This document is a bid tabulation report for a federal construction project. Bluegrass Contracting Corporation was awarded a contract for $2,846,106 on June 29, 2022 to complete roadway and parking repairs at the Kendall Campground recreation area owned by the U.S. Army Corps of Engineers. The project was split into two schedules, with Bluegrass submitting the lowest bids of $1,844,850 for Schedule A and $1,001,256 for Schedule B. Eight contractors submitted bids, which were reviewed for accuracy and completeness by a contracting specialist from the Department of Transportation Federal Highway Administration on the reported date of June 2, 2022.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 06/02/22

1 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Contractor Responsive?

Engineer's Estimate

Adams Contracting, LLC

Aspen Construction Company

Bluegrass Contracting Corporation

Construction Solutions Group, LLC

Howard W. Pence, Inc.

Kovilic Construction Company, Inc.

Mass Crushing and Excavating, Inc.

Semper Tek, Inc. no

Base Schedule A

$2,052,000.00

$2,634,680.00

$2,354,020.85

$1,844,850.00

$3,685,993.40

$2,899,500.30

$3,328,950.00

$4,698,290.00

$2,330,477.89

Base Schedule B

$1,006,500.00

$1,486,345.00

$1,319,595.28

$1,001,256.00

$2,068,396.80

$1,691,901.50

$1,446,000.00

$2,980,050.00

$1,268,911.46

2 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: A

Schedule Type: Base

Solcitation No: 693C73-22-B-000009

Division: Eastern Federal Lands

State: KY County: Russell

Federal Land: USACE Opened at: Ashburn, VA

Opened by: Yuliya Kent

Date: 06/02/22

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: Yuliya Kent

Title: Contract Specialist

Date: June 2, 2022

Contract Awarded to: Bluegrass Contracting Corporation Award Date: June 29, 2022

Contractor Comment Bid Amount Responsive

Bluegrass Contracting Corporation $1,844,850.00 1075 Red Mile Road Lexington Kentucky 40504

Semper Tek, Inc. Non-Responsive. Did not submit Bidder's Qualification Form as per solicitation requirement.

( $2,330,477.89 ) no 848 Nandino Blvd., Suite O Lexington Kentucky 40511

Aspen Construction Company $2,354,020.85 3798 State Highway 371 NW Hackensack Minnesota 56452

Adams Contracting, LLC $2,634,680.00 131 Prosperous Place, Suite 19A Lexington Kentucky 40509

Howard W. Pence, Inc. $2,899,500.30 342 East Dixie Avenue Elizabethtown Kentucky 42701

Kovilic Construction Company, Inc. $3,328,950.00 3721 N. Carnation Street Franklin Park Illinois 60131

Construction Solutions Group, LLC $3,685,993.40 5512 Elk Valley Estates Dr St. Louis Missouri 63128

Mass Crushing and Excavating, Inc. $4,698,290.00 1012 W. 13th Ave Ct.

Milan Illinois 61264

Engineer's Estimate $2,052,000.00

3 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0010 15101-0000 MOBILIZATION

Bluegrass Contracting Corporation Lump Sum $131,000.00 Semper Tek, Inc. Lump Sum $383,594.96 Aspen Construction Company Lump Sum $371,276.80 Adams Contracting, LLC Lump Sum $260,000.00 Howard W. Pence, Inc. Lump Sum $159,900.00 Kovilic Construction Company, Inc. Lump Sum $200,000.00 Construction Solutions Group, LLC Lump Sum $315,000.00 Mass Crushing and Excavating, Inc. Lump Sum $520,000.00 Engineer's Estimate ALL LPSM Lump Sum $252,610.00

A0020 15201-0000 CONSTRUCTION SURVEY AND STAKING

Bluegrass Contracting Corporation Lump Sum $18,750.00 Semper Tek, Inc. Lump Sum $15,323.35 Aspen Construction Company Lump Sum $14,342.50 Adams Contracting, LLC Lump Sum $50,000.00 Howard W. Pence, Inc. Lump Sum $80,589.60 Kovilic Construction Company, Inc. Lump Sum $20,000.00 Construction Solutions Group, LLC Lump Sum $107,100.00 Mass Crushing and Excavating, Inc. Lump Sum $195,000.00 Engineer's Estimate ALL LPSM Lump Sum $48,000.00

A0030 15401-0000 CONTRACTOR TESTING

Bluegrass Contracting Corporation Lump Sum $96,500.00 Semper Tek, Inc. Lump Sum $33,876.85 Aspen Construction Company Lump Sum $64,541.24 Adams Contracting, LLC Lump Sum $60,000.00 Howard W. Pence, Inc. Lump Sum $48,867.90 Kovilic Construction Company, Inc. Lump Sum $50,000.00 Construction Solutions Group, LLC Lump Sum $126,000.00 Mass Crushing and Excavating, Inc. Lump Sum $167,000.00 Engineer's Estimate ALL LPSM Lump Sum $35,000.00

A0040 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Bluegrass Contracting Corporation $6.00 $7,800.00 Semper Tek, Inc. $5.52 $7,176.00 Aspen Construction Company $12.78 $16,614.00 Adams Contracting, LLC $7.00 $9,100.00 Howard W. Pence, Inc. $10.46 $13,598.00 Kovilic Construction Company, Inc. $25.00 $32,500.00 Construction Solutions Group, LLC $10.71 $13,923.00 Mass Crushing and Excavating, Inc. $22.00 $28,600.00 Engineer's Estimate 1,300 LNFT $13.00 $16,900.00

