This is a Capability Certification Matrix that documents six core sustainment capabilities required to support U.S. Navy surface-ship air conditioning (AC) plant systems worldwide. The matrix is part of a pre-solicitation market research effort (Solicitation N0002427R4452) issued by PAE Maritime on behalf of Naval Sea Systems Command to identify responsible sources capable of providing AC plant sustainment services.

The six capability areas assessed in the matrix are: (1) Major AC Plant Pit Stops—comprehensive assessment, repair, and in-place compressor overhaul completed within six weeks or less across the fleet; (2) Embedded AC&R Technical Expertise—provision of embedded technical experts at Navy Ship Intermediate Maintenance Activities (SIMAs) to provide Sailor training, technical assistance, and OEM-level oversight of Minor Pit Stops within six weeks or less; (3) AC Plant Materiel—supply of OEM AC plant repair parts, components, and assemblies supporting all applicable Navy surface ship configurations; (4) Global Rotable and OPP Management—establishment and management of warehouse facilities, rotable component inventories, and Overhaul Parts Packages (OPPs) with global distribution capability; (5) Engineering, Technical Data, Logistics, and Integrated Product Support (IPS)—provision of configuration-specific engineering, technical data, technical assistance, and diagnostics to sustain the Navy's complete AC plant inventory; and (6) Global Unplanned and Emergent Field Services—qualified technical personnel and materiel support for worldwide unplanned and emergent requirements while maintaining scheduled pit stop commitments. For each capability, respondents must indicate current capability status (Yes/Partial/No), method of performance (Organic/Existing OEM License/Subcontractor/Capability to be Developed), and provide supporting evidence addressing specific operational and technical requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1. Capability Certification Matrix *Do not edit the “Requirement” column.

Requirement
Current Capability
Method of Performance
Supporting Evidence
1. Major AC Plant Pit Stops: Ability to execute complete Major AC Plant Pit Stops throughout the fleet, including assessment and repair of the entire AC plant and in-place compressor overhaul, within a mandatory six-week window or less.
YES / PARTIAL / NO
Organic / Existing OEM or License / Subcontractor or Teaming Partner / Capability to be Developed
Identify specific AC plant systems and configurations supported; locations; personnel; facilities; tooling; diagnostic/test equipment; compressor overhaul capability; number of comparable Pit Stops performed; and demonstrated ability to complete comparable work within six weeks or less.
2. Embedded AC&R Technical Expertise: Ability to provide an embedded AC&R technical expert at each designated Navy SIMA to provide Sailor training, technical assistance, and OEM-level oversight of SIMA-led Minor AC Plant Pit Stops executed within a mandatory six-week window or less.
YES / PARTIAL / NO
Organic / Existing OEM or License / Subcontractor or Teaming Partner / Capability to be Developed
Identify available personnel, qualifications, geographic coverage, training experience, AC&R technical expertise, existing Navy support, and demonstrated ability to provide sustained embedded support at multiple locations.
3. AC Plant Materiel: Ability to provide OEM AC plant materiel, repair parts, components, and assemblies supporting all applicable Navy surface ship AC plant configurations.
YES / PARTIAL / NO
Organic / Existing OEM or License / Subcontractor or Teaming Partner / Capability to be Developed
Identify specific Navy AC plant configurations currently supported; materiel sources; manufacturing or procurement capability; technical data required for sourcing; lead times; and demonstrated experience providing configuration-specific AC plant materiel.
4. Global Rotable and OPP Management: Ability to establish, warehouse, maintain, repair, manage, and globally distribute rotable AC plant components and Overhaul Parts Packages (OPPs) supporting Major and Minor Pit Stops.
YES / PARTIAL / NO
Organic / Existing OEM or License / Subcontractor or Teaming Partner / Capability to be Developed
Identify warehouse locations, existing rotable inventories, OPP capability, inventory-management systems, repair/overhaul capability, transportation infrastructure, replenishment processes, and demonstrated global distribution capability.
5. Engineering, Technical Data, Logistics, and IPS: Ability to provide configuration-specific AC plant engineering, technical data, technical assistance, logistics, and integrated product support necessary to sustain the complete Navy AC plant inventory.
YES / PARTIAL / NO
Organic / Existing OEM or License / Subcontractor or Teaming Partner / Capability to be Developed
Identify engineering personnel and disciplines; technical data and data rights; proprietary information access; diagnostic software; specialized tooling; engineering facilities; technical documentation; failure-analysis capability; and relevant Navy AC plant experience.
6. Global Unplanned and Emergent Field Services: Ability to provide qualified AC plant technical personnel, engineering support, troubleshooting, materiel support, and field services for unplanned and emergent requirements worldwide, while maintaining scheduled Pit Stop commitments.
YES / PARTIAL / NO
Organic / Existing OEM or License / Subcontractor or Teaming Partner / Capability to be Developed
Identify geographic coverage, available personnel, response times, field-service infrastructure, materiel access, emergency-response experience, and demonstrated ability to support simultaneous planned and emergent requirements.