Tabulation of Bids - MO ERFO NPS OZAR 2017-1(1) and 1(3).pdf

PDF 2 MB Posted

Attached to
Ozark National Scenic Riverways Federal contract opportunity
Solicitation number
693C73-21-C-000012
Issued by
Department of Transportation Federal Highway Administration

About this file

This document is a bid tabulation for reconstruction and rehabilitation work at Ozark National Scenic Riverways following extensive flooding in April 2017. Kozeny-Wagner, Inc. was awarded the contract for a total of $3,649,915.50 for work covered under Schedules A through H. The work includes items such as mobilization, surveying, testing, erosion control, excavation, riprap, road base, asphalt paving, signage and traffic control. The contract was awarded by the Department of Transportation Federal Highway Administration on March 4, 2021 under solicitation number 693C73-21-C-000012. Kozeny-Wagner, Inc. provided the lowest bids for individual schedules A, B, D, E and F. The document provides line item details for quantities, units, and pricing for all items included under the various schedules of work.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 02/12/21

1 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Base Schedule A

$2,510,000.00

$3,699,900.00

$3,321,798.51

$1,307,802.50

$2,553,178.00

$2,238,495.00

$2,401,040.00

$3,157,975.00

Option: B

$390,000.00

$654,675.00

$701,399.50

$386,128.00

$330,569.50

$554,437.00

$473,107.00

$462,270.00

Option: C

$34,000.00

$137,350.00

$106,420.00

$162,187.00

$78,361.00

$55,640.00

$30,450.00

$103,250.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

2 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Option: D

$46,000.00

$109,550.00

$105,174.50

$111,329.00

$52,857.00

$45,425.00

3 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$66,540.00

$107,310.00

Option: E

$108,000.00

$167,550.00

$133,441.50

$183,110.00

$119,830.00

$122,815.00

4 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$113,590.00

$131,500.00

Option: F

$108,000.00

$192,325.00

$177,785.00

$216,702.50

$192,793.00

$204,550.00

5 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$156,300.00

$238,575.00

6 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Option: G

$128,000.00

$187,375.00

$172,068.00

$206,415.00

$160,862.00

$259,280.00

$171,790.00

$210,950.00

Option: H

$230,000.00

$270,950.00

$232,694.00

$254,130.00

$161,465.00

$312,550.00

$172,185.00

$312,425.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

7 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): B

$2,900,000.00

$4,354,575.00

$4,023,198.01

$1,693,930.50

$2,883,747.50

$2,792,932.00

8 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,874,147.00

$3,620,245.00

Total Base Schedule A and Option(s): BC

$2,934,000.00

$4,491,925.00

$4,129,618.01

$1,856,117.50

$2,962,108.50

$2,848,572.00

9 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,904,597.00

$3,723,495.00

Total Base Schedule A and Option(s): BCD

$2,980,000.00

$4,601,475.00

$4,234,792.51

$1,967,446.50

$3,014,965.50

$2,893,997.00

10 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,971,137.00

$3,830,805.00

11 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): BCDF

$3,088,000.00

$4,793,800.00

$4,412,577.51

$2,184,149.00

$3,207,758.50

$3,098,547.00

$3,127,437.00

$4,069,380.00

Total Base Schedule A and Option(s): BCDG

$3,108,000.00

$4,788,850.00

$4,406,860.51

$2,173,861.50

$3,175,827.50

$3,153,277.00

$3,142,927.00

$4,041,755.00

Total Base Schedule A and Option(s): BCDH

$3,210,000.00

$4,872,425.00

$4,467,486.51

$2,221,576.50

$3,176,430.50

$3,206,547.00

$3,143,322.00

$4,143,230.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

12 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): BCE

$3,042,000.00

$4,659,475.00

$4,263,059.51

$2,039,227.50

$3,081,938.50

$2,971,387.00

13 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,018,187.00

$3,854,995.00

Total Base Schedule A and Option(s): BCEG

$3,170,000.00

$4,846,850.00

$4,435,127.51

$2,245,642.50

$3,242,800.50

$3,230,667.00

14 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,189,977.00

$4,065,945.00

Total Base Schedule A and Option(s): BCEH

$3,272,000.00

$4,930,425.00

$4,495,753.51

$2,293,357.50

$3,243,403.50

$3,283,937.00

15 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,190,372.00

$4,167,420.00

16 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): BCF

$3,042,000.00

$4,684,250.00

$4,307,403.01

$2,072,820.00

$3,154,901.50

$3,053,122.00

$3,060,897.00

$3,962,070.00

Total Base Schedule A and Option(s): BCFH

$3,272,000.00

$4,955,200.00

$4,540,097.01

$2,326,950.00

$3,316,366.50

$3,365,672.00

$3,233,082.00

$4,274,495.00

Total Base Schedule A and Option(s): BCG

$3,062,000.00

$4,679,300.00

$4,301,686.01

$2,062,532.50

$3,122,970.50

$3,107,852.00

$3,076,387.00

