T2T000112EBM.v2.pdf
PDF 50 KB Posted
- Solicitation number
- HC101325PA189
- Issued by
-
Defense Information Systems Agency
About this file
This document is an Order for Commercial Items contract awarded by the Defense Information Systems Agency (DISA) to T2 Technologies, Inc. The contract, numbered HC101325PA189, is for providing, installing, and maintaining a 10GB Ethernet lease connecting two locations: Building DC2 in Ashburn, VA and Building 246 at Fort Belvoir, VA. The service is set to begin on 07/09/2025 and continue through 03/13/2030, with a monthly recurring charge of $1,526.00 and a non-recurring charge of $5,776.50.
The contract includes detailed technical specifications for circuit acceptance testing, requiring bi-directional testing with specific frame sizes, throughput tests, and latency measurements. Strict compliance with DoD network equipment requirements is mandated, including use of equipment from the DoD Information Network Approved Products List or Service Provider Equipment List. The contract also includes provisions for monthly outage reporting, critical infrastructure compliance, and specific security requirements related to telecommunications equipment from certain foreign manufacturers.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ORDER
IQO CONTRACT
FM: PL8211
TO: T2 TECHNOLOGIES, INC. - 3C232
DATE (MM/DD/YYYY): 3/14/2025
SUBJECT: HC101325PA189
A. TYPE ACTION: START
1. PURPOSE: 1.IN ACCORDANCE WITH SOLICITATION HC101325QA140 PROVIDE, INSTALL,
AND MAINTAIN A 10GB ETHERNET LEASE BETWEEN: A. (BLDG) DC2; (RM) 001830; (FL) 1;
21715 FILIGREE CT; ASHBURN, VA 20147 AND B. BLDG 246, ROOM 202, 2ND FLOOR, 9800
FLAGLER ROAD, FT BELVIOR, VA 22060-5123.
2. CONTRACTOR MUST COMPLY WITH TESTING & ACCEPTANCE SPECIFICATIONS AND
UNIQUE INSTALL FACTORS REQUESTED IN SOLICITATION AND INCLUDED IN THIS AWARD.
3. THE SERVICE DATE TO BE MET IS: 07/09/2025
5. THE GOVERNMENT MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION IAW
STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE.
6. ESTABLISH TSP: TSP0L0YVD-02
7. NOTICE OF COMPLETION MUST BE UPLOADED TO IDEAS.
8. TEST & ACCEPTANCE INSTRUCTIONS: TEST & ACCEPTANCE INSTRUCTIONS: CIRCUIT
SPECIFICATIONS: CONUS JUMBO FRAME ETHERNET ACCEPTANCE TESTING SHALL BE
PERFORMED BY VENDOR IN ACCORDANCE WITH ITU-T Y.1564. TEST PERIOD 24 HOURS.
TESTS COVERED IN SECTIONS 9.1, 10, 11.1, 14, 20, 21, 26.1, 26.2, AND 26.3 OF RFC 6815
MUST BE PERFORMED AND RESULTS REPORTED IN THE FORMAT SPECIFIED BY THE
RFC OR ITU-T Y. SPECIFICALLY FRAMES SIZE OF 3000 BYTES MUST BE USED. THE TEST
MUST VERIFY LENGTH OF RECEIVED FRAMES, INDICATE NUMBER OF FRAMES DROPPED,
NUMBER OF FRAMES RECEIVED OUT OF ORDER, AND DUPLICATE FRAMES. TESTS MUST
BE BI-DIRECTIONAL USING THE SAME DATA RATE IN EACH DIRECTION. BURST TESTS
MUST BE RUN TO DETERMINE MINIMUM INTERVAL BETWEEN FRAMES THAT CAN BE
PROCESSED WITHOUT FRAME LOSS. A THROUGHPUT TEST IS REQUIRED INDICATING
THE FASTEST RATE AT WHICH TEST FRAMES CAN BE TRANSMITTED WITHOUT FRAME
LOSS. A SEPARATE THROUGHPUT TEST MUST BE RUN WITH FRAMES ADDRESSED TO THE
HARDWARE BROADCAST ADDRESS CONSTITUTING AT LEAST 1% OF THE TEST STREAM
AND BE EVENLY DISTRIBUTED THROUGHOUT THE TEST. LATENCY TEST MUST BE RUN FOR
A PERIOD OF NO LESS THAN 120 SECONDS, AND REPEATED NO LESS THAT 20 TIMES. THE
TEST STREAM FOR THE LATENCY TEST SHOULD BE RUN AT THE THROUGHPUT RATE FOR
CORRESPONDING FRAME SIZES FROM THE THROUGHPUT TEST. END TO END LATENCY
WILL BE CALCULATED AS THE AVERAGE OVER THE 20 TEST RUNS. FRAME LOSS RATE
TESTS SHOULD BE RUN AT THE FRAME RATE CORRESPONDING TO THE MAXIMUM FRAME
RATE AND REDUCED BY 10% INTERVALS UNTIL THERE ARE AT LEAST TWO CONSECUTIVE
HC101325PA189 / T2T000112EBM
RUNS IN WHICH NO FRAMES ARE LOST. THROUGHPUT TEST RESULTS: PASSING RATE
100% FOR ALL FRAME BYTE SIZES EXERCISED. FRAME LOSS RATE (%) RESULTS: FRAME
LOSS RATE LESS THAN 0.01% FOR ALL FRAME BYTE SIZES EXERCISED. LATENCY WILL BE
MEASURED ACCORDING TO THE FOLLOWING: ANY APS SWITCHOVER SHALL TAKE LESS
THAN 50 MILLISECONDS. MONTHLY AVAILABILITY SHALL BE NO LESS THAN 99.5%.
