This is a Signing Specification Sheet and Scope of Work document from the County of Louisville, Kentucky, detailing the requirements for sign fabrication, installation, and maintenance on a highway or transportation project. The project encompasses the furnishing, fabrication, and erection of various road signs including sheeting signs, panel signs, warning signs, pedestrian crossing signs, bicycle warning signs, school warning signs, and milepost markers. The specification requires compliance with current editions of the Manual on Uniform Traffic Control Devices (MUTCD), Kentucky Department of Highways Standard Specifications for Road and Bridge Construction, and Federal Highway Administration standards. All existing sheeting signs within the project limits must be removed and replaced with new signs and posts that conform to current standards. The contractor must notify TRIMARC representatives at least two weeks in advance of beginning work on enhanced reference location signs and obtain written approval from the engineer before installation, submitting mill test reports and manufacturer documentation for all materials including beams, steel panels, and sheeting of different gauges.
The specifications establish detailed material and installation requirements, including the use of Type I or Type II steel posts driven 32 to 34 inches below ground line, Type "A" or Type "C" breakaway beam systems, and Class "A" concrete for all sign bases. Permanent signs must be fabricated using Type XI sheeting, with specific signs such as warning messages, school signs, and pedestrian crossing signs requiring Type XI fluorescent yellow-green or yellow sheeting. All hardware must comply with ASTM B-776 and ASTM A-307 standards and be cadmium-plated steel. The contractor bears all costs for removing existing signs and posts, excavation, site clearing and grubbing, tree trimming, and ground restoration, which are considered incidental to the contract. The horizontal clearance for sheeting signs must maintain a minimum of 6 feet from the shoulder edge or 12 feet from the traveled way edge, and spacing between multiple sign assemblies must provide approximately 6 inches of clearance.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T002
SIGNING SPECIFICATION SHEET
SCOPE OF WORK
SIGN MATERIALS
STEEL POSTS:
SHEET.
PLACEMENT OF POST CLIP SHALL BE AS SHOWN ON THE SIGNING MISCELLANEOUS DETAIL
SIGNS TO THEIR SUPPORTS SHALL BE AS RECOMMENDED BY THE PANEL MANUFACTURER.
ALL HARDWARE FOR THE ASSEMBLY OF PANEL SIGNS AND THE ATTACHMENT OF THESE
IN ACCORDANCE WITH ASTM B-776 AND ASTM A-307.
ALL HARDWARE FOR THE ERECTION OF SHEETING SIGNS SHALL BE CADMIUM PLATED STEEL
HARDWARE:
WITH MANUFACTURER'S SPECIFICATIONS AND/OR RECOMMENDATIONS.
ALL RETROREFLECTIVE MATERIALS SHALL BE FABRICATED AND ASSEMBLED IN ACCORDANCE
LETTERS, SYMBOLS, AND BORDERS:
SIGNING SPECIFICATION NOTES
TO THE WORK DESCRIBED HEREIN:
THE FOLLOWING PUBLICATIONS ARE APPLICABLE
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
ALL STEEL POSTS SHALL MEET THE REQUIREMENTS OF SECTION 832 OF THE STANDARD
E S
H E
T
N A
M
M ic r o
S t a t io n v 1.
COUNTY OF ITEM NO. SHEET NO.
SIGN SUBSTRATES
SHEETING SIGN DETAIL SHEET.
INSTALLATION PROCEDURES AND BRACING REQUIREMENTS ARE DETAILED ON THE
TYPE II POST SHALL BE STANDARD INSTALLATION IN SOIL WITH A SOIL STABILIZER.
MEDIAN CROSSOVER SIGNS
MISCELLANEOUS
270-307-7456
502-587-6624
LOUISVILLE, KY 40202
901 WEST MAIN STREET
DETAIL SHEET AND ENHANCED REFERENCE LOCATION SIGNS DETAIL SHEET.
