Tabulation of Bids - NP BLRI PVT PRES FY23(1).pdf

PDF 695 KB Posted

Attached to
Blue Ridge Parkway Federal contract opportunity
Solicitation number
693C73-24-C-000002
Issued by
Department of Transportation Federal Highway Administration

About this file

This document provides a tabulation of bids received in response to Solicitation Number 693C73-24-B-000002 for pavement preservation work along the Blue Ridge Parkway.

The solicitation was issued by the Department of Transportation Federal Highway Administration and sought bids for pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from milepost 27.2 to 97.0. Six bids were received and evaluated across six schedules (A through F) for base work and options. The apparent low bidder for each schedule ranged from 16.98% to 50.15% below the independent government cost estimate. Construction Solutions Group was the apparent low bidder for Schedules B, C, D and F. The award was made to Construction Solutions Group on December 17, 2023 for their bids totaling $2,882,222.30 across all schedules.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 10/19/23

1 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Contractor Responsive?

Engineer's Estimate

Bryant's Land and Development Industries, Inc.

Central Southern Construction Corp.

Construction Solutions Group, LLC

MC3 Solutions, LLC

RBA Engineering International, PLLC

Base Schedule A

$1,410,000.00

$1,530,471.50

$1,722,779.25

$1,440,464.50

$1,208,164.50

$1,170,552.25

Option: B

$1,405,000.00

$1,546,827.00

$857,617.50

$700,377.55

$949,119.25

$1,120,808.20

Option: C

$375,000.00

$595,493.00

$371,040.25

$210,600.75

$287,608.25

$330,078.95

Contractor Responsive?

Engineer's Estimate

Bryant's Land and Development Industries, Inc.

Central Southern Construction Corp.

Construction Solutions Group, LLC

MC3 Solutions, LLC

RBA Engineering International, PLLC

Option: D

$1,400,000.00

$1,551,433.25

$846,410.50

$718,863.20

$973,540.00

$1,173,462.05

Option: E

$1,410,000.00

$1,551,601.75

$846,197.75

$703,968.80

$974,666.75

$1,128,184.40

Option: F

$495,000.00

$658,311.00

$406,068.00

$249,513.00

$347,345.75

$392,752.05

2 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Contractor Responsive?

Engineer's Estimate

Bryant's Land and Development Industries, Inc.

Central Southern Construction Corp.

Construction Solutions Group, LLC

MC3 Solutions, LLC

RBA Engineering International, PLLC

Total Base Schedule A and Option(s): B

$2,815,000.00

$3,077,298.50

$2,580,396.75

$2,140,842.05

$2,157,283.75

$2,291,360.45

Total Base Schedule A and Option(s): BC

$3,190,000.00

$3,672,791.50

$2,951,437.00

$2,351,442.80

$2,444,892.00

$2,621,439.40

Total Base Schedule A and Option(s): BCD

$4,590,000.00

$5,224,224.75

$3,797,847.50

$3,070,306.00

$3,418,432.00

$3,794,901.45

Contractor Responsive?

Engineer's Estimate

Bryant's Land and Development Industries, Inc.

Central Southern Construction Corp.

Construction Solutions Group, LLC

MC3 Solutions, LLC

RBA Engineering International, PLLC

Total Base Schedule A and Option(s): BCDF

$5,085,000.00

$5,882,535.75

$4,203,915.50

$3,319,819.00

$3,765,777.75

$4,187,653.50

Total Base Schedule A and Option(s): BCE

$4,600,000.00

$5,224,393.25

$3,797,634.75

$3,055,411.60

$3,419,558.75

$3,749,623.80

Total Base Schedule A and Option(s): BCF

$3,685,000.00

$4,331,102.50

$3,357,505.00

$2,600,955.80

$2,792,237.75

$3,014,191.45

3 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Contractor Responsive?

Engineer's Estimate

Bryant's Land and Development Industries, Inc.

Central Southern Construction Corp.

Construction Solutions Group, LLC

MC3 Solutions, LLC

RBA Engineering International, PLLC

Total Base Schedule A and Option(s): BD

$4,215,000.00

$4,628,731.75

$3,426,807.25

$2,859,705.25

$3,130,823.75

$3,464,822.50

Total Base Schedule A and Option(s): BDE

$5,625,000.00

$6,180,333.50

$4,273,005.00

$3,563,674.05

$4,105,490.50

$4,593,006.90

Total Base Schedule A and Option(s): BDF

$4,710,000.00

$5,287,042.75

$3,832,875.25

$3,109,218.25

$3,478,169.50

$3,857,574.55

Contractor Responsive?

Engineer's Estimate

Bryant's Land and Development Industries, Inc.

Central Southern Construction Corp.

Construction Solutions Group, LLC

MC3 Solutions, LLC

RBA Engineering International, PLLC

Total Base Schedule A and Option(s): BE

$4,225,000.00

$4,628,900.25

$3,426,594.50

$2,844,810.85

$3,131,950.50

$3,419,544.85

Total Base Schedule A and Option(s): BEF

$4,720,000.00

$5,287,211.25

$3,832,662.50

$3,094,323.85

$3,479,296.25

$3,812,296.90

Total Base Schedule A and Option(s): BF

$3,310,000.00

$3,735,609.50

$2,986,464.75

$2,390,355.05

$2,504,629.50

$2,684,112.50

4 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Contractor Responsive?

Engineer's Estimate

Bryant's Land and Development Industries, Inc.

Central Southern Construction Corp.

Construction Solutions Group, LLC

MC3 Solutions, LLC

RBA Engineering International, PLLC

Total Base Schedule A and Option(s): C

$1,785,000.00

$2,125,964.50

$2,093,819.50

$1,651,065.25

$1,495,772.75

$1,500,631.20

Total Base Schedule A and Option(s): CD

$3,185,000.00

$3,677,397.75

$2,940,230.00

$2,369,928.45

$2,469,312.75

$2,674,093.25

Total Base Schedule A and Option(s): CDE

$4,595,000.00

$5,228,999.50

$3,786,427.75

$3,073,897.25

$3,443,979.50

$3,802,277.65

Contractor Responsive?

Engineer's Estimate

Bryant's Land and Development Industries, Inc.

Central Southern Construction Corp.

