Tabulation of Bids - NP BLRI PVT PRES FY23(1).pdf
PDF 695 KB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- 693C73-24-C-000002
About this file
This document provides a tabulation of bids received in response to Solicitation Number 693C73-24-B-000002 for pavement preservation work along the Blue Ridge Parkway.
The solicitation was issued by the Department of Transportation Federal Highway Administration and sought bids for pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from milepost 27.2 to 97.0. Six bids were received and evaluated across six schedules (A through F) for base work and options. The apparent low bidder for each schedule ranged from 16.98% to 50.15% below the independent government cost estimate. Construction Solutions Group was the apparent low bidder for Schedules B, C, D and F. The award was made to Construction Solutions Group on December 17, 2023 for their bids totaling $2,882,222.30 across all schedules.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 10/19/23
1 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Contractor Responsive?
Engineer's Estimate
Bryant's Land and Development Industries, Inc.
Central Southern Construction Corp.
Construction Solutions Group, LLC
MC3 Solutions, LLC
RBA Engineering International, PLLC
Base Schedule A
$1,410,000.00
$1,530,471.50
$1,722,779.25
$1,440,464.50
$1,208,164.50
$1,170,552.25
Option: B
$1,405,000.00
$1,546,827.00
$857,617.50
$700,377.55
$949,119.25
$1,120,808.20
Option: C
$375,000.00
$595,493.00
$371,040.25
$210,600.75
$287,608.25
$330,078.95
Contractor Responsive?
Engineer's Estimate
Bryant's Land and Development Industries, Inc.
Central Southern Construction Corp.
Construction Solutions Group, LLC
MC3 Solutions, LLC
RBA Engineering International, PLLC
Option: D
$1,400,000.00
$1,551,433.25
$846,410.50
$718,863.20
$973,540.00
$1,173,462.05
Option: E
$1,410,000.00
$1,551,601.75
$846,197.75
$703,968.80
$974,666.75
$1,128,184.40
Option: F
$495,000.00
$658,311.00
$406,068.00
$249,513.00
$347,345.75
$392,752.05
2 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Contractor Responsive?
Engineer's Estimate
Bryant's Land and Development Industries, Inc.
Central Southern Construction Corp.
Construction Solutions Group, LLC
MC3 Solutions, LLC
RBA Engineering International, PLLC
Total Base Schedule A and Option(s): B
$2,815,000.00
$3,077,298.50
$2,580,396.75
$2,140,842.05
$2,157,283.75
$2,291,360.45
Total Base Schedule A and Option(s): BC
$3,190,000.00
$3,672,791.50
$2,951,437.00
$2,351,442.80
$2,444,892.00
$2,621,439.40
Total Base Schedule A and Option(s): BCD
$4,590,000.00
$5,224,224.75
$3,797,847.50
$3,070,306.00
$3,418,432.00
$3,794,901.45
Contractor Responsive?
Engineer's Estimate
Bryant's Land and Development Industries, Inc.
Central Southern Construction Corp.
Construction Solutions Group, LLC
MC3 Solutions, LLC
RBA Engineering International, PLLC
Total Base Schedule A and Option(s): BCDF
$5,085,000.00
$5,882,535.75
$4,203,915.50
$3,319,819.00
$3,765,777.75
$4,187,653.50
Total Base Schedule A and Option(s): BCE
$4,600,000.00
$5,224,393.25
$3,797,634.75
$3,055,411.60
$3,419,558.75
$3,749,623.80
Total Base Schedule A and Option(s): BCF
$3,685,000.00
$4,331,102.50
$3,357,505.00
$2,600,955.80
$2,792,237.75
$3,014,191.45
3 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Contractor Responsive?
Engineer's Estimate
Bryant's Land and Development Industries, Inc.
Central Southern Construction Corp.
Construction Solutions Group, LLC
MC3 Solutions, LLC
RBA Engineering International, PLLC
Total Base Schedule A and Option(s): BD
$4,215,000.00
$4,628,731.75
$3,426,807.25
$2,859,705.25
$3,130,823.75
$3,464,822.50
Total Base Schedule A and Option(s): BDE
$5,625,000.00
$6,180,333.50
$4,273,005.00
$3,563,674.05
$4,105,490.50
$4,593,006.90
Total Base Schedule A and Option(s): BDF
$4,710,000.00
$5,287,042.75
$3,832,875.25
$3,109,218.25
$3,478,169.50
$3,857,574.55
Contractor Responsive?
Engineer's Estimate
Bryant's Land and Development Industries, Inc.
Central Southern Construction Corp.
Construction Solutions Group, LLC
MC3 Solutions, LLC
RBA Engineering International, PLLC
Total Base Schedule A and Option(s): BE
$4,225,000.00
$4,628,900.25
$3,426,594.50
$2,844,810.85
$3,131,950.50
$3,419,544.85
Total Base Schedule A and Option(s): BEF
$4,720,000.00
$5,287,211.25
$3,832,662.50
$3,094,323.85
$3,479,296.25
$3,812,296.90
Total Base Schedule A and Option(s): BF
$3,310,000.00
$3,735,609.50
$2,986,464.75
$2,390,355.05
$2,504,629.50
$2,684,112.50
4 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Contractor Responsive?
Engineer's Estimate
Bryant's Land and Development Industries, Inc.
Central Southern Construction Corp.
Construction Solutions Group, LLC
MC3 Solutions, LLC
RBA Engineering International, PLLC
Total Base Schedule A and Option(s): C
$1,785,000.00
$2,125,964.50
$2,093,819.50
$1,651,065.25
$1,495,772.75
$1,500,631.20
Total Base Schedule A and Option(s): CD
$3,185,000.00
$3,677,397.75
$2,940,230.00
$2,369,928.45
$2,469,312.75
$2,674,093.25
Total Base Schedule A and Option(s): CDE
$4,595,000.00
$5,228,999.50
$3,786,427.75
$3,073,897.25
$3,443,979.50
$3,802,277.65
Contractor Responsive?
Engineer's Estimate
Bryant's Land and Development Industries, Inc.
Central Southern Construction Corp.