$3,934,445.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

17 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): BCH

$3,164,000.00

$4,762,875.00

$4,362,312.01

$2,110,247.50

$3,123,573.50

$3,161,122.00

18 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,076,782.00

$4,035,920.00

Total Base Schedule A and Option(s): BD

$2,946,000.00

$4,464,125.00

$4,128,372.51

$1,805,259.50

$2,936,604.50

$2,838,357.00

19 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,940,687.00

$3,727,555.00

Total Base Schedule A and Option(s): BDE

$3,054,000.00

$4,631,675.00

$4,261,814.01

$1,988,369.50

$3,056,434.50

$2,961,172.00

20 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,054,277.00

$3,859,055.00

21 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): BDEG

$3,182,000.00

$4,819,050.00

$4,433,882.01

$2,194,784.50

$3,217,296.50

$3,220,452.00

$3,226,067.00

$4,070,005.00

Total Base Schedule A and Option(s): BDEH

$3,284,000.00

$4,902,625.00

$4,494,508.01

$2,242,499.50

$3,217,899.50

$3,273,722.00

$3,226,462.00

$4,171,480.00

Total Base Schedule A and Option(s): BDF

$3,054,000.00

$4,656,450.00

$4,306,157.51

$2,021,962.00

$3,129,397.50

$3,042,907.00

$3,096,987.00

$3,966,130.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

22 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): BDFH

$3,284,000.00

$4,927,400.00

$4,538,851.51

$2,276,092.00

$3,290,862.50

$3,355,457.00

23 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,269,172.00

$4,278,555.00

Total Base Schedule A and Option(s): BDG

$3,074,000.00

$4,651,500.00

$4,300,440.51

$2,011,674.50

$3,097,466.50

$3,097,637.00

24 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,112,477.00

$3,938,505.00

Total Base Schedule A and Option(s): BDH

$3,176,000.00

$4,735,075.00

$4,361,066.51

$2,059,389.50

$3,098,069.50

$3,150,907.00

25 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,112,872.00

$4,039,980.00

26 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): BE

$3,008,000.00

$4,522,125.00

$4,156,639.51

$1,877,040.50

$3,003,577.50

$2,915,747.00

$2,987,737.00

$3,751,745.00

Total Base Schedule A and Option(s): BEF

$3,116,000.00

$4,714,450.00

$4,334,424.51

$2,093,743.00

$3,196,370.50

$3,120,297.00

$3,144,037.00

$3,990,320.00

Total Base Schedule A and Option(s): BEFH

$3,346,000.00

$4,985,400.00

$4,567,118.51

$2,347,873.00

$3,357,835.50

$3,432,847.00

$3,316,222.00

$4,302,745.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

27 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): BEG

$3,136,000.00

$4,709,500.00

$4,328,707.51

$2,083,455.50

$3,164,439.50

$3,175,027.00

28 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,159,527.00

$3,962,695.00

Total Base Schedule A and Option(s): BEH

$3,238,000.00

$4,793,075.00

$4,389,333.51

$2,131,170.50

$3,165,042.50

$3,228,297.00

29 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,159,922.00

$4,064,170.00

Total Base Schedule A and Option(s): BF

$3,008,000.00

$4,546,900.00

$4,200,983.01

$1,910,633.00

$3,076,540.50

$2,997,482.00

30 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,030,447.00

$3,858,820.00

31 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): BFG

$3,136,000.00

$4,734,275.00

$4,373,051.01

$2,117,048.00

$3,237,402.50

$3,256,762.00

$3,202,237.00

$4,069,770.00

Total Base Schedule A and Option(s): BFH

$3,238,000.00

$4,817,850.00

$4,433,677.01

$2,164,763.00

$3,238,005.50

$3,310,032.00

$3,202,632.00

$4,171,245.00

Total Base Schedule A and Option(s): BG

$3,028,000.00

$4,541,950.00

$4,195,266.01

$1,900,345.50

$3,044,609.50

$3,052,212.00

$3,045,937.00

$3,831,195.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

32 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): BGH

$3,258,000.00

$4,812,900.00

$4,427,960.01

$2,154,475.50

$3,206,074.50

$3,364,762.00

33 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,218,122.00

$4,143,620.00

Total Base Schedule A and Option(s): BH

$3,130,000.00

$4,625,525.00

$4,255,892.01

$1,948,060.50

$3,045,212.50

$3,105,482.00

34 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,046,332.00

$3,932,670.00

Total Base Schedule A and Option(s): C

$2,544,000.00

$3,837,250.00

$3,428,218.51

$1,469,989.50

$2,631,539.00

$2,294,135.00

35 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,431,490.00

$3,261,225.00

36 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): CD

$2,590,000.00

$3,946,800.00

$3,533,393.01

$1,581,318.50

$2,684,396.00

$2,339,560.00

$2,498,030.00

$3,368,535.00

Total Base Schedule A and Option(s): CDE

$2,698,000.00

$4,114,350.00

$3,666,834.51

$1,764,428.50

$2,804,226.00

$2,462,375.00

$2,611,620.00

$3,500,035.00

Total Base Schedule A and Option(s): CDEG

$2,826,000.00

$4,301,725.00

$3,838,902.51

$1,970,843.50

$2,965,088.00

$2,721,655.00

$2,783,410.00

