Tab 04 SOW.pdf
PDF 106 KB Posted
- Attached to
- LilyPond Laboratory Test Suite Federal contract opportunity
- Solicitation number
- 80NSSC902988Q
About this file
This is a Statement of Work (SOW) for NASA Marshall Space Flight Center's acquisition of a Space Lab LilyPond Laboratory Test Suite to demonstrate biofilm reduction through duckweed phytoremediation. The comprehensive procurement includes multiple fabrication and deployment components: Non-Recurring Engineering (NRE), μG-LilyPond Test Rig Assembly & Test, delivery and deployment to MSFC, and various system fabrications including growth bed, harvester, lighting panel, and control system. Additional deliverables include equipment, tooling, miscellaneous supplies, a laptop for system control, shipping, and a one-week on-site trip for setup and training.
The project will be performed at NASA Marshall Space Flight Center in Building 4464, Huntsville, AL, with a 30-day performance period after receipt of order (ARO). The solicitation number is 80NSSC902988Q, representing a special notice procurement by the National Aeronautics and Space Administration (NASA) for this specialized laboratory test suite focused on scientific research involving biofilm reduction techniques.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tab 07 Capability Statement SAM.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
This requirement is for the acquisition of Space Lab LilyPond Laboratory Test Suite for NASA Marshall Space Flight Center (MSFC) for demonstrating biofilm reduction through duckweed phytoremediation.
2. Characteristics, Scope, and Specs
QTY DESCRIPTION
1 Non-Recurring Engineering (NRE) 1 μG-LilyPond Test Rig Assembly & Test 1 Delivery and Deployment to MSFC 1 Growth Bed Fabrication 1 Harvester Fabrication 1 Lighting Panel Fabrication 1 Control System Fabrication 1 Equipment & Tooling 1 Miscellaneous Supplies 1 Laptop (for system control via GUI) 1 Shipping 1 Travel (One Week Trip to MSFC for Setup and Training)
3. Place of Performance
NASA Marshall Space Flight Center (MSFC) Building 4464 Huntsville, AL 35812
4. Period of Performance
30 days ARO
File details come from the government source that posted it. Updated .