T17SOL10015_am_2.pdf
PDF 6 MB Posted
- Solicitation number
- T17SOL10015
About this file
Amendment 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_4.pdf | ||
| National_Zoological_Park_Central_Parking_Facility_Parking_Concession_Agr..__(007).docx | DOCX document | |
| Project_Agreement_Exhibit_G_(Operating_Standards).docx | DOCX document | |
| am_5.pdf | ||
| Project_Agreement_Exhibit_C_(Technical_Requirements).docx | DOCX document | |
| am_3_-NZP_FINAL.pdf | ||
| T17SOL10015_am_1.pdf | ||
| Smithsonian_NZP_CPF_P3_-_RFQ_T17SOL10015_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
T17SOL10015
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
OCON
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
SMITHSONIAN INSTITUTION
01/26/2017000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/26/2017
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Attached please find the Industry Day sign-in sheet and powerpoint presentations.
The response date is hereby extended to March 22, 2017 at 3:00 EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Thomas Dempsey
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
PUBLIC‐PRIVATE‐PARTNERSHIP FOR THE DESIGN, CONSTRUCTION, FINANCING, OPERATION
AND MAINTENANCE OF THE NATIONAL ZOOLOGICAL PARK CENTRAL PARKING FACILITY
Request for Qualifications NO. T17SOL10015 Industry Forum
January 13, 2017
CENTRAL PARKING FACILITY
Please note that in the event of any conflict between the content of this presentation and the RFQ, the terms and conditions of the RFQ shall prevail. This presentation is intended to summarize key provisions of the RFQ and is not binding on Respondents.
Background and Overview
Background
Lot A: 33,720 sq ft | 100 spaces Lot B: 38,778 sq ft | 115 spaces Lot C: 85,986 sq ft | 255 spaces Lot D: 73,510 sq ft | 218 spaces Lot E: 57,661 sq ft | 171 spaces
Lot A: 33,720 sq ft | 100 spaces Lot B: 38,778 sq ft | 115 spaces Lot C: 85,986 sq ft | 255 spaces Lot D: 73,510 sq ft | 218 spaces Lot E: 57,661 sq ft | 171 spaces
Zoo currently hosts 859 parking spaces across five surface lots covering 6.38 acres
NZP’s 2008 Comprehensive Facilities Master Plan sets out the development of a Central Parking Facility (CPF) in order to meet the following objectives:
1. Facilitate visitation
a) provide visitors an access point that is central, accessible and modernized
b) provide visitors expanded onsite parking
2. Regain acreage to expand animal habitats;
3. Consolidate access points for increased security;
4. Improve pedestrian safety by reducing pedestrian/vehicular conflict.
Project scope includes:
• Central parking structure (≈1300 spaces);
• Pedestrian bridge and midpoint entry;
• Bus drop‐off and turn‐around point;
• Ancillary works.
NZP CPF P3 ‐ RFQ No. T17SOL100152/13/2017
Snapshot of Current Parking Operations
• 2016 Zoo visitation – 2.56 million
• In addition to vehicles, Zoo also accessible by public transportation
• Smithsonian Enterprises is current operator
• Parking access control systems installed in
• Zoo closes its gates by 10:30 a.m. between 100‐130 days a year, as it is unable to attend to demand
• Flat rate of $22 per vehicle per day for all lots (most stay 3 hours)
• Total revenues having grown steadily at over 4% per year despite capacity constraints
• NZP has an extensive privilege regime, but this is being restructured [will be fully defined prior to RFP]
1,500,000
2,000,000
2,500,000
3,000,000
2010 2011 2012 2013 2014 2015 2016
Total Zoo Visitation by Fiscal Year
Total Visits Linear (Total Visits)
FY 2015 FY 2016
Vehicles 285,957 295,204 Gross Revenue $6,345,037 $7,149,358 Privileges $1,715,447 $1,886,547
Revenues (net of privileges) $4,629,590 $5,262,811
Existing surface parking lots no longer meet the needs of the Zoo’s growing attendance and future programming
Key Delivery Considerations
Category Objectives
Timeline • Avoid schedule delays and protracted construction. Transfer completion risk
Design / Aesthetics • Landmark site requires / aesthetic alignment with NZP mission
• Design to meet current and future requirements and green standards
Constructability and Integration
• Integrate with existing General Services Building
• Construction must take place without disrupting ongoing GSB operations
Operability • Fully integrated into NZP traffic management plan
• Technologies to facilitate traffic flow and maximize revenues
Life‐Cycle • Ensure life‐cycle management at prescribed performance standards.