$3,710,985.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

37 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): CDEH

$2,928,000.00

$4,385,300.00

$3,899,528.51

$2,018,558.50

$2,965,691.00

$2,774,925.00

38 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,783,805.00

$3,812,460.00

Total Base Schedule A and Option(s): CDF

$2,698,000.00

$4,139,125.00

$3,711,178.01

$1,798,021.00

$2,877,189.00

$2,544,110.00

39 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,654,330.00

$3,607,110.00

Total Base Schedule A and Option(s): CDFH

$2,928,000.00

$4,410,075.00

$3,943,872.01

$2,052,151.00

$3,038,654.00

$2,856,660.00

40 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,826,515.00

$3,919,535.00

41 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): CDG

$2,718,000.00

$4,134,175.00

$3,705,461.01

$1,787,733.50

$2,845,258.00

$2,598,840.00

$2,669,820.00

$3,579,485.00

Total Base Schedule A and Option(s): CDH

$2,820,000.00

$4,217,750.00

$3,766,087.01

$1,835,448.50

$2,845,861.00

$2,652,110.00

$2,670,215.00

$3,680,960.00

Total Base Schedule A and Option(s): CE

$2,652,000.00

$4,004,800.00

$3,561,660.01

$1,653,099.50

$2,751,369.00

$2,416,950.00

$2,545,080.00

$3,392,725.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

42 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): CEF

$2,760,000.00

$4,197,125.00

$3,739,445.01

$1,869,802.00

$2,944,162.00

$2,621,500.00

43 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,701,380.00

$3,631,300.00

Total Base Schedule A and Option(s): CEFH

$2,990,000.00

$4,468,075.00

$3,972,139.01

$2,123,932.00

$3,105,627.00

$2,934,050.00

44 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,873,565.00

$3,943,725.00

Total Base Schedule A and Option(s): CEG

$2,780,000.00

$4,192,175.00

$3,733,728.01

$1,859,514.50

$2,912,231.00

$2,676,230.00

45 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,716,870.00

$3,603,675.00

46 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): CEH

$2,882,000.00

$4,275,750.00

$3,794,354.01

$1,907,229.50

$2,912,834.00

$2,729,500.00

$2,717,265.00

$3,705,150.00

Total Base Schedule A and Option(s): CF

$2,652,000.00

$4,029,575.00

$3,606,003.51

$1,686,692.00

$2,824,332.00

$2,498,685.00

$2,587,790.00

$3,499,800.00

Total Base Schedule A and Option(s): CFG

$2,780,000.00

$4,216,950.00

$3,778,071.51

$1,893,107.00

$2,985,194.00

$2,757,965.00

$2,759,580.00

$3,710,750.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

47 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): CFH

$2,882,000.00

$4,300,525.00

$3,838,697.51

$1,940,822.00

$2,985,797.00

$2,811,235.00

48 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,759,975.00

$3,812,225.00

Total Base Schedule A and Option(s): CG

$2,672,000.00

$4,024,625.00

$3,600,286.51

$1,676,404.50

$2,792,401.00

$2,553,415.00

49 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,603,280.00

$3,472,175.00

Total Base Schedule A and Option(s): CGH

$2,902,000.00

$4,295,575.00

$3,832,980.51

$1,930,534.50

$2,953,866.00

$2,865,965.00

50 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,775,465.00

$3,784,600.00

51 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): CH

$2,774,000.00

$4,108,200.00

$3,660,912.51

$1,724,119.50

$2,793,004.00

$2,606,685.00

$2,603,675.00

$3,573,650.00

Total Base Schedule A and Option(s): D

$2,556,000.00

$3,809,450.00

$3,426,973.01

$1,419,131.50

$2,606,035.00

$2,283,920.00

$2,467,580.00

$3,265,285.00

Total Base Schedule A and Option(s): DE

$2,664,000.00

$3,977,000.00

$3,560,414.51

$1,602,241.50

$2,725,865.00

$2,406,735.00

$2,581,170.00

$3,396,785.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

52 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): DEF

$2,772,000.00

$4,169,325.00

$3,738,199.51

$1,818,944.00

$2,918,658.00

$2,611,285.00

53 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,737,470.00

$3,635,360.00

Total Base Schedule A and Option(s): DEFH

$3,002,000.00

$4,440,275.00

$3,970,893.51

$2,073,074.00

$3,080,123.00

$2,923,835.00

54 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,909,655.00

$3,947,785.00

Total Base Schedule A and Option(s): DEG

$2,792,000.00

$4,164,375.00

$3,732,482.51

$1,808,656.50

$2,886,727.00

$2,666,015.00

55 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,752,960.00

$3,607,735.00

56 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): DEH

$2,894,000.00

$4,247,950.00

$3,793,108.51

$1,856,371.50

$2,887,330.00

$2,719,285.00

$2,753,355.00

$3,709,210.00

Total Base Schedule A and Option(s): DF

$2,664,000.00

$4,001,775.00

$3,604,758.01

$1,635,834.00

$2,798,828.00

$2,488,470.00

$2,623,880.00

$3,503,860.00

Total Base Schedule A and Option(s): DFG

$2,792,000.00

$4,189,150.00

$3,776,826.01

$1,842,249.00

$2,959,690.00

$2,747,750.00

$2,795,670.00

$3,714,810.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

