This is a Statement of Work (SOW) for the procurement of equipment by the National Aeronautics and Space Administration (NASA) Glenn Research Center located at Lewis Field in Cleveland, Ohio and the Neil A. Armstrong Test Facility in Sandusky, Ohio.
The Propulsion Systems Laboratory requires two pieces of equipment: a 115V electric tube bender and a multihead hydraulic swaging unit with a complete tooling kit. The laboratory intends to perform swaging operations on various ferrules and tubing in-house rather than outsourcing this work, thereby improving efficiency and reducing costs. The scope of work is limited to procuring these two items. The period of performance runs from July 30, 2026 to November 14, 2026. The primary deliverable is that both the multihead hydraulic swaging unit and electric tube bender must be delivered in functional condition. The contractor must include the applicable manufacturer warranty with the delivery. Non-conforming deliverables will be evaluated by NASA Glenn Research Center for potential acceptance as-is, or the contractor must correct deficiencies at its own expense with expedited redelivery. All work requires coordination with Clint Shrewsbury and Jennifer Zayac, and access to a secure area requiring an escort. Inspections shall be conducted in accordance with ASME BPVC Section VIII Division 1 and NBIC NB-23 standards with approval by an Authorized Inspector, focusing on visual inspection for general workmanship. No Health and Safety Plan, pressure vessel requirements, quality assurance standards, reference documents, government-furnished items, or environmental impacts are applicable to this procurement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tab 07 Capability Statement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE: THE LAST PAGE IS A CHANGE REQUEST FORM FOR FUTURE REVISIONS
STATEMENT OF WORK
FOR
Propulsion Systems Laboratory Swaging Machines, Version
1.0
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
GLENN RESEARCH CENTER
NEIL A. ARMSTRONG TEST FACILITY
3597 SCHEID ROAD
SANDUSKY, OHIO 44870
LEWIS FIELD
21000 BROOKPARK ROAD
CLEVELAND, OHIO 44135
Propulsion Systems Laboratory Beautification, Version 1.0
Propulsion Systems Laboratory needs an Multihead Hydraulic Swaging Unit unit to be able to swage various ferrules onto various tubing. Propulsion Systems Laboratory needs an electric tube bender for bending metal tubes of various diameters. This capability will allow for the facility to work in house instead of sending items outside, this will make tasks move quicker and more affordable.
Quality Assurance Standards (e.g. ISO 9001, AS9100, NFPA, ASME Boiler & Pressure Vessel Code, etc.)
None
Reference Documents None
Government Furnished Items ☐Materials
☐Equipment
☐Support Labor
☐Other
☐None
Applicable details of boxes checked:
Unique Considerations
☐Other than 1st Shift work
☐Holidays
☒Secure Area requiring escort (list POC below)
☒Coordination required with other work in the area (list POCs below)
☐Other
☐None
Applicable details of boxes checked: POC: Clint Shrewsbury/Jennifer Zayac
Environmental Impacts
☐Universal waste, recycling
☐Hazardous waste (see Appendix B for details)
☐Air
☐Storm Water
☐Wastewater
☐Species Management
☐Soil
☐Underground/Aboveground Storage tanks
☐Chemical Management
☐Other
☐None
Applicable details of boxes checked:
Propulsion Systems Laboratory Beautification, Version 1.0
Health and Safety Plan (HASP)
Is a HASP required for this work? No
Pressure Vessels and Systems Does this work include pressure vessels and systems? No
Scope of Work Description
- Procure a 115 V Electric Electric Tube Bender
- Procure Multihead Hydraulic Swaging Unit
Unit with Tooling Kit Inspections Note: All examinations, inspections and testing shall be in accordance with ASME BPVC Sect.
VIII Div 1 and NBIC NB-23 and approved by the Authorized Inspector (AI)Safety (See Chapter 17 Section 6.7 of the Glenn Safety Manual)
Visual inspection of work for general workmanship.
Milestones None
Period-of-Performance: 7/30/2026 to 11/14/2026
Deliverables Multihead Hydraulic Swaging Unit unit and electric tube bender is delivered and functional.
Non-Conforming Deliverables Non-Conforming Deliverables will be evaluated by NASA Glenn Research Center for consideration of acceptance “as-is”. Deliverables not meeting the requirements will be corrected at the contractor’s expense. Delivery of corrected deliverables shall be expedited. Actual delivery dates will be negotiated with NASA Glenn Research Center at the time of rework.
Warranty Applicable manufacture warranty MUST be included.
Government Acceptance