***********JUMBO FRAMES AT 3000 MTU ARE REQUIRED.**************
9. GOVERNMENT ACCEPTING AUTHORITY FOR 24-HOUR TESTING, END-TO-
END TESTING AND IMPLEMENTATION ASSISTANCE IS: MS TAMMY F DUPREE AT
TAMMY.F.DUPREE.CIV@US.NAVY.MIL. PHONE: 843-323-2394.
FOR CIRCUIT INSTALLATION ASS ISTANCE WITH THE COMMERCIAL LEASED PATH,
CONTACT DCP COMMERCIAL A CTIVATION TEAM (CAT) AT D312-850-0820, C614-692-0820 OR
DISA.DSCC.PEO-TRANSPORT.MBX.DCP-COMMERCIAL-ACTIVATION@MAIL.MIL.
10. NOTE: ANYONE VISITING BLDG 246 MUST PROVIDE APPROPRIATE SECURITY
CLEARANCE PAPERWORK, ALONG WITH THEIR NAME, PHONE NUMBER, SSAN, AND
PURPOSE OF THEIR VISIT TO THE SECURITY MANAGER DANNY DALE AT D654-2835/1633,
C703-704-2835/1633, FAX C703-704-1458, EMAIL AT DANNY.E.DALE2.CIV@MAIL.MIL VIA
FAX OR VIA THE JPAS (JOINT PERSONNEL AJUDICATION SYSTEM) USING SMO CODE
W6SHAA6. ALSO, WHEN FAXING A CLEARANCE, ALSO SEND TOHEBRON WATSON AT
FAX C703-805-3664. THIS INFO IS NEEDED INORDER FOR THE SITE TO DETERMINE IF AN
ESCORT IS REQUIRED FOR THE VISITOR. IF THE VISITOR HAS A SECURITY CLEARANCE,
THE SITE DOES NOT NEED TO SCHEDULE AND PROVIDE AN ESCORT. IF THE VISITOR
DOES NOT HAVE A SECURITY CLEARANCE, THEN THE SITE WILL NEED TO SCHEDULE AND
PROVIDE AN ESCORT FOR THE VISITOR. THIS ADVANCE NOTICE WILL BE WAIVED IN THE
EVENT OF A CIRCUIT OUTAGE.
11. NOTICE OF COMPLETION (NOC) MUST BE UPLOADED TO IDEAS AFTER 24-HOUR TEST
AND END-TO-END TESTING IS COMPLETED. NOC MUST INCLUDE NAME, PHONE AND EMAIL
ADDRESS OF GOVERNMENT POC ACCEPTING THE CIRCUIT.
If there are more than two locations, their information will be found in Attachment B to this Order.
B. ALLA NUMBER:
C. TSP AUTHORIZATION CODE: TSP0L0YVD-02
D. DEMANDER'S CODE:
E. SERVICE DATE (MM/DD/YYYY): 7/9/2025
F. TYPE OF CIRCUIT/BANDWIDTH/DATA RATE: 10 Gigabit
G. LOCATION OF TERMINATION A:
1. ADDRESS: DC2; 21715 FILIGREE CT ASHBURN, VA, 20147
2. ROOM: 1830; 1 FL
H. LOCAL PART A:
1. EXTENSION OF TELECOMMUNICATIONS SERVICE: All facilities between vendor's commercial communications interface point and termination location shall be provided by vendor. All cables shall be run in accordance with local site standards
2. INTERFACE: 10GBASE-LR, SM FIBER, LC CONNECTOR
3. DEMARK: (BLDG) DC2; (RM) 001830; (FL) 1; 21715 FILIGREE CT;
ASHBURN, VA 20147
(PMRY POC) LOUIS MONDELLO; (CMCL) 843-670-9066
(UNCLASS ORG)LOUIS.S.MONDELLO.CTR@MAIL.MIL
4. NPA/NXX: 703/723
5. UNIQUE INSTALLATION FACTORS: (1) FOR LOCAL COMMUNICATIONS UNIT: THE LOCAL
COMM UNIT
WILL ASSIST COMMERCIAL VENDOR IN EXTENDING SERVICE FROM THE COMMERCIAL
DEMARC TO THE SERVICE DELIVERY POINT (SDP).
FOR CIRCUIT ACTIVATION ASSISTANCE CONTACT DCP COMMERICIAL ACTIVATION TEAM
(CAT) AT D312-850-0820, C614-692-0820.DISA REQUIRES THAT CIRCUIT VENDOR OBTAIN A
SIGNATURE FROM A RESPONSIBLE SITE POC CERTIFYING THAT THE VENDOR PROVIDED
THE CONNECTIVITY AND THAT THE CIRCUIT IS PROPERLY TAGGED WITH CIRCUIT ID AND
TSR NUMBER OR CCSD.