DEVICES (CURRENT EDITION). ADDTIONAL REQUIREMENTS ARE GIVEN ON THE SIGNING POSITIONING
THE GENERAL REQUIREMENTS SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL
MILEPOST MARKERS AND ENHANCED REFERENCE LOCATION SIGNS SHALL CONFORM TO
WEEKS IN ADVANCE OF BEGINNING WORK ON THIS ITEM:
BE VERIFIED BY TRIMARC. NOTIFY A REPRESENTATIVE OF TRIMARC AT LEAST TWO
FOR THE LOUISVILLE AREA, FINAL LOCATION OF ENHANCED REFERENCE LOCATION SIGNS SHALL
CROSSOVERS.
FOR FLEXIBLE DELINEATOR POST ARRANGEMENT FOR INTERCHANGE RAMPS AND
TRAFFIC IN EACH DIRECTION. FOR ADDITIONAL GUIDANCE, SEE SEPIA DRAWING
AT THE MEDIAN SHOULDER ON THE FAR SIDE OF THE CROSSOVER, ONE FACING
SIGNS SHALL BE MOUNTED PERPENDICULAR TO THE ROADWAY ON SEPARATE POSTS
IN EACH DIRECTION. AT CROSSOVERS ON MEDIANS OVER SIXTY FEET (60') WIDE, THE
ROADWAY ON THE SAME POSTS IN THE CENTER OF THE MEDIAN, ONE FACING TRAFFIC
FEET (60') WIDE OR LESS, THE SIGNS SHALL BE MOUNTED PERPENDICULAR TO THE
MENTIONED IN THE FOLLOWING SHEETS OR NOT. AT CROSSOVERS ON MEDIANS SIXTY
CROSSOVER. THIS IS TO BE DONE WHETHER ALL NEEDED INSTALLATIONS ARE
THE CONTRACTOR SHALL INSTALL 48" X 48", "NO U TURN" SIGNS (R3-4) AT EACH MEDIAN
VISIBILITY OF SIGNS, SHALL BE INCIDENTAL TO THE CONTRACT.
CLEARING AND GRUBBING, AND TREE TRIMMING, WHEN REQUIRED FOR CONSTRUCTION OR
DEPARTMENT.
SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE
SHEET METAL COVERS. ANY SIGNS THAT ARE DAMAGED AS A RESULT OF COVERING
USED SUCCESSFULLY FOR LIMITED PERIODS. DO NOT USE TAPE, PAPER, PLASTIC, OR
ARE FOLDED OVER THE SIGN EDGES AND SECURED AT THE BACK OF THE SIGN HAVE BEEN
TO MOISTURE, SUNLIGHT, ETC. POROUS CLOTH OR GEOTEXTILE FABRIC COVERS WHICH
COVERINGS MAY CAUSE PERMANENT DAMAGE TO THE SIGN FACE FOLLOWING EXPOSURE
COVER THE SIGN FACE TEMPORARILY FOLLOWING ERECTION, USE CAUTION SINCE SOME
SIGN COVERING IS NOT RECOMMENDED. HOWEVER, IF IT IS ABSOLUTELY NECESSARY TO
AS DIRECTED BY THE ENGINEER, AT NO ADDITIONAL COST TO THE DEPARTMENT.
ANY AREA DISTURBED SHALL BE SIDE GRADED TO THE EXISTING SLOPES AND RESEEDED
APPLY COPY IN A WORKMANLIKE MANNER.
DIAMETER OF 3/16 INCH, AND THE LENGTH SHALL BE AS NECESSARY TO PROPERLY
PANEL OVERLAY SECTIONS SHALL BE AFFIXED WITH A "POP" RIVET WITH A MINIMUM
GROUND-MOUNTED SIGN SUPPORTS
GENERAL:
NOTED ON THE PLANS.
PLANS. NEW SIGNS ARE TO BE INSTALLED AT EXISTING LOCATIONS UNLESS OTHERWISE
COMPLETED SIGNS AS INDICATED AT LOCATIONS DESCRIBED ELSEWHERE IN THESE
TO FURNISH, FABRICATE AND ERECT IN PLACE ALL MATERIALS NECESSARY TO FORM
BEHIND GUARDRAIL.
