Table C - Appendix # 8 - SOW, Rail and Rail Welding Kits.pdf

PDF 6 MB Posted

Attached to
IFB LHR271000 - Rail and Rail Welding Kits
Solicitation number
BPM059705
Issued by
Maryland

About this file

This is a Statement of Work and Contract Specifications Book for IFB LHR271000, issued by the Maryland Transit Administration (MTA), a division of the Maryland Department of Transportation, for the procurement of rail and rail welding services. The contract calls for the procurement of 115RE 78-foot straight rails for Metro use, with nine delivery lots totaling 920 rails, and the performance of approximately 1,028 rail welds allocated as follows: 800 flash butt welds and 200 thermite welds for Metro, and 28 thermite welds for Light Rail. Welds may be performed using either electric-flash butt welding (preferred) or Aluminothermic (Thermite) welding processes. The contractor must furnish all materials, labor, and equipment required for manufacturing, testing, shipping, delivery, and stacking of rail to the MTA Metro Portal Yard at 3400 Carlins Park Drive, Baltimore, Maryland 21215, or other MTA-designated storage sites. Rail welding assignments must be completed within 14 calendar days of the Notice to Proceed (maximum 30 welds per day), while rail deliveries must occur within 45 calendar days after notification, with no fewer than 100 rails per delivery. The contractor must provide 30 calendar days advance notice before shipping, and the MTA will provide at least 30 calendar days advance notice of required delivery dates.

Liquidated damages are assessed at a daily rate for failure to meet the specified completion deadlines for welds and delivery dates, and additional damages apply for failure to complete all contract work within 1,095 calendar days. The contractor must perform at least 25 percent of the total contract price with its own staff, must obtain written approval from the Engineer before subcontracting beyond this threshold, and must submit a Contract Quality Control Plan and Safety Plan before mobilization payments are processed. Progress payments are made monthly based on work performed, with payment withheld pending approval of required plans. The contractor is responsible for all unloading, stacking, and protection of materials at delivery sites, and the MTA will not provide equipment, tools, labor, or materials for these activities. No separate payment is made for mobilization beyond the fixed price lump sum specified in the Unit Price Schedule, divided per rail weld and rail delivery, with 50 percent payable upon moving in facilities and 12.5 percent withheld pending CQC plan approval. The overall project delivery period does not exceed nine anticipated deliveries, and the contract includes provisions for interface coordination with MTA Metro and Light Rail operations, including mandatory weekly work block meetings.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB LHR271000

TABLE C – APPENDIX # 8 – SOW,

RAIL AND RAIL WELDING KITS

Statement of Work

Contract Specification Book

PROCUREMENT OF RAIL AND RAIL WELDING KITS

CONTRACT SPECIFICATIONS BOOK

TABLE OF CONTENTS

DESCRIPTION PAGE NO.

TABLE OF CONTENTS ........................................................................................ TOC-1

SPECIAL PROVISIONS

01 11 00 SUMMARY OF WORK .............................................................................. SP-1

01 13 00 VENDOR RESPONSIBILITIES………….................................................SP-7

01 15 00 CONSTRUCTION PROCEDURES..........................................................SP-13

01 18 13 INTERFACE REQUIREMENTS..............................................................SP-20

01 21 00 MISCELLANEOUS WORK ALLOWANCES.........................................SP-24

01 31 15 COORDINATION AND MEETINGS ......................................................SP-26

01 33 00 SUBMITTALS...........................................................................................SP-28

01 43 00 QUALITY ASSURANCE AND QUALITY CONTROL.........................SP-36

01 50 00 TEMPORARY FACILITIES AND CONTROLS .....................................SP-53

01 61 00 PRODUCTS...............................................................................................SP-57

01 78 00 CLOSE OUT..............................................................................................SP-59

34 11 13 TRACK RAIL............................................................................................SP-62

34 11 16 RAIL WELDING.......................................................................................SP-66

APPENDICES

APPENDIX A CONTRACTOR SAFETY & HEALTH PLAN GUIDELINES A1

APPENDIX D BUY AMERICA REQUIREMENTS D1

APPENDIX F CONTRACT DATA REQUIREMENT LIST (CDRL) F1

TOC 1 of 1

SUMMARY OF WORK 01 11 00- 1

SP-1

PART 1 - GENERAL

1.1 DESCRIPTION

SECTION 01 11 00

SUMMARY OF WORK

A. This section specifies the general scope of work for this Project.

B. Related Sections:

1. Section 01 33 00 - Submittals.

2. Section 01 43 00 - Quality Assurance and Quality Control.

1.2 GENERAL

A. Perform the work conforming to all applicable State and Local regulations.

B. Whenever reference is made to Administration, it means the Maryland

Transit Administration (MTA).

C. Whenever reference is made to Engineer (often referred to as the Resident

Engineer), it means the MTA designated representative to manage the execution of this contract.

D. Make submittals in accordance with Section 01 33 00 - Submittals.

1.3 CONTRACT DOCUMENTS

A. Perform the work in accordance with the following documents:

1. The General Provisions for Construction Contracts dated October

2001, issued by the Maryland Department of Transportation; and the

Supplemental General Provisions issued by the MTA; both contained in the Contract Specifications Book.

2. The Special Provisions, Divisions 01 through 49; the Notice to

Contractors; the List of Contract Drawings; and the various forms and exhibits; all contained in the Contract Specifications Book.

3. The Liability Insurance Requirements; and the MTA Contractor

Safety and Health Plan Guidelines; all issued by the MTA of the

State of Maryland Department of Transportation and contained in the Contract Specifications Book.

4. The Contract Drawings, Standard Plates and Reference Drawings, contained in the Contract Specifications Book or bound separately in the Contract Drawings Books.