6. INSIDE WIRE INSTALLATION/MAINTENANCE REQUIRED: CPIWI-YES/CPIWM-YES
7. CONTACT: (PMRY POC) LOUIS MONDELLO
LOUIS.S.MONDELLO.CTR@US.NAVY.MIL
(CMCL) 843-670-9066
(ALT POC) RYAN H MIMS
RYAN.H.MIMS.CIV@US.NAVY.MIL
(CMCL) 843-218-6657; (OFFHRS) 843-364-6010
I. TERMINATION EQUIPMENT A: COMMERICAL DEMARK
J. LOCATION OF TERMINATION B:
1. ADDRESS: 246; 9800 FLAGLER ROAD FORT BELVOIR, VA, 22060-5123
2. ROOM: 210; 2 FL
K. LOCAL PART B:
1. EXTENSION OF TELECOMMUNICATIONS SERVICE: All facilities between vendor's commercial communications interface point and termination location shall be provided by vendor. All cables shall be run in accordance with local site standards
2. INTERFACE: 10GBASE-LR, SM FIBER, SC CONNECTORPORT: TE0/7/0/2/7VCID: 901894
3. DEMARK: BLDG 246, ROOM 202, 2ND FLOOR,
9800 FLAGLER ROAD
FT BELVIOR, VA 22060-5123
PRI: KENNETH NOPP, C571-515-3000
EMAIL: KENNETH.R.NOPP.CIV@MAIL.MIL
4. NPA/NXX: 703/805
5. UNIQUE INSTALLATION FACTORS: (1) FOR LOCAL COMMUNICATIONS UNIT: THE LOCAL
COMM UNIT
WILL ASSIST COMMERCIAL VENDOR IN EXTENDING SERVICE FROM THE COMMERCIAL
DEMARC TO THE SERVICE DELIVERY POINT (SDP).
FOR CIRCUIT ACTIVATION ASSISTANCE CONTACT DCP
COMMERICIAL ACTIVATION TEAM (CAT) AT D312-850-0820, C614-692-0820. DISA REQUIRES
THAT CIRCUIT VENDOR OBTAIN A SIGNATURE FROM A RESPONSIBLE SITE POC
CERTIFYING THAT THE VENDOR PROVIDED THE CONNECTIVITY AND THAT THE CIRCUIT IS
PROPERLY
TAGGED WITH CIRCUIT ID AND TSR NUMBER OR CCSD.
6. INSIDE WIRE INSTALLATION/MAINTENANCE REQUIRED: CPIWI-YES/CPIWM-YES
7. CONTACT: PRI: KENNETH NOPP, D515-3000, C571-515-3000
EMAIL: KENNETH.R.NOPP.CIV@MAIL.MIL
ALT: HEBRON WATSON, C571-515-3000
EMAIL: HEBRON.A.WATSON.CIV@MAIL.MIL
AFTER HOURS: C703-805-3000
ORG EMAIL: USARMY.BELVOIR.NETCOM.MBX.ITC-CIRCUIT-A
CTIVAT@MAIL.MIL
L. TERMINATION EQUIPMENT B: CISCO ASR 9010 IPT-PE ROUTER (DISA PROVIDED)
M. ADDITIONAL INFORMATION:
1. CSA NUMBER: T2T000112EBM
2. BASIC AGREEMENT NUMBER: HC101321H0005
3. TSR NUMBER: NA20DEC247531A
4. CCSD: BUED7M0N
5. DIVERSITY REQUIREMENTS: NA
6. LOCATIONS TO BE AVOIDED: N/A
7. TRANSMISSION MEDIA TO BE AVOIDED: N/A
8. NETWORKS TO BE AVOIDED: N/A
9. CIRCUIT PARAMETERS: SEE TESTING REQUIREMENTS
10. TESTING REQUIREMENTS: SEE PURPOSE STATEMENT
11. GOVERNMENT ACCEPTANCE ACTIVITY: NWS/C843-323-2394
12. SECURITY REQUIREMENTS: CONTACT SITE POC (S) FOR SPECIFIC SECURITY REQ.
13. SITE ACCESS REQUIREMENTS: ESCORT REQUIRED. CONTACT SITE POC (S)
14. STANDARD PROVISIONS: Incorporated in full text below
15. CHARGES: See Attachment
16. DITCO FUND CITE: 97X4930.5F20 000 C1013 0 068142 2F 233003
17. EXPIRATION DATE: Telecommunications service provided under this contract will continue until 03/13/2030 unless sooner discontinued.
18. SIMULTANEOUS ACTION TSR NUMBER:
N. ADDRESS FOR SUBMISSION OF INVOICES: As per contract
Z. DITCO CONTACT:
Renee Lintz
667-891-3234 renee.a.lintz.civ@mail.mil
Angelina Hutson
DITCO Contracting Officer
667-890-1017 angelina.hutson.civ@mail.mil
Attachment A - CLINs and Charges
Currency: USD
CLIN/SLIN Item # Description Qty Unit NRC MRC EXT Price PoP From PoP To Location
0001 MRC 7/9/2025 3/13/2030 ASHBUR
N; CCI;
0001AA Monthly
Recurring
Charge
1 EA $1,526.00 $1526.00 7/9/2025 3/13/2030 ASHBUR
N; CCI;
0002 NRC 3/13/2025 7/9/2025 ASHBUR
N; CCI;
0002AA Non
Recurring
Charge
1 EA $5,776.50 $5776.50 3/13/2025 7/9/2025 ASHBUR
N; CCI;
Total EXT MRC: $1526.00 for POP from 7/9/2025 to 3/13/2030
Total EXT NRC: $5776.50
Section G - Contract Administration Data
Included Clauses
G1 - Points of Contact - OCT 2024 Communications with the Contractor will be conducted with the identified Point(s) of Contact (POC). Should a change in POC be required, the Contractor shall initiate this request through notification to the Contracting Officer.
