About this file
This document is a solicitation from Greene County, Georgia for the construction of a single, 220-foot-long, 59-foot-wide T-Hangar at the Greene County Airport. The project will incorporate two end-wall storage buildings and eight individual airplane hangars. Sealed proposals will be accepted until May 17, 2024 at 10:00 AM, with a mandatory pre-bid conference held on April 22, 2024. The successful bidder must complete the project by September 30, 2024. All work must comply with various building codes and Greene County ordinances. The winning contractor will be required to provide a performance bond and must perform at least 50% of the work with its own organization.
The bid proposal requires the submission of a bid bond or certified check in the amount of 5% of the total bid. The contractor must certify that it does not and will not maintain segregated facilities and that the bid prices are genuine and not the result of collusion. The project will be awarded to the lowest responsive and responsible bidder, and Greene County reserves the right to reject all bids.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT: Construction of a single, 220-foot-long, 59-foot-wide T-Hanger at the Greene County airfield, incorporating two end-wall storage buildings and eight individual airplane hangars.
Underground utilities must be located for every excavation before any work is done. To drain any fluids to the exterior of the building, the newly placed T-Hanger slab needs to be sloped in both directions to the outside and have a minimum of 95% compaction throughout the slab. Any harm done to property or utilities is within the contractor's responsibility. Before payment, every part of the construction will be examined.
Project Number: PLL 2024-001 – 2024-001
NOTICE TO CONTRACTORS
Sealed proposals will be received by the Greene County Project Manager until Friday, May 17, 2024, at 10:00 AM, at the Greene County Building and Zoning Office, located at 1034 Silver Drive, Suite 103, Greensboro, GA 30642. The bids will be publicly opened and read aloud. No submitted bid may be withdrawn after the scheduled closing time or receipt of bids for a period of thirty (30) days. No bids will be accepted after 10:00 AM local time on May 17, 2024.
The work to be performed consists of the furnishing of all labor, materials, and equipment for the complete construction of:
Construction of a single, 220-foot-long, 59-foot-wide T-Hanger at the Greene County airfield, incorporating two end-wall storage buildings and eight individual airplane hangars.
The Bidder is required to submit only the Bid Proposal, which includes:
1. Completed Bid Proposal Form Page
2. Bid Bond or Certified Check
3. Certification of Contractor re: Non-Segregated Facilities
4. Non collusion Affidavit of Prime Bidder
5. Certifications
6. Completed Schedule of Items…(Sign Each Page)
A Pre-Bid Conference for all bidders will be held April 22, 2024, at 10:00 AM, at the Greene County Building and Zoning Office, located at 1034 Silver Drive, Suite 103, Greensboro, GA 30642.
Bidding Documents are open to the public at the Greene County Building and Zoning Office.
All work performed for this project will be in accordance with the 2018 International Building Code, 2018 International Fire Code, 2020 National Electrical Code, Life Safety Code, 2015 International Energy Conservation Code, Chapter 10, and Appendix B of the Greene County Code of Ordinances, all addenda issued to the Specifications of the published codes and any modifications identified in the bid documents.
The Bidder shall be responsible for performing with his/her own organization at least fifty percent (50%) of the work in this contract. The Bidder shall not subcontract, transfer, assign, or otherwise dispose of the contract or any portion thereof, without the written consent of the County.
The successful bidder shall secure and pay for necessary approvals, permits, assessments, and changes required for construction and installation of this project as required by local, state, and federal regulations.
The successful Bidder will be required to post a performance bond in the amount of the Contract.
Bidders must comply with Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, the Contract Work Hour Standard Act, and the National Occupational Safety and Health Act of 1970.
Bidders must certify that they do not and will not maintain or provide for their employees any facilities which are segregated on a basis of race, color, creed, or national origin.
Bidders must comply with the Georgia Security and Immigration Compliance Act
The Greene County Board of Commissioners reserves the right to reject all bids and to waive formalities. Any claims for cost incurred for any Bidder in preparation of any part of or total package for this project will not be considered for reimbursement by Greene County.
PROJECT: Construction of a single, 220-foot-long, 59-foot-wide T-Hanger at the Greene County airfield, incorporating two end-wall storage buildings and eight individual airplane hangars.