Construction Solutions Group, LLC
MC3 Solutions, LLC
RBA Engineering International, PLLC
Total Base Schedule A and Option(s): CDF
$3,680,000.00
$4,335,708.75
$3,346,298.00
$2,619,441.45
$2,816,658.50
$3,066,845.30
Total Base Schedule A and Option(s): CE
$3,195,000.00
$3,677,566.25
$2,940,017.25
$2,355,034.05
$2,470,439.50
$2,628,815.60
Total Base Schedule A and Option(s): CEF
$3,690,000.00
$4,335,877.25
$3,346,085.25
$2,604,547.05
$2,817,785.25
$3,021,567.65
5 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Contractor Responsive?
Engineer's Estimate
Bryant's Land and Development Industries, Inc.
Central Southern Construction Corp.
Construction Solutions Group, LLC
MC3 Solutions, LLC
RBA Engineering International, PLLC
Total Base Schedule A and Option(s): CF
$2,280,000.00
$2,784,275.50
$2,499,887.50
$1,900,578.25
$1,843,118.50
$1,893,383.25
Total Base Schedule A and Option(s): D
$2,810,000.00
$3,081,904.75
$2,569,189.75
$2,159,327.70
$2,181,704.50
$2,344,014.30
Total Base Schedule A and Option(s): DE
$4,220,000.00
$4,633,506.50
$3,415,387.50
$2,863,296.50
$3,156,371.25
$3,472,198.70
Contractor Responsive?
Engineer's Estimate
Bryant's Land and Development Industries, Inc.
Central Southern Construction Corp.
Construction Solutions Group, LLC
MC3 Solutions, LLC
RBA Engineering International, PLLC
Total Base Schedule A and Option(s): DEF
$4,715,000.00
$5,291,817.50
$3,821,455.50
$3,112,809.50
$3,503,717.00
$3,864,950.75
Total Base Schedule A and Option(s): DF
$3,305,000.00
$3,740,215.75
$2,975,257.75
$2,408,840.70
$2,529,050.25
$2,736,766.35
Total Base Schedule A and Option(s): E
$2,820,000.00
$3,082,073.25
$2,568,977.00
$2,144,433.30
$2,182,831.25
$2,298,736.65
6 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Contractor Responsive?
Engineer's Estimate
Bryant's Land and Development Industries, Inc.
Central Southern Construction Corp.
Construction Solutions Group, LLC
MC3 Solutions, LLC
RBA Engineering International, PLLC
Total Base Schedule A and Option(s): EF
$3,315,000.00
$3,740,384.25
$2,975,045.00
$2,393,946.30
$2,530,177.00
$2,691,488.70
Total Base Schedule A and Option(s): F
$1,905,000.00
$2,188,782.50
$2,128,847.25
$1,689,977.50
$1,555,510.25
$1,563,304.30
Total Base Schedule A and Option(s): BCDEF
$6,495,000.00
$7,434,137.50
$5,050,113.25
$4,023,787.80
$4,740,444.50
$5,315,837.90
7 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: A
Schedule Type: Base
Solcitation No: 693C73-24-B-000002
Division: Eastern Federal Lands
State: VA County: Bedford, Botetourt, Rockbridge
Federal Land: Blue Ridge Parkway Opened at: Ashburn, Virginia
Opened by: Emily McCleary
Date: 10/17/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
RBA Engineering International, PLLC $1,170,552.25 7830 Backlick Road, Suite B3 Springfield Virginia 22150
MC3 Solutions, LLC $1,208,164.50 8772 Roanoke Road Elliston Virginia 24087
Construction Solutions Group, LLC Apparent low bidder $1,440,464.50 425 Highland Ave St. Louis Missouri 63122
Bryant's Land and Development Industries, Inc. $1,530,471.50 159 Depot Street Burnsville North Carolina 28714
Central Southern Construction Corp. $1,722,779.25 119 Sewald Street Jacksonville Florida 32204
Engineer's Estimate $1,410,000.00
Emily McCleary
Contract Specialist
19 October 2023
Construction Solutions Group, LLC 17 December 2023
8 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0100 15101-0000 MOBILIZATION
RBA Engineering International, PLLC Lump Sum $65,000.00 MC3 Solutions, LLC Lump Sum $279,000.00 Construction Solutions Group, LLC Lump Sum $660,470.00 Bryant's Land and Development Industries, Inc. Lump Sum $350,000.00 Central Southern Construction Corp. Lump Sum $795,000.00 Engineer's Estimate ALL LPSM Lump Sum $67,737.00
A0120 15401-0000 CONTRACTOR TESTING
RBA Engineering International, PLLC Lump Sum $15,050.00 MC3 Solutions, LLC Lump Sum $13,500.00 Construction Solutions Group, LLC Lump Sum $11,100.00 Bryant's Land and Development Industries, Inc. Lump Sum $40,000.00 Central Southern Construction Corp. Lump Sum $160,000.00 Engineer's Estimate ALL LPSM Lump Sum $33,000.00
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (INLET PROTECTION)
RBA Engineering International, PLLC $11.75 $176.25 MC3 Solutions, LLC $75.00 $1,125.00 Construction Solutions Group, LLC $55.50 $832.50 Bryant's Land and Development Industries, Inc. $35.00 $525.00 Central Southern Construction Corp. $100.00 $1,500.00 Engineer's Estimate 15 LNFT $13.75 $206.25
A0160 20302-2600 REMOVAL OF PAVEMENT MARKINGS
RBA Engineering International, PLLC $1.75 $35,175.00 MC3 Solutions, LLC $1.35 $27,135.00 Construction Solutions Group, LLC $1.24 $24,924.00 Bryant's Land and Development Industries, Inc. $0.94 $18,894.00 Central Southern Construction Corp. $1.00 $20,100.00 Engineer's Estimate 20,100 LNFT $3.00 $60,300.00
A0180 40602-0000 FOG SEAL
RBA Engineering International, PLLC $1.05 $126,845.25 MC3 Solutions, LLC $0.90 $108,724.50 Construction Solutions Group, LLC $0.78 $94,227.90 Bryant's Land and Development Industries, Inc. $1.80 $217,449.00 Central Southern Construction Corp. $0.70 $84,563.50 Engineer's Estimate 120,805 SQYD $1.60 $193,288.00
9 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0220 40702-0300 CHIP SEAL, TYPE 1C
RBA Engineering International, PLLC $3.92 $473,555.60 MC3 Solutions, LLC $3.45 $416,777.25 Construction Solutions Group, LLC $2.89 $349,126.45 Bryant's Land and Development Industries, Inc. $4.80 $579,864.00 Central Southern Construction Corp. $2.95 $356,374.75 Engineer's Estimate 120,805 SQYD $5.75 $694,628.75
A0240 41401-3000 CRACKS, CLEANING AND FILLING