Contracting Officer
Name: Angelina Hutson
Organization/Office Symbol: Phone No.: DITCO/PS8211/ 667-890-1017
E-Mail Address: angelina.hutson.civ@mail.mil
Contract Specialist
Name: Renee Lintz
Organization/Office Symbol: Phone No.: DITCO/PS8211/667-894-3234
E-Mail Address: renee.a.lintz.civ@mail.mil
COR/Mission Partner Point of Contact
Name: LOUIS MONDELLO
Organization/Office Symbol: NAVY
Phone No.: 843-670-9066
E-Mail Address: LOUIS.S.MONDELLO.CTR@US.NAVY.MIL
Contractor Point of Contact
Contractor Legal Business Name: T2 TECHNOLOGIES
UEI: 95-621-0611
Contractor POC: KRISTIN MCDONALD
E-Mail Address: kmcdonald@t2tech.net
Phone Number: 303-762-6868
Standard Provisions
252.204-7018 - Prohibition on the Acquisition of Covered Defense Telecommunications
Equipment or Services - JAN 2023 Definitions. As used in this clause--
"Covered defense telecommunications equipment or services" means--
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation, or any subsidiary or affiliate of such entities;
(2) Telecommunications services provided by such entities or using such equipment; or
(3) Telecommunications equipment or services produced or provided by an entity that the Secretary of Defense reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
"Covered foreign country" means--
(1) The People's Republic of China; or
(2) The Russian Federation.
"Covered missions" means--
(1) The nuclear deterrence mission of DoD, including with respect to nuclear command, control, and communications, integrated tactical warning and attack assessment, and continuity of Government; or
(2) The homeland defense mission of DoD, including with respect to ballistic missile defense.
"Critical technology" means--
(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms
Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;
(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration
Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled--
(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or
(ii) For reasons relating to regional stability or surreptitious listening;
(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);
(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);
(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part
73 of title 42 of such Code; or
(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50
U.S.C. 4817).
"Substantial or essential component" means any component necessary for the proper function or performance of a piece of equipment, system, or service.
(b) Prohibition. In accordance with section 1656 of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L. 115-91), the contractor shall not provide to the Government any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless the covered defense telecommunication equipment or services are covered by a waiver described in Defense Federal Acquisition Regulation Supplement 204.2104 .
(c) Procedures. The Contractor shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service, to carry out covered missions, that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless a waiver is granted.
(d) Reporting.
(1) In the event the Contractor identifies covered defense telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, the Contractor shall report at https://dibnet.dod.mil the information in paragraph (d)(2) of this clause.
(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause:
(i) Within 3 business days from the date of such identification or notification: the contract number; the order number(s), if applicable; supplier name; brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 30 business days of submitting the information in paragraph (d)(2)(i) of this clause: any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of a covered defense telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services.
(End of clause)
52.204-25 - Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment - NOV 2021
(a) Definitions. As used in this clause--
Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).
Covered foreign country means The People's Republic of China.
Covered Telecommunications Equipment or Services means-
(1) Telecommunications equipment produced by Huawei Technologies company or ZTE Corporation (or any subsidiary or affiliate of such entities);
(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera
Communications Corporation, Hangzhou Hikvision Digital Technology company, or Dahua Technology company (or any subsidiary or affiliate of such entities);
(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the Government of a Covered foreign country.
critical technology means-
(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;
(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration
Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled-
(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or
(ii) For reasons relating to regional stability or surreptitious listening;
(3) Specially designed and prepared nuclear equipment, parts and components, Materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);
(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);
(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or
(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018
(50 U.S.C. 4817).
Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.
Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of Covered Telecommunications Equipment or Services used by the entity that excludes the need to include an internal or third-party audit.
Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.
substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain national defense authorization Act for fiscal year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses Covered Telecommunications Equipment or Services as a substantial or essential component of any system, or as critical technology as part of any system. The contractor is prohibited from providing to the Government any equipment, system, or service that uses Covered Telecommunications
Equipment or Services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104.
(2) Section 889(a)(1)(B) of the John S. McCain national defense authorization Act for fiscal year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses Covered Telecommunications Equipment or
Services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of Covered Telecommunications Equipment or Services, regardless of whether that use is in performance of work under a Federal contract.
(c) Exceptions. This clause does not prohibit contractors from providing--
(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements;
or
(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(d) Reporting requirement.
(1) In the event the contractor identifies Covered Telecommunications Equipment or Services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the contractor is notified of such by a subcontractor at any tier or by any other source, the contractor shall report the information in paragraph
(d)(2) of this clause to the contracting officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the contractor shall report to the contracting officer for the indefinite delivery contract and the contracting officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The contractor shall report the following information pursuant to paragraph (d)(1) of this clause
(i) Within one business day from the date of such identification or notification: the contract number; the order number(s), if applicable; supplier name; supplier Unique Entity Identifier (if known); supplier Commercial and Government Entity
(CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: any further available information about mitigation actions undertaken or recommended. In addition, the contractor shall describe the efforts it undertook to prevent use or submission of Covered Telecommunications Equipment or Services, and any additional efforts that will be incorporated to prevent future use or submission of Covered Telecommunications Equipment or Services.
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e) and excluding paragraph (b)(2), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services.
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 02 - Understanding of DITCO IQO
Acquisition Deskbook - DEC 2022 Contractor/Telecommunications Provider (TP) acknowledges it has read and understands the current published "DITCO
Inquiry/Quote/Order (IQO) Acquisition Deskbook" version 8.0 available from the DISA Procurement Directorate web site https://www.ditco.disa.mil/. Contractor agrees that the most recent DITCO Additional Telecommunications Text as set forth in this order take precedent over any conflicting terms and conditions in the Basic Agreement.
ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: "UNDERSTAND."
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 07 - Contractor Monitoring and
Trouble Reporting - DEC 2022 Contractor/Telecommunications Provider (TP) shall utilize its existing Network Operations Centers (NOCs) to monitor and manage the performance of this service 24 hours a day/7 day a week/365 days a year including holidays and weekends
(24/7/365) to ensure that services are delivered and maintained in accordance with the contract/order. The Contractor/TP shall provide the Government its 24/7/365 trouble reporting number to assist with troubleshooting technical issues.
ACCEPTABLE TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: "UNDERSTAND," and provide contractor trouble reporting number.
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 12 - One-Stop-Shopping/End-to-End
Service - DEC 2022 U.S. Government's preference is to obtain this service on a "One-Stop-Shopping" (OSS) or end-to-end service basis. Under an
OSS or end-to-end arrangement, Contractor/Telecommunications Provider (TP) receiving this contract shall have total responsibility for end-to-end technical sufficiency and invoicing (i.e., end-to-end provisioning, restoral/maintenance, and invoicing) for entire service.
ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: "UNDERSTAND"
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 27 - Approvals and Permits - DEC
Contractor/Telecommunications Provider (TP) receiving this contract shall be responsible for having or obtaining all approvals and permits necessary to provide this service for the life of the contract. The requirement that the TP obtain all approvals and permits is a contract administration issue. Inability of Contractor/TP to obtain any such approval or permit shall not be a valid basis for not meeting service date or providing service. Failure of a Contractor/TP to obtain any approval or permit necessary to provide this service may result in termination of this contract by U.S. Government for default at no cost to U.S. Government and/or receipt of a negative past performance rating.
ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: "UNDERSTAND/WILL COMPLY.
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 30 - Contract Period - DEC 2022 This telecommunications service contract shall continue on a month-to-month basis with a not to exceed date of 13 MAR 2030.
After this period the contract will be considered expired with no authority for service to continue unless the U.S. Government issues a modification to extend. Should service continue through the end of this contract period, no modification will be issued to authorize discontinuance of service. The minimum service period shall be one month. Accordingly, the U.S. Government may discontinue service, at no additional cost to U.S. Government. U.S. Government will provide Contractor/Telecommunications
Provider (TP) 30 days' notice prior to discontinuing service before the not to exceed period. Contractors shall consider the ability of the Government to discontinue service with 30 days' notice when determining the reasonableness of incurring any costs. See
DFARS 252.239-7007, Cancellation or Termination of Orders.
Quotes/Proposals that do not accept the minimum one-month service period may be excluded from the competition and found unacceptable. The U.S. Government may consider quotes/proposals with a minimum service period greater than one month, when the Contracting Officer determines it is to the benefit of the U.S. Government. Thus, a Contractor/Telecommunications
Provider (TP) may provide more than one quote/proposal; one at a rate that accepts the minimum one-month service period, and others at rates that propose a different minimum service period.
The Government reserves the right to re-solicit these contracted services prior to the end of the not to exceed contract period when commercial market pricing demonstrates these services become available at lower prices.
ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: "UNDERSTAND/WILL COMPLY."
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 33 - Notice of Completion - DEC
For non-DTI (Delivery Ticket Invoice) contracts/orders, Contractor/Telecommunications Provider (TP) shall provide a Notice of
Completion (NOC) to DITCO within 72 duty hours (based on 24-hour workday not including weekends and holidays) of delivering service/test results to U.S. Government acceptance activity. The customer then has an additional 72 duty hours to notify DITCO if they disagree that the service is complete.
For DTI contracts/orders, Contractor/Telecommunications Provider (TP) shall provide a NOC to DITCO within 72 duty hours of government acceptance in accordance with DITCO Additional Telecommunications Text 49.
A notice of completion must include the following information:
a. Contract number
b. Communication Service Authorization (CSA)/Order Number
c. DITCO TSR number
d. Description of service (purpose statement of each individual order/modification)
e. Contracted service date
f. Date Service/Test Results Delivered/Completion Date/Effective Billing Date
g. Date Government Accepted Service
h. Government POC name and title that accepted the service
i. Contractor circuit ID(s)
j. Local Exchange Company (LEC) circuit ID(s)
k. A listing by location (including rack, row, port, etc.) of any equipment installed on government premises
l. Prime Contractor's trouble reporting number
m. Contractor bill cycle end date (not applicable for DTI)
n. Quantity
o. Unit of Measure
p. Non-Recurring Cost (NRC) Price
q. Monthly Recurring Cost (MRC) Price
r. Contractor Program Manager information, name, signature, title, and date
Unless deviations are identified, the NOC will serve as Contractor/TP's confirmation that service was provided in accordance with the contract. A follow-up NOC will be required when deviations are cleared. Failure of Contractor/TP to provide notice of completion may result in delay in invoice payment. DITCO's preferred method of receiving a NOC is via Integrated Defense
Enterprise Acquisition System (IDEAS). However, Contractors/TPs without IDEAS access may submit their NOC via email to the applicable following address that issued the inquiry/solicitation:
DITCO-Scott (IQO Section) disa.scott.ditco.mbx.pl8211@mail.mil
DITCO-Scott (PL8212 Section) disa.scott.ditco.mbx.pl8212@mail.mil
DITCO-Scott (Transport Section) disa.scott.ditco.mbx.eis-transport@mail.mil
DITCO-Scott EIS Individual Orders disa.scott.ditco.mbx.eis-individual-orders@mail.mil
DITCO-Pacific (Ford Is Office) disa.jbphh.ditco.mbx.iqo@mail.mil
DITCO-Pacific (Alaska Office) disa.jber.ditco.other.ditcoako@mail.mil
DITCO-Europe (PL51 Office) disa.stuttgart.ditco.mbx.ps511@mail.mil
DITCO-Europe (PL52 Office) disa.stuttgart.ditco.mbx.ps52@mail.mil
ACCEPTABLE CONTRACTOR/TELECOMMUNICATION PROVIDER (TP) RESPONSE: "UNDERSTAND/WILL COMPLY."
