Tab 04 SOW.pdf

PDF 189 KB Posted

Attached to
Zylon yarn with density of 1640 dtex. Federal contract opportunity
Solicitation number
80NSSC891706Q
Issued by
National Aeronautics and Space Administration

About this file

This Statement of Work (SOW) outlines NASA's requirements for procuring Zylon Poly-Benzobisoxazole (PBO) Yarn with linear density of 1640 dtex HM. The contractor must deliver 90 kg of the specified yarn along with Material Certification Data Sheets for each lot that include material description, quantity, manufacture date, and tested tenacity.

The SOW permits partial delivery of in-stock quantities with subsequent delivery of newly manufactured yarn. All deliveries must be made directly to NASA with a final delivery date of February 11, 2025. The requirements are straightforward with no complex technical specifications beyond the basic material requirements and certification documentation.

View the file

Other files for this federal contract opportunity

Other files attached to Zylon yarn with density of 1640 dtex., newest first.
File Type Posted
Tab 07 Capability Statement SAM.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK - Zylon Poly-Benzobisoxazole (PBO) Yarn

1. Objective/Requirements NASA is procuring Zylon Poly-Benzobisoxazole (PBO) Yarn with linear density of 1640 dtex HM. The Contractor shall deliver the yarn, quantities, and documentation as defined below.

2. Characteristics, Scope, and Specs The contractor shall provide the following:

• Provide Zylon Poly-Benzobisoxazole (PBO) Yarn with linear density and quantity as follows:

1) Zylon yarn 1640, dtex HM, 90 kg

• Material Certification Data Sheets shall be provided with each lot that includes description of material, quantity, manufacture date, and tested tenacity.

• Partial delivery of in-stock quantities of yarn with subsequent delivery of newly manufactured yarn is acceptable.

3. Place of Performance Contractor delivers items to NASA.

4. Period of Performance Delivery date of February 11, 2025.

File details come from the government source that posted it. Updated .