4 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0050 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

Bluegrass Contracting Corporation $3,500.00 $3,500.00 Semper Tek, Inc. $3,371.14 $3,371.14 Aspen Construction Company $3,910.17 $3,910.17 Adams Contracting, LLC $5,000.00 $5,000.00 Howard W. Pence, Inc. $7,380.00 $7,380.00 Kovilic Construction Company, Inc. $3,500.00 $3,500.00 Construction Solutions Group, LLC $7,560.00 $7,560.00 Mass Crushing and Excavating, Inc. $12,000.00 $12,000.00 Engineer's Estimate 1 EACH $3,500.00 $3,500.00

A0060 20102-0000 CLEARING AND GRUBBING

Bluegrass Contracting Corporation Lump Sum $58,000.00 Semper Tek, Inc. Lump Sum $49,341.17 Aspen Construction Company Lump Sum $9,169.10 Adams Contracting, LLC Lump Sum $70,000.00 Howard W. Pence, Inc. Lump Sum $30,750.00 Kovilic Construction Company, Inc. Lump Sum $50,000.00 Construction Solutions Group, LLC Lump Sum $37,800.00 Mass Crushing and Excavating, Inc. Lump Sum $168,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

A0070 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE

Bluegrass Contracting Corporation $18.00 $1,980.00 Semper Tek, Inc. $24.52 $2,697.20 Aspen Construction Company $13.64 $1,500.40 Adams Contracting, LLC $35.00 $3,850.00 Howard W. Pence, Inc. $24.60 $2,706.00 Kovilic Construction Company, Inc. $25.00 $2,750.00 Construction Solutions Group, LLC $25.20 $2,772.00 Mass Crushing and Excavating, Inc. $15.00 $1,650.00 Engineer's Estimate 110 LNFT $22.00 $2,420.00

A0080 20302-2600 REMOVAL OF PAVEMENT MARKINGS

Bluegrass Contracting Corporation $18.00 $4,500.00 Semper Tek, Inc. $12.26 $3,065.00 Aspen Construction Company $7.17 $1,792.50 Adams Contracting, LLC $5.00 $1,250.00 Howard W. Pence, Inc. $36.90 $9,225.00 Kovilic Construction Company, Inc. $5.00 $1,250.00 Construction Solutions Group, LLC $5.04 $1,260.00 Mass Crushing and Excavating, Inc. $15.00 $3,750.00 Engineer's Estimate 250 LNFT $4.00 $1,000.00

5 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0090 20315-0000 SAWCUTTING PAVEMENT

Bluegrass Contracting Corporation $6.50 $1,430.00 Semper Tek, Inc. $12.26 $2,697.20 Aspen Construction Company $4.83 $1,062.60 Adams Contracting, LLC $5.00 $1,100.00 Howard W. Pence, Inc. $12.30 $2,706.00 Kovilic Construction Company, Inc. $10.00 $2,200.00 Construction Solutions Group, LLC $12.60 $2,772.00 Mass Crushing and Excavating, Inc. $15.00 $3,300.00 Engineer's Estimate 220 LNFT $7.50 $1,650.00

A0100 20401-0000 ROADWAY EXCAVATION

Bluegrass Contracting Corporation $32.00 $134,400.00 Semper Tek, Inc. $30.65 $128,730.00 Aspen Construction Company $23.46 $98,532.00 Adams Contracting, LLC $70.00 $294,000.00 Howard W. Pence, Inc. $43.05 $180,810.00 Kovilic Construction Company, Inc. $75.00 $315,000.00 Construction Solutions Group, LLC $44.10 $185,220.00 Mass Crushing and Excavating, Inc. $48.00 $201,600.00 Engineer's Estimate 4,200 CUYD $42.00 $176,400.00

A0110 20403-0000 UNCLASSIFIED BORROW

Bluegrass Contracting Corporation $47.00 $59,220.00 Semper Tek, Inc. $61.30 $77,238.00 Aspen Construction Company $33.45 $42,147.00 Adams Contracting, LLC $85.00 $107,100.00 Howard W. Pence, Inc. $67.65 $85,239.00 Kovilic Construction Company, Inc. $100.00 $126,000.00 Construction Solutions Group, LLC $69.30 $87,318.00 Mass Crushing and Excavating, Inc. $78.00 $98,280.00 Engineer's Estimate 1,260 CUYD $38.00 $47,880.00

A0120 20701-0200 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE B

Bluegrass Contracting Corporation $3.50 $6,230.00 Semper Tek, Inc. $4.91 $8,739.80 Aspen Construction Company $13.89 $24,724.20 Adams Contracting, LLC $4.00 $7,120.00 Howard W. Pence, Inc. $12.30 $21,894.00 Kovilic Construction Company, Inc. $5.00 $8,900.00 Construction Solutions Group, LLC $12.60 $22,428.00 Mass Crushing and Excavating, Inc. $18.00 $32,040.00 Engineer's Estimate 1,780 SQYD $5.00 $8,900.00

6 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0130 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C

