Tables 1-3 for Sources Sought.docx
DOCX document 105 KB Posted
- Attached to
- In-Flight Trainer (IFT) Aircraft
- Solicitation number
- N00019-26-RFPREQ-APM271-0023
About this file
This document is a Sources Sought notice for the In-Flight Trainer (IFT) Aircraft contract opportunity issued by the Naval Air Systems Command (NAVAIR). The notice is being used as a market research tool to determine potential sources and their technical capabilities to provide a Contractor Owned Government Operated (COGO) Boeing 707/737 aircraft to support E-6B Mercury pilot training.
The key requirements include providing all operational, logistical, and engineering services for the aircraft, as well as initial pilot differences training for 8-10 Fleet Replacement Squadron (FRS) instructors. The desired concept of operations is to provide "turnkey" operational support to conduct currency flights for Student Naval Aviators (SNA) and squadron pilots. The contract is for a base year with four one-year options from FY25 through FY29. Interested parties are requested to provide a capability statement addressing their ability to meet the requirements, including proposed approach, rough order of magnitude costs, timelines, and past experience. Responses are due by 10:00 (Eastern) on 31 October 2024.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 below, represents the Requirements in Threshold and Objective for the performance required from the aircraft. These requirements are subject to change. Final requirements will be included as part of the Government’s Request For Proposal (RFP).
Table 2 below, represents the Contract Requirements. These requirements are subject to change. Final requirements will be included as part of the Government’s Request For Proposal (RFP).
Table 3 below, represents the Contractor Pilot Requirements for the performance required from the aircraft. These requirements are subject to change. Final requirements will be included as part of the Government’s Request For Proposal (RFP).
image1.png image2.png image3.png
File details come from the government source that posted it. Updated .