Cost • Cost efficiencies through innovation and bundling through DBFOM
Revenue • Annual concession fee and/or a revenue‐sharing arrangement with NZP
• Commercialization / Innovative CPF usage during off‐peak hours
Service Levels • Focus on visitor satisfaction and quality of service
• Real time information and best‐in‐class amenities and technology
Asset Stewardship • Maintain facilities in accordance with optimal standards over term
Continuous Improvement • Continuously improve service levels via new technologies
Safety • Provide safe, secure, efficient parking at NZP
Project Delivery Approach
Baseline Transaction Structure
Transaction Structure: Design‐Build‐ Finance‐Operate‐Maintain (DBFOM).
Compensation Structure: User payments, with rates and charges regulated by NZP. SI does not anticipate additional owner guarantees.
Anticipated Term: Construction + 30 year O&M.
Ownership: Smithsonian
Owner Consideration: Annual concession fee (fixed and/or variable).
Scope of Services: Private Partner to design, build, finance, operate and maintain CPF and related facilities in accordance with prescribed standards (as set out in RFP and Contract).
Rights: Anticipated leasehold concession.
7NZP CPF P3 ‐ RFQ No. T17SOL100152/13/2017
Anticipated Scope
2.2.2. Design and Construction Scope
2.2.2.1 Central Parking Facility (≈1300 spaces)
2.2.2.2 Pedestrian bridge and midpoint entry
2.2.2.3 Bus drop off and turn‐around
2.2.2.4 Ancillary works
Design and Construction Considerations:
• Aesthetic alignment with Zoo mission
• Functionality and operability
• Green Garage standards
• Constructability
• Third party consultations and approvals
2.2.3 Financing Scope
• Private financing (off‐balance to SI)
• Open to all capital structures
2.2.4 Operations & Maintenance
2.2.4.1 Parking operations
• Obligation to provide a broad range of parking and traffic management services at prescribed service levels, including responsibility for continual technology management
2.2.4.2 Maintenance
• Routine and major maintenance of facilities
• Handback standards
Procurement Overview
RFQ Overview
(1 ) Introduction & General Information
Appendix A – Information Memorandum
(2) Project Description
(3) Procurement Requirements and Protocol
(5) SOQ EVALUATION & QUALIFICATION
Appendices
Invitation for submission of statements of qualifications , description of Contracting Authority, Procurement overview (two‐stage process), definitions and statement of no‐ liability.
2.1 Background and Objectives
2.2 Description of Anticipated Scope and
Transaction Structure
3.1 Procurement process
3.2 Anticipated timeline
3.3 No obligation
3.4 Request for Information
3.5 Information Memorandum & Available
Data
3.6 Teaming and Representation
3.6.1 Right to form Consortia
3.6.2 Exclusivity
3.6.3 Leader Designation
3.6.4 Changes in Organization
5.1. Evaluation & Short‐Listing Procedure
5.1.1 Minimum Qualifications
5.1.2 Evaluation Procedure
5.1.3 Clarifications and Additional Information
5.1.4 Notifications
5.2 Evaluation Criteria and Weighting
5.2.1 Evaluation Categories and Criteria
5.2.2 Organization and Management
5.2.3 Technical Qualifications and Capability
5.2.4 Financial Qualifications and Capability
5.2.5 Discretion to Disqualify Respondent
Presents general information relevant to the project scope, Site and parking operations at the National Zoological Park.