1.4 CONTRACT DESCRIPTION:

A. This Contract is for the procurement of 115RE 78-foot rail to be used by the MTA in the Baltimore Light Rail and Metro and welds to be performed on an as-needed basis. Welds will be requested in lots of not

SUMMARY OF WORK 01 11 00- 2

SP-2

less than 20 electric-flash butt welds per assignment when constructing stringers and lots of 1 to 5 thermite welds.

B. Welds may be performed by either the electric-flash butt welding process

(preferred) or the Aluminothermic (Thermite) welding process. See

Special Provision 34 11 16 Rail Welding for additional information.

C. The work involves:

1. Submittals of project schedules, quality assurance/quality control data, and other records and materials to the Administration as required in Special Provisions.

2. Furnishing all required materials, labor, and equipment required for the manufacturing, testing, shipping, delivery and stacking of rail specified by this contract.

3. Manufacturing of rail specified by this contract.

4. Conducting all required quality assurance and quality control testing.

5. Shipping, delivery, stacking and protection of all rail to the designated MTA storage site.

6. Saw cutting rail as required.

7. Maintenance and operation of vehicle for transportation of the

Mobile Flash Butt Welding (MFBW) apparatus in accordance with

Special Provision 34 11 16 Rail Welding.

8. Maintenance and operation of fully automated MFBW apparatus.

9. Off-track electric-flash butt welding and thermite welding of joints specified by the Administration, including all required grinding, smoothing and testing, in accordance with Special Provision 34

11 16 Rail Welding.

D. The 1,028 welds are anticipated to be allocated according to the following table as directed by the Engineer.

Flash Butt Welds Thermite Welds

Light Rail 0 28

METRO 800 200

E. Metro Flash Butt and Thermite welding will be performed at 3400

Carlins Park Drive, Baltimore, MD 21215.

F. Thermite welding for Light Rail will be performed off-track at a designated location determined by the Administration.

SUMMARY OF WORK 01 11 00- 3

SP-3

1.5 COMPLETION TIME AND LIQUIDATED DAMAGES:

A. For Rail Welding: Pursuant to General Provisions Articles GP-8.02 and

GP-8.03, commence work after the Notice to Proceed (NTP) for each individual assignment/task, and complete the specified portions of the work within 14 calendar days (Maximum of 30 welds per day) of the Task

NTP.

B. For Rail: Pursuant to General Provisions Articles GP 8.02 and GP 8.03, commence work after the Notice to Proceed (NTP) and complete the specified portions of the work in accordance with the Delivery Table specified below.

WORK ITEM QTY. DELIVERY NO.

115 RE 78 Foot Straight Rails for Metro 120 1

115 RE 78 Foot Straight Rails for Metro 120 2

115 RE 78 Foot Straight Rails for Metro 100 3

115 RE 78 Foot Straight Rails for Metro 100 4

115 RE 78 Foot Straight Rails for Metro 100 5

115 RE 78 Foot Straight Rails for Metro 100 6

115 RE 78 Foot Straight Rails for Metro 100 7

115 RE 78 Foot Straight Rails for Metro 100 8

115 RE 78 Foot Straight Rails for Metro 100 9

C. In the event that the Contractor fails to complete the specified work and deliver Contract materials by the duration from Notice to Proceed specified above, liquidated damages in the amount specified below in the

Delivery/Liquidated Damages Schedule may be assessed for each calendar day the completion of the specified work is delayed. The Contractor shall pay to the Administration the applicable amount specified as liquidated damages for every additional calendar day in excess of the specified duration. The Administration may deduct the sum of liquidated damages from any monies due or that may become due the Contractor under the

Contract, or if such monies are insufficient, the Contractor or sureties thereof shall pay to the Administration any deficiency within 30 calendar days.

SUMMARY OF WORK 01 11 00- 4

SP-4

WORK ITEM NUMBER OF

CALENDAR

DAYS

LIQUIDATED

DAMAGES PER

CALENDAR

DAY

Completion of Specified Welds per

Assignment (Maximum of 30)

Failure to meet delivery dates per

Contract

Completion of All Contract Work 1095

D. Within the overall project delivery period specified in Paragraph 1.5.B above, MTA will require deliveries of contract deliverables on dates which will not be determined until after NTP in coordination with MTA construction work by others. Manufacture the rails and store them at the

Contractor’s own facilities until directed by MTA to ship and deliver the quantities required and on the date required. MTA will give the

Contractor at least 30 calendar days advance notice of any required delivery. Delivery quantities for each directed delivery will vary, but will not be less than 100 rails, as measured and defined in accordance with SP

34 11 13. Due to possible changes in construction schedules, MTA cannot predict exactly how many deliveries will be required. For the purposes of bidding and planning, the number of deliveries will not exceed nine.

Deliver the materials requested within 45 calendar days after notification.

E. In the event that the Contractor fails to deliver the specified work within the specified number of days after Notice to Proceed, with the exception of extensions granted by change order, the administration reserves the right to cancel the portion of the contract for work not completed within the specified number of days.

1.6 COMPLETION TIME AND OTHER SCHEDULE REQUIREMENTS:

A. Pursuant to Article GP-8.03 of the General Provisions, commence work on or before the date stipulated in the Notice to Proceed (NTP) and complete the entire work within the number of calendar days specified above.

B. Other schedule requirements are given in Section 01 33 00 Submittals.

C. MTA Representatives for Light Rail and Metro are:

MTA Light Rail MTA Metro

344 W. North Avenue 4380 Old Court Road

Baltimore, MD 21217 Baltimore, MD 21208

Contact: Robert Arbogast, Contact: Arkadiy Ruditskiy,

(410) 454-7615 (410) 454-1818

SUMMARY OF WORK 01 11 00- 5

SP-5

1.7 CONTRACTOR REPRESENTATIVES:

A. Designate in Writing within five (5) days after receiving the Notice to

Proceed (NTP), the name, official mailing address and telephone number of the Contractor's representative having complete authority to represent and to act for the Contractor.

