern Construction Corp. $1,354,075.00 Engineer's Estimate $678,000.00

Bid Error Report

1 out of 4

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: A

Schedule Type: Base

Bid Item Check Pass

Bidder Line Item Number Bidder's Extension Computed Extension

No Line Item Errors Found

2 out of 4

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: A

Schedule Type: Base

Bid Total Check Pass

Bidder Bidder's Bid Amount Computed Bid Amount Error

Kovilic Construction Company, Inc. $4,477,945.00 $4,477,945.00

Kyle Conti Construction, LLC $3,222,869.00 $3,222,869.00

Central Southern Construction Corp. $4,558,035.00 $4,540,785.00 X

The apparent low bidder is 11.91% above the engineer's estimate.

3 out of 4

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: B

Schedule Type: Options

Bid Item Check Pass

Bidder Line Item Number Bidder's Extension Computed Extension

No Line Item Errors Found

4 out of 4

Project No: NP DEWA 10(6), 218(2)

Project Name: Replacement of the Dingmans Falls Access Bridge #1 and rehabilitation of the

Vancampens Glen Bridge

Schedule: B

Schedule Type: Options

Bid Total Check Pass

Bidder Bidder's Bid Amount Computed Bid Amount Error

Kovilic Construction Company, Inc. $715,315.00 $715,315.00

Kyle Conti Construction, LLC $902,256.00 $902,256.00

Central Southern Construction Corp. $1,354,075.00 $1,354,075.00

The apparent low bidder is 5.50% above the engineer's estimate.