Volume 1 ‐ Experience & Capabilities Part 1 General Information Part 2 Organization and Management Part 3 Technical Experience, Capabilities and Project Understanding Part 4 Financial Capabilities and
Experience Volume 2 ‐ Financial Information
A. Submittal Letter B. Certifications C. Legal Disclosures D. Confidentiality E. Major Participant Information F. Technical Experience G. Financial Information H. Safety Performance Questionnaire
RFQ No. T17SOL10015
4.1 Generalities
4.2 Form and Content of the Response
4.3 Delivery
4.3.1 Copies and Marking of Responses
4.3.2 Delivery Location
4.3.3 SOQ Submission Deadline
4.3.4 Formatting and Page Limits
(4) SUBMISSION REQUIREMENTS
(6) General Provisions, Statement Limitations
6.1. Conflicts of Interest
6.2 Public Disclosure
6.3 Reserved Rights
Appendix B – Submittal Requirements
Appendix C – Forms
Key Procurement Considerations
Communications and Clarifications
• Please direct all communications through Eve Errickson at ErricksonE@si.edu
• Formal Notifications posted to Fed Biz Opps
• Deadline for request for clarification 2 p.m. Eastern on February 22, 2017
• All addenda and amendments to this RFQ shall be posted on www.fbo.gov by 2:00 p.m. on March 01, 2017
• Respondents are solely and exclusively responsible for checking this site for updates
Anticipated Procurement Timeline
RFQ Issue Jan 26, 2017 Request for Clarifications Deadline Feb 22, 2017 SOQ Submission Deadline Mar 10, 2017 Respondent interviews (if held) Mar 27‐29, 2017 Proposers announced April 10, 2017 Draft RFP issued May 15, 2017 Proposals Due Oct / Nov 2017 Successful Proposer announced Dec 2017
Teaming and Exclusivity
• §3.6.2 stipulates that Major Participants are prohibited from participating on more than one team
• Major Participant is defined in §1.5 and refers to key team member
• Non‐major participants are not subject to exclusivity
Submission Requirements
Submission Deadline: 2:00 P.M. Eastern on March 10, 2017
Volume 1: Experience and Capabilities
• Submittal Letter – Form A
• Executive Summary
• Certifications – Form B
• Legal Disclosures – Form C
• Confidential Info Index – Form D
2.1 Legal Structure
Describe organizational structure and identify Major Participants and key entities
2.2 Major Participant Info – Form E
2.3 Organizational Charts
Management and functional structures for each stage of Project.
2.4 Organizational Narrative
Integration and functional relationship among Major Participants, where Major Participants have worked together previously and approach to each project delivery element and benefits of structure.
2.5 Key Personnel Information
Principal in charge
Part 1 – General Information Part 2 – Organization & Management
Submission Requirements
Volume 1: Experience and Capabilities (continued)
3.1 – 3.6 Technical Experience For each Lead Architect, Contractor, and Parking Operator – Forms F1‐F3. Looking for experience with similar contracting arrangements and projects of similar size, scope and complexity
3.7 Technical Capabilities Narrative & Resumes
Overall capability, stressing integration of diverse project elements. Up to 10 resumes (across all delivery areas)
3.8 Safety Narrative – Form H
3.9 Technical Approach
Narrative of approach to design and construction, as well as parking O&M.
3.10 Project Understanding
Narrative describing major elements of Project;
potential opportunities, risks and challenges; etc.
4.1 Equity Member Experience – Form G‐1
Identify similar projects where Equity Member has successfully reached financial close
4.2 Equity member Experience – Attachment to
Form G‐1 Narrative ‐relevant project finance experience
4.3 Information regarding Equity Members –
Form GG1
Part 3 –Experience, Capabilities and Project Understanding
Part 4 – Financial Capabilities & Experience
Volume 2: Financial Information
5.1 Financial Officer Certificate – Form GG2
For each Equity Member, Lead Contractor, Lead Contractor Member and Guarantor
5.2 Financial Statements
5.3 Equity Funding Letter
5.4 Surety Letter
Evaluation and Shortlisting
Category Requirement
Design and Construction
Within past 7 years, Respondent must have designed and built at least fivemulti‐level parking garages accommodating a minimum of 1,300 spaces
Operations & Maintenance
Within past 7 years, Respondent has operated and maintained at least five parking systems with multi‐level parking garages offering at least 1,300 spaces
Financing Within past 5 years, Respondent has successfully reached financial close at least once for capital improvements related to a DBFOM
• Minimum qualification threshold for eligibility set forth in § 5.1.1
• Submissions meeting minimum qualification threshold shall be eligible for evaluation using the qualitative criteria indicated in § 5.2
MINIMUM QUALIFICATION THRESHOLD
Evaluation & Shortlisting
• Specific evaluation parameters and considerations detailed throughout § 5.2
• Intention is to short‐list three to four Respondents; however, Smithsonian may, in its sole discretion, increase or decrease this number.