Bluegrass Contracting Corporation $3.50 $1,470.00 Semper Tek, Inc. $3.68 $1,545.60 Aspen Construction Company $16.95 $7,119.00 Adams Contracting, LLC $4.00 $1,680.00 Howard W. Pence, Inc. $12.30 $5,166.00 Kovilic Construction Company, Inc. $5.00 $2,100.00 Construction Solutions Group, LLC $12.60 $5,292.00 Mass Crushing and Excavating, Inc. $18.00 $7,560.00 Engineer's Estimate 420 SQYD $5.00 $2,100.00

A0140 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E

Bluegrass Contracting Corporation $3.50 $4,480.00 Semper Tek, Inc. $3.68 $4,710.40 Aspen Construction Company $11.03 $14,118.40 Adams Contracting, LLC $4.00 $5,120.00 Howard W. Pence, Inc. $12.30 $15,744.00 Kovilic Construction Company, Inc. $5.00 $6,400.00 Construction Solutions Group, LLC $12.60 $16,128.00 Mass Crushing and Excavating, Inc. $18.00 $23,040.00 Engineer's Estimate 1,280 SQYD $5.00 $6,400.00

A0145 25102-0000 PLACED RIPRAP, METHOD A (GOVERNMENT-PROVIDED MATERIAL STOCKPILE)

Bluegrass Contracting Corporation $13.00 $1,560.00 Semper Tek, Inc. $18.39 $2,206.80 Aspen Construction Company $72.73 $8,727.60 Adams Contracting, LLC $40.00 $4,800.00 Howard W. Pence, Inc. $61.50 $7,380.00 Kovilic Construction Company, Inc. $150.00 $18,000.00 Construction Solutions Group, LLC $35.00 $4,200.00 Mass Crushing and Excavating, Inc. $35.00 $4,200.00 Engineer's Estimate 120 TON $250.00 $30,000.00

A0150 25302-1000 GABIONS, GALVANIZED OR ALUMINIZED COATED

Bluegrass Contracting Corporation $287.50 $416,875.00 Semper Tek, Inc. $312.60 $453,270.00 Aspen Construction Company $258.83 $375,303.50 Adams Contracting, LLC $365.00 $529,250.00 Howard W. Pence, Inc. $615.00 $891,750.00 Kovilic Construction Company, Inc. $565.00 $819,250.00 Construction Solutions Group, LLC $819.00 $1,187,550.00 Mass Crushing and Excavating, Inc. $460.00 $667,000.00 Engineer's Estimate 1,450 CUYD $255.00 $369,750.00

7 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0160 25901-0000 SOIL NAIL

Bluegrass Contracting Corporation $63.50 $488,950.00 Semper Tek, Inc. $93.04 $716,408.00 Aspen Construction Company $103.99 $800,723.00 Adams Contracting, LLC $100.00 $770,000.00 Howard W. Pence, Inc. $93.48 $719,796.00 Kovilic Construction Company, Inc. $135.00 $1,039,500.00 Construction Solutions Group, LLC $113.40 $873,180.00 Mass Crushing and Excavating, Inc. $275.00 $2,117,500.00 Engineer's Estimate 7,700 LNFT $75.00 $577,500.00

A0170 25903-0000 VERIFICATION TEST NAIL

Bluegrass Contracting Corporation $2,500.00 $5,000.00 Semper Tek, Inc. $1,838.81 $3,677.62 Aspen Construction Company $2,151.37 $4,302.74 Adams Contracting, LLC $2,500.00 $5,000.00 Howard W. Pence, Inc. $24,600.00 $49,200.00 Kovilic Construction Company, Inc. $20,000.00 $40,000.00 Construction Solutions Group, LLC $7,560.00 $15,120.00 Mass Crushing and Excavating, Inc. $12,500.00 $25,000.00 Engineer's Estimate 2 EACH $4,000.00 $8,000.00

A0180 30101-4000 AGGREGATE BASE GRADING C OR D

Bluegrass Contracting Corporation $34.00 $159,800.00 Semper Tek, Inc. $38.01 $178,647.00 Aspen Construction Company $40.73 $191,431.00 Adams Contracting, LLC $40.00 $188,000.00 Howard W. Pence, Inc. $61.50 $289,050.00 Kovilic Construction Company, Inc. $75.00 $352,500.00 Construction Solutions Group, LLC $63.00 $296,100.00 Mass Crushing and Excavating, Inc. $35.00 $164,500.00 Engineer's Estimate 4,700 TON $35.00 $164,500.00

A0190 31302-0150 AGGREGATE-TOPSOIL COURSE, 1 1/2-INCH DEPTH

Bluegrass Contracting Corporation $16.00 $1,520.00 Semper Tek, Inc. $18.39 $1,747.05 Aspen Construction Company $105.16 $9,990.20 Adams Contracting, LLC $80.00 $7,600.00 Howard W. Pence, Inc. $98.40 $9,348.00 Kovilic Construction Company, Inc. $10.00 $950.00 Construction Solutions Group, LLC $100.80 $9,576.00 Mass Crushing and Excavating, Inc. $100.00 $9,500.00 Engineer's Estimate 95 SQYD $24.00 $2,280.00

8 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0200 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Bluegrass Contracting Corporation $352.00 $102,080.00 Semper Tek, Inc. $370.52 $107,450.80 Aspen Construction Company $430.27 $124,778.30 Adams Contracting, LLC $340.00 $98,600.00 Howard W. Pence, Inc. $369.00 $107,010.00 Kovilic Construction Company, Inc. $250.00 $72,500.00 Construction Solutions Group, LLC $378.00 $109,620.00 Mass Crushing and Excavating, Inc. $175.00 $50,750.00 Engineer's Estimate 290 TON $230.00 $66,700.00

