This is a set of construction design drawings for the Town of Clayton Depauville Wastewater Treatment Plant (WWTP) Disinfection System Improvements project located in Jefferson County, New York. The project, designed by St. Lawrence Engineering DPC and Fourth Coast Inc., includes the installation of a new UV disinfection building with associated process improvements to the existing wastewater treatment facility. The scope of work encompasses construction of a new UV disinfection system with three UV reactors (2 duty, 1 redundant) configured in series, a new effluent pump station with variable speed pumps rated at 3 HP with a design flow of 100 gallons per minute (GPM), a post-aeration manhole with diffuser assembly and blower system, new piping installations including 3-inch DR11 HDPE and 8-inch SDR 35 PVC lines, a new 200-amp electrical service with emergency generator, a propane tank, and a new concrete sidewalk. The design accommodates average daily flow of 0.034 million gallons per day (MGD) based on historical maximum month average daily flow of 0.038 MGD, with peak instantaneous flow capacity of 0.310 MGD (215 GPM). The project drawings include comprehensive site plans, process flow diagrams, detailed electrical and mechanical specifications, manhole restoration details, erosion control measures including silt fence installation, and pipe bedding specifications. The SPDES permit number is NY 0215791, and the drawings were revised as of January 16, 2026, with the review set dated October 1, 2025.
The project involves coordination with multiple existing structures including four existing 5,000-gallon septic tanks, sand filters, distribution boxes, and dosing chambers. Construction activities require contractor responsibilities for site restoration, lawn establishment with specified seed mixtures, erosion and sediment control implementation, utility coordination, dewatering, and material backfill. The design specifies UV transmittance requirements of 35-80% UVT with maximum water hardness of 855 mg/L, and includes detailed specifications for equipment such as submersible effluent pumps, cooling system assemblies with 1/2 HP jet pumps, and aeration systems with 20 standard cubic feet per minute (SCFM) capacity across two redundant blowers. The project includes provisions for Build America, Buy America (BABA) and American Iron & Steel (AIS) compliance, with the related sealed bid for REBID Contract No. 2 (Collection System Rehabilitation and Manhole Restoration) due on July 23, 2026, at 2:00 p.m. local time, with 19 base bid manhole restoration locations and potential additional locations based on available funding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| T Clayton Depauville Disinfection Specs (3).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE LOCATION MAP
T1 TITLE SHEET
GENERAL NOTES AND LEGENDG1
C001
AREA LOCATION MAP
C102
WWTP OVERALL SITE PLAN
UV BUILDING PROCESS DETAILS
DRAWING LIST
C101 UV BUILDING PROCESS DETAILS
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER
THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER,
LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON
THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS
DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE
NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND
SPECIFIC DESCRIPTION OF THE ALTERATIONS.
ST LAWRENCE ENGINEERING DPC
745 GRAVES STREET, CLAYTON NY 13624
(315) 783-6384 (315) 408-7443 www.stlawrenceengineering.com
Town Supervisor Tim Doney
TOWN OFFICIALS
Ken Knapp Donna Patchen James Kenney Kathy LaClair