• Shortlisted Respondents will subsequently be invited to submit proposals, in accordance with a Request for Proposals
(“RFP”).
Evaluation Categories Maximum Points
Organization and Management 10 Technical Qualifications and Capabilities Design‐Build Capabilities and
Experience
Parking O&M Capabilities and Experience
Project Understanding
Financial Qualifications and Capabilities 30 Total 100
Wrap‐Up
Wrap up and Q&A
• Central Parking Facility is a critically important project for the Smithsonian and the National Zoological Park
• Potentially precedent‐making public‐private‐ partnership
• Landmark project
• Steadfast commitment to project advancement by Smithsonian leadership
• Smithsonian welcomes Statements of Qualifications in response to this RFQ and looks forward to a competitive and transparent process involving the best operators, design‐ builders and investors in today’s market.
COPYRIGHT © JONES LANG LASALLE IP, INC. 2016
Industry Forum Jill Jamieson
Managing Director Jones Lang LaSalle
Jill.Jamieson@am.jll.com
CENTRAL PARKING FACILITY
Site Tour & Industry Forum
Monday, February 13, 2017
9:00 a.m. – 10:00 a.m. Site Tour
Participants to sign-in at the roof of General Services Building in Parking Lot C. The Smithsonian will provide a brief project overview and then participants will take a walking tour of the Site.
10:00 a.m. – 10:25 a.m.
Transfer to Visitors Center Auditorium
Transfer from Lot C to the Visitors Center Auditorium. Shuttle buses will be provided, but participants are encouraged to walk in order to further inspect and understand the Site.
10:30 a.m. – 11:30 a.m.
Industry Forum [at NZP Visitors Center Auditorium]
Welcome and Opening Remarks
Dennis Kelly, Director of the Smithsonian National Zoological Park
Central Parking Facility Project Overview
Steve Sumner, Program Executive for the Capital Program at the Smithsonian National Zoo
P3 Solicitation and Transaction Overview
Jill Jamieson, Managing Director, JLL
11:30 a.m. – 11:45 a.m. Questions and Answers / Conclusion
Panel
CENTRAL PARKING FACILITY P3
Background on the Parking Garage Idea
1973 Master Plan proposed a terraced, multi-level parking facility on Lot C
1986 Master Plan proposed the same
2007 Parking Garage Study
Key Assumptions:
• Steel preferred over concrete (lighter)
• Existing lot has a 6% east/west slope; new levels will be set with a 2% slope
• Existing North Road serves as primary vehicle ramp to multiple parking levels (no internal garage ramp) Options Considered:
• 43,000 square foot addition of new, multi-story office space at west end of garage
December 2008Final Summary Presentation--Rock Creek & Front Royal Sites
Comprehensive Facility Master Plan
Existing Conditions
Comprehensive Facility Master Plan continued to include a terraced, multi-level parking facility on Lot C and an underground parking facility near Connecticut Avenue, based on need analysis conducted as part of the Transportation Management Plan and the Environmental Assessment
2011 Concept Updates
Based on 2007 Concept “2”, with adjustments:
• Revised retaining wall location and parking layout to accommodate third lane on
North Road
• Evaluation of bus parking and staging on grade at east end
• Evaluation of permanent and seasonal program space opportunities on Level 6
(terrace level), with reduction in total parking space count
• Preliminary analysis of opportunities for zero-net energy and green development strategies discussed in 2007 report
Quinn Evans Architects - April 2011 Context image © 2011 Google & Grey Buildings © DC GIS & CyberCity
2011 Proposed 6-Level Garage – Elevations
2011 Proposed 6-Level Garage – Sections and Floor Plans of Levels 1-5