1.8 LIABILITY INSURANCE REQUIREMENTS:

A. Liability of Insurance Requirement will be provided. See section 3.13

Insurance Requirements

1.9 CONTINGENT ITEMS:

A. Construction items for which quantities are listed in the Unit Price

Schedule as "Contingent" are established for the purpose of obtaining bids on one or more pay items that may be incorporated into the project.

B. The Engineer will have sole discretion in determining whether and to what extent these items will be incorporated into the project. The Engineer may order these items to be used at any location within the project and anytime during the work. In most cases contingent items will not be shown on the Plans. The estimated quantities specified in the Unit Price Schedule for these items are presented solely for the purpose of obtaining a representative bid price.

The total of actual quantities required for the construction may be only a fraction of, or many times the estimated quantity. The requirements of GP-4.04

(Variations in Estimated Quantities) shall apply.

1.10 DELIVERIES

A. Deliver Contract materials to the specific storage area within the following location as designated by the Engineer.

B. Straight rail for Metro: MTA Metro Portal Yard, 3400 Carlins Park Drive, Baltimore, MD 21215. Contact Rory Damico, (410) 454-1814

C. The Contractor shall be fully responsible for providing all labor, tools, equipment, blocking, and protecting materials required for proper unloading and stacking of materials at the designated areas within the above location. The Administration will not provide, loan, or rent out any equipment, tools, labor and/or materials or provide any assistance.

D. The Contractor shall notify the Administration at least 30 days before scheduled day(s) for shipping of Contract materials to MTA. Coordinate with the Administration for locations of each delivery location, and conditions and timing for access to the material storage areas that the materials shall be delivered to. Do not ship or deliver Contract materials to

Baltimore without the approval of the Administration.

E. The Contractor shall ship, deliver and unload and stack Contract materials at the location specified above in section 1.11.B for Metro and at MTA material storage site(s) for Light Rail which will be specified by the

Administration at least 30 days in advance of scheduled shipping date(s).

SUMMARY OF WORK 01 11 00- 6

SP-6

F. The Contractor may use railcar or truck but not limited to the two means of transportation for the project items delivery.

PART 2 - PRODUCTS

NOT USED

PART 3 - EXECUTION

NOT USED

PART 4 - MEASUREMENT AND PAYMENT

4.1 SUMMARY OF WORK:

A. Summary of Work will not be measured separately.

B. Summary of Work will be considered incidental to the appropriate work item.

END OF SECTION

VENDOR RESPONSIBILITIES 01 13 00 - 1

SP-7

SECTION 01 13 00

VENDOR RESPONSIBILITIES

1.1 DEFINITIONS

A. Administration - The Maryland Department of Transportation. Maryland

Transit Administration (MTA)

B. Change Order - A written document amending the Contract by adding, deleting or modifying the Contract to include price, time, work, and conditions not previously addressed within the Contract. Refer to GP-1.05.

C. Engineer - The work site Resident Engineer designated by MTA to manage the overall work. The contractor must coordinate all documents, submittals, work orders, etc. and site activity through the Engineer.

D. General Provisions (GP) - MDOT General Provisions for Construction

Contracts

E. Special Provisions (SP) - Specifications issued as part of the contract for a specific item or condition requirement not otherwise thoroughly or satisfactorily detailed in the contract drawings or General Provisions.

1.2 AUTHORIZED REPRESENTATIVE OF THE ADMINISTRATION:

A. The work will be conducted under the general direction of the Engineer or their designated representative. The Engineer is the authorized designated representative of the Procurement Officer with full authority to take all actions, not specifically reserved herein, that can lawfully be taken by the

Procurement Officer, including, but not necessarily limited to the following:

1. Inspection of the work for compliance with the Contract.

2. Issuance of orders to stop and/or resume work where such orders are authorized by the Contract (excluding suspension of work under

SECTION 8.07, Suspension of Work, of the General Provisions).

3. Negotiation with the Contractor without dollar limitation as to adjustment of the Contract price and/or time and recommendation of acceptance or rejection of negotiating results.

4. Preparation of the MTA estimate for Work Order modifications.

5. Modification of the Contract in accordance with SECTION 4.06, Changes, of the General Provisions.

6. Approval of Subcontractors and Vendors. These changes must also be reviewed by the MTA Office of Fair Practice for compliance

7. Preparation of the MTA estimate for change order modifications for submission to the Procurement Officer for approval.

VENDOR RESPONSIBILITIES

01 13 00 - 2

SP-8

8. Approval of the Contractor's shop drawings, working drawings, materials, equipment and operations and storage areas.

9. Approval / Coordination of progress meetings, site visits and discussions regarding requests for information regarding contract work.

10. Issuing approval of the Contractor's progress schedule.

11. Issue Order for Service Modifications within the limits authorized by the Procurement Officer.

B. The presence or absence of the Engineer or their designated representative or their inspectors will not relieve the Contractor from the requirements of the Contract.

C. Upon failure of the Contractor to comply with any of the requirements of the Contract Drawings, Specifications, or other Contract Documents, the

Engineer or their designated representative may stop any operation of the

Contractor affected by such failure until the failure is corrected. Time lost during such work stoppage will be regarded as Contract time for which no extension will be granted and no increase in cost to the Contactor caused by the stoppage shall be subject to claim against the Administration.

D. The authorized representatives of public and private utilities, and other agencies, have the right to inspect their facilities, communicating through the Engineer or their designated representative as follows:

1. Inspection or supervision of work by utility forces and utility contractors.

2. Inspection of work by MTA Contractors on, or adjacent to, utility facilities.

3. Access to the site of work and the right to inspect all project works by the U.S. Government.

E. In the event that the Contractor's work endangers utility property or facilities, the utility's representative shall immediately inform the Engineer or their designated representative of the impending hazard. When time does not permit this action, the utility representative is authorized to stop such work until the Engineer or their designated representative is present, or until safety of the utility property is ensured. Any such stop order is to be delivered to the Contractor's representative in writing (any handwritten note with date, time and inspector's signature is acceptable), and the

Contactor shall report in writing and explain the stop order to the Engineer or their designated representative at the earliest opportunity.

F. Highway and roadway facilities, which may be affected, are considered for the purpose herein as utility facilities.

G. The Engineer or their designated representative is not authorized to render final decisions under SECTION 5.15 "Disputes" of the General Provisions, 01 13 00 - 3

SP-9

nor can he/she render a final determination concerning the existence of a differing site condition under SECTION 4.05 "Differing Site Conditions" of the General Provisions.

1.3 CONTRACTOR REPRESENTATIVES:

A. Designate in Writing within five days after receiving the Notice to Proceed

(NTP) of each Contract, the name, official mailing address, email address, and telephone number of the Contractor's representative having complete authority to represent and to act for the Contractor. The representative shall be authorized to receive and execute instructions from the Engineer or their designated representative. The Contractor's representative shall supervise and direct the work. Such representative will not be required to be on the site of work at all times but shall be available when required by either the Engineer or their designated representative or requirements of work.

B. If the performance of the Contractor's authorized representative is not satisfactory to the Engineer or their designated representative, the

Contractor shall replace them within ten days following notification with a person determined to be satisfactory.

C. No separate payment will be made for the Contractor's authorized representative. The cost shall be incidental to the various pay items included in or added to the Contract.

1.4 WORK TO BE PERFORMED BY THE CONTRACTOR'S STAFF:

A. Execute on the site, with its own organization, work equivalent to at least twenty five percent (25%) of the total amount of the Contract price. The cost of work performed by skilled and unskilled labor carried on the

Contractor's own payroll, together with the cost of materials delivered, may be included in the above percentages.

B. If, during the progress of the work thereunder, the Contractor requests a reduction in such percentages and the Engineer or their designated representative determines that it would be to the MTA's advantage, the percentage of the work required to be performed by the Contractor may be reduced provided written approval of such reduction is obtained by the

Contractor from the Engineer or their designated representative prior to the beginning of work on a Contract.

1.5 SUBCONTRACTS

A. The divisions or sections of the specifications are not intended to control the Contractor in dividing the work among subcontractors, or to limit the work performed by trade.

B. Do not enter into subcontracts totaling in amount more than the percentage of the total contract price permissible under Paragraph 1.4 above, "Work to be Performed by the Contractor's Staff", without written permission from the Engineer or their designated representative.

01 13 00 - 4

SP-10

C. Before entering into any subcontracts, submit a written statement to the

Engineer or their designated representative giving the name and address of the proposed subcontractor, the portion of the work and material that they are to perform and finish, and any other information tending to prove that the proposed subcontractor has the necessary facilities, skill, integrity, past experience, and financial resources to perform the work in accordance with the vendor responsibilities of the Contract.

D. If the Engineer or their designated representative finds that the proposed subcontractor is qualified, they will notify the Contractor within ten days.

If the determination is to the contrary, however, the Engineer or their designated representative will, within ten days, notify the Contractor who may thereupon submit the name of another proposed subcontractor unless they decide to do the work themself.

E. The Engineer or their designated representative's approval of the subcontractor shall not relieve the Contractor of any of their responsibilities, duties, and liabilities thereunder. The Contractor shall be solely responsible to the MTA for the acts or defaults of their subcontractors and of such subcontractors' officers, agents, and employees of the Contractor to the extent of their subcontractor. Assume responsibility for the coordination of the work of the trades, subcontractors and material.

F. No subcontractor, supplier, fabricator, or vendor shall be permitted to perform work at the site until the subcontractor, supplier, fabricator, or vendor is in compliance with the provisions of "Liability Insurance

Requirements" of the Contract Specifications and has furnished satisfactory evidence of insurance as required.

G. Promptly, upon request, file with the Engineer or their designated representative a conformed copy of the subcontract, with the price and terms of payment deleted.

H. On occasion, the Administration may require specialized work of specific subcontractors. The Prime Contractor shall be responsible for ensuring that all the requirements of the Contract are met and for informing the subcontractor of the relevant requirements. When the Administration directs that a particular subcontractor is to be used, payment shall be based on the sum of:

a. Actual costs incurred, i.e., submittal of an approved detailed invoice from the particular subcontractor.

b. A single administrative charge, regardless of tier, not to exceed ten percent (10%) on each invoice.

I. When the contractor uses a subcontractor which has not been specifically directed to be used by the Administration, payment shall be based on the sum of:

CONDITIONS

01 13 00 - 5

SP-11

a. Actual costs incurred, i.e., submittal of an approved detailed invoice from the particular subcontractor.

b. A single administrative charge, regardless of tier, not to exceed five percent (5%) on each invoice.

1.6 PAYMENT

A. Submit for each Contract, a monthly Progress Payment Request for the services actually performed during the period for the pay items and bid prices contained in the Unit Price Schedule.

B. Progress payment equal to the value of the work performed may be made monthly on estimates approved by the Engineer or their designated representative as set forth in this Article. Payment to the contractor under this section for materials on hand shall not be construed in any way as acceptance by the Administration of title to the material. Title shall remain with the Contractor until the project has been completed and accepted in conformance with GP 5.13. Notify the MTA when all work is complete.

Final payment will be made after final acceptance.

C. No progress payments will be processed for Mobilization until the Contract

Quality Control (CQC) Plan, and the Safety Plan have been submitted and approved by the MTA.

D. No change shall be made to the Contract that shall cause an increase in the price or of the time required for the performance of any part of the work under this Contract, except as made by the MTA.

E. Orders issued during the effective period of this Contract and not completed within the administration respecting those orders shall be governed by the terms and unit bid prices of the Contract to the same extent as if completed during the effective period of the Contact.

1.7 LIMITATION OF FUNDS:

A. It is estimated that the total cost to the MTA for the performance of this

Contract will not exceed the Total Estimated Price set forth in the Unit

Price Schedule, and the Contractor agrees to use their best efforts to perform the work specified in the Unit Price Schedule and all obligations under this Contract within the Total Estimated Price.

B. If at any time the Contractor has reason to believe that the costs that it expects to incur in the performance of the Contract in the next succeeding thirty (30) days, when added to all other payments and prices previously accrued, will exceed eighty-five (85%) of the Total Estimated Price set forth in the Unit Price Schedule, notify the Engineer or their designated representative to that effect, giving their revised estimate of the total price with the supporting reasons and documentation.

C. It is estimated that the total cost to the MTA for the performance of this

Contract will not exceed the ceiling price set forth in the Contract, and the

Contractor agrees to use their best efforts to perform the work specified in

01 13 00 - 6

SP-12

the Contract and all obligations under this Contract within such ceiling price set forth in the Contract.

PART 2 - PRODUCTS

NOT USED

PART 3 - EXECUTION

NOT USED

PART 4 - MEASUREMENT AND PAYMENT

4.1 VENDOR RESPONSIBILITIES:

A. Vendor responsibilities will not be measured separately.

B. Vendor responsibilities will not be paid for directly but will be considered incidental to the appropriate work item.

CONSTRUCTION PROCEDURES 01 15 00 - 1

SP-13

SECTION 01 15 00

CONSTRUCTION PROCEDURES

1.1 DESCRIPTION

A. This section specifies the requirements for preparing to perform the work, which includes:

1. Mobilization.

2. Pre-construction meeting.

3. Construction layout.

4. Construction safety requirements.

5. Protection of utilities.

6. Protection of property.

7. Fire protection.

8. Disposal of material outside the work Site.

9. Measurement of quantities.

10. Final inspection.

B. Related Sections:

1. Section 01 13 00 – Vendor Responsibilities

2. Section 01 33 00 - Submittals.

3. Section 01 43 00 - Quality Assurance and Quality Control.

1.2 MOBILIZATION:

A. Mobilization includes the preparation of construction equipment, materials, supplies, appurtenances and other items for commencing and prosecuting the work;

and the subsequent demobilization and removal from the site of the same construction equipment, appurtenances and other items upon completion of the work.

B. Mobilization also includes MTA contractor badging and safety training, assembly and delivery to the site of plant, equipment, materials, and supplies necessary for the prosecution of the work that are not intended to be incorporated into the work;

clearing of and preparation of the Contractor's work area; the complete assembly in working order of equipment necessary to perform the required work; personnel services and work preparatory to commencing actual work; and other items for which payment is provided under this Contract.

C. Mobilization is considered complete only after the submission and subsequent approval of the Contractor's Quality Control Plans (CQC Plans) by the Engineer

CONSTRUCTION PROCEDURES 01 15 00 - 2

SP-14

in accordance with Section 01 43 00 "Quality Assurance and Quality Control", and submission and subsequent approval of the Contractor's Safety Plan.

1.3 PRE-CONSTRUCTION MEETING:

A. Requirements for the pre-construction meeting are contained in Supplementary

General Provisions SGP-3.03.

B. After Award of the Contract, the Engineer will request the participation of the

Contractor in a pre-construction meeting. The date, time and agenda of the meeting will be determined by the Engineer. Minutes of the meeting will be prepared by the Engineer.

1.4 CONSTRUCTION LAYOUT:

A. Exercise care in the preservation of monuments, stakes, and benchmarks set by the Engineer. The Contractor shall ensure that no damage nor destruction shall occur during rail welding and delivery of rail. If any damage occurs, the

Contractor shall reestablish them at no additional cost to the MTA.

1.5 CONSTRUCTION SAFETY REQUIREMENTS

A. In accordance with and in addition to the General Provision's Articles GP-7.05 and GP-7.06 and Supplementary General Provisions:

1. Ensure observance of the most stringent provisions of the applicable statues and regulations of the State of Maryland or political subdivisions in which the work is being performed, as well as the

OSHA provisions pertaining to the safe performance of the work.

2. Ensure that the methods of performing the work do not involve undue danger to the personnel employed thereon, the public, and public and private property as specified in the General Provision

Article GP-7.06 "Public Convenience and Safety".

3. Should charges of violation of any of the above be issued to the

Contractor in the course of the work, submit a copy of each charge immediately to the Engineer.

1.6 PROTECTION OF UTILITIES

A. The Contractor shall protect all utilities from damage and shall ensure no interruption to any utility services during the delivery of rail and execution of rail welding.

B. Exercise care when working adjacent to and crossing any existing utilities. For overhead facilities, adhere to the Maryland High Voltage Line Act.

C. Establish and maintain direct contact with the owner or operator of each utility which may be affected by the work and proceed with work which may affect a utility only with the cooperation and approval of the utility owner and the

Engineer.

CONSTRUCTION PROCEDURES 01 15 00 - 3

SP-15

1.7 PROTECTION OF PROPERTY

A. Requirements hereinafter specified are in addition to General Provision's Article

GP-7.11.