57 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): DFH

$2,894,000.00

$4,272,725.00

$3,837,452.01

$1,889,964.00

$2,960,293.00

$2,801,020.00

58 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,796,065.00

$3,816,285.00

Total Base Schedule A and Option(s): DG

$2,684,000.00

$3,996,825.00

$3,599,041.01

$1,625,546.50

$2,766,897.00

$2,543,200.00

59 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,639,370.00

$3,476,235.00

Total Base Schedule A and Option(s): DGH

$2,914,000.00

$4,267,775.00

$3,831,735.01

$1,879,676.50

$2,928,362.00

$2,855,750.00

60 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,811,555.00

$3,788,660.00

61 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): DH

$2,786,000.00

$4,080,400.00

$3,659,667.01

$1,673,261.50

$2,767,500.00

$2,596,470.00

$2,639,765.00

$3,577,710.00

Total Base Schedule A and Option(s): E

$2,618,000.00

$3,867,450.00

$3,455,240.01

$1,490,912.50

$2,673,008.00

$2,361,310.00

$2,514,630.00

$3,289,475.00

Total Base Schedule A and Option(s): EF

$2,726,000.00

$4,059,775.00

$3,633,025.01

$1,707,615.00

$2,865,801.00

$2,565,860.00

$2,670,930.00

$3,528,050.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

62 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): EFG

$2,854,000.00

$4,247,150.00

$3,805,093.01

$1,914,030.00

$3,026,663.00

$2,825,140.00

63 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,842,720.00

$3,739,000.00

Total Base Schedule A and Option(s): EFH

$2,956,000.00

$4,330,725.00

$3,865,719.01

$1,961,745.00

$3,027,266.00

$2,878,410.00

64 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,843,115.00

$3,840,475.00

Total Base Schedule A and Option(s): EG

$2,746,000.00

$4,054,825.00

$3,627,308.01

$1,697,327.50

$2,833,870.00

$2,620,590.00

65 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,686,420.00

$3,500,425.00

66 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): EGH

$2,976,000.00

$4,325,775.00

$3,860,002.01

$1,951,457.50

$2,995,335.00

$2,933,140.00

$2,858,605.00

$3,812,850.00

Total Base Schedule A and Option(s): EH

$2,848,000.00

$4,138,400.00

$3,687,934.01

$1,745,042.50

$2,834,473.00

$2,673,860.00

$2,686,815.00

$3,601,900.00

Total Base Schedule A and Option(s): F

$2,618,000.00

$3,892,225.00

$3,499,583.51

$1,524,505.00

$2,745,971.00

$2,443,045.00

$2,557,340.00

$3,396,550.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

67 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): FG

$2,746,000.00

$4,079,600.00

$3,671,651.51

$1,730,920.00

$2,906,833.00

$2,702,325.00

68 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,729,130.00

$3,607,500.00

Total Base Schedule A and Option(s): FGH

$2,976,000.00

$4,350,550.00

$3,904,345.51

$1,985,050.00

$3,068,298.00

$3,014,875.00

69 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,901,315.00

$3,919,925.00

Total Base Schedule A and Option(s): FH

$2,848,000.00

$4,163,175.00

$3,732,277.51

$1,778,635.00

$2,907,436.00

$2,755,595.00

70 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$2,729,525.00

$3,708,975.00

71 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

Kozeny-Wagner, Inc

Lehman Construction LLC

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): G

$2,638,000.00

$3,887,275.00

$3,493,866.51

$1,514,217.50

$2,714,040.00

$2,497,775.00

$2,572,830.00

$3,368,925.00

Total Base Schedule A and Option(s): GH

$2,868,000.00

$4,158,225.00

$3,726,560.51

$1,768,347.50

$2,875,505.00

$2,810,325.00

$2,745,015.00

$3,681,350.00

Total Base Schedule A and Option(s): H

$2,740,000.00

$3,970,850.00

$3,554,492.51

$1,561,932.50

$2,714,643.00

$2,551,045.00

$2,573,225.00

$3,470,400.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corp

Eclipse Co., LLC

GC Works, Inc.

72 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Pavkov Contracting Co., Inc.

Robertson Contractors Inc

Total Base Schedule A and Option(s): BCDEFGH

$3,554,000.00

$5,419,675.00

$4,950,781.01

$2,827,804.00

$3,649,915.50

$3,793,192.00

73 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

$3,585,002.00

$4,724,255.00

74 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Schedule: A

Schedule Type: Base

Solcitation No: 693C73-21-B-000002

Division: Eastern Federal Lands

State: MO County: Shannon, Dent, Carter

Federal Land: Ozark National Scenic Riverways Opened at: Ashburn, VA

Opened by: Tiphanie Thompson

Date: 11/17/20

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

GC Works, Inc. $1,307,802.50 1820 SW 3rd Avenue Miami Florida 33129

Lehman Construction LLC $2,238,495.00 900 Russellville Rd.

California Missouri 65018

Pavkov Contracting Co., Inc. $2,401,040.00 55 S. Guignard Drive Sumter South Carolina 29150

Kozeny-Wagner, Inc $2,553,178.00 951 W Outer Road Arnold Missouri 63110

Robertson Contractors Inc $3,157,975.00 1909 S Westwood Blvd.