RBA Engineering International, PLLC $6.06 $28,572.90 MC3 Solutions, LLC $4.80 $22,632.00 Construction Solutions Group, LLC $4.46 $21,028.90 Bryant's Land and Development Industries, Inc. $4.00 $18,860.00 Central Southern Construction Corp. $5.00 $23,575.00 Engineer's Estimate 4,715 LNFT $9.65 $45,499.75
A0260 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID
RBA Engineering International, PLLC $2.50 $226,587.50 MC3 Solutions, LLC $0.95 $86,103.25 Construction Solutions Group, LLC $0.89 $80,665.15 Bryant's Land and Development Industries, Inc. $0.95 $86,103.25 Central Southern Construction Corp. $0.80 $72,508.00 Engineer's Estimate 90,635 LNFT $1.35 $122,357.25
A0280 63401-0600 PAVEMENT MARKINGS, TYPE C, BROKEN
RBA Engineering International, PLLC $2.50 $12,912.50 MC3 Solutions, LLC $1.10 $5,681.50 Construction Solutions Group, LLC $0.89 $4,596.85 Bryant's Land and Development Industries, Inc. $0.85 $4,390.25 Central Southern Construction Corp. $0.80 $4,132.00 Engineer's Estimate 5,165 LNFT $0.80 $4,132.00
A0300 63501-0000 TEMPORARY TRAFFIC CONTROL
RBA Engineering International, PLLC Lump Sum $28,850.00 MC3 Solutions, LLC Lump Sum $136,000.00 Construction Solutions Group, LLC Lump Sum $22,200.00 Bryant's Land and Development Industries, Inc. Lump Sum $50,000.00 Central Southern Construction Corp. Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00
10 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0320 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
RBA Engineering International, PLLC $9,050.00 $18,100.00 MC3 Solutions, LLC $7,100.00 $14,200.00 Construction Solutions Group, LLC $6,660.00 $13,320.00 Bryant's Land and Development Industries, Inc. $14,800.00 $29,600.00 Central Southern Construction Corp. $4,000.00 $8,000.00 Engineer's Estimate 2 EACH $12,000.00 $24,000.00
A0340 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
RBA Engineering International, PLLC $25.40 $49,276.00 MC3 Solutions, LLC $25.40 $49,276.00 Construction Solutions Group, LLC $25.40 $49,276.00 Bryant's Land and Development Industries, Inc. $25.40 $49,276.00 Central Southern Construction Corp. $25.40 $49,276.00 Engineer's Estimate 1,940 HOUR $25.40 $49,276.00
A0360 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
RBA Engineering International, PLLC $52.75 $24,001.25 MC3 Solutions, LLC $42.00 $19,110.00 Construction Solutions Group, LLC $38.85 $17,676.75 Bryant's Land and Development Industries, Inc. $122.00 $55,510.00 Central Southern Construction Corp. $50.00 $22,750.00 Engineer's Estimate 455 HOUR $65.00 $29,575.00
A0380 63701-0000 FIELD OFFICE
RBA Engineering International, PLLC $66,450.00 $66,450.00 MC3 Solutions, LLC $28,900.00 $28,900.00 Construction Solutions Group, LLC $91,020.00 $91,020.00 Bryant's Land and Development Industries, Inc. $30,000.00 $30,000.00 Central Southern Construction Corp. $75,000.00 $75,000.00 Engineer's Estimate 1 EACH $16,000.00 $16,000.00
Total Schedule - All Items
RBA Engineering International, PLLC $1,170,552.25 MC3 Solutions, LLC $1,208,164.50 Construction Solutions Group, LLC $1,440,464.50 Bryant's Land and Development Industries, Inc. $1,530,471.50 Central Southern Construction Corp. $1,722,779.25 Engineer's Estimate $1,410,000.00
11 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: B
Schedule Type: Options
Solcitation No: 693C73-24-B-000002
Division: Eastern Federal Lands
State: VA County: Bedford, Botetourt, Rockbridge
Federal Land: Blue Ridge Parkway Opened at: Ashburn, Virginia
Opened by: Emily McCleary
Date: 10/17/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Construction Solutions Group, LLC Apparent low bidder $700,377.55 425 Highland Ave St. Louis Missouri 63122
Central Southern Construction Corp. $857,617.50 119 Sewald Street Jacksonville Florida 32204
MC3 Solutions, LLC $949,119.25 8772 Roanoke Road Elliston Virginia 24087
RBA Engineering International, PLLC $1,120,808.20 7830 Backlick Road, Suite B3 Springfield Virginia 22150
Bryant's Land and Development Industries, Inc. $1,546,827.00 159 Depot Street Burnsville North Carolina 28714
Engineer's Estimate $1,405,000.00
Emily McCleary
Contract Specialist
12 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: B
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B0100 15101-0000 MOBILIZATION
Construction Solutions Group, LLC Lump Sum $11,100.00 Central Southern Construction Corp. Lump Sum $65,000.00 MC3 Solutions, LLC Lump Sum $140,000.00 RBA Engineering International, PLLC Lump Sum $15,000.00 Bryant's Land and Development Industries, Inc. Lump Sum $360,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,990.00
B0120 15401-0000 CONTRACTOR TESTING
Construction Solutions Group, LLC Lump Sum $11,100.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $13,500.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Bryant's Land and Development Industries, Inc. Lump Sum $41,000.00 Engineer's Estimate ALL LPSM Lump Sum $33,000.00
B0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (INLET PROTECTION)
Construction Solutions Group, LLC $33.30 $1,931.40 Central Southern Construction Corp. $100.00 $5,800.00 MC3 Solutions, LLC $75.00 $4,350.00 RBA Engineering International, PLLC $11.75 $681.50 Bryant's Land and Development Industries, Inc. $35.00 $2,030.00 Engineer's Estimate 58 LNFT $13.75 $797.50
B0160 20302-2600 REMOVAL OF PAVEMENT MARKINGS
Construction Solutions Group, LLC $1.24 $25,401.40 Central Southern Construction Corp. $1.00 $20,485.00 MC3 Solutions, LLC $1.35 $27,654.75 RBA Engineering International, PLLC $1.75 $35,848.75 Bryant's Land and Development Industries, Inc. $0.90 $18,436.50 Engineer's Estimate 20,485 LNFT $3.00 $61,455.00
B0180 40602-0000 FOG SEAL