A0210 41202-0000 TACK COAT

Bluegrass Contracting Corporation $6.00 $2,760.00 Semper Tek, Inc. $6.23 $2,865.80 Aspen Construction Company $7.23 $3,325.80 Adams Contracting, LLC $6.00 $2,760.00 Howard W. Pence, Inc. $6.20 $2,852.00 Kovilic Construction Company, Inc. $5.00 $2,300.00 Construction Solutions Group, LLC $6.35 $2,921.00 Mass Crushing and Excavating, Inc. $30.00 $13,800.00 Engineer's Estimate 460 GAL $30.00 $13,800.00

A0220 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH

Bluegrass Contracting Corporation $15.50 $20,925.00 Semper Tek, Inc. $16.06 $21,681.00 Aspen Construction Company $18.65 $25,177.50 Adams Contracting, LLC $15.00 $20,250.00 Howard W. Pence, Inc. $15.99 $21,586.50 Kovilic Construction Company, Inc. $9.00 $12,150.00 Construction Solutions Group, LLC $16.38 $22,113.00 Mass Crushing and Excavating, Inc. $20.00 $27,000.00 Engineer's Estimate 1,350 SQYD $60.00 $81,000.00

A0230 60501-0000 STANDARD UNDERDRAIN SYSTEM

Bluegrass Contracting Corporation $12.00 $5,520.00 Semper Tek, Inc. $15.02 $6,909.20 Aspen Construction Company $53.57 $24,642.20 Adams Contracting, LLC $35.00 $16,100.00 Howard W. Pence, Inc. $79.95 $36,777.00 Kovilic Construction Company, Inc. $50.00 $23,000.00 Construction Solutions Group, LLC $81.90 $37,674.00 Mass Crushing and Excavating, Inc. $16.00 $7,360.00 Engineer's Estimate 460 LNFT $32.00 $14,720.00

9 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0240 60510-0800 6-INCH OUTLET PIPE

Bluegrass Contracting Corporation $29.50 $11,800.00 Semper Tek, Inc. $26.36 $10,544.00 Aspen Construction Company $50.89 $20,356.00 Adams Contracting, LLC $35.00 $14,000.00 Howard W. Pence, Inc. $49.20 $19,680.00 Kovilic Construction Company, Inc. $50.00 $20,000.00 Construction Solutions Group, LLC $50.40 $20,160.00 Mass Crushing and Excavating, Inc. $60.00 $24,000.00 Engineer's Estimate 400 LNFT $25.00 $10,000.00

A0250 60902-0800 CURB AND GUTTER, CONCRETE, 10-INCH DEPTH

Bluegrass Contracting Corporation $60.00 $7,200.00 Semper Tek, Inc. $61.30 $7,356.00 Aspen Construction Company $104.84 $12,580.80 Adams Contracting, LLC $90.00 $10,800.00 Howard W. Pence, Inc. $28.29 $3,394.80 Kovilic Construction Company, Inc. $75.00 $9,000.00 Construction Solutions Group, LLC $122.22 $14,666.40 Mass Crushing and Excavating, Inc. $142.00 $17,040.00 Engineer's Estimate 120 LNFT $90.00 $10,800.00

A0260 61701-4650 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS B STEEL POSTS

Bluegrass Contracting Corporation $88.00 $11,440.00 Semper Tek, Inc. $116.46 $15,139.80 Aspen Construction Company $107.57 $13,984.10 Adams Contracting, LLC $90.00 $11,700.00 Howard W. Pence, Inc. $47.97 $6,236.10 Kovilic Construction Company, Inc. $100.00 $13,000.00 Construction Solutions Group, LLC $126.00 $16,380.00 Mass Crushing and Excavating, Inc. $200.00 $26,000.00 Engineer's Estimate 130 LNFT $155.00 $20,150.00

A0270 62502-0000 TURF ESTABLISHMENT

Bluegrass Contracting Corporation $2.00 $1,960.00 Semper Tek, Inc. $3.68 $3,606.40 Aspen Construction Company $6.74 $6,605.20 Adams Contracting, LLC $7.00 $6,860.00 Howard W. Pence, Inc. $24.60 $24,108.00 Kovilic Construction Company, Inc. $10.00 $9,800.00 Construction Solutions Group, LLC $25.20 $24,696.00 Mass Crushing and Excavating, Inc. $36.00 $35,280.00 Engineer's Estimate 980 SQYD $8.00 $7,840.00

10 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0280 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Bluegrass Contracting Corporation $15.00 $4,200.00 Semper Tek, Inc. $15.44 $4,323.20 Aspen Construction Company $17.93 $5,020.40 Adams Contracting, LLC $13.00 $3,640.00 Howard W. Pence, Inc. $15.38 $4,306.40 Kovilic Construction Company, Inc. $5.00 $1,400.00 Construction Solutions Group, LLC $6.30 $1,764.00 Mass Crushing and Excavating, Inc. $18.00 $5,040.00 Engineer's Estimate 280 LNFT $15.00 $4,200.00