Popar Bluff Missouri 63901

Eclipse Co., LLC $3,321,798.51 11554 East Washington Street Chagrin Fall Ohio 44023

Central Southern Construction Corp $3,699,900.00 2410 Harper Street Jacksonville Florida 32204

Engineer's Estimate $2,510,000.00

C. Shawn Long

Contract Specialist

11/17/2020

Kozeny-Wagner, Inc March 4, 2021

75 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

GC Works, Inc. Lump Sum $165,000.00 Lehman Construction LLC Lump Sum $233,000.00 Pavkov Contracting Co., Inc. Lump Sum $240,000.00 Kozeny-Wagner, Inc Lump Sum $352,200.00 Robertson Contractors Inc Lump Sum $185,000.00 Eclipse Co., LLC Lump Sum $395,000.00 Central Southern Construction Corp Lump Sum $850,000.00 Engineer's Estimate ALL LPSM Lump Sum $327,131.50

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

GC Works, Inc. Lump Sum $40,000.00 Lehman Construction LLC Lump Sum $8,000.00 Pavkov Contracting Co., Inc. Lump Sum $28,000.00 Kozeny-Wagner, Inc Lump Sum $8,300.00 Robertson Contractors Inc Lump Sum $25,000.00 Eclipse Co., LLC Lump Sum $99,102.00 Central Southern Construction Corp Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $56,000.00

A0060 15401-0000 CONTRACTOR TESTING

GC Works, Inc. Lump Sum $20,000.00 Lehman Construction LLC Lump Sum $6,000.00 Pavkov Contracting Co., Inc. Lump Sum $33,000.00 Kozeny-Wagner, Inc Lump Sum $10,100.00 Robertson Contractors Inc Lump Sum $20,000.00 Eclipse Co., LLC Lump Sum $386,383.01 Central Southern Construction Corp Lump Sum $125,000.00 Engineer's Estimate ALL LPSM Lump Sum $52,000.00

A0080 15702-4000 SOIL EROSION CONTROL, FILTER BAG

GC Works, Inc. Lump Sum $150,000.00 Lehman Construction LLC Lump Sum $1,000.00 Pavkov Contracting Co., Inc. Lump Sum $47,700.00 Kozeny-Wagner, Inc Lump Sum $4,500.00 Robertson Contractors Inc Lump Sum $18,500.00 Eclipse Co., LLC Lump Sum $5,250.00 Central Southern Construction Corp Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,200.00

76 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0100 15705-0100 SOIL EROSION CONTROL, SILT FENCE

GC Works, Inc. $7.50 $2,137.50 Lehman Construction LLC $3.00 $855.00 Pavkov Contracting Co., Inc. $13.00 $3,705.00 Kozeny-Wagner, Inc $5.60 $1,596.00 Robertson Contractors Inc $15.00 $4,275.00 Eclipse Co., LLC $10.50 $2,992.50 Central Southern Construction Corp $5.00 $1,425.00 Engineer's Estimate 285 LNFT $10.00 $2,850.00

A0120 15705-2000 SOIL EROSION CONTROL, FLOATING TURBIDITY CURTAIN

GC Works, Inc. $7.50 $3,937.50 Lehman Construction LLC $67.00 $35,175.00 Pavkov Contracting Co., Inc. $47.00 $24,675.00 Kozeny-Wagner, Inc $62.00 $32,550.00 Robertson Contractors Inc $65.00 $34,125.00 Eclipse Co., LLC $12.50 $6,562.50 Central Southern Construction Corp $100.00 $52,500.00 Engineer's Estimate 525 LNFT $55.00 $28,875.00

A0140 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

GC Works, Inc. $20,000.00 $40,000.00 Lehman Construction LLC $2,500.00 $5,000.00 Pavkov Contracting Co., Inc. $15,400.00 $30,800.00 Kozeny-Wagner, Inc $7,500.00 $15,000.00 Robertson Contractors Inc $10,000.00 $20,000.00 Eclipse Co., LLC $3,428.50 $6,857.00 Central Southern Construction Corp $20,000.00 $40,000.00 Engineer's Estimate 2 EACH $7,000.00 $14,000.00

A0160 15720-0000 STORM WATER POLLUTION PREVENTION PLAN

GC Works, Inc. Lump Sum $24,000.00 Lehman Construction LLC Lump Sum $2,500.00 Pavkov Contracting Co., Inc. Lump Sum $24,300.00 Kozeny-Wagner, Inc Lump Sum $3,000.00 Robertson Contractors Inc Lump Sum $10,000.00 Eclipse Co., LLC Lump Sum $13,650.00 Central Southern Construction Corp Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $7,000.00

77 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0180 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (JACKS FORK ABUTMENTS)

GC Works, Inc. Lump Sum $50,000.00 Lehman Construction LLC Lump Sum $15,000.00 Pavkov Contracting Co., Inc. Lump Sum $79,700.00 Kozeny-Wagner, Inc Lump Sum $12,000.00 Robertson Contractors Inc Lump Sum $65,000.00 Eclipse Co., LLC Lump Sum $10,769.00 Central Southern Construction Corp Lump Sum $30,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00