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 37 - Jeopardy Notice - DEC 2022 Contractor/Telecommunications Provider (TP) shall immediately provide a Jeopardy Notice via Integrated Defense Enterprise
Acquisition System (IDEAS) prior to the contracted service date as soon as Contractor/TP becomes aware contract service date may not be or cannot be met. A Jeopardy Notice must include the following information: (1) Contract PIID number; (2) DITCO
CSA number; (3) TSR number; (4) contracted service date; (5) explanation of why contracted service date may not be or cannot be met; (6) revised service date requested; and (7) name, phone number, and email address of Contractor/TP representative that can be contacted for any questions concerning the Jeopardy Notice. DITCO's preferred method of receiving a jeopardy notice is via Integrated Defense Enterprise Acquisition System (IDEAS). However, Contractors/TPs without IDEAS access may submit their jeopardy notice via email to the applicable following address that issued the inquiry/solicitation:
DITCO-Scott (IQO Section) disa.scott.ditco.mbx.pl8211@mail.mil
DITCO-Scott (PL8212 Section) disa.scott.ditco.mbx.pl8212@mail.mil
DITCO-Scott (Transport Section) disa.scott.ditco.mbx.eis-transport@mail.mil
DITCO-Scott EIS Individual Orders disa.scott.ditco.mbx.eis-individual-orders@mail.mil
DITCO-Pacific (Ford Is Office) disa.jbphh.ditco.mbx.iqo@mail.mil
DITCO-Pacific (Alaska Office) disa.jber.ditco.other.ditcoako@mail.mil
DITCO-Europe (PL51 Office) disa.stuttgart.ditco.mbx.ps511@mail.mil
DITCO-Europe (PL 52 Office) disa.stuttgart.ditco.mbx.ps52@mail.mil
DISA's acknowledgement of the Contractor/TP's representation of delayed performance is not an explicit or implicit acceptance of the performance delay nor is it a waiver of any rights or remedies allowed under the contract, the FAR, or applicable case law.
Moreover, it is not an acknowledgment that DISA is responsible for any part of the Contractor/TP's delayed performance.
ACCEPTABLE CONTRACTOR/TELECOMMUNICATION PROVIDER (TP) RESPONSE: "UNDERSTAND/WILL COMPLY."
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 38 - Status Report - AUG 2017 Due to the criticality of this telecommunications service, Contractor/Telecommunications Provider (TP) shall provide an updated status report to DITCO contracting officer weekly. Status report shall include (1) Contract PIID number; (2) DITCO CSA number,
(3) TSR number, (4) contracted service date, (5) explanation of current status of telecommunications service installation and how current status provides assurance that contracted service date will be met, and (6) name, phone number, and e-mail address of Contractor/TP representative to contact for any questions concerning the status report.
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 41 - Scheduled Outages - MAY
To ensure this service is available to support U.S. Government requirements, Contractor/Telecommunications Provider (TP) shall utilize alternate or spare facilities whenever possible to eliminate or minimize service interruptions. However, when a scheduled service interruption cannot be avoided, Contractor/TP shall obtain the approval of appropriate approval authority before initiating any scheduled outage. To obtain such approval, a written "circuit release request" must be submitted to appropriate approval authority at least 21 calendar days prior to requested circuit release date. Contractor/TP shall notify appropriate approval authority at least 30 minutes prior to the scheduled start time of the scheduled outage to receive verbal final approval to proceed. Additionally, Contractor/TP shall notify appropriate approval authority no later than 30 minutes after completion of the scheduled outage.
When an interruption of service is required to correct hazardous or degraded conditions, a 48-hour prior notification is required, if practicable. Contractor/TP shall notify the U.S. Government service acceptance activity as soon as it is known that a service interruption will occur. The request from Contractor/TP must include the same information as identified below, and additionally, identify the hazardous or degraded conditions that exist which preclude providing the U.S. Government with 21-day advance notice. Contractor/TP shall notify appropriate approval authority at least 30 minutes prior to the scheduled start time of the scheduled outage to receive verbal final approval to proceed. Additionally, Contractor/TP shall notify appropriate approval authority no later than 30 minutes after completion of the scheduled outage
In emergency situations, when loss of life or property might occur through lack of immediate action, Contractor/TP must make every reasonable attempt to notify the U.S. Government service acceptance activity identified on the CSA immediately, and coordinate arrangements for the service interruption to the maximum extent possible. Within one business day of the interruption, Contractor/TP must submit the same information as identified below, and additionally, identify the emergency conditions that existed which precluded providing the U.S. Government with 21-day advance notice.
"Circuit Release Request" must include following information: (1) Contractor/TP requesting circuit release, and name and phone number of Contractor/TP representative responsible for managing circuit release; (2) Contract PIID number or DITCO CSA number of circuit for which release is being requested; (3) CCSD Number; (4) date and inclusive times of scheduled circuit release, along with an alternate circuit release date and time; (5) purpose of scheduled circuit release; (6) statement indicating all equipment, parts, and/or supplies required to complete action are on-hand, or their expected delivery date; (7) statement indicating that all avenues of bypass capability (e.g., alternate facilities, spare facilities, etc.) have been considered; and (8) estimated maximum recovery time to restore circuit. The authority for approving circuit releases for this service is U.S.