Clerk Megan Badour
O1 SITE MAP
Board Member Board Member Board Member
E001
ELECTRICAL OVERALL SITE PLAN
E000 ELECTRICAL GENERAL NOTES SHEET
UV BUILDING PROCESS PLANC100
C200 WWTP SITE DETAILS
ELECTRICAL SCHEDULES
E100
UV BUILDING ELECTRICAL PLANE101
C201
A100 UV BUILDING FLOOR PLAN
A102 UV BUILDING DETAILS
UV BUILDING ELEVATIONSA101
ELECTRICAL RISER DIAGRAMSE102
MECHANICAL GENERAL NOTES SHEETM000
MECHANICAL SCHEDULESM001
UV BUILDING MECHANICAL PLANM100
MECHANICAL DETAILSM101
Board Member
C002 WWTP ENLARGED SITE PLAN
C003 WWTP LAYOUT AND GRADING PLAN
P1 EXISTING SITE PHOTOS
P2 EXISTING SITE PHOTOS
P3 EXISTING SITE PHOTOS
C004 WWTP PROFILE
C103 UV BUILDING PROCESS DETAILS
C005 WWTP PROCESS FLOW AND BASIS OF DESIGN
AS
S
HO
W
N
JR
C W
AW
SEPTEMBER 30, 2025
JANUARY 16, 2026
TI
TL
E
SH
EE
T
PR
O
JE
C
T:
D
EP
AU
VI
LL
E W
W
TP
D
IS
IN
FE
C
TI
O N
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
T O
W N
O F
C
LA
YT
O
N
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
T1
FO
UR
TH
C
OA
ST
IN
C
G R
AV
ES
, C
LA
YT
O
N N
EW
Y
O R
K, 5/
3-
/4
-7 w w w
.fo ur th co as t.c om w w w .s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
WWTP SITE DETAILS
WWTP SITE DETAILS
WWTP SITE DETAILS
C202 C203
Comment Responses 26 January 2026
AutoCAD SHX Text
SEE AREA LOCATION MAP
AutoCAD SHX Text Not to Scale
AutoCAD SHX Text
ONONDAGA
AutoCAD SHX Text
OSWEGO
AutoCAD SHX Text
LEWIS
AutoCAD SHX Text
WAYNE
AutoCAD SHX Text
CAYUGA
AutoCAD SHX Text
SENECA
AutoCAD SHX Text
YATES
AutoCAD SHX Text
CORTLAND
AutoCAD SHX Text
MADISON
AutoCAD SHX Text
ONEIDA
AutoCAD SHX Text
UTICA
AutoCAD SHX Text
JEFFERSON
AutoCAD SHX Text
CHENANGO
AutoCAD SHX Text
HERKIMER
AutoCAD SHX Text
OTSEGO
AutoCAD SHX Text
ORLEANS
AutoCAD SHX Text
MONROE
AutoCAD SHX Text
ROCHESTER
AutoCAD SHX Text
ONTARIO
AutoCAD SHX Text
LIVINGSTON
AutoCAD SHX Text
WYOMING
AutoCAD SHX Text
GENESEE
AutoCAD SHX Text
ERIE
AutoCAD SHX Text
BUFFALO
AutoCAD SHX Text
NIAGARA
AutoCAD SHX Text
ALLEGANY
AutoCAD SHX Text
STUBEN
AutoCAD SHX Text
CHEMUNG
AutoCAD SHX Text
TIOGA
AutoCAD SHX Text
BROOME
AutoCAD SHX Text
TOMPKINS
AutoCAD SHX Text
SCHUYLER
AutoCAD SHX Text
CATTARAUGUA
AutoCAD SHX Text
CHAUTAUGUA
AutoCAD SHX Text
NIAGARA FALLS
AutoCAD SHX Text
CLINTON
AutoCAD SHX Text
FRANKLIN
AutoCAD SHX Text
ST. LAWRENCE
AutoCAD SHX Text
HAMILTON
AutoCAD SHX Text
FULTON
AutoCAD SHX Text
SARATOGA
AutoCAD SHX Text
MONTGOMERY
AutoCAD SHX Text
WASHINGTON
AutoCAD SHX Text
SYRACUSE
AutoCAD SHX Text
SCHDY
AutoCAD SHX Text
SCHDY
AutoCAD SHX Text
ALBANY
AutoCAD SHX Text
ALBANY
AutoCAD SHX Text
TROY
AutoCAD SHX Text
SCHOHARIE
AutoCAD SHX Text
DELEWARE
AutoCAD SHX Text
GREEENE
AutoCAD SHX Text
COLUMBIA
AutoCAD SHX Text
ULSTER
AutoCAD SHX Text
SULLIVAN
AutoCAD SHX Text
DUTCHESS
AutoCAD SHX Text
RENSSELAER
AutoCAD SHX Text
ORANGE
AutoCAD SHX Text
PUTMAN
AutoCAD SHX Text
ROCKLAND
AutoCAD SHX Text
WESTCHESTER
AutoCAD SHX Text
WHITE PLAINS
AutoCAD SHX Text
YONKERS
AutoCAD SHX Text
NEW YORK CITY
AutoCAD SHX Text
NASSAU
AutoCAD SHX Text
SUFFOLK
AutoCAD SHX Text
ATLANTIC OCEAN
AutoCAD SHX Text
LONG ISLAND SOUND
AutoCAD SHX Text
LAKE ERIE
AutoCAD SHX Text
LAKE ONTARIO
AutoCAD SHX Text
WARREN
AutoCAD SHX Text
NEW YORK STATE
AutoCAD SHX Text
ESSEX
AutoCAD SHX Text Not to Scale
AutoCAD SHX Text Town of Clayton DEPAUVILLE WWTP DISINFECTION SYSTEM IMPROVEMENTS SPDES PERMIT NO. NY 0215791 Town of CLAYTON, Jefferson County, New York REVIEW SET OCTOBER 1, 2025
AutoCAD SHX Text
PROJECT LOCATION
nichol RJC's Stamp
GENERAL NOTES
1. THE DRAWINGS SHOW KNOWN SUBSURFACE STRUCTURES, ABOVEGROUND STRUCTURES AND/OR UTILITIES BELIEVED TO EXIST IN THE WORKING AREA.
