Tab 04 SOW.pdf

PDF 466 KB Posted

Attached to
E-Complex Liquid Nitrogen and Hydrogen Pump Cold End Parts. Federal contract opportunity
Solicitation number
80NSSC26928117Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This is a Statement of Objectives for the purchase and delivery of Nikkiso pump components for the E-Complex at Stennis Space Center in Mississippi. The procurement requires three specific items: one GA/GUPD Drive End with 1.3" Stroke (Part Number 47440-1), one Drive Assembly GUPD Pump with DIGITA (Part Number 45970-10), and three 1.25" Diameter, 16.5 KSI ASY Cold End Bolted Flanges (Part Number 57245-1). All items must be sourced from authorized vendors or original equipment manufacturers operating within their contractual local territory at Stennis Space Center.

The delivery location is E-Complex, Building 4010, Stennis Space Center, MS 39529, with a required delivery timeline of 20 weeks from contract award. The solicitation specifies that vendors must be authorized distributors or OEM representatives with established contractual relationships in the local service territory to ensure proper support and fulfillment of this specialized equipment procurement.

View the file

Other files for this federal contract opportunity

Other files attached to E-Complex Liquid Nitrogen and Hydrogen Pump Cold End Parts., newest first.
File Type Posted
Tab 07 Capability Statement.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Objectives:

Purchase and deliver the following list from authorized vendors/OEM within their contractual local territory of Stennis Space Center.

E-Complex LN/LH Nikkiso Pump Cold Ends Description Part Number QTY:

1 GA/GUPD Drive End 1.3" Stroke 47440-1 1 2 Drive Assembly, GUPD Pump W/DIGITA 45970-10 1 3 1.25" Diameter, 16.5 KSI, ASY Cold End Bolted Flange 57245-1 3

2. Delivery:

Deliver to: E-Complex, B4010, Stennis Space Center MS 39529

3. Delivery Timeline:

20 weeks delivery time.

File details come from the government source that posted it. Updated .