Government CCO/CMO. Failure of Contractor/TP to obtain an approved circuit release prior to initiating a scheduled outage may result in U.S. Government termination of this contract for default at no cost to U.S. Government, receipt of a negative past performance rating, and/or outage credits in accordance with DITCO Additional Text G23, Outage Credits.
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 42 - Consideration - AUG 2015 Upon Contractor/Telecommunications Provider (TP) caused failure to provide telecommunications service by the specified date in the contract, failure to make progress as to endanger performance by that date, or failure to comply with any contract terms or conditions; U.S. Government may cancel or terminate this contract pursuant to contract clause DFARS 252.239-7007 at no cost to the Government. However, U.S. Government may elect to waive its right to cancel or terminate and request Contractor/TP to provide consideration to U.S. Government in lieu thereof. Consideration will be negotiated on a case-by-case basis. If
Contractor/TP fails to meet the service date or comply with any contract terms or conditions and U.S. Government elects to request consideration, Contractor/TP hereby agrees to negotiate in good faith and provide such consideration. Quotes, which fail to accept this standard provision, may be excluded from consideration for award.
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 45 - Contractor Registration - DEC
Contractor/Telecommunications Provider (TP) must register for access to Integrated Defense Enterprise Acquisition System
(IDEAS) by providing the below information to DISA PSD tech support at disa.scott.ditco.mbx.basic-agreements@mail.mil
First name
Last name
Nickname (if desired)
UEI
CAGE
Email address
Legal Business Name (as registered in System for Award Management (SAM))
Phone number
Company IDEAS Representative
Once registered, Contractor/TP can access IDEAS to download Inquiries/Solicitations, Orders, and Modifications sent directly to
Contractor/TP, and to upload Quotes, Jeopardy Notices, and Notices of Completion. An Order or Modification sent to
Contractor/TP's in IDEAS is considered the official issuance of the Order or Modification by the U.S. Government. All information concerning Contractor access to IDEAS is located at https://depsland.csd.disa.mil/html/vendor.html.
ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE:
"UNDERSTAND/WILL COMPLY."
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 49 - Delivery Ticket Invoice (DTI) -
Payments - APRIL 2024 Payment for telecommunication service provided under this Communications Service Authorization (CSA) shall be made using the DTI contract payment method in accordance with G21 - CONTRACT PAYMENTS -DELIVERY TICKET INVOICE (DTI).
The Contractor shall not submit separate invoices for telecommunication services provided under this CSA.
The Contractor provided Receiving Report (i.e., Notice of Completion (NOC) signed by the government acceptor, or a NOC combined with an email from an authorized government POC denoting acceptance.) combined with the order represents a DTI and shall form the basis for payment for each accepted telecommunication service.
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 51 - Monthly Outage Report - DEC
The primary Contractor/Telecommunications Provider (TP) shall provide a monthly report of circuit outages addressing when and why this leased service was reported out of service. One consolidated report may be submitted when more than one leased circuit provided by the Contractor/TP is reported out of service. However, each circuit outage must be reported separately and include the information below. Only closed outages shall be included in the report. Therefore, if an outage ticket is still open on the last day of the month it shall be reported on the following month's report. If the Contractor/TP has no outages to report among its inventory of DITCO Orders or Circuit Demands, no monthly report is required; however, the Contractor/TP will advise that no report is being provided as no outages have occurred. The reports must be provided electronically. Acceptable applications are Microsoft Word, Excel and Adobe Acrobat pdf. The monthly report shall contain the following information:
a. Contract PIID Number:
b. CCSD Number:
c. CSA and Circuit ID/ALLA Number:
d. Bandwidth or Data Rate:
e. Circuit Availability Rate:
f. Time Started/Date logged out to Contractor/TP:
g. Time Ended/Date logged in from Contractor/TP:
h. Duration of outage in Hours/Minutes:
i. Contractor/TP representative: Company Name, Commercial Outage Ticket Number, Technician's Name, E-mail Address and
Phone Number.
j. Government POC: Organization, Full Name, E-mail Address and Phone Number of the POC that reported the outage.
k. Remarks: (Detailed description of the reason for outage and the Contractor/TP action taken to restore service).
Reports shall be submitted to the following email address no later than the 15th day of the month following the reporting month.
DITCO-Scott disa.scott.ditco.mbx.1368-outage-info@mail.mil
DITCO-Pacific (Ford Is Office) disa.fordisland.ditco.mbx.cmdr-ditco-pac@mail.mil
DITCO-Pacific (Alaska Office) disa.jber.ditco.other.ditcoako@mail.mil
DITCO-Europe (PL51 Office) disa.stuttgart.ditco.mbx.pl511@mail.mil
DITCO-Europe (PL52 Office) disa.stuttgart.ditco.mbx.pl52@mail.mil
Outage credits will be due no later than the next Billing Cycle/Month following the outage in accordance with DITCO Additional text G23, Outage Credits in the basic agreement/order/circuit demand.