A0290 63501-0000 TEMPORARY TRAFFIC CONTROL

Bluegrass Contracting Corporation Lump Sum $25,000.00 Semper Tek, Inc. Lump Sum $2,470.13 Aspen Construction Company Lump Sum $7,171.25 Adams Contracting, LLC Lump Sum $10,000.00 Howard W. Pence, Inc. Lump Sum $18,450.00 Kovilic Construction Company, Inc. Lump Sum $25,000.00 Construction Solutions Group, LLC Lump Sum $55,200.00 Mass Crushing and Excavating, Inc. Lump Sum $27,500.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

A0300 63701-0000 FIELD OFFICE

Bluegrass Contracting Corporation $49,000.00 $49,000.00 Semper Tek, Inc. $70,068.42 $70,068.42 Aspen Construction Company $49,051.35 $49,051.35 Adams Contracting, LLC $60,000.00 $60,000.00 Howard W. Pence, Inc. $24,000.00 $24,000.00 Kovilic Construction Company, Inc. $50,000.00 $50,000.00 Construction Solutions Group, LLC $64,500.00 $64,500.00 Mass Crushing and Excavating, Inc. $15,000.00 $15,000.00 Engineer's Estimate 1 EACH $13,000.00 $13,000.00

Total Schedule - All Items

Bluegrass Contracting Corporation $1,844,850.00 Semper Tek, Inc. $2,330,477.89 Aspen Construction Company $2,354,020.85 Adams Contracting, LLC $2,634,680.00 Howard W. Pence, Inc. $2,899,500.30 Kovilic Construction Company, Inc. $3,328,950.00 Construction Solutions Group, LLC $3,685,993.40 Mass Crushing and Excavating, Inc. $4,698,290.00 Engineer's Estimate $2,052,000.00

11 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: B

Schedule Type: Base

Solcitation No: 693C73-22-B-000009

Division: Eastern Federal Lands

State: KY County: Russell

Federal Land: USACE Opened at: Ashburn, VA

Opened by: Yuliya Kent

Date: 06/02/22

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: Yuliya Kent

Title: Contract Specialist

Date: June 2, 2022

Contract Awarded to: Bluegrass Contracting Corporation Award Date: June 29, 2022

Contractor Comment Bid Amount Responsive

Bluegrass Contracting Corporation $1,001,256.00 1075 Red Mile Road Lexington Kentucky 40504

Semper Tek, Inc. Non-Responsive. Did not submit Bidder's Qualification Form as per solicitation requirement.

( $1,268,911.46 ) no 848 Nandino Blvd., Suite O Lexington Kentucky 40511

Aspen Construction Company $1,319,595.28 3798 State Highway 371 NW Hackensack Minnesota 56452

Kovilic Construction Company, Inc. $1,446,000.00 3721 N. Carnation Street Franklin Park Illinois 60131

Adams Contracting, LLC $1,486,345.00 131 Prosperous Place, Suite 19A Lexington Kentucky 40509

Howard W. Pence, Inc. $1,691,901.50 342 East Dixie Avenue Elizabethtown Kentucky 42701

Construction Solutions Group, LLC $2,068,396.80 5512 Elk Valley Estates Dr St. Louis Missouri 63128

Mass Crushing and Excavating, Inc. $2,980,050.00 1012 W. 13th Ave Ct.

Milan Illinois 61264

Engineer's Estimate $1,006,500.00

12 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: B

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0010 15101-0000 MOBILIZATION

Bluegrass Contracting Corporation Lump Sum $48,000.00 Semper Tek, Inc. Lump Sum $213,282.27 Aspen Construction Company Lump Sum $210,250.95 Kovilic Construction Company, Inc. Lump Sum $50,000.00 Adams Contracting, LLC Lump Sum $145,000.00 Howard W. Pence, Inc. Lump Sum $153,750.00 Construction Solutions Group, LLC Lump Sum $252,000.00 Mass Crushing and Excavating, Inc. Lump Sum $295,000.00 Engineer's Estimate ALL LPSM Lump Sum $59,950.00

B0020 15201-0000 CONSTRUCTION SURVEY AND STAKING

Bluegrass Contracting Corporation Lump Sum $12,500.00 Semper Tek, Inc. Lump Sum $11,069.62 Aspen Construction Company Lump Sum $14,299.59 Kovilic Construction Company, Inc. Lump Sum $10,000.00 Adams Contracting, LLC Lump Sum $20,000.00 Howard W. Pence, Inc. Lump Sum $48,937.50 Construction Solutions Group, LLC Lump Sum $63,000.00 Mass Crushing and Excavating, Inc. Lump Sum $145,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,500.00

B0030 15401-0000 CONTRACTOR TESTING

Bluegrass Contracting Corporation Lump Sum $75,500.00 Semper Tek, Inc. Lump Sum $15,525.29 Aspen Construction Company Lump Sum $24,309.30 Kovilic Construction Company, Inc. Lump Sum $10,000.00 Adams Contracting, LLC Lump Sum $30,000.00 Howard W. Pence, Inc. Lump Sum $28,291.25 Construction Solutions Group, LLC Lump Sum $37,800.00 Mass Crushing and Excavating, Inc. Lump Sum $125,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00