Construction Solutions Group, LLC

MC3 Solutions, LLC

RBA Engineering International, PLLC

Total Base Schedule A and Option(s): CDF

$3,680,000.00

$4,335,708.75

$3,346,298.00

$2,619,441.45

$2,816,658.50

$3,066,845.30

Total Base Schedule A and Option(s): CE

$3,195,000.00

$3,677,566.25

$2,940,017.25

$2,355,034.05

$2,470,439.50

$2,628,815.60

Total Base Schedule A and Option(s): CEF

$3,690,000.00

$4,335,877.25

$3,346,085.25

$2,604,547.05

$2,817,785.25

$3,021,567.65

5 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Contractor Responsive?

Engineer's Estimate

Bryant's Land and Development Industries, Inc.

Central Southern Construction Corp.

Construction Solutions Group, LLC

MC3 Solutions, LLC

RBA Engineering International, PLLC

Total Base Schedule A and Option(s): CF

$2,280,000.00

$2,784,275.50

$2,499,887.50

$1,900,578.25

$1,843,118.50

$1,893,383.25

Total Base Schedule A and Option(s): D

$2,810,000.00

$3,081,904.75

$2,569,189.75

$2,159,327.70

$2,181,704.50

$2,344,014.30

Total Base Schedule A and Option(s): DE

$4,220,000.00

$4,633,506.50

$3,415,387.50

$2,863,296.50

$3,156,371.25

$3,472,198.70

Contractor Responsive?

Engineer's Estimate

Bryant's Land and Development Industries, Inc.

Central Southern Construction Corp.

Construction Solutions Group, LLC

MC3 Solutions, LLC

RBA Engineering International, PLLC

Total Base Schedule A and Option(s): DEF

$4,715,000.00

$5,291,817.50

$3,821,455.50

$3,112,809.50

$3,503,717.00

$3,864,950.75

Total Base Schedule A and Option(s): DF

$3,305,000.00

$3,740,215.75

$2,975,257.75

$2,408,840.70

$2,529,050.25

$2,736,766.35

Total Base Schedule A and Option(s): E

$2,820,000.00

$3,082,073.25

$2,568,977.00

$2,144,433.30

$2,182,831.25

$2,298,736.65

6 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Contractor Responsive?

Engineer's Estimate

Bryant's Land and Development Industries, Inc.

Central Southern Construction Corp.

Construction Solutions Group, LLC

MC3 Solutions, LLC

RBA Engineering International, PLLC

Total Base Schedule A and Option(s): EF

$3,315,000.00

$3,740,384.25

$2,975,045.00

$2,393,946.30

$2,530,177.00

$2,691,488.70

Total Base Schedule A and Option(s): F

$1,905,000.00

$2,188,782.50

$2,128,847.25

$1,689,977.50

$1,555,510.25

$1,563,304.30

Total Base Schedule A and Option(s): BCDEF

$6,495,000.00

$7,434,137.50

$5,050,113.25

$4,023,787.80

$4,740,444.50

$5,315,837.90

7 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: A

Schedule Type: Base

Solcitation No: 693C73-24-B-000002

Division: Eastern Federal Lands

State: VA County: Bedford, Botetourt, Rockbridge

Federal Land: Blue Ridge Parkway Opened at: Ashburn, Virginia

Opened by: Emily McCleary

Date: 10/17/23

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

RBA Engineering International, PLLC $1,170,552.25 7830 Backlick Road, Suite B3 Springfield Virginia 22150

MC3 Solutions, LLC $1,208,164.50 8772 Roanoke Road Elliston Virginia 24087

Construction Solutions Group, LLC Apparent low bidder $1,440,464.50 425 Highland Ave St. Louis Missouri 63122

Bryant's Land and Development Industries, Inc. $1,530,471.50 159 Depot Street Burnsville North Carolina 28714

Central Southern Construction Corp. $1,722,779.25 119 Sewald Street Jacksonville Florida 32204

Engineer's Estimate $1,410,000.00

Emily McCleary

Contract Specialist

19 October 2023

Construction Solutions Group, LLC 17 December 2023

8 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0100 15101-0000 MOBILIZATION

RBA Engineering International, PLLC Lump Sum $65,000.00 MC3 Solutions, LLC Lump Sum $279,000.00 Construction Solutions Group, LLC Lump Sum $660,470.00 Bryant's Land and Development Industries, Inc. Lump Sum $350,000.00 Central Southern Construction Corp. Lump Sum $795,000.00 Engineer's Estimate ALL LPSM Lump Sum $67,737.00

A0120 15401-0000 CONTRACTOR TESTING

RBA Engineering International, PLLC Lump Sum $15,050.00 MC3 Solutions, LLC Lump Sum $13,500.00 Construction Solutions Group, LLC Lump Sum $11,100.00 Bryant's Land and Development Industries, Inc. Lump Sum $40,000.00 Central Southern Construction Corp. Lump Sum $160,000.00 Engineer's Estimate ALL LPSM Lump Sum $33,000.00

A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (INLET PROTECTION)

RBA Engineering International, PLLC $11.75 $176.25 MC3 Solutions, LLC $75.00 $1,125.00 Construction Solutions Group, LLC $55.50 $832.50 Bryant's Land and Development Industries, Inc. $35.00 $525.00 Central Southern Construction Corp. $100.00 $1,500.00 Engineer's Estimate 15 LNFT $13.75 $206.25

A0160 20302-2600 REMOVAL OF PAVEMENT MARKINGS

RBA Engineering International, PLLC $1.75 $35,175.00 MC3 Solutions, LLC $1.35 $27,135.00 Construction Solutions Group, LLC $1.24 $24,924.00 Bryant's Land and Development Industries, Inc. $0.94 $18,894.00 Central Southern Construction Corp. $1.00 $20,100.00 Engineer's Estimate 20,100 LNFT $3.00 $60,300.00

A0180 40602-0000 FOG SEAL

RBA Engineering International, PLLC $1.05 $126,845.25 MC3 Solutions, LLC $0.90 $108,724.50 Construction Solutions Group, LLC $0.78 $94,227.90 Bryant's Land and Development Industries, Inc. $1.80 $217,449.00 Central Southern Construction Corp. $0.70 $84,563.50 Engineer's Estimate 120,805 SQYD $1.60 $193,288.00

9 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0220 40702-0300 CHIP SEAL, TYPE 1C

RBA Engineering International, PLLC $3.92 $473,555.60 MC3 Solutions, LLC $3.45 $416,777.25 Construction Solutions Group, LLC $2.89 $349,126.45 Bryant's Land and Development Industries, Inc. $4.80 $579,864.00 Central Southern Construction Corp. $2.95 $356,374.75 Engineer's Estimate 120,805 SQYD $5.75 $694,628.75

