This is a Statement of Work (SOW) for the National Center for Critical Information Processing and Storage (NCCIPS) located at Stennis Space Center, Mississippi. The objective is to purchase and install two Schneider Electric PM8000 series meters to replace existing end-of-life Eaton IQ250/260 meters, along with associated Digital Power Services for meter setup and integration to existing SE EcoStruxure PME/EPO platforms.

The contractor must furnish all labor, materials, and equipment required for the complete replacement project, including removal of existing meters, installation of two Schneider Electric PM8240 panel-mounted meters, digital meter programming, and integration to existing platforms. The work scope encompasses a single site trip for meter installation during standard business hours (Monday-Friday, 8:00 AM - 5:00 PM), with assumptions that unimpeded access exists and no system shutdown is required. Digital Power Services deliverables include office system design, onsite installation and commissioning, project management, and PSO SCADA development. The contractor must provide commissioning and verification of meter communications, final system configuration documentation, and field service reports upon completion. The work area must be cleaned of all debris and materials, and the system must be left in operational condition using only new equipment with no remanufactured or gray-market items. Payment of 100% contract value is due upon delivery, installation, programming, and integration of meters. The place of performance is NCCIPS Data Center, 9353 Cypress Loop Road, Stennis Space Center, Mississippi 39529. The period of performance extends from award through January 5, 2027, with principal maintenance hours defined as 7:00 AM to 5:00 PM local time, Monday through Friday. Security requirements mandate U.S. citizenship verification, NCCIPS escort for all contractor personnel, formal Site Visit Requests, prohibition on photography or video, and prohibition of cellular hotspots on NCCIPS grounds.

View the file

Other files

File Type Posted
Tab 07 Capability Statement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

The National Center for Critical Information Processing and Storage (NCCIPS), located at Stennis Space Center, requires the purchase and installation of two (2) Schneider PM8000 series meters to replace the existing End of Life (EOL) Eaton IQ250/260 meters, as well as Schneider Electric Digital Power Services for meter setups and integration to existing SE EcoStruxure PME/EPO platforms.

2. Characteristics, Scope, and Specs

Designation Description Qty

PM8k Meter Hardware 2-SRVOTHMETHDWR-Metering Hardware

SCOPE OF WORK

Replacement Meter Hardware:

Existing Eaton IQ250/260 meters Replacement: Schneider Electric PM8240 panel mounted meter with additional hardware for installation.

CLARIFICATIONS

NOTES: reuse of all existing CT (5A secondary) and VT/control circuits assumed.

Customer to provide direct Ethernet drops to each new meter to connect it to external Power Monitoring Platform.

Meter Installation 1-SRVINSOTHMETS-Metering Services

SCOPE OF WORK

Schneider Electric Field Services Meter Installation Single site trip for both meters.

Standard business hours only.

CLARIFICATIONS

Assumes unimpeded access to site/meters.

Assumes shutdown is not required and any voltage presence at the meter body can be removed/isolated from existing PT/VT disconnect point and CT signals can be shorted at CT shorting block (all assumed to be part of the existing distribution gear).

Verification of all the above assumptions prior to site service scope scheduling is mandatory.

Labor Type This job is being quoted for work to be performed during normal working hours (M-F 8:00 AM - 5:00 PM excluding Schneider Electric holidays) unless otherwise noted.

DP Services 1-SRVINSOTHMETS-Metering Services

SCOPE OF WORK

Digital Power Services: meter setups and integration to existing SE EcoStruxure PME/EPO platforms

Product Description 1-DZCSOFFICE01-ln Office System Design 1-OSOONSITESERVE02-Onsite Inst. Commissioning 1-PMCOSERVICES01-Project Management 1-PSOSERVICE01-PSO SCADA Development

Deliverables Payment

Delivery, Installation, programming, and integration of meters. 100% Contract Value

Security Requirements:

• United States citizenship is required to gain access into the NASA Stennis Space

Center and into the NCCIPS data center. Verification of US citizenship documents (i.e. birth certificate, passport, naturalization certificate, etc.) shall be required.

• All Contractor and any/all Subcontractors will require an NCCIPS escort during performance of the work described in this SOW.

• Contractor personnel required to visit NCCIPS to perform their work will require a formal Site Visit Request (SVR) to be coordinated with NCCIPS Project Managers

(PM).

• All photography or video requirements of the NCCIPS complex must be coordinated with NCCIPS personnel, as photography and video of any kind is prohibited at

NCCIPS.

• Cellular hotspots which generate a personal wireless network of any kind are also prohibited on NCCIPS grounds.

Contractor Requirements:

Contractor shall provide the following:

• Contractor shall furnish all labor, materials, and equipment required to replace the two (2) existing Eaton IQ250/260 metering devices with two (2) Schneider Electric PM8240 Panel Mounted Meters and additional hardware for installation.

• Work includes the removal of existing meters, installation of new meters, digital meter programming, Integration to existing PME/EPO platforms.

• Contractor shall perform commissioning and verification of meter communications and provide final system configuration documentation.

• Upon completion of installation, contractor shall provide field service reports summarizing work performed.

• All debris, equipment, and materials shall be removed from the work area upon completion.

• The system shall be left in operational condition

• Contractor shall ensure the use of new equipment only, no remanufactured products, and no gray-market items.

3. Place of Performance

Delivery Address:

NCCIPS Data Center 9353 Cypress Loop Road Stennis Space Center, MS 39529

Place of Performance Address:

National Aeronautics and Space Administration (NASA) Cypress Loop Road; Bldg. 9357 Stennis Space Center, Mississippi 39529

4. Period of Performance

Award through 01/05/2027

The hours of 7 AM to 5 PM local time, Monday through Friday of each week, will be referred to as the Principal Period of Maintenance.