Table 1..pdf

PDF 153 KB Posted

Attached to
Hartwell Dam and Lake Project
Solicitation number
W912HN-25-S-5000
Issued by

About this file

This document appears to be a Sources Sought request for information (RFI) for a federal contract opportunity related to the Hartwell Dam and Lake Project. The U.S. Army Corps of Engineers, Savannah District is seeking information from parties interested in and capable of conducting geotechnical investigations for civil works construction at this location.

The key details include: the project requires drilling and rock coring at up to 12 locations along the western side of the Clemson Lower Diversion Dam at Hartwell Lake, with depths up to 40 feet. The drilling must be performed from a floating platform or barge. The contractor will need to provide daily transportation for a government geologist to and from the drill site. The work is estimated to begin in November 2024 and be completed by December 2024. The government is requesting interested parties to provide company information, capabilities, and availability to start work by November 15, 2024. The applicable NAICS code is 541330, with a $25.5 million size standard, and the estimated contract value range is between $100,000 and $250,000.

View the file

Other files

File Type Posted
Table 3..pdf PDF
Table 2..pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1. Boring designations, coordinates, and target depths.

Propose d Boring Easting Northing

Approx. Top of Ground

El.*

(ft. NGVD29)

Estimated TOR El.**

(ft.

NGVD29)

Estimate d Depth to TOR

(ft.)

Estimated Boring

Depth (ft.)

Inclination (deg.)

2024-

LD5

1442734.88

1036599.20 3 653.0 623.0 30 40 90

2024-

LD6

1442671.27

1036590.51 6 648.0 618.0 30 30 90

2024-

LD7

1442592.89

1036579.91 1 636.0 606.0 30 40 90

2024-

LD8

1442534.60

1036582.77 6 635.0 605.0 30 30 90

2024-

LD9

1442485.35

1036687.39 9 626.0 596.0 30 30 90

2024-

LD10

1442437.10

1036495.71 1 634.0 604.0 30 30 90

2024-

LD11*** UNK UNK UNK UNK 30 40 90

2024-

LD12*** UNK UNK UNK UNK 30 40 90

* Vertical datum is NGVD29, top of water surface at normal pool is ~ El. 660-ft.

** TOR elevation estimated by interpolating between nearby borings.

*** Borings will be drilled within 1,200’ radius of 2024-LD9.

SAS FY24 GEOTECHNICAL INVESTIGATION
29 July 2024
2. Assignment
3. Rights of Entry
4. Schedule
5. Points of Contact

File details come from the government source that posted it. Updated .