A0240 41401-3000 CRACKS, CLEANING AND FILLING

RBA Engineering International, PLLC $6.06 $28,572.90 MC3 Solutions, LLC $4.80 $22,632.00 Construction Solutions Group, LLC $4.46 $21,028.90 Bryant's Land and Development Industries, Inc. $4.00 $18,860.00 Central Southern Construction Corp. $5.00 $23,575.00 Engineer's Estimate 4,715 LNFT $9.65 $45,499.75

A0260 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID

RBA Engineering International, PLLC $2.50 $226,587.50 MC3 Solutions, LLC $0.95 $86,103.25 Construction Solutions Group, LLC $0.89 $80,665.15 Bryant's Land and Development Industries, Inc. $0.95 $86,103.25 Central Southern Construction Corp. $0.80 $72,508.00 Engineer's Estimate 90,635 LNFT $1.35 $122,357.25

A0280 63401-0600 PAVEMENT MARKINGS, TYPE C, BROKEN

RBA Engineering International, PLLC $2.50 $12,912.50 MC3 Solutions, LLC $1.10 $5,681.50 Construction Solutions Group, LLC $0.89 $4,596.85 Bryant's Land and Development Industries, Inc. $0.85 $4,390.25 Central Southern Construction Corp. $0.80 $4,132.00 Engineer's Estimate 5,165 LNFT $0.80 $4,132.00

A0300 63501-0000 TEMPORARY TRAFFIC CONTROL

RBA Engineering International, PLLC Lump Sum $28,850.00 MC3 Solutions, LLC Lump Sum $136,000.00 Construction Solutions Group, LLC Lump Sum $22,200.00 Bryant's Land and Development Industries, Inc. Lump Sum $50,000.00 Central Southern Construction Corp. Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00

10 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0320 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

RBA Engineering International, PLLC $9,050.00 $18,100.00 MC3 Solutions, LLC $7,100.00 $14,200.00 Construction Solutions Group, LLC $6,660.00 $13,320.00 Bryant's Land and Development Industries, Inc. $14,800.00 $29,600.00 Central Southern Construction Corp. $4,000.00 $8,000.00 Engineer's Estimate 2 EACH $12,000.00 $24,000.00

A0340 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

RBA Engineering International, PLLC $25.40 $49,276.00 MC3 Solutions, LLC $25.40 $49,276.00 Construction Solutions Group, LLC $25.40 $49,276.00 Bryant's Land and Development Industries, Inc. $25.40 $49,276.00 Central Southern Construction Corp. $25.40 $49,276.00 Engineer's Estimate 1,940 HOUR $25.40 $49,276.00

A0360 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

RBA Engineering International, PLLC $52.75 $24,001.25 MC3 Solutions, LLC $42.00 $19,110.00 Construction Solutions Group, LLC $38.85 $17,676.75 Bryant's Land and Development Industries, Inc. $122.00 $55,510.00 Central Southern Construction Corp. $50.00 $22,750.00 Engineer's Estimate 455 HOUR $65.00 $29,575.00

A0380 63701-0000 FIELD OFFICE

RBA Engineering International, PLLC $66,450.00 $66,450.00 MC3 Solutions, LLC $28,900.00 $28,900.00 Construction Solutions Group, LLC $91,020.00 $91,020.00 Bryant's Land and Development Industries, Inc. $30,000.00 $30,000.00 Central Southern Construction Corp. $75,000.00 $75,000.00 Engineer's Estimate 1 EACH $16,000.00 $16,000.00

Total Schedule - All Items

RBA Engineering International, PLLC $1,170,552.25 MC3 Solutions, LLC $1,208,164.50 Construction Solutions Group, LLC $1,440,464.50 Bryant's Land and Development Industries, Inc. $1,530,471.50 Central Southern Construction Corp. $1,722,779.25 Engineer's Estimate $1,410,000.00

11 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: B

Schedule Type: Options

Solcitation No: 693C73-24-B-000002

Division: Eastern Federal Lands

State: VA County: Bedford, Botetourt, Rockbridge

Federal Land: Blue Ridge Parkway Opened at: Ashburn, Virginia

Opened by: Emily McCleary

Date: 10/17/23

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Construction Solutions Group, LLC Apparent low bidder $700,377.55 425 Highland Ave St. Louis Missouri 63122

Central Southern Construction Corp. $857,617.50 119 Sewald Street Jacksonville Florida 32204

MC3 Solutions, LLC $949,119.25 8772 Roanoke Road Elliston Virginia 24087

RBA Engineering International, PLLC $1,120,808.20 7830 Backlick Road, Suite B3 Springfield Virginia 22150

Bryant's Land and Development Industries, Inc. $1,546,827.00 159 Depot Street Burnsville North Carolina 28714

Engineer's Estimate $1,405,000.00

Emily McCleary

Contract Specialist

12 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0100 15101-0000 MOBILIZATION

Construction Solutions Group, LLC Lump Sum $11,100.00 Central Southern Construction Corp. Lump Sum $65,000.00 MC3 Solutions, LLC Lump Sum $140,000.00 RBA Engineering International, PLLC Lump Sum $15,000.00 Bryant's Land and Development Industries, Inc. Lump Sum $360,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,990.00

B0120 15401-0000 CONTRACTOR TESTING

Construction Solutions Group, LLC Lump Sum $11,100.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $13,500.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Bryant's Land and Development Industries, Inc. Lump Sum $41,000.00 Engineer's Estimate ALL LPSM Lump Sum $33,000.00

B0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (INLET PROTECTION)

Construction Solutions Group, LLC $33.30 $1,931.40 Central Southern Construction Corp. $100.00 $5,800.00 MC3 Solutions, LLC $75.00 $4,350.00 RBA Engineering International, PLLC $11.75 $681.50 Bryant's Land and Development Industries, Inc. $35.00 $2,030.00 Engineer's Estimate 58 LNFT $13.75 $797.50

B0160 20302-2600 REMOVAL OF PAVEMENT MARKINGS

Construction Solutions Group, LLC $1.24 $25,401.40 Central Southern Construction Corp. $1.00 $20,485.00 MC3 Solutions, LLC $1.35 $27,654.75 RBA Engineering International, PLLC $1.75 $35,848.75 Bryant's Land and Development Industries, Inc. $0.90 $18,436.50 Engineer's Estimate 20,485 LNFT $3.00 $61,455.00