CONTRACTOR IS WARNED THAT THE EXACT OR EVEN APPROXIMATE LOCATION OF SUCH MAY BE DIFFERENT FROM THAT SHOWN OR MAY NOT BE SHOWN, AND IT SHALL BE HIS RESPONSIBILITY TO PROCEED WITH THE GREAT CARE IN EXECUTING ANY WORK. CONTRACTOR SHALL COMPLY WITH THE STATE OF NEW YORK DEPARTMENT OF PUBLIC SERVICE, 16NYCRR PART 753, EFFECTIVE FEBRUARY 5,1997. CALL BEFORE YOU DIG @ 1-800-962-7962.
2. THE ENGINEER SHALL BE NOTIFIED IN WRITING OF ANY CONDITIONS THAT VARY FROM THOSE SHOWN ON THE PLANS. THE CONTRACTOR'S WORK SHALL
NOT VARY FROM THE PLANS WITHOUT THE EXPRESSED APPROVAL OF THE ENGINEER.
3. THE CONTRACTOR SHALL RESTORE LAWNS, DRIVEWAYS, CULVERTS, SIGNS AND OTHER PUBLIC OR PRIVATE PROPERTY DAMAGED OR REMOVED TO AT LEAST AS GOOD A CONDITION AS BEFORE BEING DISTURBED AS DETERMINED BY THE ENGINEER. ANY DAMAGED TREES, SHRUBS, AND/ OR HEDGES SHALL
BE REPLACED AT THE CONTRACTOR'S EXPENSE.
4. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIRED PERMITS.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND INCURRING THE COST OF ALL REQUIRED PERMITS, INSPECTIONS, CERTIFICATES, ETC.
6. THE CONTRACTOR SHALL PROTECT EXISTING PROPERTY LINE MONUMENTATION. ANY MONUMENTATION DISTURBED OR DESTROYED, AS JUDGED BY THE ENGINEER OR OWNER, SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE UNDER THE SUPERVISION OF
A NEW YORK STATE LICENSED LAND SURVEYOR.
7. DIG EXPLORATORY TEST PITS AS REQUIRED TO DETERMINE UNDERGROUND CONDITIONS. RECOMMENDED LOCATIONS ARE DESIGNATED ON THE PLANS.
DIG ADDITIONAL PITS AS REQUIRED FOR PERFORMANCE OF WORK AT NO ADDITIONAL COST TO OWNER.
8. ALL TRENCH EXCAVATION AND ANY REQUIRED SHEETING AND SHORING SHALL BE DONE IN ACCORDANCE WITH THE LATEST REVISIONS OF
NEW YORK STATE CODE RULE 23 AND OSHA REGULATIONS FOR CONSTRUCTION.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING AND THE MAINTENANCE OF SURFACE DRAINAGE DURING THE COURSE OF WORK.
10. MAINTAIN FLOW FOR ALL EXISTING UTILITIES, CULVERTS, AND DITCHES.
11. BEFORE CONSTRUCTING LINES TO CONNECT TO EXISTING UTILITIES OR UTILITIES INSTALLED UNDER OTHER CONTRACTS, VERIFY EXISTING UTILITY
INVERTS AND NOTIFY ENGINEER IF AY VARIATION FROM THE PLAN IS REQUIRED.
12. GRADE ALL AREAS ON THE SITE TO PROVIDE POSITIVE DRAINAGE.
13. PROVIDE ALL FIELD LAYOUT, TAKE TIES TO ALL UTILITY CONNECTIONS AND PROVIDE MARKED-UP RECORD PLANS FOR ALL UTILITIES SHOWING TIES TO CONNECTIONS, BENDS, VALVES, LENGTHS OF LINES AND INVERTS. RECORD PLANS SHALL BE REVIEWED BY THE OWNER AND HIS REPRESENTATIVES, AND THE CONTRACTOR SHALL PROVIDE ANY CORRECTION OR ADDITIONS TO THE SATISFACTION OF THE OWNER AND HIS REPRESENTATIVES
BEFORE UTILITIES WILL BE ACCEPTED.
14. EXERCISE CAUTION WHEN OPERATING CONSTRUCTION EQUIPMENT OVER NEW UTILITY TRENCHES. MAINTAIN A MINIMUM COVER OF TWO FEET OR MORE
IF REQUIRED, OVER ANY UTILITY LINE SUBJECT TO CONSTRUCTION TRAFFIC.
15. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL WORK, LANE CLOSURES AND DISRUPTIONS WITH GOVERNING AGENCIES.
