This is a Statement of Work (SOW) for testing and calibration services on a 250-ton hydraulic lifting system. The contractor shall complete comprehensive functional testing, proof-load testing, and calibration of one Model DHS-250R System at the contractor's facility within six weeks of the equipment's arrival. The work includes a static structural proof test at 200% load capacity (1,000,000 lbs. with piston rod fully extended), a static hydraulic system proof test at 125% load capacity (625,000 lbs. with piston rod at mid-stroke), and a 10-point calibration ensuring accuracy within 0.5% of full load scale.

Additional deliverables include a complete functional hoisting and rotation test at 250,000 lbs. load, which encompasses hanging the system, rotating it in both directions, verifying the full 12-inch stroke travel, and confirming the 250,000 lb. weight measurement is within the 0.5% calibration standard (±2,500 lbs.), along with a one-hour hang test at 250,000 lbs. load. The contractor must also perform physical inspections for external and internal leakage, provide a calibration test report, and deliver a Certificate of Conformance upon completion of all testing activities.

View the file

Other files for this federal contract opportunity

Other files attached to Service Maintenance for 250-Ton Hydra-Set., newest first.
File Type Posted
Tab 07 Capability Statement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements 250-Ton Hydra-Set Complete Functional Test, Proof-Load and Calibration

2. Characteristics, Scope, and Specs The contractor shall perform the following duties:

Complete Functional test, Proof-load and Calibration of one (1) Model DHS-

250R System.

Perform static structural proof test at 200% (1,000,000 lb.) with the piston rod fully extended.

Static hydraulic system proof test at 125% (625,000 lb.) with the piston rod at mid stroke.

10-point calibration for accuracy within .5% of full load scale.

Complete Functional hoisting and rotation test at 250,000 lbs. This test includes hanging the Hydra Set with a load of 250,000 lbs., rotation both directions of the Hydra Sets load, the full 12-inch stroke (checking the linear travel function), verifying the 250,000 weight to be within the .5% calibration standard, plus or minus 2500 lbs.

One hour hang test with a 250,000 lbs. load.

Physical check of external leakage.

Physical check of internal leakage.

Calibration test report.

Certificate of Conformance

3. Place of Performance Contractor Facility

4. Period of Performance

Six week after arrival of the hydra-set at Contractor Facility