B0040 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Bluegrass Contracting Corporation $6.00 $2,100.00 Semper Tek, Inc. $5.57 $1,949.50 Aspen Construction Company $12.85 $4,497.50 Kovilic Construction Company, Inc. $25.00 $8,750.00 Adams Contracting, LLC $7.00 $2,450.00 Howard W. Pence, Inc. $10.63 $3,720.50 Construction Solutions Group, LLC $10.71 $3,748.50 Mass Crushing and Excavating, Inc. $22.00 $7,700.00 Engineer's Estimate 350 LNFT $13.00 $4,550.00

13 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: B

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0050 20102-0000 CLEARING AND GRUBBING

Bluegrass Contracting Corporation Lump Sum $8,800.00 Semper Tek, Inc. Lump Sum $21,644.49 Aspen Construction Company Lump Sum $4,570.83 Kovilic Construction Company, Inc. Lump Sum $10,000.00 Adams Contracting, LLC Lump Sum $50,000.00 Howard W. Pence, Inc. Lump Sum $25,000.00 Construction Solutions Group, LLC Lump Sum $37,800.00 Mass Crushing and Excavating, Inc. Lump Sum $125,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00

B0060 20315-0000 SAWCUTTING PAVEMENT

Bluegrass Contracting Corporation $6.50 $520.00 Semper Tek, Inc. $12.37 $989.60 Aspen Construction Company $6.44 $515.20 Kovilic Construction Company, Inc. $10.00 $800.00 Adams Contracting, LLC $5.00 $400.00 Howard W. Pence, Inc. $25.00 $2,000.00 Construction Solutions Group, LLC $25.20 $2,016.00 Mass Crushing and Excavating, Inc. $15.00 $1,200.00 Engineer's Estimate 80 LNFT $7.50 $600.00

B0070 20401-0000 ROADWAY EXCAVATION

Bluegrass Contracting Corporation $42.50 $51,000.00 Semper Tek, Inc. $30.93 $37,116.00 Aspen Construction Company $21.22 $25,464.00 Kovilic Construction Company, Inc. $75.00 $90,000.00 Adams Contracting, LLC $85.00 $102,000.00 Howard W. Pence, Inc. $43.75 $52,500.00 Construction Solutions Group, LLC $44.10 $52,920.00 Mass Crushing and Excavating, Inc. $48.00 $57,600.00 Engineer's Estimate 1,200 CUYD $42.00 $50,400.00

B0080 20403-0000 UNCLASSIFIED BORROW

Bluegrass Contracting Corporation $47.00 $22,325.00 Semper Tek, Inc. $61.85 $29,378.75 Aspen Construction Company $30.72 $14,592.00 Kovilic Construction Company, Inc. $100.00 $47,500.00 Adams Contracting, LLC $125.00 $59,375.00 Howard W. Pence, Inc. $68.75 $32,656.25 Construction Solutions Group, LLC $69.30 $32,917.50 Mass Crushing and Excavating, Inc. $78.00 $37,050.00 Engineer's Estimate 475 CUYD $38.00 $18,050.00

14 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: B

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0090 20701-0200 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE B

Bluegrass Contracting Corporation $3.50 $2,800.00 Semper Tek, Inc. $4.95 $3,960.00 Aspen Construction Company $11.64 $9,312.00 Kovilic Construction Company, Inc. $5.00 $4,000.00 Adams Contracting, LLC $4.00 $3,200.00 Howard W. Pence, Inc. $12.50 $10,000.00 Construction Solutions Group, LLC $12.60 $10,080.00 Mass Crushing and Excavating, Inc. $18.00 $14,400.00 Engineer's Estimate 800 SQYD $5.00 $4,000.00

B0100 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C

Bluegrass Contracting Corporation $3.50 $595.00 Semper Tek, Inc. $3.72 $632.40 Aspen Construction Company $16.03 $2,725.10 Kovilic Construction Company, Inc. $5.00 $850.00 Adams Contracting, LLC $4.00 $680.00 Howard W. Pence, Inc. $12.50 $2,125.00 Construction Solutions Group, LLC $12.60 $2,142.00 Mass Crushing and Excavating, Inc. $18.00 $3,060.00 Engineer's Estimate 170 SQYD $5.00 $850.00

B0110 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E

Bluegrass Contracting Corporation $3.50 $1,225.00 Semper Tek, Inc. $3.72 $1,302.00 Aspen Construction Company $9.92 $3,472.00 Kovilic Construction Company, Inc. $5.00 $1,750.00 Adams Contracting, LLC $4.00 $1,400.00 Howard W. Pence, Inc. $12.50 $4,375.00 Construction Solutions Group, LLC $12.60 $4,410.00 Mass Crushing and Excavating, Inc. $18.00 $6,300.00 Engineer's Estimate 350 SQYD $5.00 $1,750.00

B0120 25102-0700 PLACED RIPRAP, METHOD A, CLASS 7

Bluegrass Contracting Corporation $18.00 $522.00 Semper Tek, Inc. $18.56 $538.24 Aspen Construction Company $135.12 $3,918.48 Kovilic Construction Company, Inc. $100.00 $2,900.00 Adams Contracting, LLC $50.00 $1,450.00 Howard W. Pence, Inc. $150.00 $4,350.00 Construction Solutions Group, LLC $151.20 $4,384.80 Mass Crushing and Excavating, Inc. $200.00 $5,800.00 Engineer's Estimate 29 TON $290.00 $8,410.00

15 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: B

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0130 25302-1000 GABIONS, GALVANIZED OR ALUMINIZED COATED