B0180 40602-0000 FOG SEAL

Construction Solutions Group, LLC $0.78 $95,136.60 Central Southern Construction Corp. $0.70 $85,379.00 MC3 Solutions, LLC $0.90 $109,773.00 RBA Engineering International, PLLC $1.05 $128,068.50 Bryant's Land and Development Industries, Inc. $1.80 $219,546.00 Engineer's Estimate 121,970 SQYD $1.60 $195,152.00

13 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0200 40702-0300 CHIP SEAL, TYPE 1C

Construction Solutions Group, LLC $2.89 $352,493.30 Central Southern Construction Corp. $2.95 $359,811.50 MC3 Solutions, LLC $3.45 $420,796.50 RBA Engineering International, PLLC $3.92 $478,122.40 Bryant's Land and Development Industries, Inc. $4.80 $585,456.00 Engineer's Estimate 121,970 SQYD $5.75 $701,327.50

B0240 41401-3000 CRACKS, CLEANING AND FILLING

Construction Solutions Group, LLC $4.46 $11,506.80 Central Southern Construction Corp. $5.00 $12,900.00 MC3 Solutions, LLC $4.80 $12,384.00 RBA Engineering International, PLLC $6.06 $15,634.80 Bryant's Land and Development Industries, Inc. $4.00 $10,320.00 Engineer's Estimate 2,580 LNFT $9.65 $24,897.00

B0260 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID

Construction Solutions Group, LLC $0.89 $81,417.20 Central Southern Construction Corp. $0.80 $73,184.00 MC3 Solutions, LLC $0.95 $86,906.00 RBA Engineering International, PLLC $2.50 $228,700.00 Bryant's Land and Development Industries, Inc. $0.95 $86,906.00 Engineer's Estimate 91,480 LNFT $1.35 $123,498.00

B0280 63401-0600 PAVEMENT MARKINGS, TYPE C, BROKEN

Construction Solutions Group, LLC $0.89 $5,598.10 Central Southern Construction Corp. $0.80 $5,032.00 MC3 Solutions, LLC $1.10 $6,919.00 RBA Engineering International, PLLC $2.50 $15,725.00 Bryant's Land and Development Industries, Inc. $0.85 $5,346.50 Engineer's Estimate 6,290 LNFT $0.80 $5,032.00

B0300 63501-0000 TEMPORARY TRAFFIC CONTROL

Construction Solutions Group, LLC Lump Sum $22,200.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $36,000.00 RBA Engineering International, PLLC Lump Sum $30,150.00 Bryant's Land and Development Industries, Inc. Lump Sum $53,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00

14 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0320 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Construction Solutions Group, LLC $6,660.00 $13,320.00 Central Southern Construction Corp. $4,000.00 $8,000.00 MC3 Solutions, LLC $7,100.00 $14,200.00 RBA Engineering International, PLLC $9,050.00 $18,100.00 Bryant's Land and Development Industries, Inc. $15,000.00 $30,000.00 Engineer's Estimate 2 EACH $12,000.00 $24,000.00

B0340 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Construction Solutions Group, LLC $25.40 $49,276.00 Central Southern Construction Corp. $25.40 $49,276.00 MC3 Solutions, LLC $25.40 $49,276.00 RBA Engineering International, PLLC $25.40 $49,276.00 Bryant's Land and Development Industries, Inc. $25.40 $49,276.00 Engineer's Estimate 1,940 HOUR $25.40 $49,276.00

B0360 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

Construction Solutions Group, LLC $38.85 $17,676.75 Central Southern Construction Corp. $50.00 $22,750.00 MC3 Solutions, LLC $42.00 $19,110.00 RBA Engineering International, PLLC $52.75 $24,001.25 Bryant's Land and Development Industries, Inc. $122.00 $55,510.00 Engineer's Estimate 455 HOUR $65.00 $29,575.00

B0380 63701-0000 FIELD OFFICE

Construction Solutions Group, LLC $2,220.00 $2,220.00 Central Southern Construction Corp. $50,000.00 $50,000.00 MC3 Solutions, LLC $8,250.00 $8,250.00 RBA Engineering International, PLLC $66,450.00 $66,450.00 Bryant's Land and Development Industries, Inc. $30,000.00 $30,000.00 Engineer's Estimate 1 EACH $16,000.00 $16,000.00

Total Schedule - All Items

Construction Solutions Group, LLC $700,377.55 Central Southern Construction Corp. $857,617.50 MC3 Solutions, LLC $949,119.25 RBA Engineering International, PLLC $1,120,808.20 Bryant's Land and Development Industries, Inc. $1,546,827.00 Engineer's Estimate $1,405,000.00

15 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: C

Schedule Type: Options

Solcitation No: 693C73-24-B-000002

Division: Eastern Federal Lands

State: VA County: Bedford, Botetourt, Rockbridge

Federal Land: Blue Ridge Parkway Opened at: Ashburn, Virginia

Opened by: Emily McCleary

Date: 10/17/23

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Construction Solutions Group, LLC Apparent low bidder $210,600.75 425 Highland Ave St. Louis Missouri 63122

MC3 Solutions, LLC $287,608.25 8772 Roanoke Road Elliston Virginia 24087

RBA Engineering International, PLLC $330,078.95 7830 Backlick Road, Suite B3 Springfield Virginia 22150

Central Southern Construction Corp. $371,040.25 119 Sewald Street Jacksonville Florida 32204

Bryant's Land and Development Industries, Inc. $595,493.00 159 Depot Street Burnsville North Carolina 28714

Engineer's Estimate $375,000.00

Emily McCleary Contract Specialist

16 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0100 15101-0000 MOBILIZATION

Construction Solutions Group, LLC Lump Sum $11,100.00 MC3 Solutions, LLC Lump Sum $67,000.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Central Southern Construction Corp. Lump Sum $65,000.00 Bryant's Land and Development Industries, Inc. Lump Sum $220,000.00 Engineer's Estimate ALL LPSM Lump Sum $18,724.25

C0120 15401-0000 CONTRACTOR TESTING

Construction Solutions Group, LLC Lump Sum $11,100.00 MC3 Solutions, LLC Lump Sum $13,500.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Central Southern Construction Corp. Lump Sum $50,000.00 Bryant's Land and Development Industries, Inc. Lump Sum $18,000.00 Engineer's Estimate ALL LPSM Lump Sum $9,000.00

C0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (INLET PROTECTION)

Construction Solutions Group, LLC $55.50 $666.00 MC3 Solutions, LLC $75.00 $900.00 RBA Engineering International, PLLC $11.15 $133.80 Central Southern Construction Corp. $100.00 $1,200.00 Bryant's Land and Development Industries, Inc. $35.00 $420.00 Engineer's Estimate 12 LNFT $13.75 $165.00

C0160 20302-2600 REMOVAL OF PAVEMENT MARKINGS

Construction Solutions Group, LLC $1.24 $5,753.60 MC3 Solutions, LLC $1.35 $6,264.00 RBA Engineering International, PLLC $1.75 $8,120.00 Central Southern Construction Corp. $1.00 $4,640.00 Bryant's Land and Development Industries, Inc. $0.90 $4,176.00 Engineer's Estimate 4,640 LNFT $3.00 $13,920.00

C0180 40602-0000 FOG SEAL

Construction Solutions Group, LLC $0.78 $21,750.30 MC3 Solutions, LLC $0.90 $25,096.50 RBA Engineering International, PLLC $1.05 $29,279.25 Central Southern Construction Corp. $0.70 $19,519.50 Bryant's Land and Development Industries, Inc. $2.50 $69,712.50 Engineer's Estimate 27,885 SQYD $1.60 $44,616.00

17 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0200 40702-0300 CHIP SEAL, TYPE 1C

Construction Solutions Group, LLC $2.89 $80,587.65 MC3 Solutions, LLC $3.45 $96,203.25 RBA Engineering International, PLLC $3.92 $109,309.20 Central Southern Construction Corp. $2.95 $82,260.75 Bryant's Land and Development Industries, Inc. $5.60 $156,156.00 Engineer's Estimate 27,885 SQYD $5.75 $160,338.75

C0220 41401-3000 CRACKS, CLEANING AND FILLING

Construction Solutions Group, LLC $4.46 $4,772.20 MC3 Solutions, LLC $4.80 $5,136.00 RBA Engineering International, PLLC $6.06 $6,484.20 Central Southern Construction Corp. $5.00 $5,350.00 Bryant's Land and Development Industries, Inc. $4.00 $4,280.00 Engineer's Estimate 1,070 LNFT $9.65 $10,325.50

C0240 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

Construction Solutions Group, LLC $832.50 $4,995.00 MC3 Solutions, LLC $300.00 $1,800.00 RBA Engineering International, PLLC $620.00 $3,720.00 Central Southern Construction Corp. $1,000.00 $6,000.00 Bryant's Land and Development Industries, Inc. $400.00 $2,400.00 Engineer's Estimate 6 SQYD $200.00 $1,200.00

C0260 41801-3000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 3

Construction Solutions Group, LLC $444.00 $11,100.00 MC3 Solutions, LLC $260.00 $6,500.00 RBA Engineering International, PLLC $882.00 $22,050.00 Central Southern Construction Corp. $700.00 $17,500.00 Bryant's Land and Development Industries, Inc. $480.00 $12,000.00 Engineer's Estimate 25 SQYD $240.00 $6,000.00

C0280 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID

Construction Solutions Group, LLC $0.89 $18,431.90 MC3 Solutions, LLC $0.95 $19,674.50 RBA Engineering International, PLLC $2.50 $51,775.00 Central Southern Construction Corp. $0.80 $16,568.00 Bryant's Land and Development Industries, Inc. $0.95 $19,674.50 Engineer's Estimate 20,710 LNFT $1.35 $27,958.50

18 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0300 63401-0600 PAVEMENT MARKINGS, TYPE C, BROKEN

Construction Solutions Group, LLC $0.89 $1,281.60 MC3 Solutions, LLC $1.10 $1,584.00 RBA Engineering International, PLLC $2.50 $3,600.00 Central Southern Construction Corp. $0.80 $1,152.00 Bryant's Land and Development Industries, Inc. $0.85 $1,224.00 Engineer's Estimate 1,440 LNFT $0.80 $1,152.00

C0320 63501-0000 TEMPORARY TRAFFIC CONTROL

Construction Solutions Group, LLC Lump Sum $6,350.00 MC3 Solutions, LLC Lump Sum $18,000.00 RBA Engineering International, PLLC Lump Sum $14,500.00 Central Southern Construction Corp. Lump Sum $50,000.00 Bryant's Land and Development Industries, Inc. Lump Sum $35,000.00 Engineer's Estimate ALL LPSM Lump Sum $32,000.00

C0340 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Construction Solutions Group, LLC $6,660.00 $13,320.00 MC3 Solutions, LLC $7,100.00 $14,200.00 RBA Engineering International, PLLC $9,050.00 $18,100.00 Central Southern Construction Corp. $4,000.00 $8,000.00 Bryant's Land and Development Industries, Inc. $10,000.00 $20,000.00 Engineer's Estimate 2 EACH $12,000.00 $24,000.00

C0360 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Construction Solutions Group, LLC $25.40 $6,350.00 MC3 Solutions, LLC $25.40 $6,350.00 RBA Engineering International, PLLC $25.40 $6,350.00 Central Southern Construction Corp. $25.40 $6,350.00 Bryant's Land and Development Industries, Inc. $25.40 $6,350.00 Engineer's Estimate 250 HOUR $25.40 $6,350.00

C0380 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

Construction Solutions Group, LLC $38.85 $1,942.50 MC3 Solutions, LLC $42.00 $2,100.00 RBA Engineering International, PLLC $52.75 $2,637.50 Central Southern Construction Corp. $50.00 $2,500.00 Bryant's Land and Development Industries, Inc. $122.00 $6,100.00 Engineer's Estimate 50 HOUR $65.00 $3,250.00

19 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0400 63701-0000 FIELD OFFICE

Construction Solutions Group, LLC $11,100.00 $11,100.00 MC3 Solutions, LLC $3,300.00 $3,300.00 RBA Engineering International, PLLC $23,920.00 $23,920.00 Central Southern Construction Corp. $35,000.00 $35,000.00 Bryant's Land and Development Industries, Inc. $20,000.00 $20,000.00 Engineer's Estimate 1 EACH $16,000.00 $16,000.00

Total Schedule - All Items

Construction Solutions Group, LLC $210,600.75 MC3 Solutions, LLC $287,608.25 RBA Engineering International, PLLC $330,078.95 Central Southern Construction Corp. $371,040.25 Bryant's Land and Development Industries, Inc. $595,493.00 Engineer's Estimate $375,000.00

20 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: D

Schedule Type: Options

Solcitation No: 693C73-24-B-000002

Division: Eastern Federal Lands

State: VA County: Bedford, Botetourt, Rockbridge

Federal Land: Blue Ridge Parkway Opened at: Ashburn, Virginia

Opened by: Emily McCleary

Date: 10/17/23

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Construction Solutions Group, LLC Apparent low bidder $718,863.20 425 Highland Ave St. Louis Missouri 63122

Central Southern Construction Corp. $846,410.50 119 Sewald Street Jacksonville Florida 32204

MC3 Solutions, LLC $973,540.00 8772 Roanoke Road Elliston Virginia 24087

RBA Engineering International, PLLC $1,173,462.05 7830 Backlick Road, Suite B3 Springfield Virginia 22150

Bryant's Land and Development Industries, Inc. $1,551,433.25 159 Depot Street Burnsville North Carolina 28714

Engineer's Estimate $1,400,000.00

Emily McCleary

Contract Specialist

21 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: D

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

D0100 15101-0000 MOBILIZATION

Construction Solutions Group, LLC Lump Sum $11,100.00 Central Southern Construction Corp. Lump Sum $65,000.00 MC3 Solutions, LLC Lump Sum $164,000.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Bryant's Land and Development Industries, Inc. Lump Sum $350,000.00 Engineer's Estimate ALL LPSM Lump Sum $72,803.75

D0120 15401-0000 CONTRACTOR TESTING

Construction Solutions Group, LLC Lump Sum $11,100.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $13,500.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Bryant's Land and Development Industries, Inc. Lump Sum $41,000.00 Engineer's Estimate ALL LPSM Lump Sum $33,000.00

D0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (INLET PROTECTION)

Construction Solutions Group, LLC $55.50 $1,332.00 Central Southern Construction Corp. $100.00 $2,400.00 MC3 Solutions, LLC $75.00 $1,800.00 RBA Engineering International, PLLC $11.75 $282.00 Bryant's Land and Development Industries, Inc. $35.00 $840.00 Engineer's Estimate 24 LNFT $13.75 $330.00

D0160 20302-2600 REMOVAL OF PAVEMENT MARKINGS

Construction Solutions Group, LLC $1.24 $27,218.00 Central Southern Construction Corp. $1.00 $21,950.00 MC3 Solutions, LLC $1.35 $29,632.50 RBA Engineering International, PLLC $1.75 $38,412.50 Bryant's Land and Development Industries, Inc. $0.90 $19,755.00 Engineer's Estimate 21,950 LNFT $3.00 $65,850.00

D0180 40602-0000 FOG SEAL

Construction Solutions Group, LLC $0.78 $89,193.00 Central Southern Construction Corp. $0.70 $80,045.00 MC3 Solutions, LLC $0.90 $102,915.00 RBA Engineering International, PLLC $1.05 $120,067.50 Bryant's Land and Development Industries, Inc. $1.95 $222,982.50 Engineer's Estimate 114,350 SQYD $1.60 $182,960.00

22 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: D

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

D0220 40702-0300 CHIP SEAL, TYPE 1C

Construction Solutions Group, LLC $2.89 $330,471.50 Central Southern Construction Corp. $2.95 $337,332.50 MC3 Solutions, LLC $3.45 $394,507.50 RBA Engineering International, PLLC $3.92 $448,252.00 Bryant's Land and Development Industries, Inc. $4.95 $566,032.50 Engineer's Estimate 114,350 SQYD $5.75 $657,512.50

D0240 41401-3000 CRACKS, CLEANING AND FILLING

Construction Solutions Group, LLC $4.46 $16,970.30 Central Southern Construction Corp. $5.00 $19,025.00 MC3 Solutions, LLC $4.80 $18,264.00 RBA Engineering International, PLLC $6.06 $23,058.30 Bryant's Land and Development Industries, Inc. $4.00 $15,220.00 Engineer's Estimate 3,805 LNFT $9.65 $36,718.25

D0260 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

Construction Solutions Group, LLC $444.00 $27,972.00 Central Southern Construction Corp. $300.00 $18,900.00 MC3 Solutions, LLC $250.00 $15,750.00 RBA Engineering International, PLLC $882.00 $55,566.00 Bryant's Land and Development Industries, Inc. $332.00 $20,916.00 Engineer's Estimate 63 SQYD $200.00 $12,600.00

D0280 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID

Construction Solutions Group, LLC $0.89 $88,421.50 Central Southern Construction Corp. $0.80 $79,480.00 MC3 Solutions, LLC $0.95 $94,382.50 RBA Engineering International, PLLC $2.50 $248,375.00 Bryant's Land and Development Industries, Inc. $0.95 $94,382.50 Engineer's Estimate 99,350 LNFT $1.35 $134,122.50

D0300 63401-0600 PAVEMENT MARKINGS, TYPE C, BROKEN

Construction Solutions Group, LLC $0.89 $4,748.15 Central Southern Construction Corp. $0.80 $4,268.00 MC3 Solutions, LLC $1.10 $5,868.50 RBA Engineering International, PLLC $2.50 $13,337.50 Bryant's Land and Development Industries, Inc. $0.85 $4,534.75 Engineer's Estimate 5,335 LNFT $0.80 $4,268.00

23 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: D

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

D0320 63501-0000 TEMPORARY TRAFFIC CONTROL

Construction Solutions Group, LLC Lump Sum $22,200.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $36,000.00 RBA Engineering International, PLLC Lump Sum $30,150.00 Bryant's Land and Development Industries, Inc. Lump Sum $53,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00

D0340 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Construction Solutions Group, LLC $6,660.00 $19,980.00 Central Southern Construction Corp. $4,000.00 $12,000.00 MC3 Solutions, LLC $7,100.00 $21,300.00 RBA Engineering International, PLLC $9,050.00 $27,150.00 Bryant's Land and Development Industries, Inc. $10,000.00 $30,000.00 Engineer's Estimate 3 EACH $12,000.00 $36,000.00

D0360 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Construction Solutions Group, LLC $25.40 $48,260.00 Central Southern Construction Corp. $25.40 $48,260.00 MC3 Solutions, LLC $25.40 $48,260.00 RBA Engineering International, PLLC $25.40 $48,260.00 Bryant's Land and Development Industries, Inc. $25.40 $48,260.00 Engineer's Estimate 1,900 HOUR $25.40 $48,260.00