A0200 20403-0000 UNCLASSIFIED BORROW

GC Works, Inc. $45.00 $11,250.00 Lehman Construction LLC $27.00 $6,750.00 Pavkov Contracting Co., Inc. $88.00 $22,000.00 Kozeny-Wagner, Inc $35.00 $8,750.00 Robertson Contractors Inc $60.00 $15,000.00 Eclipse Co., LLC $62.50 $15,625.00 Central Southern Construction Corp $75.00 $18,750.00 Engineer's Estimate 250 CUYD $20.00 $5,000.00

A0220 20801-0000 STRUCTURE EXCAVATION

GC Works, Inc. $85.00 $8,500.00 Lehman Construction LLC $120.00 $12,000.00 Pavkov Contracting Co., Inc. $90.00 $9,000.00 Kozeny-Wagner, Inc $91.00 $9,100.00 Robertson Contractors Inc $150.00 $15,000.00 Eclipse Co., LLC $32.50 $3,250.00 Central Southern Construction Corp $150.00 $15,000.00 Engineer's Estimate 100 CUYD $60.00 $6,000.00

A0240 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3

GC Works, Inc. $80.00 $196,000.00 Lehman Construction LLC $55.00 $134,750.00 Pavkov Contracting Co., Inc. $110.00 $269,500.00 Kozeny-Wagner, Inc $78.00 $191,100.00 Robertson Contractors Inc $90.00 $220,500.00 Eclipse Co., LLC $75.50 $184,975.00 Central Southern Construction Corp $100.00 $245,000.00 Engineer's Estimate 2,450 CUYD $100.00 $245,000.00

78 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 30202-1000 ROADWAY AGGREGATE, METHOD 1

GC Works, Inc. $80.00 $4,000.00 Lehman Construction LLC $35.00 $1,750.00 Pavkov Contracting Co., Inc. $99.00 $4,950.00 Kozeny-Wagner, Inc $30.00 $1,500.00 Robertson Contractors Inc $100.00 $5,000.00 Eclipse Co., LLC $75.50 $3,775.00 Central Southern Construction Corp $100.00 $5,000.00 Engineer's Estimate 50 TON $50.00 $2,500.00

A0280 31302-0200 AGGREGATE-TOPSOIL COURSE, 2-INCH DEPTH

GC Works, Inc. $50.00 $32,500.00 Lehman Construction LLC $6.00 $3,900.00 Pavkov Contracting Co., Inc. $16.00 $10,400.00 Kozeny-Wagner, Inc $18.00 $11,700.00 Robertson Contractors Inc $20.00 $13,000.00 Eclipse Co., LLC $19.50 $12,675.00 Central Southern Construction Corp $20.00 $13,000.00 Engineer's Estimate 650 SQYD $6.50 $4,225.00

A0300 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

GC Works, Inc. $800.00 $34,400.00 Lehman Construction LLC $1,350.00 $58,050.00 Pavkov Contracting Co., Inc. $1,900.00 $81,700.00 Kozeny-Wagner, Inc $3,350.00 $144,050.00 Robertson Contractors Inc $2,850.00 $122,550.00 Eclipse Co., LLC $1,615.50 $69,466.50 Central Southern Construction Corp $1,700.00 $73,100.00 Engineer's Estimate 43 CUYD $1,300.00 $55,900.00

A0320 55401-1000 REINFORCING STEEL

GC Works, Inc. $1.75 $26,600.00 Lehman Construction LLC $2.00 $30,400.00 Pavkov Contracting Co., Inc. $3.30 $50,160.00 Kozeny-Wagner, Inc $1.37 $20,824.00 Robertson Contractors Inc $2.00 $30,400.00 Eclipse Co., LLC $2.00 $30,400.00 Central Southern Construction Corp $3.00 $45,600.00 Engineer's Estimate 15,200 LB $1.45 $22,040.00

79 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0340 55504-0000 PRE-FABRICATED STEEL BRIDGE

GC Works, Inc. Lump Sum $285,000.00 Lehman Construction LLC Lump Sum $1,540,000.00 Pavkov Contracting Co., Inc. Lump Sum $1,104,000.00 Kozeny-Wagner, Inc Lump Sum $1,404,220.00 Robertson Contractors Inc Lump Sum $1,550,000.00 Eclipse Co., LLC Lump Sum $1,744,615.50 Central Southern Construction Corp Lump Sum $1,680,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,300,000.00

A0360 56501-0400 DRILLED SHAFT, 36-INCH DIAMETER

GC Works, Inc. $650.00 $54,600.00 Lehman Construction LLC $635.00 $53,340.00 Pavkov Contracting Co., Inc. $1,300.00 $109,200.00 Kozeny-Wagner, Inc $1,082.00 $90,888.00 Robertson Contractors Inc $3,500.00 $294,000.00 Eclipse Co., LLC $1,292.50 $108,570.00 Central Southern Construction Corp $1,300.00 $109,200.00 Engineer's Estimate 84 LNFT $1,400.00 $117,600.00