SHALL BE REMOVED AND REPLACED WITH TYPE I OR TYPE II POSTS, UNLESS THEY ARE LOCATED
REQUIRED BASE EMBEDMENT. EXISTING I-BEAMS ON WHICH SHEETING SIGNS ARE ATTACHED
AND POSTS SHALL BE OF SUFFICIENT LENGTHS TO EXTEND FROM THE TOP OF THE SIGN TO THE
ALL SIGNS SHALL BE POSITIONED AS SHOWN ON THE POSITIONING DETAIL SHEET. ALL BEAMS
CONCRETE BASES
SHOWN ELSEWHERE IN THESE PLANS.
ALL CONCRETE BASES SHALL BE OF CLASS "A" CONCRETE FOR SIGNS AND SHALL BE AS
COST OF CLASS "A" CONCRETE FOR SIGNS.
EXCAVATION NECESSARY TO CONSTRUCT BASES AND FOOTINGS IS INCIDENTAL TO THE
COMPLETELY AND BACKFILLED TO EXISTING GROUND LINE.
BELOW EXISTING GROUND LINE OR THE ENTIRE BEAM AND CONCRETE BASE ARE TO BE REMOVED
PROJECTING ABOVE THE GROUND LINE ARE TO BE CUT OFF A MINIMUM OF ONE FOOT (1')
WHERE THE REMOVAL OF BEAM SIGN SUPPORTS IS CALLED FOR, THE BEAM AND ANY CONCRETE
EXISTING GROUND LINE, AND THE DISTURBED AREAS RESEEDED.
IS TO BE REMOVED TO A MINIMUM OF ONE FOOT (1') BELOW THE GROUND LINE, BACKFILLED TO
WHERE THE REMOVAL OF OVERHEAD STRUCTURE CONCRETE BASE IS CALLED FOR, THE BASE
SAMPLES, TESTING, ETC.
DIVISION OF CONSTRUCTION AND APPROVED PRIOR TO ERECTION.
DIFFERENT GAUGE OF ALUMINUM OR STEEL SHEETING USED MUST BE SUBMITTED TO THE
OF ALL MATERIALS TO BE USED. MILL TEST REPORTS FOR BEAMS, STEEL PANELS, AND EACH
ENGINEER DRAWINGS, DESCRIPTIONS, MANUFACTURER'S CUTS ETC. FOR WRITTEN APPROVAL
BEFORE BEGINNING INSTALLATION, THE CONTRACTOR SHALL FURNISH TO THE PROJECT
REMOVE AND DO NOT REPLACE THE WHITE ON BLUE GENERAL SERVICES SIGNS AT THE
EXIT RAMP TERMINALS, "EMERGENCY STOPPING ONLY" SIGNS, AND THE ROUTE MARKER THAT
IS LOCATED INSIDE THE INTERCHANGE PAST THE EXIT GORE AREA.
INSTALLATION OF ADVISORY EXIT AND RAMP SPEED SIGNS (W13-2 AND W13-3) SHALL CONFORM
TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
AND SPECIFICATIONS, SEE THE CURRENT PROJECT SIGNING PLAN DETAIL SHEETS.
ALL EXISTING SIGNS, ALL SIGNS SHOWN ON THE SIGNING PLANS MUST BE INSTALLED. FOR SIGN SIZES
AND ALL HARDWARE REQUIRED, SHALL BE INCIDENTAL TO THE PROJECT. IN ADDITION TO REPLACING
RELOCATING EXISTING SIGNS AND POSTS TO CONFORM TO THE SIGNING PLANS AND SPECIFICATIONS, STANDARDS/SPECIFICATIONS. THE COST FOR REMOVING EXISTING SHEETING SIGNS AND POSTS, AND REPLACED WITH NEW SIGNS AND POSTS. SIGNS AND POSTS SHALL CONFORM TO CURRENT
ALL EXISTING SHEETING SIGNS WITHIN THE LIMITS OF THIS PROJECT ARE TO BE REMOVED
THE COST FOR SIGN BRACKETS AND ANY OTHER HARDWARE REQUIRED TO ATTACH NEW SIGNS
ON EXISTING TRUSSES AND CANTILEVERS SHALL BE INCLUDED IN THE UNIT PRICE OF SIGN BASE
MATERIAL FOR PANEL SIGNS.
DUPLICATE SIGNS SHALL NOT BE DISPLAYED DURING THE CONSTRUCTION OF THIS PROJECT.
SHEETING SIGNS (D1-1, D1-2, D1-3) EQUAL TO OR LESS THAN 72" X 42" REQUIRE TWO TYPE I OR
TYPE II POSTS.
THE HORIZONTAL CLEARANCE "X" ON ALL THE SHEETING SIGNS SHOULD BE A MINIMUM OF
6' FROM THE EDGE OF THE SHOULDER TO THE EDGE OF THE SIGN OR A MINIMUM OF 12' FROM
THE EDGE OF THE SIGN TO THE EDGE OF THE TRAVELLED WAY AS SHOWN IN THE SIGNING
POSITIONING DETAIL SHEET.
IF ANY SIGN IS LOCATED NEAR A LUMINAIRE OR ANOTHER POLE, IT SHALL BE INSTALLED IN
ADVANCE OF THE POLE SO THAT THE MOTORISTS VIEW OF THE SIGN WILL NOT BE OBSTRUCTED.
SIGNS THAT DO NOT COMPLY WITH THE MUTCD SHALL BE REMOVED BY THE CONTRACTOR AS
APPROVED AND DIRECTED BY THE ENGINEER.
SPACING BETWEEN SIGNS.
EACH OTHER, THE POSTS SHALL BE SPACED TO PROVIDE APPROXIMATELY SIX INCHES (6") OF
ON SHEETING SIGNS WHERE THERE ARE MORE THAN ONE SIGN ASSEMBLY MOUNTED BESIDE
THE PROJECT.
THE COST FOR REMOVING EXISTING PANEL SIGNS SHALL BE INCIDENTAL TO THE COST OF
ADMINISTRATION
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CURRENT EDITION) -- FEDERAL HIGHWAY
STANDARD HIGHWAY SIGNS AND MARKINGS (CURRENT EDITION) -- FEDERAL HIGHWAY ADMINISTRATION
CONSTRUCTION (CURRENT EDITION)
KENTUCKY DEPARTMENT OF HIGHWAYS STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION (CURRENT EDITION) AND THESE PLANS.
SIGN SUBSTRATES SHALL CONFORM TO SECTION 833 OF KENTUCKY'S STANDARD
PANEL SIGNS SHALL BE LABELED AS P-#. SHEETING SIGNS SHALL BE LABELED AS S-#.
SIGN SHEETING:
ON THE DEPARTMENT'S LIST OF APPROVED MATERIALS SHALL BE USED.
FOR ROAD AND BRIDGE CONSTRUCTION (CURRENT EDITION) AND THESE PLANS. ONLY SHEETING
SIGN SHEETING SHALL CONFORM TO SECTION 830 OF KENTUCKY'S STANDARD SPECIFICATIONS
MATERIALS SHALL BE USED. BRACING, IF REQUIRED, SHALL BE INCIDENTAL TO TYPE I POST.
ONLY BREAKAWAY TYPE "D" POST SYSTEMS ON THE DEPARTMENT'S LIST OF APPROVED
STABILIZER, OR TYPE "D" (BREAKAWAY SIGN POST SUPPORT SYSTEM INSTALLATION).
TYPE I STEEL POSTS SHALL BE EITHER STANDARD INSTALLATION IN SOIL, WITH SOIL
BEAMS:
RESOLUTION.
BEAM LENGTHS, WITH ANY DISCREPANCIES BROUGHT TO THE ATTENTION OF THE ENGINEER FOR
MEASUREMENTS AT EACH SIGN LOCATION AND CROSS SECTIONS SHALL BE DEVELOPED TO VERIFY
THESE PLANS ARE FOR INFORMATIONAL PURPOSES ONLY. THE CONTRACTOR SHALL TAKE FIELD
BE INDICATED FOR EACH PANEL SIGN ON THE SIGN DETAIL SHEETS. BEAM LENGTHS INCLUDED IN
LIST OF APPROVED MATERIALS SHALL BE USED. THE TYPE AND SIZE OF BEAM TO BE USED SHALL
FOR "C" BEAM SHEET. ONLY BREAKAWY (TYPE "C") BEAM SUPPORT SYSTEMS ON THE DEPARTMENT'S
DETAIL SHEET, AND THE TYPE "C" BEAMS ARE SHOWN ON THE BREAKAWAY SIGN SUPPORT SYSTEM
SIGN POST SUPPORT SYSTEM INSTALLATION). TYPE "A" BEAMS ARE SHOWN ON THE PANEL SIGN
ALL BEAMS SHALL BE EITHER TYPE "A" (STANDARD BEAM INSTALLATION) OR TYPE "C" (BREAKAWAY
USING TYPE XI SHEETING.
ALL OTHER PERMANENT SIGNS (INCLUDING THE BACKGROUNDS OF PANEL SIGNS) SHALL BE FABRICATED
SIGNS LISTED ABOVE
- SUPPLEMENTAL PLAQUES TO ANY OF THE PREVIOUSLY LISTED FLUORESCENT YELLOW-GREEN
SIGNS
- IN-STREET PEDESTRIAN CROSSING (R1-6) SIGNS AND OVERHEAD PEDESTRIAN CROSSING (R1-9)
SUPPLEMENT PEDESTRIAN WARNING SIGNS
- PEDESTRIAN WARNING SIGNS AND DIAGONAL DOWNWARD POINTING ARROW PLAQUES THAT
ARROW PLAQUES THAT SUPPLEMENT BICYCLE WARNING SIGNS.
- BICYCLE WARNING SIGNS AND 'SHARE THE ROAD' PLAQUES OR DIAGONAL DOWNWARD POINTING
- ALL SCHOOL AND SCHOOL BUS WARNING SIGNS.
THE FOLLOWING SIGNS SHALL BE FABRICATED USING TYPE XI FLUORESCENT YELLOW-GREEN SHEETING:
- WARNING MESSAGES ON PANEL SIGNS
- ALL ADVISORY SPEED PLAQUES
- HORIZONTAL ALIGNMENT SIGNS AND PLAQUES
THE FOLLOWING SIGNS SHALL BE FABRICATED USING TYPE XI FLUORESCENT YELLOW SHEETING:
PERMANENT SIGNS AND SIGN COMPONENTS SHALL BE FABRICATED USING TYPE XI SHEETING:
CONCRETE BASES (CONTINUED)
FONTS:
MILEPOST MARKERS AND ENHANCED REFERENCE MARKERS
WILL NOT BE REQUIRED.
CONCRETE. THE COST SHALL BE INCIDENTAL TO STEEL POST, AND SOIL STABILIZERS
SHALL DRILL HOLES OF THE REQUIRED DEPTH INTO THE ROCK AND BACKFILL WITH
LINE AS SHOWN. HOWEVER, IF SOLID ROCK IS ENCOUNTERED, THE CONTRACTOR
TYPE I AND II STEEL POSTS IN SOIL SHALL BE DRIVEN 32" TO 34" BELOW THE GROUND
STANDARD ALPHABETS SHALL BE USED FOR ALL LEGENDS ON PANEL GUIDE SIGNS.
C
P W
W O
R K
T E
D S
W A
N S
E G
A R
D M
S
T
S I G
N I
G
G
N E
R
L
O
T E S
D G
N F I L
M
6-24-2020
J u ly
D A
T E
P
L O
T T
E D
T e d S w a n s e g a r
U S
E R
File details come from the government source that posted it. Updated .