Bluegrass Contracting Corporation $287.50 $244,375.00 Semper Tek, Inc. $321.58 $273,343.00 Aspen Construction Company $244.90 $208,165.00 Kovilic Construction Company, Inc. $165.00 $140,250.00 Adams Contracting, LLC $380.00 $323,000.00 Howard W. Pence, Inc. $625.00 $531,250.00 Construction Solutions Group, LLC $819.00 $696,150.00 Mass Crushing and Excavating, Inc. $460.00 $391,000.00 Engineer's Estimate 850 CUYD $255.00 $216,750.00

B0140 25901-0000 SOIL NAIL

Bluegrass Contracting Corporation $64.50 $370,875.00 Semper Tek, Inc. $87.20 $501,400.00 Aspen Construction Company $103.67 $596,102.50 Kovilic Construction Company, Inc. $145.00 $833,750.00 Adams Contracting, LLC $100.00 $575,000.00 Howard W. Pence, Inc. $95.00 $546,250.00 Construction Solutions Group, LLC $107.10 $615,825.00 Mass Crushing and Excavating, Inc. $275.00 $1,581,250.00 Engineer's Estimate 5,750 LNFT $75.00 $431,250.00

B0150 25903-0000 VERIFICATION TEST NAIL

Bluegrass Contracting Corporation $2,500.00 $2,500.00 Semper Tek, Inc. $1,855.25 $1,855.25 Aspen Construction Company $2,144.94 $2,144.94 Kovilic Construction Company, Inc. $20,000.00 $20,000.00 Adams Contracting, LLC $2,500.00 $2,500.00 Howard W. Pence, Inc. $25,000.00 $25,000.00 Construction Solutions Group, LLC $7,560.00 $7,560.00 Mass Crushing and Excavating, Inc. $12,500.00 $12,500.00 Engineer's Estimate 1 EACH $4,000.00 $4,000.00

B0160 30101-4000 AGGREGATE BASE GRADING C OR D

Bluegrass Contracting Corporation $34.00 $66,640.00 Semper Tek, Inc. $38.35 $75,166.00 Aspen Construction Company $40.61 $79,595.60 Kovilic Construction Company, Inc. $75.00 $147,000.00 Adams Contracting, LLC $40.00 $78,400.00 Howard W. Pence, Inc. $62.50 $122,500.00 Construction Solutions Group, LLC $63.00 $123,480.00 Mass Crushing and Excavating, Inc. $32.00 $62,720.00 Engineer's Estimate 1,960 TON $35.00 $68,600.00

16 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: B

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0170 31302-0150 AGGREGATE-TOPSOIL COURSE, 1 1/2-INCH DEPTH

Bluegrass Contracting Corporation $16.00 $560.00 Semper Tek, Inc. $18.56 $649.60 Aspen Construction Company $104.84 $3,669.40 Kovilic Construction Company, Inc. $10.00 $350.00 Adams Contracting, LLC $90.00 $3,150.00 Howard W. Pence, Inc. $100.00 $3,500.00 Construction Solutions Group, LLC $100.80 $3,528.00 Mass Crushing and Excavating, Inc. $120.00 $4,200.00 Engineer's Estimate 35 SQYD $24.00 $840.00

B0180 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1

Bluegrass Contracting Corporation $505.00 $47,975.00 Semper Tek, Inc. $535.83 $50,903.85 Aspen Construction Company $614.88 $58,413.60 Kovilic Construction Company, Inc. $250.00 $23,750.00 Adams Contracting, LLC $485.00 $46,075.00 Howard W. Pence, Inc. $537.50 $51,062.50 Construction Solutions Group, LLC $541.80 $51,471.00 Mass Crushing and Excavating, Inc. $250.00 $23,750.00 Engineer's Estimate 95 TON $230.00 $21,850.00

B0190 41202-0000 TACK COAT

Bluegrass Contracting Corporation $6.00 $720.00 Semper Tek, Inc. $6.29 $754.80 Aspen Construction Company $7.21 $865.20 Kovilic Construction Company, Inc. $5.00 $600.00 Adams Contracting, LLC $6.00 $720.00 Howard W. Pence, Inc. $6.30 $756.00 Construction Solutions Group, LLC $6.35 $762.00 Mass Crushing and Excavating, Inc. $90.00 $10,800.00 Engineer's Estimate 120 GAL $30.00 $3,600.00

B0200 60501-0000 STANDARD UNDERDRAIN SYSTEM

Bluegrass Contracting Corporation $12.00 $1,200.00 Semper Tek, Inc. $15.16 $1,516.00 Aspen Construction Company $55.03 $5,503.00 Kovilic Construction Company, Inc. $50.00 $5,000.00 Adams Contracting, LLC $50.00 $5,000.00 Howard W. Pence, Inc. $81.25 $8,125.00 Construction Solutions Group, LLC $44.10 $4,410.00 Mass Crushing and Excavating, Inc. $12.00 $1,200.00 Engineer's Estimate 100 LNFT $32.00 $3,200.00

17 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: B

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0210 60510-0800 6-INCH OUTLET PIPE

Bluegrass Contracting Corporation $29.50 $2,950.00 Semper Tek, Inc. $26.60 $2,660.00 Aspen Construction Company $50.13 $5,013.00 Kovilic Construction Company, Inc. $50.00 $5,000.00 Adams Contracting, LLC $50.00 $5,000.00 Howard W. Pence, Inc. $50.00 $5,000.00 Construction Solutions Group, LLC $44.10 $4,410.00 Mass Crushing and Excavating, Inc. $60.00 $6,000.00 Engineer's Estimate 100 LNFT $25.00 $2,500.00

B0220 61701-4650 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS B STEEL POSTS

Bluegrass Contracting Corporation $88.00 $10,384.00 Semper Tek, Inc. $117.50 $13,865.00 Aspen Construction Company $107.25 $12,655.50 Kovilic Construction Company, Inc. $100.00 $11,800.00 Adams Contracting, LLC $90.00 $10,620.00 Howard W. Pence, Inc. $48.75 $5,752.50 Construction Solutions Group, LLC $126.00 $14,868.00 Mass Crushing and Excavating, Inc. $250.00 $29,500.00 Engineer's Estimate 118 LNFT $155.00 $18,290.00

B0230 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT

Bluegrass Contracting Corporation $5,900.00 $11,800.00 Semper Tek, Inc. $2,473.66 $4,947.32 Aspen Construction Company $7,149.79 $14,299.58 Kovilic Construction Company, Inc. $5,000.00 $10,000.00 Adams Contracting, LLC $4,000.00 $8,000.00 Howard W. Pence, Inc. $1,375.00 $2,750.00 Construction Solutions Group, LLC $6,300.00 $12,600.00 Mass Crushing and Excavating, Inc. $1,000.00 $2,000.00 Engineer's Estimate 2 EACH $5,000.00 $10,000.00

B0240 62502-0000 TURF ESTABLISHMENT

Bluegrass Contracting Corporation $2.00 $390.00 Semper Tek, Inc. $3.72 $725.40 Aspen Construction Company $45.16 $8,806.20 Kovilic Construction Company, Inc. $10.00 $1,950.00 Adams Contracting, LLC $15.00 $2,925.00 Howard W. Pence, Inc. $50.00 $9,750.00 Construction Solutions Group, LLC $25.20 $4,914.00 Mass Crushing and Excavating, Inc. $36.00 $7,020.00 Engineer's Estimate 195 SQYD $8.00 $1,560.00

18 out of 18

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: B

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0250 63501-0000 TEMPORARY TRAFFIC CONTROL

Bluegrass Contracting Corporation Lump Sum $15,000.00 Semper Tek, Inc. Lump Sum $3,737.08 Aspen Construction Company Lump Sum $6,434.81 Kovilic Construction Company, Inc. Lump Sum $10,000.00 Adams Contracting, LLC Lump Sum $10,000.00 Howard W. Pence, Inc. Lump Sum $12,500.00 Construction Solutions Group, LLC Lump Sum $25,200.00 Mass Crushing and Excavating, Inc. Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

Total Schedule - All Items

Bluegrass Contracting Corporation $1,001,256.00 Semper Tek, Inc. $1,268,911.46 Aspen Construction Company $1,319,595.28 Kovilic Construction Company, Inc. $1,446,000.00 Adams Contracting, LLC $1,486,345.00 Howard W. Pence, Inc. $1,691,901.50 Construction Solutions Group, LLC $2,068,396.80 Mass Crushing and Excavating, Inc. $2,980,050.00 Engineer's Estimate $1,006,500.00

Bid Error Report

1 out of 4

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: A

Schedule Type: Base

Bid Item Check Pass

Bidder Line Item Number Bidder's Extension Computed Extension

No Line Item Errors Found

2 out of 4

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: A

Schedule Type: Base

Bid Total Check Pass

Bidder Bidder's Bid Amount Computed Bid Amount Error

Bluegrass Contracting Corporation $1,844,850.00 $1,844,850.00

Mass Crushing and Excavating, Inc. $4,698,290.00 $4,698,290.00

Semper Tek, Inc. $2,330,477.89 $2,330,477.89

Howard W. Pence, Inc. $2,899,500.30 $2,899,500.30

Aspen Construction Company $2,354,020.85 $2,354,020.85

Construction Solutions Group, LLC $3,685,993.40 $3,685,993.40

Kovilic Construction Company, Inc. $3,328,950.00 $3,328,950.00

Adams Contracting, LLC $2,634,680.00 $2,634,680.00

The apparent low bidder is 10.10% below the engineer's estimate.

3 out of 4

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: B

Schedule Type: Base

Bid Item Check Pass

Bidder Line Item Number Bidder's Extension Computed Extension

No Line Item Errors Found

4 out of 4

Project No: KY ERFO COE 2019-1(1)

Project Name: Kendall Campground Roadway and Parking Repairs

Schedule: B

Schedule Type: Base

Bid Total Check Pass

Bidder Bidder's Bid Amount Computed Bid Amount Error

Bluegrass Contracting Corporation $1,001,256.00 $1,001,256.00

Mass Crushing and Excavating, Inc. $2,980,050.00 $2,980,050.00

Semper Tek, Inc. $1,268,911.46 $1,268,911.46

Howard W. Pence, Inc. $1,691,901.50 $1,691,901.50

Aspen Construction Company $1,319,595.28 $1,319,595.28

Construction Solutions Group, LLC $2,068,396.80 $2,068,396.80

Kovilic Construction Company, Inc. $1,786,000.00 $1,446,000.00 X

Adams Contracting, LLC $1,486,345.00 $1,486,345.00

The apparent low bidder is 0.37% below the engineer's estimate.