Underground utilities must be located for every excavation before any work is done. To drain any fluids to the exterior of the building, the newly placed T-Hanger slab needs to be sloped in both directions to the outside and have a minimum of 95% compaction throughout the slab. Any harm done to property or utilities is within the contractor's responsibility. Before payment, every part of the construction will be examined.
Project Number: PLL 2024-001 – 2024-001
BID PROPOSAL, Page 1 of 3
Proposal of __________________________________________________ (hereinafter called “Bidder”) a contractor organized and existing under the laws of the State of Georgia, *an individual, a corporation, or partnership doing business as ______________
| TO: | Greene County |
| (Hereinafter called “County”) |
The Bidder in compliance with your Notice to Contractors and all Bidding Documents for the construction of:
Construction of a single, 220-foot-long, 59-foot-wide T-Hanger at the Greene County airfield, incorporating two end-wall storage buildings and eight individual airplane hangars.
Having examined the specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project, including the availability of materials and supplies to construct the project in accordance with the contract documents, within the time set forth herein, and at the prices stated below, proposes to enter into a Contract with Greene County to provide the necessary machinery, tools, apparatus, all materials and labor, and other means of construction necessary to complete the work. The undersigned proposes to furnish and construct the items listed in the attached Schedule of Items for the unit prices stated.
Bidder agrees that the cost of any work performed, materials furnished, services provided or expenses incurred, which are not specifically delineated in the Contract Documents, but which are incidental to the scope, intent, and completion of the Contract, shall be deemed to have been included in the prices bid for the various items scheduled.
Bidder further proposes and agrees hereby to promptly commence the Work with adequate force and equipment within ten (10) calendar days from receipt of Notice to Proceed, or as may be specified by Special Provision, and to complete the Work by 5:00 p.m. on September 30, 2024, or as may be specified by Special Provision.
*Strike Out Inapplicable Terms.
PROJECT: Construction of a single, 220-foot-long, 59-foot-wide T-Hanger at the Greene County airfield, incorporating two end-wall storage buildings and eight individual airplane hangars.
Underground utilities must be located for every excavation before any work is done. To drain any fluids to the exterior of the building, the newly placed T-Hanger slab needs to be sloped in both directions to the outside and have a minimum of 95% compaction throughout the slab. Any harm done to property or utilities is within the contractor's responsibility. Before payment, every part of the construction will be examined.
BID PROPOSAL, Page 2 of 3
Bidder acknowledges receipt of the following addenda:
The undersigned further agrees that in case of failure on his part to execute said contract and bond, or provide satisfactory proof of carriage of the insurance required, within fourteen (14) calendar days after the award thereof, the Bid Bond or certified check accompanying his bid and the money payable thereon shall be forfeited to the County as liquidated damages; otherwise, the check or Bond accompanying this proposal shall be returned to the Bidder.
The Bidder declares that he/she understands that the quantities shown on the proposal are subject to adjustment by either increase or decrease, and that should the quantities of any of the items of work be increased, the undersigned proposes to do the additional work at the unit prices stated herein; and should the quantities be decreased, he also understands that payment will be made on actual quantities at the unit price bid and will make no claim for anticipated profits for any decrease in the quantities, and that actual quantities will be determined upon completion of work, at which time adjustment will be made to the Contract amount by direct increase or decrease.
Attached hereto is a bid bond or certified check on the (Bank) ______________________ in the amount of _______________________________________, (Five percent of Total Amount Bid).
The full name and residence of persons or parties interested in the foregoing bid as contractors, are named as follows:
PROJECT: Construction of a single, 220-foot-long, 59-foot-wide T-Hanger at the Greene County airfield, incorporating two end-wall storage buildings and eight individual airplane hangars.
Underground utilities must be located for every excavation before any work is done. To drain any fluids to the exterior of the building, the newly placed T-Hanger slab needs to be sloped in both directions to the outside and have a minimum of 95% compaction throughout the slab. Any harm done to property or utilities is within the contractor's responsibility. Before payment, every part of the construction will be examined.
