About this file

This is a Bid Solicitation Notice issued by the Florida Department of Transportation (FDOT) for resurfacing work along State Road 5 (US-1/Overseas Highway) in Monroe County. The project extends from West of Venetian Boulevard to Executive Bay Club and encompasses 1.528 miles of roadway with no bridge work. Key work items include milling existing asphalt pavement (52,933 square yards), placement of Superpave asphaltic concrete and friction course materials (totaling approximately 5,305 tons), installation of guardrails (346 linear feet), concrete sidewalk and driveways (280 square yards), performance turf sodding (3,060 square yards), and comprehensive signing and pavement markings throughout the project area. Additional items include mobilization, maintenance of traffic with numerous traffic control devices and signage, clearing and grubbing, geosynthetic reinforcement, lighting infrastructure including conduit installation and light poles, and landscape work. The contract allows 220 days for completion following a special start date of April 5, 2027, with 10 days allocated for contract execution. The letting date is scheduled for September 30, 2026.

The proposal budget estimate is $3,890,871.00 for this FDOT project (Federal Aid No. D626031B, Project No. 44973815201). The project is designated as Call Order 014 under Proposal T6593 in FDOT District 06. Bidders should anticipate traffic control requirements including 640 hours of traffic control officer services, placement of approximately 43,370 channelizing devices, and comprehensive work zone safety measures. An initial contingency amount is included in the bid but contractors are instructed not to bid on this line item.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities

Letting:

Counties:

Road Name:

Limits:

CT260930 Call Order: 014 Proposal: T6593 District:06

MONROE

SR 5 (US 1 / OVERSEAS HWY)

FROM W OF VENETIAN BLVD TO EXECUTIVE BAY CLUB

Project(s): 44973815201(*) Federal Aid No: D626031B

Total Roadway Length: 1.528 Miles Contract Days: 220

Total Bridge Length: 0.000 Miles Letting Date: 09/30/26

Total Proposal Length: 1.528 Miles Contract Execution Days: 10

Special Start Date: 04/05/27

Aquis/Flexible Start Time:

Proposal Budget Estimate: $3,890,871.00

Please read the full advertisement

Description: Incentive / Disincentive

THE IMPROVEMENTS UNDER THIS CONTRACT CONSIST OF RESURFACING ALONG SR 5/US-1/OVERSEAS HWY FROM

WEST OF VENETIAN BLVD TO EXECUTIVE BAY CLUB IN MONROE COUNTY.

Call Order: 014 Proposal: T6593

ALT Item Description Unit Quantity Section 0001 Roadway

0101- 1- MOBILIZATION (44973815201) LS 1.000

0102- 1- MAINTENANCE OF TRAFFIC (44973815201) LS 1.000

0102- 14- TRAFFIC CONTROL OFFICER HR 640.000

0102- 60- WORK ZONE SIGN ED 2,780.000

0102- 71- 13 TEMPORARY BARRIER, F&I, LOW PROFILE, CONCRETE LF 1,340.000

0102- 71- 23 TEMPORARY BARRIER, RELOCATE, LOW PROFILE CONCRETE LF 150.000

0102- 74- 1 CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD ED 43,370.000

0102- 74- 8 CHANNELIZING DEVICE- PEDESTRIAN LCD (LONGITUDINAL

CHANNELIZING DEVICE)

FD 12,880.000

0102- 76- ARROW BOARD / ADVANCE WARNING ARROW PANEL ED 460.000

0102- 99- PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY ED 468.000

0102-115- TYPE III BARRICADE ED 550.000

0104- 10- 3 SEDIMENT BARRIER LF 3,562.000

0104- 18- INLET PROTECTION SYSTEM EA 10.000

0107- 1- LITTER REMOVAL AC 62.180

0107- 2- MOWING AC 62.180

0110- 1- 1 CLEARING & GRUBBING (44973815201) LS 1.000

0110- 21- TREE PROTECTION BARRIER LF 368.000

0110- 22- TREE ROOT AND BRANCH PRUNING EA 1.000

0120- 2- 2 BORROW EXCAVATION, TRUCK MEASURE CY 83.900

0120- 71- REGULAR EXCAVATION (3-R PROJECTS ONLY) (44973815201) LS 1.000

0145- 3- GEOSYNTHETIC REINFORCED EMBANKMENT SY 283.000

0160- 4- TYPE B STABILIZATION SY 4,393.000

0285-706- OPTIONAL BASE, BASE GROUP 06 SY 1,413.000

0285-710- OPTIONAL BASE, BASE GROUP 10 SY 2,123.000

0327- 70- 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 52,933.000

Page 49Bid Solicitation Notice - Proposal Item Quantities

Call Order: 014 Proposal: T6593

ALT Item Description Unit Quantity

0334- 1- 15 SUPERPAVE ASPHALTIC CONC, TRAFFIC E TN 200.500

0334- 1- 55 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC E, PG76-22 TN 51.000