B. Existing Facilities:

1. Take positive action to protect existing facilities from damage resulting from the work defined in this Contract.

2. Protect paving, landscaping, and utilities from damage.

3. Protect finished surfaces, against possible damage.

4. Items removed for the convenience of the Contractor or to expedite operations shall be restored, repaired, reinstalled, salvaged and replaced, or replaced with new work and refinished, as appropriate, to a condition equal to or better than existed following the completion of the work. Materials and workmanship used in repair or restoration work shall conform in type and quality to original existing construction. If a structure is deemed historic, items to be removed shall be brought to the attention of the Engineer for approval.

5. Inspect existing items to be altered, extended, salvaged or relocated and reused. If an existing item is found to be missing or defective in any way, report the condition to the Engineer before the item is disturbed.

C. New Work:

1. Ensure finished surfaces of items are clean and not marred upon acceptance of the work. Refinish all surfaces that have been damaged.

2. Provide and maintain protection against weather so as to preserve the work, materials and fixtures free from injury or damage.

D. Repair of Damage:

1. Repair damage to surfaces or facilities, which are to remain in place, as directed by the Engineer.

2. Ensure that repairs result in conditions equal in strength to the previous conditions.

3. Ensure repaired surfaces are identical in color and texture to the adjacent existing materials, except where materials cannot be matched. When the area cannot be matched, refinish the affected area and surrounding area to give a uniform appearance acceptable to the Engineer and the owner of the damaged facility.

1.8 FIRE PROTECTION

A. Provide temporary fire protection for use during the term of the Contract, subject to approval of the Engineer.

CONSTRUCTION PROCEDURES 01 15 00 - 4

SP-16

B. Comply with provisions for fire protection systems and equipment as required by

OSHA, Safety and Health Regulations for Construction, Part 1926, Subpart F -

Fire Protection and Prevention.

1.9 DISPOSAL OF MATERIAL OUTSIDE THE WORK SITE

A. Unless otherwise specified elsewhere in the Specifications, make arrangements for disposing of waste outside the work site and pay associated costs.

B. Prior to disposing of material outside the work site, obtain written permission from the owner on whose property the disposal is to be made. File with the

Engineer the permit, or a certified copy thereof, together with a written release from the property owner absolving the MTA from any and all responsibility in connection with the disposal of material on said property.

1.10 MEASUREMENT OF QUANTITIES

A. Work to be paid for at the Contract price per unit of measurement will be measured by the Engineer in accordance with U.S. Standard Measures. A ton shall consist of 2,000 pounds avoirdupois.

B. Weigh material paid for by weight on accurate, approved scales, furnished by and at the expense of the Contractor. Use platform scales of sufficient size and capacity to permit the entire vehicle or combination of vehicles to rest on the scale platform while being weighed. Combinations of vehicles may be weighed as separate units provided that they are disconnected while being weighed. Have all scales inspected and certified as often as the Engineer may deem necessary to ascertain accuracy. Cost incurred as a result of regulating, testing, inspecting, and certifying scales shall be borne by the Contractor.

C. The Engineer may be present to witness the weighing and to check and compile the daily record of such scale weights; however, in any case, the Engineer will require the Contractor to furnish weigh slips and daily summary weigh sheets.

In such cases, furnish a duplicate weigh slip or a load slip in each vehicle weighed and deliver the slip to the Engineer at the point of material delivery.

D. Trucks used to haul material being paid by weight shall be weighed empty on a daily basis and as such times as the Engineer may require. Each truck shall bear a plainly legible identification mark. The Engineer may require the weight of the material to be verified by weighing empty and loaded trucks on such other scales as the Engineer may designate.

E. When material is to be measured and paid for on a volume basis it shall be accomplished using the average end method and when impractical to determine the volume by specific method of measurement, or when requested by the

Contractor in writing and approved by the Engineer in writing, the material will be weighed in accordance with the requirements specified for weight measurement. Such weights will be converted to volume for payment purposes.

Factor for conversion from weight agreed to by the Contractor before such method of measurement of pay quantities will be adopted.

CONSTRUCTION PROCEDURES 01 15 00 - 5

SP-17

F. When metering devices are required in the Specifications or are used to measure the quantity of liquids used in the work, inspect and test the metering devices for accuracy at the Contractor's expense as often as the Engineer may deem necessary.

G. Full compensation for all expenses involved in conforming to the requirements for measuring and weighing materials shall be considered as included in the unit prices for the materials being measured or weighed and no additional compensation will be allowed therefor.

H. Quantities of material wasted or disposed of in a manner not called for under the

Contract; rejected loads of materials, including material rejected after it has been placed by reasons of failure of the Contractor to conform to the provision of the

Contract's material not unloaded from the transporting vehicle; material placed outside the lines indicated on the Contract Drawings or established by the

Engineer; or material remaining on hand after completion of the work will not be paid for, and such quantities will not be included in the final total quantities. No compensation will be allowed for loading, hauling and disposing of unused rejected material.

1.11 FINAL INSPECTION

A. Notify the Engineer at least 10 calendar days in advance of the date the work of each bid item will be fully complete and ready for final inspection.