Construction Solutions Group, LLC $0.78 $95,136.60 Central Southern Construction Corp. $0.70 $85,379.00 MC3 Solutions, LLC $0.90 $109,773.00 RBA Engineering International, PLLC $1.05 $128,068.50 Bryant's Land and Development Industries, Inc. $1.80 $219,546.00 Engineer's Estimate 121,970 SQYD $1.60 $195,152.00
13 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: B
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B0200 40702-0300 CHIP SEAL, TYPE 1C
Construction Solutions Group, LLC $2.89 $352,493.30 Central Southern Construction Corp. $2.95 $359,811.50 MC3 Solutions, LLC $3.45 $420,796.50 RBA Engineering International, PLLC $3.92 $478,122.40 Bryant's Land and Development Industries, Inc. $4.80 $585,456.00 Engineer's Estimate 121,970 SQYD $5.75 $701,327.50
B0240 41401-3000 CRACKS, CLEANING AND FILLING
Construction Solutions Group, LLC $4.46 $11,506.80 Central Southern Construction Corp. $5.00 $12,900.00 MC3 Solutions, LLC $4.80 $12,384.00 RBA Engineering International, PLLC $6.06 $15,634.80 Bryant's Land and Development Industries, Inc. $4.00 $10,320.00 Engineer's Estimate 2,580 LNFT $9.65 $24,897.00
B0260 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID
Construction Solutions Group, LLC $0.89 $81,417.20 Central Southern Construction Corp. $0.80 $73,184.00 MC3 Solutions, LLC $0.95 $86,906.00 RBA Engineering International, PLLC $2.50 $228,700.00 Bryant's Land and Development Industries, Inc. $0.95 $86,906.00 Engineer's Estimate 91,480 LNFT $1.35 $123,498.00
B0280 63401-0600 PAVEMENT MARKINGS, TYPE C, BROKEN
Construction Solutions Group, LLC $0.89 $5,598.10 Central Southern Construction Corp. $0.80 $5,032.00 MC3 Solutions, LLC $1.10 $6,919.00 RBA Engineering International, PLLC $2.50 $15,725.00 Bryant's Land and Development Industries, Inc. $0.85 $5,346.50 Engineer's Estimate 6,290 LNFT $0.80 $5,032.00
B0300 63501-0000 TEMPORARY TRAFFIC CONTROL
Construction Solutions Group, LLC Lump Sum $22,200.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $36,000.00 RBA Engineering International, PLLC Lump Sum $30,150.00 Bryant's Land and Development Industries, Inc. Lump Sum $53,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00
14 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: B
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B0320 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
Construction Solutions Group, LLC $6,660.00 $13,320.00 Central Southern Construction Corp. $4,000.00 $8,000.00 MC3 Solutions, LLC $7,100.00 $14,200.00 RBA Engineering International, PLLC $9,050.00 $18,100.00 Bryant's Land and Development Industries, Inc. $15,000.00 $30,000.00 Engineer's Estimate 2 EACH $12,000.00 $24,000.00
B0340 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Construction Solutions Group, LLC $25.40 $49,276.00 Central Southern Construction Corp. $25.40 $49,276.00 MC3 Solutions, LLC $25.40 $49,276.00 RBA Engineering International, PLLC $25.40 $49,276.00 Bryant's Land and Development Industries, Inc. $25.40 $49,276.00 Engineer's Estimate 1,940 HOUR $25.40 $49,276.00
B0360 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
Construction Solutions Group, LLC $38.85 $17,676.75 Central Southern Construction Corp. $50.00 $22,750.00 MC3 Solutions, LLC $42.00 $19,110.00 RBA Engineering International, PLLC $52.75 $24,001.25 Bryant's Land and Development Industries, Inc. $122.00 $55,510.00 Engineer's Estimate 455 HOUR $65.00 $29,575.00
B0380 63701-0000 FIELD OFFICE
Construction Solutions Group, LLC $2,220.00 $2,220.00 Central Southern Construction Corp. $50,000.00 $50,000.00 MC3 Solutions, LLC $8,250.00 $8,250.00 RBA Engineering International, PLLC $66,450.00 $66,450.00 Bryant's Land and Development Industries, Inc. $30,000.00 $30,000.00 Engineer's Estimate 1 EACH $16,000.00 $16,000.00
Total Schedule - All Items
Construction Solutions Group, LLC $700,377.55 Central Southern Construction Corp. $857,617.50 MC3 Solutions, LLC $949,119.25 RBA Engineering International, PLLC $1,120,808.20 Bryant's Land and Development Industries, Inc. $1,546,827.00 Engineer's Estimate $1,405,000.00
15 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: C
Schedule Type: Options
Solcitation No: 693C73-24-B-000002
Division: Eastern Federal Lands
State: VA County: Bedford, Botetourt, Rockbridge
Federal Land: Blue Ridge Parkway Opened at: Ashburn, Virginia
Opened by: Emily McCleary
Date: 10/17/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Construction Solutions Group, LLC Apparent low bidder $210,600.75 425 Highland Ave St. Louis Missouri 63122
MC3 Solutions, LLC $287,608.25 8772 Roanoke Road Elliston Virginia 24087
RBA Engineering International, PLLC $330,078.95 7830 Backlick Road, Suite B3 Springfield Virginia 22150
Central Southern Construction Corp. $371,040.25 119 Sewald Street Jacksonville Florida 32204
Bryant's Land and Development Industries, Inc. $595,493.00 159 Depot Street Burnsville North Carolina 28714
Engineer's Estimate $375,000.00
Emily McCleary Contract Specialist
16 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: C
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
C0100 15101-0000 MOBILIZATION
Construction Solutions Group, LLC Lump Sum $11,100.00 MC3 Solutions, LLC Lump Sum $67,000.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Central Southern Construction Corp. Lump Sum $65,000.00 Bryant's Land and Development Industries, Inc. Lump Sum $220,000.00 Engineer's Estimate ALL LPSM Lump Sum $18,724.25
C0120 15401-0000 CONTRACTOR TESTING
Construction Solutions Group, LLC Lump Sum $11,100.00 MC3 Solutions, LLC Lump Sum $13,500.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Central Southern Construction Corp. Lump Sum $50,000.00 Bryant's Land and Development Industries, Inc. Lump Sum $18,000.00 Engineer's Estimate ALL LPSM Lump Sum $9,000.00
