TAB 12a - STATEMENT OF WORK.pdf

PDF 154 KB Posted

Attached to
DEMOLITION OF A USCG AUXILLARY BUILDING
Solicitation number
2121301CB1459
Issued by

View the file

Other files

File Type Posted
TAB 7m - WAGE DETERMINATION.pdf PDF
TAB 12a - FAR 52.246-13 DEMOLITION.pdf PDF
TAB 12a - PAST PERFORMANCE.pdf PDF
TAB12a - FAR MATRIX SERVICE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Homeland Security

United States Coast Guard

Scope of Services

For

Demolition of

U.S. Coast Guard Auxilliary Trailer Facilities at

HAMLIN Beach, NY

May 2021

Commanding Officer

United States Coast Guard

SECTOR BUFFALO

Buffalo, N.Y. 14203

TABLE OF CONTENTS

Section Title Page

01010 Scope of Work 3

01020 Coordination 4

01030 Safety Program 4

01040 General Cleanup & Site Restoration of Work Areas

SECTION 01010

SCOPE OF WORK

1. SCOPE OF WORK: Contract work shall encompass the following items of work as described in these specifications. This summary is not all-inclusive and delineates only those work items deemed as major to the contract. Ancillary work items not listed below, though necessary to attain the completed project, shall be included in the contract.

Specifically, the contractor shall:

1. Removal of entire doublewide trailer that is approx.. 50’ long X

25’ wide and 13’ tall including superstructure and support foundations.

a. Will meet all standards in accordance with all applicable state regulations and enviromental laws

2. Clean-up and removal of demolition debris, materials and equipment

a. Will comply with all state and federal regulations.

3. Rough grade site with existing materials to match existing grade and countours.

1.2 LOCATION: The site is located at 8100 Newco Drive Hamlin, NY 14464

GPS location is 43.35715-77.92437

SECTION 01020

COORDINATION

1. INTERFERENCE WITH STATE PARK OPERATIONS: Accomplish work in a manner that causes minimal impact on normal operations, and coordinate with Hamlin

Beach State Park for any forseen logistics issues.

2. THE CONTRACTING OFFICEER’S TECHNICAL REPRESENTATIVE

The Contracting Officer’s Technical Representative is: CWO Daniel Howes @ 716-432-

7235.

3. GOVERNMENT FACILITIES AND UTILITIES: No Water and electrical power will be provided.

4. MATERIALS AND LOCATIONS: Contractor is required to comply with Federal, State and Local laws, codes and regulations. All subject Safety Data Sheets shall be available upon request.

5. SCHEDULE OF WORK: Upon arrival and completion of the work the contractor must check in and with Hamlin Beach State Park reprsentatives and Coast Guard POC, CWO

Daniel Howes

SECTION 01030

SAFETY PROGRAM

1. GENERAL: The Contractor is wholly responsible for work site safety. The

Contractor shall implement a safety program that protects the lives and health of personnel in the area, prevents damage to property, and avoids work interruptions. To accomplish this end, the Contractor shall provide appropriate safety barricades, signs, signal lights, etc. as well as complying with the requirements of all Federal, State and

Local safety laws, rules and regulations.

2. Workmen shall wear proper personal protective equipment when required by Federal, State and Local safety laws.

3.The Contractor shall ensure all members of the working party have a valid identification.

SECTION 01040

GENERAL CLEANUP & SITE RESTORATION OF WORK AREAS

1. GENERAL: The Contractor shall remove and properly dispose of all trash and debris incidental to the contract work, from the limits of government property, as well as all adjacent affected areas. The Contracting Officer Technical Representative shall determine the extent and interval of these cleanups.

2. SITE RESTORATION: If at any time while performing the contract the Contractor causes damage or destruction to any portion of the State Park or grounds; e.g., bulkheads, pavement, lawns, shrubbery, etc., it shall be the Contractor's responsibility to replace and/or restore the damage as approved by the Contracting Officer’s Technical

Representative at no additional cost to the Government.

3. POST CONSTRUCTION CLEANUP: Upon completion of the job, the Contractor shall clean up the job site, returning it to a state of cleanliness equal to or exceeding that in which it was found. The Contractor shall properly dispose of any trash, extra materials, dirt, debris, or other litter that remains as well. If the job site appearance is not to the satisfaction of the Contracting Officer’s Technical Representative, final acceptance will not be approved.

SECTION 01 55 00

ACCESS ROADS AND PARKING

1. ACCESS: Access to the site is available from public roads which will need a permit issued from the Hamlin State Park for heavy trucks and equipment. Any damage to these road/ paved areas by the Contractor's vehicles shall be repaired without cost to the Government.

2. PARKING: Vehicular operations and parking shall comply with all applicable state regulations.

END OF SPECIFICATION