PART 2 - PRODUCTS

NOT USED

PART 3 - EXECUTION

NOT USED

PART 4 - MEASUREMENT AND PAYMENT

4.1 MOBILIZATION

A. Mobilization will not be measured for payment.

B. Mobilization will be paid at Fifty percent of the contract Fixed Price Lump Sum shown in the Unit Price Schedule for the item Mobilization minus funds withheld pending approval of the CQC plans will be payable on the first monthly invoice subsequent to the Contractor's moving in all necessary facilities and performing all work, as described above, that will enable work to begin satisfactorily on the preliminary contract items. Further, twelve and a half percent of the contract

Fixed Price Lump Sum amount due to the Contractor on the first monthly invoice for the item Mobilization shall be withheld and released only after the Engineer's approval of the CQC plans. The remaining fifty percent will be payable in equal installments on each of the subsequent monthly invoices, for a maximum of five months, provided that, in the opinion of the Engineer, mobilization continues to proceed satisfactorily. Payment as specified above shall be full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing the

CONSTRUCTION PROCEDURES 01 15 00 - 6

SP-18

work necessary to complete the work described in this Section. Payment for the contract Fixed Price shown in the Unit Price Schedule for the item Mobilization will not be made more than once, regardless of the fact that the Contractor may, for any reason, shut down work on the project or move equipment away from the project and then back again. The overall mobilization price set for this Contract will be divided per rail weld and rail delivery.

4.2 PRE-CONSTRUCTION MEETING:

A. Pre-construction meeting will not be measured separately.

B. Pre-construction meeting will be considered incidental to the appropriate work item.

4.3 CONSTRUCTION LAYOUT:

A. Construction layout will not be measured separately.

B. Construction layout will be considered incidental to the appropriate item of work.

4.4 CONSTRUCTION SAFETY REQUIREMENTS

A. Construction safety requirements will not be measured separately.

B. Construction safety requirements will be considered incidental to the appropriate item of work.

4.5 PROTECTION OF UTILITIES

A. Protection of utilities will not be measured separately.

B. Protection of utilities will be considered incidental to the appropriate item of work.

4.6 PROTECTION OF PROPERTY

A. Protection of property will not be measured separately.

B. Protection of property will be considered incidental to the appropriate item of work.

4.7 FIRE PROTECTION

A. Fire protection will not be measured separately.

B. Fire protection will be considered incidental to the appropriate item of work.

4.8 DISPOSAL OF MATERIAL OUTSIDE THE WORK SITE

A. Disposal of materials outside the work site will not be measured separately.

B. Disposal of materials outside the work site will be considered incidental to the appropriate item of work.

4.9 MEASUREMENT OF QUANTITIES

A. Measurement of quantities will not be measured separately.

B. Measurement of quantities will be considered incidental to the appropriate item of work.

CONSTRUCTION PROCEDURES 01 15 00 - 7

SP-19

4.10 FINAL INSPECTION

A. Final inspection will not be measured separately.

B. Final inspection will be considered incidental to the appropriate item of work.

INTERFACE REQUIREMENTS 01 18 13- 2

SP-20

SECTION 01 18 13

INTERFACE REQUIREMENTS

1.1 DESCRIPTION:

A. This Section describes the Contractor's obligations and other pertinent information relative to the various interfaces between the Contractor and the MTA and other third parties.

B. Related work Specified Elsewhere:

1. Section 01 50 00 - Temporary Facilities and Controls.

1.2 BASIC INTERFACES:

A. The Contractor is responsible for the design, development and implementation of the interface procedures between the work of this

Contract and work performed by others, and for Contractor work at all interface locations with existing MTA and other third-party facilities.

B. Railroad Interfaces

1. Elements of the work under this Contract may be performed on, over, under, and adjacent to existing operating railroad facilities, some of which are electrified. The term Railroad used throughout this Section shall mean the MTA, their operations, facilities, and representatives, etc. Refer to the article Specific Interfaces elsewhere in this Section for any additional specific information pertinent to each Railroad.

2. Maintain Railroad operations at all times with safety and continuity.

Conduct all operations on, over, under, or adjacent to Railroad right-of-way fully within the rules, regulations, and requirements of the

Railroad. Become acquainted with such requirements as the

Railroad may demand.

3. Work encroaching on the Railroad schedules and operations will not be permitted. Such work must be accomplished in accordance with days/nights and times in these Special Provisions and be performed at such times and in such manners as not to interfere with the movement of trains or traffic upon the tracks of the Railroad.

Perform work to be done within (on, over, or under) or adjacent to the Railroad right-of-way in a manner satisfactory to Railroad. Use necessary care and precaution in order to eliminate accidents, delay or interference with the Railroad trains, or properties.

4. Obtain verification of the time and schedule of track occupancy from the Railroad before proceeding with any construction or demolition work within or adjacent to the Railroad right-of-way.

Submit for approval to the Railroad, staging plans, computations, and a detailed description of the methods or procedures for

INTERFACE REQUIREMENTS 01 18 13- 2

SP-21

accomplishing the construction work required under this Contract, including methods of protecting rail operations. Do not proceed until these plans and procedures have been approved by the Railroad.

However, such approval shall not serve in any way to relieve the

Contractor of its complete responsibility for the adequacy and safety of its methods or procedures or from responsibility for any damage to the Railroad facilities by the acts of the Contractor.

5. Consult with the Railroad in order to determine the type of protection required to insure safety and continuity of Railroad operations based on the particular construction methods and equipment to be used. Furnish required flagmen, watchmen, and other protective measures for the Central Light Rail Line (CLRL).

Contractor's personnel working as flagmen, etc., shall be exclusively assigned to this task and not be involved in other work during this time.

6. The providing of such flagmen, watchmen, and other precautionary measures, shall not relieve the Contractor from liability for payment of damages caused by its operations.

7. Do not use Railroad personnel for purposes of completing the Work of this Contract even though such personnel may be required at the immediate site of project construction by the Railroad solely for the safe operations of trains or protection of facilities, etc.

8. Before proceeding with any construction or work within or adjacent to Railroad property, conduct a pre-construction meeting with the contractors specific to this work. Discuss the staging plans and methods or procedures for construction work and protection of rail operations in detail and modified if necessary, at the sole discretion of the Engineer.