C0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (INLET PROTECTION)
Construction Solutions Group, LLC $55.50 $666.00 MC3 Solutions, LLC $75.00 $900.00 RBA Engineering International, PLLC $11.15 $133.80 Central Southern Construction Corp. $100.00 $1,200.00 Bryant's Land and Development Industries, Inc. $35.00 $420.00 Engineer's Estimate 12 LNFT $13.75 $165.00
C0160 20302-2600 REMOVAL OF PAVEMENT MARKINGS
Construction Solutions Group, LLC $1.24 $5,753.60 MC3 Solutions, LLC $1.35 $6,264.00 RBA Engineering International, PLLC $1.75 $8,120.00 Central Southern Construction Corp. $1.00 $4,640.00 Bryant's Land and Development Industries, Inc. $0.90 $4,176.00 Engineer's Estimate 4,640 LNFT $3.00 $13,920.00
C0180 40602-0000 FOG SEAL
Construction Solutions Group, LLC $0.78 $21,750.30 MC3 Solutions, LLC $0.90 $25,096.50 RBA Engineering International, PLLC $1.05 $29,279.25 Central Southern Construction Corp. $0.70 $19,519.50 Bryant's Land and Development Industries, Inc. $2.50 $69,712.50 Engineer's Estimate 27,885 SQYD $1.60 $44,616.00
17 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: C
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
C0200 40702-0300 CHIP SEAL, TYPE 1C
Construction Solutions Group, LLC $2.89 $80,587.65 MC3 Solutions, LLC $3.45 $96,203.25 RBA Engineering International, PLLC $3.92 $109,309.20 Central Southern Construction Corp. $2.95 $82,260.75 Bryant's Land and Development Industries, Inc. $5.60 $156,156.00 Engineer's Estimate 27,885 SQYD $5.75 $160,338.75
C0220 41401-3000 CRACKS, CLEANING AND FILLING
Construction Solutions Group, LLC $4.46 $4,772.20 MC3 Solutions, LLC $4.80 $5,136.00 RBA Engineering International, PLLC $6.06 $6,484.20 Central Southern Construction Corp. $5.00 $5,350.00 Bryant's Land and Development Industries, Inc. $4.00 $4,280.00 Engineer's Estimate 1,070 LNFT $9.65 $10,325.50
C0240 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
Construction Solutions Group, LLC $832.50 $4,995.00 MC3 Solutions, LLC $300.00 $1,800.00 RBA Engineering International, PLLC $620.00 $3,720.00 Central Southern Construction Corp. $1,000.00 $6,000.00 Bryant's Land and Development Industries, Inc. $400.00 $2,400.00 Engineer's Estimate 6 SQYD $200.00 $1,200.00
C0260 41801-3000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3
Construction Solutions Group, LLC $444.00 $11,100.00 MC3 Solutions, LLC $260.00 $6,500.00 RBA Engineering International, PLLC $882.00 $22,050.00 Central Southern Construction Corp. $700.00 $17,500.00 Bryant's Land and Development Industries, Inc. $480.00 $12,000.00 Engineer's Estimate 25 SQYD $240.00 $6,000.00
C0280 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID
Construction Solutions Group, LLC $0.89 $18,431.90 MC3 Solutions, LLC $0.95 $19,674.50 RBA Engineering International, PLLC $2.50 $51,775.00 Central Southern Construction Corp. $0.80 $16,568.00 Bryant's Land and Development Industries, Inc. $0.95 $19,674.50 Engineer's Estimate 20,710 LNFT $1.35 $27,958.50
18 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: C
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
C0300 63401-0600 PAVEMENT MARKINGS, TYPE C, BROKEN
Construction Solutions Group, LLC $0.89 $1,281.60 MC3 Solutions, LLC $1.10 $1,584.00 RBA Engineering International, PLLC $2.50 $3,600.00 Central Southern Construction Corp. $0.80 $1,152.00 Bryant's Land and Development Industries, Inc. $0.85 $1,224.00 Engineer's Estimate 1,440 LNFT $0.80 $1,152.00
C0320 63501-0000 TEMPORARY TRAFFIC CONTROL
Construction Solutions Group, LLC Lump Sum $6,350.00 MC3 Solutions, LLC Lump Sum $18,000.00 RBA Engineering International, PLLC Lump Sum $14,500.00 Central Southern Construction Corp. Lump Sum $50,000.00 Bryant's Land and Development Industries, Inc. Lump Sum $35,000.00 Engineer's Estimate ALL LPSM Lump Sum $32,000.00
C0340 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
Construction Solutions Group, LLC $6,660.00 $13,320.00 MC3 Solutions, LLC $7,100.00 $14,200.00 RBA Engineering International, PLLC $9,050.00 $18,100.00 Central Southern Construction Corp. $4,000.00 $8,000.00 Bryant's Land and Development Industries, Inc. $10,000.00 $20,000.00 Engineer's Estimate 2 EACH $12,000.00 $24,000.00
C0360 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Construction Solutions Group, LLC $25.40 $6,350.00 MC3 Solutions, LLC $25.40 $6,350.00 RBA Engineering International, PLLC $25.40 $6,350.00 Central Southern Construction Corp. $25.40 $6,350.00 Bryant's Land and Development Industries, Inc. $25.40 $6,350.00 Engineer's Estimate 250 HOUR $25.40 $6,350.00
C0380 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
Construction Solutions Group, LLC $38.85 $1,942.50 MC3 Solutions, LLC $42.00 $2,100.00 RBA Engineering International, PLLC $52.75 $2,637.50 Central Southern Construction Corp. $50.00 $2,500.00 Bryant's Land and Development Industries, Inc. $122.00 $6,100.00 Engineer's Estimate 50 HOUR $65.00 $3,250.00
19 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: C
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
C0400 63701-0000 FIELD OFFICE
Construction Solutions Group, LLC $11,100.00 $11,100.00 MC3 Solutions, LLC $3,300.00 $3,300.00 RBA Engineering International, PLLC $23,920.00 $23,920.00 Central Southern Construction Corp. $35,000.00 $35,000.00 Bryant's Land and Development Industries, Inc. $20,000.00 $20,000.00 Engineer's Estimate 1 EACH $16,000.00 $16,000.00
Total Schedule - All Items
Construction Solutions Group, LLC $210,600.75 MC3 Solutions, LLC $287,608.25 RBA Engineering International, PLLC $330,078.95 Central Southern Construction Corp. $371,040.25 Bryant's Land and Development Industries, Inc. $595,493.00 Engineer's Estimate $375,000.00
20 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: D
Schedule Type: Options
Solcitation No: 693C73-24-B-000002
Division: Eastern Federal Lands
State: VA County: Bedford, Botetourt, Rockbridge
Federal Land: Blue Ridge Parkway Opened at: Ashburn, Virginia
Opened by: Emily McCleary
Date: 10/17/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Construction Solutions Group, LLC Apparent low bidder $718,863.20 425 Highland Ave St. Louis Missouri 63122
Central Southern Construction Corp. $846,410.50 119 Sewald Street Jacksonville Florida 32204
MC3 Solutions, LLC $973,540.00 8772 Roanoke Road Elliston Virginia 24087
RBA Engineering International, PLLC $1,173,462.05 7830 Backlick Road, Suite B3 Springfield Virginia 22150
Bryant's Land and Development Industries, Inc. $1,551,433.25 159 Depot Street Burnsville North Carolina 28714
Engineer's Estimate $1,400,000.00
Emily McCleary
Contract Specialist
21 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: D
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
D0100 15101-0000 MOBILIZATION
Construction Solutions Group, LLC Lump Sum $11,100.00 Central Southern Construction Corp. Lump Sum $65,000.00 MC3 Solutions, LLC Lump Sum $164,000.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Bryant's Land and Development Industries, Inc. Lump Sum $350,000.00 Engineer's Estimate ALL LPSM Lump Sum $72,803.75
D0120 15401-0000 CONTRACTOR TESTING
Construction Solutions Group, LLC Lump Sum $11,100.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $13,500.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Bryant's Land and Development Industries, Inc. Lump Sum $41,000.00 Engineer's Estimate ALL LPSM Lump Sum $33,000.00
D0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (INLET PROTECTION)
Construction Solutions Group, LLC $55.50 $1,332.00 Central Southern Construction Corp. $100.00 $2,400.00 MC3 Solutions, LLC $75.00 $1,800.00 RBA Engineering International, PLLC $11.75 $282.00 Bryant's Land and Development Industries, Inc. $35.00 $840.00 Engineer's Estimate 24 LNFT $13.75 $330.00
D0160 20302-2600 REMOVAL OF PAVEMENT MARKINGS
Construction Solutions Group, LLC $1.24 $27,218.00 Central Southern Construction Corp. $1.00 $21,950.00 MC3 Solutions, LLC $1.35 $29,632.50 RBA Engineering International, PLLC $1.75 $38,412.50 Bryant's Land and Development Industries, Inc. $0.90 $19,755.00 Engineer's Estimate 21,950 LNFT $3.00 $65,850.00
D0180 40602-0000 FOG SEAL
Construction Solutions Group, LLC $0.78 $89,193.00 Central Southern Construction Corp. $0.70 $80,045.00 MC3 Solutions, LLC $0.90 $102,915.00 RBA Engineering International, PLLC $1.05 $120,067.50 Bryant's Land and Development Industries, Inc. $1.95 $222,982.50 Engineer's Estimate 114,350 SQYD $1.60 $182,960.00
22 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: D
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
D0220 40702-0300 CHIP SEAL, TYPE 1C
Construction Solutions Group, LLC $2.89 $330,471.50 Central Southern Construction Corp. $2.95 $337,332.50 MC3 Solutions, LLC $3.45 $394,507.50 RBA Engineering International, PLLC $3.92 $448,252.00 Bryant's Land and Development Industries, Inc. $4.95 $566,032.50 Engineer's Estimate 114,350 SQYD $5.75 $657,512.50
D0240 41401-3000 CRACKS, CLEANING AND FILLING
Construction Solutions Group, LLC $4.46 $16,970.30 Central Southern Construction Corp. $5.00 $19,025.00 MC3 Solutions, LLC $4.80 $18,264.00 RBA Engineering International, PLLC $6.06 $23,058.30 Bryant's Land and Development Industries, Inc. $4.00 $15,220.00 Engineer's Estimate 3,805 LNFT $9.65 $36,718.25
D0260 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
Construction Solutions Group, LLC $444.00 $27,972.00 Central Southern Construction Corp. $300.00 $18,900.00 MC3 Solutions, LLC $250.00 $15,750.00 RBA Engineering International, PLLC $882.00 $55,566.00 Bryant's Land and Development Industries, Inc. $332.00 $20,916.00 Engineer's Estimate 63 SQYD $200.00 $12,600.00
D0280 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID
Construction Solutions Group, LLC $0.89 $88,421.50 Central Southern Construction Corp. $0.80 $79,480.00 MC3 Solutions, LLC $0.95 $94,382.50 RBA Engineering International, PLLC $2.50 $248,375.00 Bryant's Land and Development Industries, Inc. $0.95 $94,382.50 Engineer's Estimate 99,350 LNFT $1.35 $134,122.50
D0300 63401-0600 PAVEMENT MARKINGS, TYPE C, BROKEN
Construction Solutions Group, LLC $0.89 $4,748.15 Central Southern Construction Corp. $0.80 $4,268.00 MC3 Solutions, LLC $1.10 $5,868.50 RBA Engineering International, PLLC $2.50 $13,337.50 Bryant's Land and Development Industries, Inc. $0.85 $4,534.75 Engineer's Estimate 5,335 LNFT $0.80 $4,268.00
23 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: D
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
D0320 63501-0000 TEMPORARY TRAFFIC CONTROL
Construction Solutions Group, LLC Lump Sum $22,200.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $36,000.00 RBA Engineering International, PLLC Lump Sum $30,150.00 Bryant's Land and Development Industries, Inc. Lump Sum $53,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00
D0340 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
Construction Solutions Group, LLC $6,660.00 $19,980.00 Central Southern Construction Corp. $4,000.00 $12,000.00 MC3 Solutions, LLC $7,100.00 $21,300.00 RBA Engineering International, PLLC $9,050.00 $27,150.00 Bryant's Land and Development Industries, Inc. $10,000.00 $30,000.00 Engineer's Estimate 3 EACH $12,000.00 $36,000.00