A0380 56501-0600 DRILLED SHAFT, 48-INCH DIAMETER

GC Works, Inc. $690.00 $64,170.00 Lehman Construction LLC $635.00 $59,055.00 Pavkov Contracting Co., Inc. $1,600.00 $148,800.00 Kozeny-Wagner, Inc $1,760.00 $163,680.00 Robertson Contractors Inc $4,500.00 $418,500.00 Eclipse Co., LLC $1,481.00 $137,733.00 Central Southern Construction Corp $1,500.00 $139,500.00 Engineer's Estimate 93 LNFT $2,000.00 $186,000.00

A0400 62502-0000 TURF ESTABLISHMENT

GC Works, Inc. $7.50 $4,875.00 Lehman Construction LLC $8.00 $5,200.00 Pavkov Contracting Co., Inc. $10.00 $6,500.00 Kozeny-Wagner, Inc $4.00 $2,600.00 Robertson Contractors Inc $20.00 $13,000.00 Eclipse Co., LLC $4.50 $2,925.00 Central Southern Construction Corp $20.00 $13,000.00 Engineer's Estimate 650 SQYD $8.00 $5,200.00

80 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0420 62901-0800 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D

GC Works, Inc. $3.50 $525.00 Lehman Construction LLC $5.00 $750.00 Pavkov Contracting Co., Inc. $11.00 $1,650.00 Kozeny-Wagner, Inc $11.50 $1,725.00 Robertson Contractors Inc $20.00 $3,000.00 Eclipse Co., LLC $26.50 $3,975.00 Central Southern Construction Corp $35.00 $5,250.00 Engineer's Estimate 150 SQYD $5.00 $750.00

A0440 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

GC Works, Inc. $300.00 $4,500.00 Lehman Construction LLC $25.00 $375.00 Pavkov Contracting Co., Inc. $200.00 $3,000.00 Kozeny-Wagner, Inc $85.00 $1,275.00 Robertson Contractors Inc $150.00 $2,250.00 Eclipse Co., LLC $13.50 $202.50 Central Southern Construction Corp $400.00 $6,000.00 Engineer's Estimate 15 EACH $105.00 $1,575.00

A0460 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

GC Works, Inc. $275.00 $16,500.00 Lehman Construction LLC $29.00 $1,740.00 Pavkov Contracting Co., Inc. $40.00 $2,400.00 Kozeny-Wagner, Inc $25.00 $1,500.00 Robertson Contractors Inc $150.00 $9,000.00 Eclipse Co., LLC $26.50 $1,590.00 Central Southern Construction Corp $100.00 $6,000.00 Engineer's Estimate 60 LNFT $30.00 $1,800.00

A0480 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

GC Works, Inc. $70.00 $11,550.00 Lehman Construction LLC $7.00 $1,155.00 Pavkov Contracting Co., Inc. $70.00 $11,550.00 Kozeny-Wagner, Inc $11.00 $1,815.00 Robertson Contractors Inc $20.00 $3,300.00 Eclipse Co., LLC $9.50 $1,567.50 Central Southern Construction Corp $70.00 $11,550.00 Engineer's Estimate 165 SQFT $19.00 $3,135.00

81 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0500 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

GC Works, Inc. $69.50 $26,757.50 Lehman Construction LLC $50.00 $19,250.00 Pavkov Contracting Co., Inc. $110.00 $42,350.00 Kozeny-Wagner, Inc $73.00 $28,105.00 Robertson Contractors Inc $95.00 $36,575.00 Eclipse Co., LLC $103.50 $39,847.50 Central Southern Construction Corp $65.00 $25,025.00 Engineer's Estimate 385 HOUR $68.10 $26,218.50

A0520 63701-0000 FIELD OFFICE

GC Works, Inc. $31,000.00 $31,000.00 Lehman Construction LLC $3,500.00 $3,500.00 Pavkov Contracting Co., Inc. $12,000.00 $12,000.00 Kozeny-Wagner, Inc $31,100.00 $31,100.00 Robertson Contractors Inc $25,000.00 $25,000.00 Eclipse Co., LLC $34,040.00 $34,040.00 Central Southern Construction Corp $50,000.00 $50,000.00 Engineer's Estimate 1 EACH $14,000.00 $14,000.00

Total Schedule - All Items

GC Works, Inc. $1,307,802.50 Lehman Construction LLC $2,238,495.00 Pavkov Contracting Co., Inc. $2,401,040.00 Kozeny-Wagner, Inc $2,553,178.00 Robertson Contractors Inc $3,157,975.00 Eclipse Co., LLC $3,321,798.51 Central Southern Construction Corp $3,699,900.00 Engineer's Estimate $2,510,000.00

82 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Schedule: B

Schedule Type: Options

Solcitation No: 693C73-21-B-000002

Division: Eastern Federal Lands

State: MO County: Shannon, Dent, Carter

Federal Land: Ozark National Scenic Riverways Opened at: Ashburn, VA

Opened by: Tiphanie Thompson

Date: 11/17/20

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Kozeny-Wagner, Inc $330,569.50 951 W Outer Road Arnold Missouri 63110

GC Works, Inc. $386,128.00 1820 SW 3rd Avenue Miami Florida 33129

Robertson Contractors Inc $462,270.00 1909 S Westwood Blvd.