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 52 - Approved Products List - JUN
Department of Defense (DoD) Instruction 8100.04, DoD Unified Capabilities, (December 9, 2010), establishes governing policy for products and services that support and connect to the DoD Information Network (DoDIN). DoDI 8100.04 also sets forth instructions that are implemented by the Defense Capabilities Requirement (formerly the Unified Capabilities Requirement document), the DoDIN Approved Products List (APL), and the DoDIN Service Provider Equipment (SPE) List. The DoDIN APL lists products that have been certified for Cybersecurity and Interoperability and are approved for use within and on DoD networks. The DoDIN SPE lists products that may be used to interface with the DoDIN when used by Internet Service Providers
(ISP) or other Telecommunications Providers. For the purposes of this solicitation, equipment at the point of interface with the
Government's network must conform to either the DoDIN APL or the DoDIN SPE.
CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) must list the make and model number of all equipment the TP or any subcontractor will use at the point of interface with the Government's network. The Government has the right to evaluate the list of equipment at the point of interface with the Government's network to ensure it is compliant with either the DoDIN APL or the DoDIN SPE. A TP's failure to list the specific equipment used at the point of interface with the Government's network, or inclusion of equipment not on the DoDIN APL or the DoDIN SPE, may result in the TP being deemed not technically acceptable.
Additionally, during the period of performance, service delivery, and contract administration, the TP is required to ensure the TP and all subcontractors use only equipment that conforms to DoDIN APL or DoDIN SPE requirements at the point of interface with the Government's network. If at any time during the performance of this contract/order the specified equipment will not be in compliance with the requirements of this provision, the TP must notify the Contracting Officer prior to installation. The
Government has the right to review the equipment used at any time during this contract/order. When determined by the
Government that an exception is in the Government's best interest, the Government or the TP may seek an exception to policy in accordance with DoDI 8100.04 or the DoDIN APL Process Guide to allow the TP to use equipment beneficial to the
Government's mission.
The DoDIN Approved Products List and applicable procedures can be accessed at:
https://aplits.disa.mil/processAPList.action
The DoDIN Service Provider Equipment List can be accessed at:
https://aplits.disa.mil/dodinspe
ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: LIST THE MAKE AND MODEL
NUMBER OF ALL EQUIPMENT THE TP OR ANY SUBCONTRACTOR WILL USE AT THE POINT OF INTERFACE WITH THE
GOVERNMENT'S NETWORK AND PROVIDE THE FOLLOWING STATEMENT"BY SUBMISSION OF THIS QUOTE, I (AS THE
TP) CERTIFY THAT I UNDERSTAND THE PROVISION OUTLINED AND WILL COMPLY."
The submission of this quote/proposal constitutes the Telecommunications Provider's Certification that the TP has complied with the terms of the provision, and acknowledges that the TP's continued compliance with the provision is a material precondition for the Government's continued payment under the contract.
DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 53 - Critical Infrastructure
Compliance - JUL 2023 A critical element of U.S. national security is the security of America's communications networks. Threats to the security of the nation's communications networks posed by certain telecommunications equipment or service providers are a matter of concern as reflected in both Executive Branch regulations and Congressional legislation.
In order to be eligible for (contract) award, Contractor/Telecommunications Provider (TP) must certify in writing in its quote/proposal the following:
Even if the prime Contractor/TP's solution relies upon the exception of backhaul, roaming, or interconnection arrangements for delivery of some portion of the circuit/network, the solution will not use Telecommunications equipment produced by Huawei
Technologies Company, ZTE Corporation (or any subsidiary or affiliate of such entities), or other covered telecommunications equipment/service on U.S. Government camps/posts/stations, or that directly connects to U.S. Government facilities.
During evaluation and administration of any resulting contract, the Government may consult other sources to determine whether the Contractor/TP is in compliance with the certification. Furthermore, the Government may inspect the Contractor/TP's equipment or services in accordance with the terms of the contract/ order that will result from this contracting opportunity. Failure to comply with the certification may result in termination of the contract for default or cause. If the Government determines that the security risks caused by the Contractor/TP's failure to comply with the certification can be eliminated or significantly reduced, then the Government shall require the contractor to take all necessary measures to mitigate such risks. Mitigation measures shall include removal and replacement of "covered telecommunications equipment" at no cost to the Government.
ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: "BY SUBMISSION OF THIS
QUOTE, I (AS THE TP) CERTIFY THAT I UNDERSTAND THE PROVISION OUTLINED AND WILL COMPLY."
The submission of this quote/proposal constitutes the Telecommunications Provider's Certification that the TP has complied with the terms of the provision, and acknowledges that the TP's continued compliance with the provision is a material precondition for the Government's continued payment under the contract.
| Attachment A - CLINs and Charges |
| Section G - Contract Administration Data |
| G1 - Points of Contact - OCT 2024 |
| Standard Provisions |
| 252.204-7018 - Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services - JAN 2023 |
| 52.204-25 - Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment - NOV 2021 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 02 - Understanding of DITCO IQO Acquisition Deskbook - DEC 2022 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 07 - Contractor Monitoring and Trouble Reporting - DEC 2022 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 12 - One-Stop-Shopping/End-to-End Service - DEC 2022 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 27 - Approvals and Permits - DEC 2022 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 30 - Contract Period - DEC 2022 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 33 - Notice of Completion - DEC 2022 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 37 - Jeopardy Notice - DEC 2022 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 38 - Status Report - AUG 2017 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 41 - Scheduled Outages - MAY 2023 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 42 - Consideration - AUG 2015 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 45 - Contractor Registration - DEC 2022 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 49 - Delivery Ticket Invoice (DTI) - Payments - APRIL 2024 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 51 - Monthly Outage Report - DEC 2022 |
| DITCO ADDITIONAL TELECOMMUNICATIONS TEXT - 52 - Approved Products List - JUN 2023 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .