Tab 04 SOW.pdf

PDF 106 KB Posted

Attached to
LilyPond Laboratory Test Suite Federal contract opportunity
Solicitation number
80NSSC902988Q
Issued by
National Aeronautics and Space Administration

About this file

This is a Statement of Work (SOW) for NASA Marshall Space Flight Center's acquisition of a Space Lab LilyPond Laboratory Test Suite to demonstrate biofilm reduction through duckweed phytoremediation. The comprehensive procurement includes multiple fabrication and deployment components: Non-Recurring Engineering (NRE), μG-LilyPond Test Rig Assembly & Test, delivery and deployment to MSFC, and various system fabrications including growth bed, harvester, lighting panel, and control system. Additional deliverables include equipment, tooling, miscellaneous supplies, a laptop for system control, shipping, and a one-week on-site trip for setup and training.

The project will be performed at NASA Marshall Space Flight Center in Building 4464, Huntsville, AL, with a 30-day performance period after receipt of order (ARO). The solicitation number is 80NSSC902988Q, representing a special notice procurement by the National Aeronautics and Space Administration (NASA) for this specialized laboratory test suite focused on scientific research involving biofilm reduction techniques.

View the file

Other files for this federal contract opportunity

Other files attached to LilyPond Laboratory Test Suite, newest first.
File Type Posted
Tab 07 Capability Statement SAM.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

This requirement is for the acquisition of Space Lab LilyPond Laboratory Test Suite for NASA Marshall Space Flight Center (MSFC) for demonstrating biofilm reduction through duckweed phytoremediation.

2. Characteristics, Scope, and Specs

QTY DESCRIPTION

1 Non-Recurring Engineering (NRE) 1 μG-LilyPond Test Rig Assembly & Test 1 Delivery and Deployment to MSFC 1 Growth Bed Fabrication 1 Harvester Fabrication 1 Lighting Panel Fabrication 1 Control System Fabrication 1 Equipment & Tooling 1 Miscellaneous Supplies 1 Laptop (for system control via GUI) 1 Shipping 1 Travel (One Week Trip to MSFC for Setup and Training)

3. Place of Performance

NASA Marshall Space Flight Center (MSFC) Building 4464 Huntsville, AL 35812

4. Period of Performance

30 days ARO

File details come from the government source that posted it. Updated .