9. Equipment to be used by the Contractor shall be in first-class condition so as to fully prevent failures of defective equipment that might cause delay in the operation of trains or damage to Railroad facilities. Equipment shall be equipped with an operating yellow flashing light. This equipment shall not be placed or put into operation adjacent to tracks without first obtaining access permission from the Railroad. Under no circumstances shall any equipment or materials be placed or stored within 15 feet from the centerline of any track or catenary wire, unless approved by the

Engineer.

10. Do not store materials and equipment on Railroad property without first having obtained permission from the Railroad and such permission will be on the condition that the Railroad will not be liable for damage to such materials and equipment from any cause.

The storage of materials or equipment shall not block access roads.

Keep the tracks adjacent to the site clear of all refuse and debris that

INTERFACE REQUIREMENTS 01 18 13- 3

SP-22

may accumulate from operations and leave the Railroad property in the condition existing before the start of the work. The Contractor will be liable for any damages to Railroad property or facilities caused by the storage, failure, vandalism, etc., of stored material or equipment.

11. Prepare and stamp all drawings by a Maryland Registered

Professional Engineer when submitting for approval.

12. Request approval/permission from the Railroad to install any temporary grade crossings of Railroad tracks. Assume the costs associated with installing, maintaining, and removing the temporary grade crossings, including flagman protection during construction, gates/chains and locks across the crossing, and any other requirements deemed necessary by the Railroad. There is no guarantee that the use of temporary grade crossings will be approved by the Railroad.

13. Upon completion of the work, and before final payment is made, remove from within the limits of the Railroad right-of-way all machinery, equipment, surplus materials, falsework, rubbish, and temporary buildings and other property of the Contractor, and leave the right-of-way in a condition satisfactory to Railroad.

C. Non-Railroad Interfaces (other Third Parties):

1. Coordinate all other third-party interfaces and notifications directly with the appropriate third party. Submit a copy of all written correspondence and a transcription of all verbal communication between the Contractor and the third party to the Engineer.

2. Refer to the article Specific Interfaces elsewhere in this Section for any additional specific information pertinent to other third parties.

1.3 SPECIFIC INTERFACES:

A. MTA Metro Interface:

1. Weekly work block meeting requirements:

a) The Contractor shall adhere to the most recent Work Block and Escort Request requirements as provided by the MTA

Engineer.

b) The contractor shall attend the in-person Metro Work Block

Track Allocation and Escort Meeting held every Wednesday morning at 8:30 AM at the Metro Operations Headquarters

Building located at 5801 Wabash Avenue, 2nd Floor

Conference Room to confirm requested access to Metro

Facilities. Meeting times may be adjusted for holidays at the direction of the Work Block Manager.

B. MTA Light Rail Interface:

INTERFACE REQUIREMENTS 01 18 13- 4

SP-23

1. Weekly work block meeting requirements:

a) The Contractor shall adhere to the most recent Work

Block and Escort Request requirements as provided by the MTA Engineer.

b) The contractor shall attend the in-person Light Rail

Work Block Track Allocation and Escort Meeting held every Thursday morning at 8:00 AM at the

North Avenue Light Rail Operations Building located at 344 W North Avenue, Classroom/Conference

Room A & B to confirm requested access to Light

Rail Facilities. Meeting times may be adjusted for holidays at the direction of the Work Block Manager.

PART 2 - PRODUCTS

NOT USED

PART 3 - EXECUTION

NOT USED

PART 4 - MEASUREMENT AND PAYMENT

4.1 INTERFACE REQUIREMENTS:

A. Interface Requirements will not be measured separately.

B. Interface Requirements will be considered incidental to the appropriate work item.

MISCELLANEOUS WORK ALLOWANCE 01 21 00 - 1

SP-24

SECTION 01 21 00

MISCELLANEOUS WORK ALLOWANCE

PART 1 - GENERAL

1.1 DESCRIPTION:

A. The work covered under this section includes the furnishing of all material, equipment and the performing of all labor to complete additional work directed by the Engineer.

B. This work includes but is not limited to: additional work not included in the scope of any other item in the Proposal Form. Including hidden or unforeseen site conditions and approved extra work required by the

Engineer after award of the Contract, which was not included in the advertised Contract Documents and within the general scope of the

Contract.

C. This allowance is for the exclusive use of the MTA and is to be distributed at its sole discretion. All unused monies remaining in the allowance at

Contract closeout shall be deleted from the Contract.

D. This allowance is for the cost associated with changes related to direct cost only. Changes/Change Orders including time related delay costs such as indirect field, home office overhead, etc. shall not be issued and/or paid under this section.

E. The work covered under this section does not include any time extension to the Contract or to any intermediate milestones.

F. Any work to be performed under this section will be approved in writing and be authorized at the discretion of the Engineer.

PART 2 - PRODUCTS

2.1 PRODUCTS AND MATERIALS:

A. Products and materials used under this Section are to be submitted to the

Engineer for review and approval before purchase.

PART 3 - EXECUTION

3.1 EXECUTION:

A. The Engineer will review the Contractor's methods and techniques which he proposes to utilize in performing the work. When this allowance is utilized for work with items specified elsewhere in these Specifications, perform the work in accordance with materials and methods of construction of those items.

B. When the Contractor is entitled to a cost entitlement as a result of additions or changes to the Contract for which there are no applicable unit prices, provide the Engineer a price proposal prior to the start of the work in accordance with Contract Provision GP 4.06 - "Changes."

MISCELLANEOUS WORK ALLOWANCE 01 21 00 - 2

SP-25

C. Do not begin work under this section unless directed by the Engineer in writing. If necessary, plans and details may be generated and provided to the Contractor for each specific condition and area.

3.2 WORK AT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .