Tab 04 Specs Redacted.pdf
PDF 335 KB Posted
- Attached to
- Series 3710 Test Oven and control system Federal contract opportunity
- Solicitation number
- 80NSSC26941985Q
About this file
This is a Technical Specification Document for a Series 3710 Test Oven System customized for Defense Intelligence Agency (DIA) applications to be delivered to NASA Langley Research Center.
The system is manufactured by Applied Test Systems (ATS), model Series 3710 Test Oven, part number 3710-10.00-17.00-25.00, and features a stainless steel exterior shell with stainless steel internal liner. The oven has internal dimensions of 10" W x 17" D x 26" H and external dimensions of 15-1/2" W x 37" D x 31-1/2" H (shell only). The system operates within a temperature range of -120°C to 300°C, requires 230 VAC, 1-phase, 60 Hz power (2200 Watts, 9.5 Amps), and includes dual heated viewports (4" W x 14" H each) positioned on opposing sides. Key features include a Watlow PM digital programmable controller with 4 program files totaling 40 segments, two Type K thermocouples with connectors and mounting brackets, integrated liquid nitrogen (LN₂) cryogenic cooling capability, a safety interlock that cuts power when the removable front door is opened, and a rear protection cover. The system includes two 4-1/8" diameter load train port inserts, two split port plugs with 1-7/8" bore, and two 1/4" diameter thermocouple ports for system control and over-temperature monitoring. Mounting compatibility is configured for MTS 3, 5, and 20 kip test machines via a slide assembly with adjustable rear support. Goods must be securely packed in a wooden crate for shipment, with Level 1 Approval Prints required for customer verification and sign-off prior to manufacturing. The estimated lead time for delivery is 20 weeks.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tab 07 Capability Statement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8. Mounting & Integration
• Mounting System: Slide assembly complete with mounting brackets.
• Compatibility: Configured for use with MTS 3, 5, and 20 kip test machines.
• Support: Includes an adjustable rear support leg.
9. Documentation, Logistics, & Shipping
• Engineering Deliverables: Level 1 Approval Prints required for customer verification and sign-off prior to the start of system manufacturing.
• Logistics Protection: Goods must be securely packed and stabilized within a wooden crate structure for shipping.
Delivery to NASA LANGLEY Research Center
Estimated lead time for delivery is 20 weeks.
File details come from the government source that posted it. Updated .