D0380 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

Construction Solutions Group, LLC $38.85 $17,676.75 Central Southern Construction Corp. $50.00 $22,750.00 MC3 Solutions, LLC $42.00 $19,110.00 RBA Engineering International, PLLC $52.75 $24,001.25 Bryant's Land and Development Industries, Inc. $122.00 $55,510.00 Engineer's Estimate 455 HOUR $65.00 $29,575.00

D0400 63701-0000 FIELD OFFICE

Construction Solutions Group, LLC $2,220.00 $2,220.00 Central Southern Construction Corp. $35,000.00 $35,000.00 MC3 Solutions, LLC $8,250.00 $8,250.00 RBA Engineering International, PLLC $66,450.00 $66,450.00 Bryant's Land and Development Industries, Inc. $29,000.00 $29,000.00 Engineer's Estimate 1 EACH $16,000.00 $16,000.00

24 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: D

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Total Schedule - All Items

Construction Solutions Group, LLC $718,863.20 Central Southern Construction Corp. $846,410.50 MC3 Solutions, LLC $973,540.00 RBA Engineering International, PLLC $1,173,462.05 Bryant's Land and Development Industries, Inc. $1,551,433.25 Engineer's Estimate $1,400,000.00

25 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: E

Schedule Type: Options

Solcitation No: 693C73-24-B-000002

Division: Eastern Federal Lands

State: VA County: Bedford, Botetourt, Rockbridge

Federal Land: Blue Ridge Parkway Opened at: Ashburn, Virginia

Opened by: Emily McCleary

Date: 10/17/23

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Construction Solutions Group, LLC Apparent low bidder $703,968.80 425 Highland Ave St. Louis Missouri 63122

Central Southern Construction Corp. $846,197.75 119 Sewald Street Jacksonville Florida 32204

MC3 Solutions, LLC $974,666.75 8772 Roanoke Road Elliston Virginia 24087

RBA Engineering International, PLLC $1,128,184.40 7830 Backlick Road, Suite B3 Springfield Virginia 22150

Bryant's Land and Development Industries, Inc. $1,551,601.75 159 Depot Street Burnsville North Carolina 28714

Engineer's Estimate $1,410,000.00

Emily McCleary

19 October 2023

Contract Specialist

26 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: E

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

E0100 15101-0000 MOBILIZATION

Construction Solutions Group, LLC Lump Sum $11,100.00 Central Southern Construction Corp. Lump Sum $65,000.00 MC3 Solutions, LLC Lump Sum $164,000.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Bryant's Land and Development Industries, Inc. Lump Sum $350,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,819.00

E0120 15401-0000 CONTRACTOR TESTING

Construction Solutions Group, LLC Lump Sum $11,100.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $13,500.00 RBA Engineering International, PLLC Lump Sum $15,050.00 Bryant's Land and Development Industries, Inc. Lump Sum $41,000.00 Engineer's Estimate ALL LPSM Lump Sum $33,000.00

E0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (INLET PROTECTION)

Construction Solutions Group, LLC $55.50 $2,220.00 Central Southern Construction Corp. $100.00 $4,000.00 MC3 Solutions, LLC $75.00 $3,000.00 RBA Engineering International, PLLC $11.75 $470.00 Bryant's Land and Development Industries, Inc. $35.00 $1,400.00 Engineer's Estimate 40 LNFT $13.75 $550.00

E0160 20302-2600 REMOVAL OF PAVEMENT MARKINGS

Construction Solutions Group, LLC $1.24 $25,854.00 Central Southern Construction Corp. $1.00 $20,850.00 MC3 Solutions, LLC $1.35 $28,147.50 RBA Engineering International, PLLC $1.75 $36,487.50 Bryant's Land and Development Industries, Inc. $0.90 $18,765.00 Engineer's Estimate 20,850 LNFT $3.00 $62,550.00

E0180 40602-0000 FOG SEAL

Construction Solutions Group, LLC $0.78 $93,611.70 Central Southern Construction Corp. $0.70 $84,010.50 MC3 Solutions, LLC $0.90 $108,013.50 RBA Engineering International, PLLC $1.05 $126,015.75 Bryant's Land and Development Industries, Inc. $1.95 $234,029.25 Engineer's Estimate 120,015 SQYD $1.60 $192,024.00

27 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: E

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

E0220 40702-0300 CHIP SEAL, TYPE 1C

Construction Solutions Group, LLC $2.89 $346,843.35 Central Southern Construction Corp. $2.95 $354,044.25 MC3 Solutions, LLC $3.45 $414,051.75 RBA Engineering International, PLLC $3.92 $470,458.80 Bryant's Land and Development Industries, Inc. $4.80 $576,072.00 Engineer's Estimate 120,015 SQYD $5.75 $690,086.25

E0240 41401-3000 CRACKS, CLEANING AND FILLING

Construction Solutions Group, LLC $4.46 $19,334.10 Central Southern Construction Corp. $5.00 $21,675.00 MC3 Solutions, LLC $4.80 $20,808.00 RBA Engineering International, PLLC $6.06 $26,270.10 Bryant's Land and Development Industries, Inc. $4.20 $18,207.00 Engineer's Estimate 4,335 LNFT $9.65 $41,832.75

E0260 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

Construction Solutions Group, LLC $555.00 $1,665.00 Central Southern Construction Corp. $1,000.00 $3,000.00 MC3 Solutions, LLC $600.00 $1,800.00 RBA Engineering International, PLLC $882.00 $2,646.00 Bryant's Land and Development Industries, Inc. $495.00 $1,485.00 Engineer's Estimate 3 SQYD $200.00 $600.00

E0280 63401-0500 PAVEMENT MARKINGS, TYPE C, SOLID

Construction Solutions Group, LLC $0.89 $82,681.00 Central Southern Construction Corp. $0.80 $74,320.00 MC3 Solutions, LLC $0.95 $88,255.00 RBA Engineering International, PLLC $2.50 $232,250.00 Bryant's Land and Development Industries, Inc. $0.95 $88,255.00 Engineer's Estimate 92,900 LNFT $1.35 $125,415.00