BID PROPOSAL, Page 3 of 3
Greene County, Georgia
Signed, sealed, and dated this _______ day of _______________________, _________.
Bidder: __________________________________________ (Company Name)
By: __________________________________________
Title: __________________________________________
Mailing Address:
| ________________________________________________ |
| ________________________________________________ |
PROJECT: Construction of a single, 220-foot-long, 59-foot-wide T-Hanger at the Greene County airfield, incorporating two end-wall storage buildings and eight individual airplane hangars.
Underground utilities must be located for every excavation before any work is done. To drain any fluids to the exterior of the building, the newly placed T-Hanger slab needs to be sloped in both directions to the outside and have a minimum of 95% compaction throughout the slab. Any harm done to property or utilities is within the contractor's responsibility. Before payment, every part of the construction will be examined.
Project Number: PLL 2024-001 - 2024-001
CERTIFICATION BY CONTRACTOR
Regarding
NON-SEGREGATED FACILITIES
The Bidder certifies that he/she does not, and will not, provide and maintain segregated facilities for his employees at his establishments and, further that he does not, and will not, permit his employees to perform their services at those locations, under his control, where segregated facilities are provided and maintained. Segregated facilities include, but are not necessarily limited, drinking fountains, transportation, parking, entertainment, recreation, and housing facilities; waiting, rest, wash, dressing, and locker rooms, and time clock, work, storage, restaurant, and other eating areas which are set apart in fact, or by explicit directive, habit, local custom, or otherwise, on the basis of color, creed, national origin, and race. The Bidder agrees that, except where he has obtained identical certifications from proposed subcontractors for specific time periods, he will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000.00 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files.
The Bidder agrees that a breach of this certification is a violation of the Equal Opportunity clause in this Contract. The penalty for making false statements is described in 18 U.S.C. 1001.
| ____________________________________ |
| Bidder |
| ____________________________________ |
| (Signature) |
| ____________________________________ |
| Name of Signer |
| ____________________________________ |
| Title of Signer |
| ____________________________________ |
| Date |
PROJECT: Construction of a single, 220-foot-long, 59-foot-wide T-Hanger at the Greene County airfield, incorporating two end-wall storage buildings and eight individual airplane hangars.
Underground utilities must be located for every excavation before any work is done. To drain any fluids to the exterior of the building, the newly placed T-Hanger slab needs to be sloped in both directions to the outside and have a minimum of 95% compaction throughout the slab. Any harm done to property or utilities is within the contractor's responsibility. Before payment, every part of the construction will be examined.
Project Number: PLL 2024-001 – 2024-001
NONCOLLUSION AFFIDAVIT OF PRIME BIDDER
State of ______________________, County of _____________________. .
________________________________________________, being first duly sworn, deposes and says that:
1. He/she is __________________________________ (owner, partner, officer, representative, or agent) of the Bidder that has submitted the attached Bid;
2. He/she is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;
3. Such Bid is genuine and is not a collusive or sham Bid;
4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees, or parties of interest, including this affiant, has in any way colluded, conspired, connived, or agreed, directly or indirectly, with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted to or refrain from bidding in connection with such Contract, or has in any collusion or communication or conference with any other Bidder, or to fix any overhead, profit or cost element of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against Greene County or any person interested in the proposed Contract; and,
5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties of interests, including this affiant.
Signed: _____________________________
Name: _____________________________
Title: _____________________________
Subscribed and Sworn to before me this _______ day of ______________________________, _________.
(SEAL)
___________________________________ Title
PROJECT: Construction of a single, 220-foot-long, 59-foot-wide T-Hanger at the Greene County airfield, incorporating two end-wall storage buildings and eight individual airplane hangars.
Underground utilities must be located for every excavation before any work is done. To drain any fluids to the exterior of the building, the newly placed T-Hanger slab needs to be sloped in both directions to the outside and have a minimum of 95% compaction throughout the slab. Any harm done to property or utilities is within the contractor's responsibility. Before payment, every part of the construction will be examined.
CERTIFICATIONS, Page 1 of 2
Failure to complete appropriate certification requirements identified below or submission of a false certification shall render the bid non-responsive.