Popar Bluff Missouri 63901

Pavkov Contracting Co., Inc. $473,107.00 55 S. Guignard Drive Sumter South Carolina 29150

Lehman Construction LLC $554,437.00 900 Russellville Rd.

California Missouri 65018

Central Southern Construction Corp $654,675.00 2410 Harper Street Jacksonville Florida 32204

Eclipse Co., LLC $701,399.50 11554 East Washington Street Chagrin Fall Ohio 44023

Engineer's Estimate $390,000.00

C. Shawn Long

Contract Specialist

83 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0020 15101-0000 MOBILIZATION

Kozeny-Wagner, Inc Lump Sum $46,800.00 GC Works, Inc. Lump Sum $100,000.00 Robertson Contractors Inc Lump Sum $75,000.00 Pavkov Contracting Co., Inc. Lump Sum $45,000.00 Lehman Construction LLC Lump Sum $88,000.00 Central Southern Construction Corp Lump Sum $100,000.00 Eclipse Co., LLC Lump Sum $120,867.50 Engineer's Estimate ALL LPSM Lump Sum $51,117.50

B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Kozeny-Wagner, Inc Lump Sum $4,000.00 GC Works, Inc. Lump Sum $20,000.00 Robertson Contractors Inc Lump Sum $15,000.00 Pavkov Contracting Co., Inc. Lump Sum $26,000.00 Lehman Construction LLC Lump Sum $4,000.00 Central Southern Construction Corp Lump Sum $25,000.00 Eclipse Co., LLC Lump Sum $50,569.00 Engineer's Estimate ALL LPSM Lump Sum $8,700.00

B0060 15401-0000 CONTRACTOR TESTING

Kozeny-Wagner, Inc Lump Sum $7,300.00 GC Works, Inc. Lump Sum $50,000.00 Robertson Contractors Inc Lump Sum $7,500.00 Pavkov Contracting Co., Inc. Lump Sum $24,800.00 Lehman Construction LLC Lump Sum $2,000.00 Central Southern Construction Corp Lump Sum $50,000.00 Eclipse Co., LLC Lump Sum $193,000.00 Engineer's Estimate ALL LPSM Lump Sum $8,000.00

B0080 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Kozeny-Wagner, Inc $5.60 $280.00 GC Works, Inc. $7.50 $375.00 Robertson Contractors Inc $40.00 $2,000.00 Pavkov Contracting Co., Inc. $14.00 $700.00 Lehman Construction LLC $10.00 $500.00 Central Southern Construction Corp $5.00 $250.00 Eclipse Co., LLC $10.50 $525.00 Engineer's Estimate 50 LNFT $10.00 $500.00

84 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Kozeny-Wagner, Inc $5.60 $168.00 GC Works, Inc. $7.50 $225.00 Robertson Contractors Inc $60.00 $1,800.00 Pavkov Contracting Co., Inc. $14.00 $420.00 Lehman Construction LLC $15.00 $450.00 Central Southern Construction Corp $10.00 $300.00 Eclipse Co., LLC $10.50 $315.00 Engineer's Estimate 30 LNFT $15.00 $450.00

B0120 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

Kozeny-Wagner, Inc $7,000.00 $7,000.00 GC Works, Inc. $18,500.00 $18,500.00 Robertson Contractors Inc $6,500.00 $6,500.00 Pavkov Contracting Co., Inc. $3,300.00 $3,300.00 Lehman Construction LLC $2,500.00 $2,500.00 Central Southern Construction Corp $20,000.00 $20,000.00 Eclipse Co., LLC $3,428.50 $3,428.50 Engineer's Estimate 1 EACH $7,000.00 $7,000.00

B0140 20103-0000 CLEARING AND GRUBBING

Kozeny-Wagner, Inc $24.00 $3,360.00 GC Works, Inc. $50.00 $7,000.00 Robertson Contractors Inc $25.00 $3,500.00 Pavkov Contracting Co., Inc. $17.00 $2,380.00 Lehman Construction LLC $40.00 $5,600.00 Central Southern Construction Corp $100.00 $14,000.00 Eclipse Co., LLC $24.00 $3,360.00 Engineer's Estimate 140 SQYD $8.50 $1,190.00

B0160 20403-0000 UNCLASSIFIED BORROW

Kozeny-Wagner, Inc $72.00 $1,872.00 GC Works, Inc. $44.00 $1,144.00 Robertson Contractors Inc $80.00 $2,080.00 Pavkov Contracting Co., Inc. $68.00 $1,768.00 Lehman Construction LLC $27.00 $702.00 Central Southern Construction Corp $75.00 $1,950.00 Eclipse Co., LLC $126.00 $3,276.00 Engineer's Estimate 26 CUYD $20.00 $520.00

85 out of 120

Project No: MO ERFO NPS OZAR 2017-1(1) & MO ERFO NPS OZAR 2017-1(3)

Project Name: Reconstruction and Rehabilitation of Damaged Areas due to Extensive Flooding in April

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0180 20421-0000 ROCK EXCAVATION

Kozeny-Wagner, Inc $630.00 $8,820.00 GC Works, Inc. $81.00 $1,134.00 Robertson Contractors Inc $250.00 $3,500.00 Pavkov…