0337- 7- 88 ASPHALT CONCRETE FRICTION COURSE,TRAFFIC E, FC-12.5, PG 76-

TN 5,053.500

0339- 1- MISCELLANEOUS ASPHALT PAVEMENT TN 17.800

0425- 5- MANHOLE, ADJUST EA 6.000

0522- 2- CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICK SY 280.000

0527- 2- DETECTABLE WARNINGS SF 132.000

0536- 1- 1 GUARDRAIL -ROADWAY, GENERAL TL-3 LF 346.000

0536- 73- GUARDRAIL REMOVAL LF 384.000

0536- 85- 20 GUARDRAIL END TREATMENT- TRAILING ANCHORAGE EA 2.000

0536- 85- 24 GUARDRAIL END TREATMENT- PARALLEL APPROACH TERMINAL EA 2.000

0570- 1- 2 PERFORMANCE TURF, SOD SY 3,060.000

0710- 11-101 PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID, 6" GM 1.162

0710- 11-201 PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SOLID, 6" GM 2.325

0770- 2- 12 MCSAW VEHICLE DETECTION AND INDENTIFICATION - FURNISH

AND INSTALL, WEIGH IN MOTION UNIT

AS 2.000

0770- 2- 13 MCSAW VEHICLE DETECTION AND INDENTIFICATION - FURNISH

AND INSTALL, INDUCTIVE LOOP ASSEMBLY

EA 1.000

0999- 25- INITIAL CONTINGENCY AMOUNT, DO NOT BID (44973815201) LS 1.000

Section 0002 Signing

0546- 72- 3 GROUND-IN RUMBLE STRIPS, 8" SINUSOIDAL GM 3.766

0700- 1-111 SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT,

LESS THAN 12 SF

EA 11.000

0700- 1-112 SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT,

12.0-20.0 SF

EA 1.000

0700- 1-500 SINGLE COLUMN GROUND SIGN ASSEMBLY, RELOCATE EA 2.000

0700- 1-600 SINGLE COLUMN GROUND SIGN ASSEMBLY, REMOVE EA 7.000

0704- 1- 3 TUBULAR MARKER, 36" WHITE POST EA 21.000

0704- 1- 4 TUBULAR MARKER, 36" YELLOW POST EA 19.000

0705- 10- 1 OBJECT MARKER, TYPE 1 EA 3.000

0706- 1- 3 RAISED PAVEMENT MARKER, TYPE B EA 1,054.000

0710- 90- PAINTED PAVEMENT MARKINGS, FINAL SURFACE (44973815201) LS 1.000

0711- 11-102 THERMOPLASTIC, STANDARD, WHITE, SOLID, 8" FOR

INTERCHANGE AND URBAN ISLAND

GM 0.225

0711- 11-123 THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK

AND ROUNDABOUT

LF 626.000

0711- 11-124 THERMOPLASTIC, STANDARD, WHITE, SOLID, 18" FOR DIAGONALS

AND CHEVRONS

LF 2,190.000

0711- 11-125 THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP LINE

AND CROSSWALK

LF 182.000

0711- 11-141 THERMOPLASTIC, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10

GAP EXTENSION, 6"

GM 0.443

0711- 11-160 THERMOPLASTIC, STANDARD, WHITE, MESSAGE OR SYMBOL EA 14.000

0711- 11-170 THERMOPLASTIC, STANDARD, WHITE, ARROW EA 63.000

0711- 11-224 THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR DIAGONAL

OR CHEVRON

LF 1,008.000

Page 50Bid Solicitation Notice - Proposal Item Quantities

Call Order: 014 Proposal: T6593

ALT Item Description Unit Quantity

0711- 11-241 THERMOPLASTIC, STANDARD, YELLOW, 2-4 DOTTED GUIDE LINE /6-

10 DOTTED EXTENSION LINE, 6"

GM 0.033

0711- 14-125 THERMOPLASTIC, PREFORMED, WHITE, SOLID, 24" FOR

CROSSWALK

LF 492.000

0711- 14-160 THERMOPLASTIC, PREFORMED, WHITE, MESSAGE EA 16.000

0711- 14-170 THERMOPLASTIC, PREFORMED, WHITE, ARROW EA 16.000

0711- 16-101 THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6" GM 4.621

0711- 16-131 THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SKIP,

6",10-30 SKIP OR 3-9 LANE DROP

GM 0.332

0711- 16-201 THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID,

6"

GM 4.177

0714- 10- GREEN-COLORED PAVEMENT MARKINGS, BIKE LANE SF 5,116.000

Section 0003 Lighting

0630- 2- 12 CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE LF 524.000

0635- 2- 11 PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE EA 5.000

0715- 1- 12 LIGHTING CONDUCTORS, F&I, INSULATED, NO.8 - 6 LF 1,962.000

0715- 1- 60 LIGHTING CONDUCTORS, REMOVE & DISPOSE, CONTRACTOR

OWNS

LF 636.000

0715- 11-213 LUMINAIRE, F&I- REPLACE EXISTING LUMINAIRE ON EXISTING

POLE/ARM, ROADWAY, POLE TOP

EA 4.000

0715- 61-300 LIGHT POLE COMPLETE, F&I, STANDARD POLE STANDARD

FOUNDATION, 40' MOUNTING HEIGHT, 0' ARM LENGTH

EA 4.000

0715- 69-000 LIGHT POLE COMPLETE, REMOVE POLE AND FOUNDATION EA 2.000

0715-500- 11 POLE CABLE DISTRIBUTION SYSTEM, FURNISH AND INSTALL

ALTERNATE SYSTEM, CONVENTIONAL

EA 8.000

Section 0004 Landscape / Peripheral

0580- 12- 35 ROOT BARRIER- 24" LF 50.000