EXAMINATION OF SPECIFICATIONS
I certify that I have carefully examined the Standard Specifications for this project, the 2018 International Building Code, 2018 International Fire Code, 2020 National Electrical Code, Life Safety Code, 2015 International Energy Conservation Code, Chapter 10, and Appendix B of the Greene County Code of Ordinances, and the Supplemental Specifications and Special Provisions included in and made a part of this Proposal, and have also personally examined the various sites of work. On the basis of the said Specifications, I proposed to furnish all necessary machinery, tools, apparatus and other means of construction, and do all the work and furnish all the materials in the manner specified.
I understand the quantities mentioned are approximate only and are subject to either increase or decrease and hereby propose to perform any increased or decreased quantities of work or extra work on the basis provided for in the specifications.
I also hereby agree that Greene County would suffer damages in a sum equal to at least the amount of the enclosed Proposal Guaranty, in the event my Proposal should be accepted and a Contract tendered me thereunder and I should refuse to execute same and furnish bond as herein required, in consideration of which I hereby agree that in the event of such failure on my part to execute said Contract and furnish bond within fifteen (15) days after the date of the letter transmitting the Contract to me, the amount of said Proposal Guaranty shall be and is hereby, forfeited to Greene County as liquidated damages as the result of such failure on my part.
I further propose to execute the Contract agreement described in the Specifications as soon as the work is awarded to me, and to begin and complete the work within the time limit provided. I also propose to furnish a Contract Bond, approved by the Greene County Board of Commissioners as required by the laws of the State of Georgia. This bond shall not only service to guarantee the excellence of both workmanship and materials until the work is finally accepted, as well as to fully comply with all the laws of the State of Georgia.
PROJECT: Construction of a single, 220-foot-long, 59-foot-wide T-Hanger at the Greene County airfield, incorporating two end-wall storage buildings and eight individual airplane hangars.
Underground utilities must be located for every excavation before any work is done. To drain any fluids to the exterior of the building, the newly placed T-Hanger slab needs to be sloped in both directions to the outside and have a minimum of 95% compaction throughout the slab. Any harm done to property or utilities is within the contractor's responsibility. Before payment, every part of the construction will be examined.
CERTIFICATIONS, Page 2 of 2
CONFLICT OF INTEREST
By signing and submitting this Contract I hereby certify that employees of this company or employees of any company supplying material or subcontracting to do work on this Contract will not engage in business ventures with employees of Greene County nor shall they provide gifts, gratuities, favors, entertainment, loans, or other items of value to employees of this Department.
Also, by signing and submitting this Contract, I hereby certify that I will notify Greene County of any business ventures entered into between employees of this company or employees of any company supplying material or subcontracting to do work on this Contract with a family member of Greene County employees.
| __________________________________________ |
| Contractor |
| __________________________________________ |
| Signature |
__________________________________________ Name of Signer
| __________________________________________ |
| Title of Signer |
GREENE COUNTY BOARD OF COMMISSIONERS
1034 SILVER DRIVE
GREENSBORO GA. 30642
PROJECT: Construction of a single, 220-foot-long, 59-foot-wide T-Hanger at the Greene County airfield, incorporating two end-wall storage buildings and eight individual airplane hangars.
001: Greene County Airfield. Greene County Senior Center. Construction of a single, 220-foot-long, 59-foot-wide T-Hanger, incorporating two end-wall storage buildings and eight individual airplane hangars. This project will include, Light grading, Hauling, Erosion control measures, Concrete slab installation, Steel erection, Fire wall installations, large hanger door installations, Walk-in door installations, Insulation, Sky lights, and Electrical installation.
Any soil required for sub-grade work is to be obtained at the contractor’s expense.
PROJECT NUMBER PLL 2024-001 GREENE COUNTY Airfield
| LINE NUMBER |
| ITEM DESCRIPTION |
| APPROXIMATE QUANTITY AND UNITS |
| UNIT PRICE |
| BID AMOUNT |
| DOLLARS |
| CTS |
| DOLLARS |
| CTS |
SECTION 001 QUANTITIES FOR a single, 220-foot-long, 59-foot-wide T-Hanger.
| 001 |
| Grading |
| 002 |
| Hauling |
| 003 |
| Erosion Control |
| 004 |
| Concrete work |
| 005 |
| Steel and erection |
| 006 |
| Fire walls |
| 007 |
| 8 48x14 hanger doors |
| 008 |
| 2 3070 metal building walk-in doors |
| 009 |
| Electrical for doors, also including one light and one receptacle in each space. |
| 010 |
| 8 Sky lights |
| 011 |
| Insulation |
TOTAL BID: $
Company Name
By
Title
I certify that I personally examined the work sites and I understand that the above quantities are approximate and subject to increase or decrease.
Signature Title Date
The Bidder whose signature appears on this document, having personally appeared before me, duly sworn, deposes and says the above statements are true and correct.
SUBSCRIBED AND SWORN
BEFORE ME ON THIS THE
______ DAY OF , 20 .
Notary Public
My Commission Expires:
CONTRACTOR/SUBCONTRACTOR EXEMPTION
Is this contract for the physical performance of services*?
Yes________ No_________
Does this vendor have one or more employees (excluding self)?
Yes________ No_________
Will any additional people not classified as employees provide these services?
Yes________ No_________
If the contractor answers yes to both of the first two questions, the contractor is required by law to fill out the contractor affidavit prior to contract being accepted. If additional persons not classified as employees provide the services, a subcontractor affidavit is required for all individuals/companies not considered employees of the contractor. Otherwise, the contractor is exempt from signing the contractor affidavit.
Company Name
| ________________________________________ | ____________________________________ | |
| Authorized Officer or Agent | Date |
(Contractor Signature)
| ________________________________________ | ____________________________________ | |
| Printed Name of Authorized Officer or Agent | Title of Authorized Officer or Agent of Contractor |
SUBSCRIBED AND SWORN
______ DAY OF , 20 .
CONTRACTOR AFFIDAVIT AND AGREEMENT
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. 13-10-91, stating affirmatively that the individual, firm, or corporation which is contracting with the Greene County Board of Commissioners has registered with and is participating in a federal work authorization program* [any of the electronic verification of work authorization programs operated by the United States Department of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA), P.L. 99-603], in accordance with the applicability provisions and deadlines established in O.C.G.A. 13-10-91.
The undersigned further agrees that, should it employ or contract with any subcontractor(s) in connection with the physical performance of services pursuant to this contract with the Greene County Board of Commissioners, contractor will secure from such subcontractor(s) similar verification of compliance with O.C.G.A. 13-10-91 on the Subcontractor Affidavit provided in Rule 300-10-01-.08 or a substantially similar form and provide copies to the Greene County Board of Commissioners within five (5) business days of entering into a contract with such subcontractor.
| ________________________________________ | ____________________________________ | |
| E-Verify * Company Identification Number | Date Authorized to Use e-Verify |
| ________________________________________ | ____________________________________ | |||
| Company Name | Authorized Officer/Agent | Date | ||
| (Contractor Signature) |
| ________________________________________ | ____________________________________ | |
| Printed Name of Authorized Officer/Agent | Title of Authorized Officer/Agent of Contractor |
______ DAY OF ______________, 20
SUBCONTRACTOR AFFIDAVIT AND AGREEMENT
By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. 13-10-91, stating affirmatively that the individual, firm, or corporation which is engaged in the physical performance of services under a contract with _________________________________________________ (Name of Contractor) on behalf of the Greene County Board of Commissioners has registered with and is participating in a federal work authorization program* [any of the electronic verification of work authorization programs operated by the United States Department of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986 (IRCA), P.L. 99-603], in accordance with the applicability provisions and deadlines established in O.C.G.A. 13-10-91.
| ________________________________________ | ____________________________________ | |
| E-Verify * Company Identification Number | Date Authorized to Use e-Verify |
| ________________________________________ | ____________________________________ | ||
| Company Name | Authorized Officer/Agent | Date |
(Contractor Signature)
| ________________________________________ | ____________________________________ | |
| Printed Name of Authorized Officer/Agent | Title of Authorized Officer/Agent of Contractor |
______ DAY OF ______________, 20__.