D0360 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Construction Solutions Group, LLC $25.40 $48,260.00 Central Southern Construction Corp. $25.40 $48,260.00 MC3 Solutions, LLC $25.40 $48,260.00 RBA Engineering International, PLLC $25.40 $48,260.00 Bryant's Land and Development Industries, Inc. $25.40 $48,260.00 Engineer's Estimate 1,900 HOUR $25.40 $48,260.00
D0380 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
Construction Solutions Group, LLC $38.85 $17,676.75 Central Southern Construction Corp. $50.00 $22,750.00 MC3 Solutions, LLC $42.00 $19,110.00 RBA Engineering International, PLLC $52.75 $24,001.25 Bryant's Land and Development Industries, Inc. $122.00 $55,510.00 Engineer's Estimate 455 HOUR $65.00 $29,575.00
D0400 63701-0000 FIELD OFFICE
Construction Solutions Group, LLC $2,220.00 $2,220.00 Central Southern Construction Corp. $35,000.00 $35,000.00 MC3 Solutions, LLC $8,250.00 $8,250.00 RBA Engineering International, PLLC $66,450.00 $66,450.00 Bryant's Land and Development Industries, Inc. $29,000.00 $29,000.00 Engineer's Estimate 1 EACH $16,000.00 $16,000.00
24 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: D
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Total Schedule - All Items
Construction Solutions Group, LLC $718,863.20 Central Southern Construction Corp. $846,410.50 MC3 Solutions, LLC $973,540.00 RBA Engineering International, PLLC $1,173,462.05 Bryant's Land and Development Industries, Inc. $1,551,433.25 Engineer's Estimate $1,400,000.00
25 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: E
Schedule Type: Options
Solcitation No: 693C73-24-B-000002
Division: Eastern Federal Lands
State: VA County: Bedford, Botetourt, Rockbridge
Federal Land: Blue Ridge Parkway Opened at: Ashburn, Virginia
Opened by: Emily McCleary
Date: 10/17/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Construction Solutions Group, LLC Apparent low bidder $703,968.80 425 Highland Ave St. Louis Missouri 63122
Central Southern Construction Corp. $846,197.75 119 Sewald Street Jacksonville Florida 32204
MC3 Solutions, LLC $974,666.75 8772 Roanoke Road Elliston Virginia 24087
RBA Engineering International, PLLC $1,128,184.40 7830 Backlick Road, Suite B3 Springfield Virginia 22150
Bryant's Land and Development Industries, Inc. $1,551,601.75 159 Depot Street Burnsville North Carolina 28714
Engineer's Estimate $1,410,000.00
Emily McCleary
19 October 2023
Contract Specialist
26 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: E
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
E0100 15101-0000 MOBILIZATION
Construction Solutions Group, LLC Lump Sum $11,100.00 Central Southern Construction Corp. Lump Sum $65,000.00 MC3 Solutions, LLC Lump Sum $164,000.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Bryant's Land and Development Industries, Inc. Lump Sum $350,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,819.00
E0120 15401-0000 CONTRACTOR TESTING
Construction Solutions Group, LLC Lump Sum $11,100.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $13,500.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Bryant's Land and Development Industries, Inc. Lump Sum $41,000.00 Engineer's Estimate ALL LPSM Lump Sum $33,000.00
E0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (INLET PROTECTION)
Construction Solutions Group, LLC $55.50 $2,220.00 Central Southern Construction Corp. $100.00 $4,000.00 MC3 Solutions, LLC $75.00 $3,000.00 RBA Engineering International, PLLC $11.75 $470.00 Bryant's Land and Development Industries, Inc. $35.00 $1,400.00 Engineer's Estimate 40 LNFT $13.75 $550.00
E0160 20302-2600 REMOVAL OF PAVEMENT MARKINGS
Construction Solutions Group, LLC $1.24 $25,854.00 Central Southern Construction Corp. $1.00 $20,850.00 MC3 Solutions, LLC $1.35 $28,147.50 RBA Engineering International, PLLC $1.75 $36,487.50 Bryant's Land and Development Industries, Inc. $0.90 $18,765.00 Engineer's Estimate 20,850 LNFT $3.00 $62,550.00
E0180 40602-0000 FOG SEAL
Construction Solutions Group, LLC $0.78 $93,611.70 Central Southern Construction Corp. $0.70 $84,010.50 MC3 Solutions, LLC $0.90 $108,013.50 RBA Engineering International, PLLC $1.05 $126,015.75 Bryant's Land and Development Industries, Inc. $1.95 $234,029.25 Engineer's Estimate 120,015 SQYD $1.60 $192,024.00
27 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: E
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
E0220 40702-0300 CHIP SEAL, TYPE 1C
Construction Solutions Group, LLC $2.89 $346,843.35 Central Southern Construction Corp. $2.95 $354,044.25 MC3 Solutions, LLC $3.45 $414,051.75 RBA Engineering International, PLLC $3.92 $470,458.80 Bryant's Land and Development Industries, Inc. $4.80 $576,072.00 Engineer's Estimate 120,015 SQYD $5.75 $690,086.25
E0240 41401-3000 CRACKS, CLEANING AND FILLING
Construction Solutions Group, LLC $4.46 $19,334.10 Central Southern Construction Corp. $5.00 $21,675.00 MC3 Solutions, LLC $4.80 $20,808.00 RBA Engineering International, PLLC $6.06 $26,270.10 Bryant's Land and Development Industries, Inc. $4.20 $18,207.00 Engineer's Estimate 4,335 LNFT $9.65 $41,832.75
E0260 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
Construction Solutions Group, LLC $555.00 $1,665.00 Central Southern Construction Corp. $1,000.00 $3,000.00 MC3 Solutions, LLC $600.00 $1,800.00 RBA Engineering International, PLLC $882.00 $2,646.00 Bryant's Land and Development Industries, Inc. $495.00 $1,485.00 Engineer's Estimate 3 SQYD $200.00 $600.00
E0280 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID
Construction Solutions Group, LLC $0.89 $82,681.00 Central Southern Construction Corp. $0.80 $74,320.00 MC3 Solutions, LLC $0.95 $88,255.00 RBA Engineering International, PLLC $2.50 $232,250.00 Bryant's Land and Development Industries, Inc. $0.95 $88,255.00 Engineer's Estimate 92,900 LNFT $1.35 $125,415.00