E0300 63401-0600 PAVEMENT MARKINGS, TYPE C, BROKEN

Construction Solutions Group, LLC $0.89 $5,882.90 Central Southern Construction Corp. $0.80 $5,288.00 MC3 Solutions, LLC $1.10 $7,271.00 RBA Engineering International, PLLC $2.50 $16,525.00 Bryant's Land and Development Industries, Inc. $0.85 $5,618.50 Engineer's Estimate 6,610 LNFT $0.80 $5,288.00

28 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: E

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

E0320 63501-0000 TEMPORARY TRAFFIC CONTROL

Construction Solutions Group, LLC Lump Sum $22,200.00 Central Southern Construction Corp. Lump Sum $50,000.00 MC3 Solutions, LLC Lump Sum $36,000.00 RBA Engineering International, PLLC Lump Sum $30,150.00 Bryant's Land and Development Industries, Inc. Lump Sum $53,000.00 Engineer's Estimate ALL LPSM Lump Sum $70,000.00

E0340 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Construction Solutions Group, LLC $6,660.00 $13,320.00 Central Southern Construction Corp. $4,000.00 $8,000.00 MC3 Solutions, LLC $7,100.00 $14,200.00 RBA Engineering International, PLLC $9,050.00 $18,100.00 Bryant's Land and Development Industries, Inc. $15,000.00 $30,000.00 Engineer's Estimate 2 EACH $12,000.00 $24,000.00

E0360 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Construction Solutions Group, LLC $25.40 $48,260.00 Central Southern Construction Corp. $25.40 $48,260.00 MC3 Solutions, LLC $25.40 $48,260.00 RBA Engineering International, PLLC $25.40 $48,260.00 Bryant's Land and Development Industries, Inc. $25.40 $48,260.00 Engineer's Estimate 1,900 HOUR $25.40 $48,260.00

E0380 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

Construction Solutions Group, LLC $38.85 $17,676.75 Central Southern Construction Corp. $50.00 $22,750.00 MC3 Solutions, LLC $42.00 $19,110.00 RBA Engineering International, PLLC $52.75 $24,001.25 Bryant's Land and Development Industries, Inc. $122.00 $55,510.00 Engineer's Estimate 455 HOUR $65.00 $29,575.00

E0400 63701-0000 FIELD OFFICE

Construction Solutions Group, LLC $2,220.00 $2,220.00 Central Southern Construction Corp. $35,000.00 $35,000.00 MC3 Solutions, LLC $8,250.00 $8,250.00 RBA Engineering International, PLLC $66,450.00 $66,450.00 Bryant's Land and Development Industries, Inc. $30,000.00 $30,000.00 Engineer's Estimate 1 EACH $16,000.00 $16,000.00

29 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: E

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Total Schedule - All Items

Construction Solutions Group, LLC $703,968.80 Central Southern Construction Corp. $846,197.75 MC3 Solutions, LLC $974,666.75 RBA Engineering International, PLLC $1,128,184.40 Bryant's Land and Development Industries, Inc. $1,551,601.75 Engineer's Estimate $1,410,000.00

30 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: F

Schedule Type: Options

Solcitation No: 693C73-24-B-000002

Division: Eastern Federal Lands

State: VA County: Bedford, Botetourt, Rockbridge

Federal Land: Blue Ridge Parkway Opened at: Ashburn, Virginia

Opened by: Emily McCleary

Date: 10/17/23

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Construction Solutions Group, LLC Apparent low bidder $249,513.00 425 Highland Ave St. Louis Missouri 63122

MC3 Solutions, LLC $347,345.75 8772 Roanoke Road Elliston Virginia 24087

RBA Engineering International, PLLC $392,752.05 7830 Backlick Road, Suite B3 Springfield Virginia 22150

Central Southern Construction Corp. $406,068.00 119 Sewald Street Jacksonville Florida 32204

Bryant's Land and Development Industries, Inc. $658,311.00 159 Depot Street Burnsville North Carolina 28714

Engineer's Estimate $495,000.00

Emily McCleary Contract Specialist

31 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: F

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

F0100 15101-0000 MOBILIZATION

Construction Solutions Group, LLC Lump Sum $11,100.00 MC3 Solutions, LLC Lump Sum $61,000.00 RBA Engineering International, PLLC Lump Sum $14,500.00 Central Southern Construction Corp. Lump Sum $65,000.00 Bryant's Land and Development Industries, Inc. Lump Sum $220,000.00 Engineer's Estimate ALL LPSM Lump Sum $26,668.00

F0120 15401-0000 CONTRACTOR TESTING

Construction Solutions Group, LLC Lump Sum $11,100.00 MC3 Solutions, LLC Lump Sum $13,500.00 RBA Engineering International, PLLC Lump Sum $14,500.00 Central Southern Construction Corp. Lump Sum $50,000.00 Bryant's Land and Development Industries, Inc. Lump Sum $19,000.00 Engineer's Estimate ALL LPSM Lump Sum $12,000.00

F0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL (INLET PROTECTION)

Construction Solutions Group, LLC $55.50 $832.50 MC3 Solutions, LLC $75.00 $1,125.00 RBA Engineering International, PLLC $11.15 $167.25 Central Southern Construction Corp. $100.00 $1,500.00 Bryant's Land and Development Industries, Inc. $35.00 $525.00 Engineer's Estimate 15 LNFT $13.75 $206.25

F0160 20302-2600 REMOVAL OF PAVEMENT MARKINGS

Construction Solutions Group, LLC $1.24 $7,564.00 MC3 Solutions, LLC $1.35 $8,235.00 RBA Engineering International, PLLC $1.75 $10,675.00 Central Southern Construction Corp. $1.00 $6,100.00 Bryant's Land and Development Industries, Inc. $0.90 $5,490.00 Engineer's Estimate 6,100 LNFT $3.00 $18,300.00

F0180 40602-0000 FOG SEAL

Construction Solutions Group, LLC $0.78 $32,011.20 MC3 Solutions, LLC $0.90 $36,936.00 RBA Engineering International, PLLC $1.05 $43,092.00 Central Southern Construction Corp. $0.70 $28,728.00 Bryant's Land and Development Industries, Inc. $2.20 $90,288.00 Engineer's Estimate 41,040 SQYD $1.60 $65,664.00

32 out of 33

Project No: NP BLRI PVT PRES FY23(1)

Project Name: Pavement preservation of roadways and parallel pull-offs along the Blue Ridge Parkway from MP 27.2 to MP 97.0

Schedule: F

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

F0200 40702-0300 CHIP…