E0300 63401-0600 PAVEMENT MARKINGS, TYPE C, BROKEN
Construction Solutions Group, LLC $0.89 $5,882.90 Central Southern Construction Corp. $0.80 $5,288.00 MC3 Solutions, LLC $1.10 $7,271.00 RBA Engineering International, PLLC $2.50 $16,525.00 Bryant's Land and Development Industries, Inc. $0.85 $5,618.50 Engineer's Estimate 6,610 LNFT $0.80 $5,288.00
28 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: E
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
E0320 63501-0000 TEMPORARY TRAFFIC CONTROL
Construction Solutions Group, LLC Lump Sum $22,200.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $36,000.00 RBA Engineering International, PLLC Lump Sum $30,150.00 Bryant's Land and Development Industries, Inc. Lump Sum $53,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00
E0340 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
Construction Solutions Group, LLC $6,660.00 $13,320.00 Central Southern Construction Corp. $4,000.00 $8,000.00 MC3 Solutions, LLC $7,100.00 $14,200.00 RBA Engineering International, PLLC $9,050.00 $18,100.00 Bryant's Land and Development Industries, Inc. $15,000.00 $30,000.00 Engineer's Estimate 2 EACH $12,000.00 $24,000.00
E0360 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Construction Solutions Group, LLC $25.40 $48,260.00 Central Southern Construction Corp. $25.40 $48,260.00 MC3 Solutions, LLC $25.40 $48,260.00 RBA Engineering International, PLLC $25.40 $48,260.00 Bryant's Land and Development Industries, Inc. $25.40 $48,260.00 Engineer's Estimate 1,900 HOUR $25.40 $48,260.00
E0380 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
Construction Solutions Group, LLC $38.85 $17,676.75 Central Southern Construction Corp. $50.00 $22,750.00 MC3 Solutions, LLC $42.00 $19,110.00 RBA Engineering International, PLLC $52.75 $24,001.25 Bryant's Land and Development Industries, Inc. $122.00 $55,510.00 Engineer's Estimate 455 HOUR $65.00 $29,575.00
E0400 63701-0000 FIELD OFFICE
Construction Solutions Group, LLC $2,220.00 $2,220.00 Central Southern Construction Corp. $35,000.00 $35,000.00 MC3 Solutions, LLC $8,250.00 $8,250.00 RBA Engineering International, PLLC $66,450.00 $66,450.00 Bryant's Land and Development Industries, Inc. $30,000.00 $30,000.00 Engineer's Estimate 1 EACH $16,000.00 $16,000.00
29 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: E
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Total Schedule - All Items
Construction Solutions Group, LLC $703,968.80 Central Southern Construction Corp. $846,197.75 MC3 Solutions, LLC $974,666.75 RBA Engineering International, PLLC $1,128,184.40 Bryant's Land and Development Industries, Inc. $1,551,601.75 Engineer's Estimate $1,410,000.00
30 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: F
Schedule Type: Options
Solcitation No: 693C73-24-B-000002
Division: Eastern Federal Lands
State: VA County: Bedford, Botetourt, Rockbridge
Federal Land: Blue Ridge Parkway Opened at: Ashburn, Virginia
Opened by: Emily McCleary
Date: 10/17/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Construction Solutions Group, LLC Apparent low bidder $249,513.00 425 Highland Ave St. Louis Missouri 63122
MC3 Solutions, LLC $347,345.75 8772 Roanoke Road Elliston Virginia 24087
RBA Engineering International, PLLC $392,752.05 7830 Backlick Road, Suite B3 Springfield Virginia 22150
Central Southern Construction Corp. $406,068.00 119 Sewald Street Jacksonville Florida 32204
Bryant's Land and Development Industries, Inc. $658,311.00 159 Depot Street Burnsville North Carolina 28714
Engineer's Estimate $495,000.00
Emily McCleary Contract Specialist
31 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: F
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
F0100 15101-0000 MOBILIZATION
Construction Solutions Group, LLC Lump Sum $11,100.00 MC3 Solutions, LLC Lump Sum $61,000.00 RBA Engineering International, PLLC Lump Sum $14,500.00 Central Southern Construction Corp. Lump Sum $65,000.00 Bryant's Land and Development Industries, Inc. Lump Sum $220,000.00 Engineer's Estimate ALL LPSM Lump Sum $26,668.00
F0120 15401-0000 CONTRACTOR TESTING
Construction Solutions Group, LLC Lump Sum $11,100.00 MC3 Solutions, LLC Lump Sum $13,500.00 RBA Engineering International, PLLC Lump Sum $14,500.00 Central Southern Construction Corp. Lump Sum $50,000.00 Bryant's Land and Development Industries, Inc. Lump Sum $19,000.00 Engineer's Estimate ALL LPSM Lump Sum $12,000.00
F0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (INLET PROTECTION)
Construction Solutions Group, LLC $55.50 $832.50 MC3 Solutions, LLC $75.00 $1,125.00 RBA Engineering International, PLLC $11.15 $167.25 Central Southern Construction Corp. $100.00 $1,500.00 Bryant's Land and Development Industries, Inc. $35.00 $525.00 Engineer's Estimate 15 LNFT $13.75 $206.25
F0160 20302-2600 REMOVAL OF PAVEMENT MARKINGS
Construction Solutions Group, LLC $1.24 $7,564.00 MC3 Solutions, LLC $1.35 $8,235.00 RBA Engineering International, PLLC $1.75 $10,675.00 Central Southern Construction Corp. $1.00 $6,100.00 Bryant's Land and Development Industries, Inc. $0.90 $5,490.00 Engineer's Estimate 6,100 LNFT $3.00 $18,300.00
F0180 40602-0000 FOG SEAL
Construction Solutions Group, LLC $0.78 $32,011.20 MC3 Solutions, LLC $0.90 $36,936.00 RBA Engineering International, PLLC $1.05 $43,092.00 Central Southern Construction Corp. $0.70 $28,728.00 Bryant's Land and Development Industries, Inc. $2.20 $90,288.00 Engineer's Estimate 41,040 SQYD $1.60 $65,664.00
32 out of 33
Project No: NP BLRI PVT PRES FY23(1)
Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0
Schedule: F
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
F0200 40702-0300 CHIP…