16. PRIOR TO BIDDING PROJECT, THE CONTRACTOR IS ENCOURAGED TO VISIT THE SITE TO VERIFY EXISTING CONDITIONS.
17. ALL PHYSICAL FEATURES, INDIVIDUAL TREES, LANDSCAPING OR UTILITY LOCATIONS COULD NOT BE POSSIBLY SHOWN ON THE CONTRACT DRAWINGS. EACH BIDDER IS ENCOURAGED TO PERSONALLY INSPECT ALL AREAS OF PROPOSED WORK, IN ORDER TO ENSURE THAT HE IS FAMILIAR WITH THE PHYSICAL
LAYOUT OF THE AREA AND THE REQUIREMENTS OF THE WORK.
18. ALL PROPOSED WORK MAY BE VARIED IN THE FIELD BY THE ENGINEER TO MEET EXISTING CONDITIONS.
19. UPON COMPLETION OF THE WORK, ALL DISTURBED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN THAT WHICH EXISTED PRIOR
TO CONSTRUCTION.
20. DISTURBED AREAS SHALL BE RESTORED AS WORK PROGRESSES AS DEEMED APPROPRIATE BY THE ENGINEER.
21. TURF ESTABLISHMENT: ALL DISTURBED, FILL OR CUT AREAS SHALL BE GRADED, SEEDED AND MULCHED, WITHIN ONE WEEK AFTER DISTURBANCE.
22. ALL EROSION CONTROL MEASURES SHALL BE PUT INTO PLACE PRIOR TO STARTING WORK.
23. TRENCHES SHALL NOT BE LEFT OPEN OVERNIGHT.
24. ALL CONSTRUCTION STAKE OUT IS THE RESPONSIBILITY OF THE CONTRACTOR.
25. OWNER'S SOIL BORINGS WERE MADE FOR DESIGN PURPOSES. THE INCLUSION OF THE INFORMATION SHALL NOT RELIEVE THE CONTRACTOR OF HIS OBLIGATION TO MAKE A THOROUGH INVESTIGATION OF SURFACE AND SUBSURFACE CONDITIONS. NEITHER ADDITIONAL PAYMENT NOR EXTENSION OF TIME WILL BE MADE TO THE CONTRACTOR BECAUSE OF CONDITIONS ENCOUNTERED WHICH DIFFER FROM THOSE REPORTED IN THE BORING LOGS.
26. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS, DIMENSIONS, AND ELEVATIONS OF EXISTING STRUCTURES, PIPING, ETC. AS SHOWN ON THE DRAWINGS.
IMMEDIATELY REPORT TO THE OWNER OR ENGINEER ANY AND ALL DISCREPANCIES BETWEEN THE CONTRACT DOCUMENTS AND EXISTING CONDITIONS.
27. EXISTING STRUCTURES, EQUIPMENT, AND PIPING ADJACENT TO PROPOSED CONSTRUCTION OR IMPROVEMENTS SHALL BE ADEQUATELY SUPPORTED AND PROTECTED DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OR REPLACEMENT OF ANY NEW EXISTING STRUCTURES, PIPING, EQUIPMENT, ETC. THAT IS DAMAGED DURING CONSTRUCTION.
28. CONTRACTORS SHALL LIMIT THE EXTENT OF DISTURBANCE FOR EACH AREA OF CONSTRUCTION AS MUCH AS POSSIBLE (UNLESS OTHERWISE SHOWN). THE CONTRACTOR SHALL UTILIZE EVERY EFFORT TO MINIMIZE DISTURBANCE TO THE NORMAL DAILY OPERATIONS OF THE PLANT.
29. FLOOR DRAINS SHALL BE CONNECTED TO THE SANITARY SYSTEM. FLOOR DRAINS DO NOT INCLUDE FOOTER DRAINAGE, FOUNDATION DRAINAGE, OR ANY
OTHER DRAINAGE INTERCEPTORS CONVEYING UNCONTAMINATED GROUNDWATER.
30. DIMENSIONS AND SIZES OF MANUFACTURED EQUIPMENT (I.E. PUMPS, PROCESS EQUIPMENT, ETC.) SHOWN ON DRAWINGS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION, FABRICATION, OR INSTALLATION. DISCREPANCIES BETWEEN TRUE DIMENSIONS AND THOSE SHOWN ON THE DRAWINGS SHALL BE IDENTIFIED IMMEDIATELY BY THE CONTRACTOR FOR REVIEW BY THE ENGINEER.
31. CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING ALL EXISTING PIPING, STRUCTURES, MOUNTING HARDWARE, ETC. IN ALL AREAS WHERE WORK IS BEING PREFORMED. ALL AREAS SHALL BE CLEANED PRIOR TO CO0MMENCING WORK, FOR INSPECTION BY THE ENGINEER OR OWNER. CONTRACTOR SHALL
CLEAN ALL AREAS AFFECTED BY WORK UPON COMPLETION OF WORK.
32. THE ENGINEER IS NOT RESPONSIBLE FOR, AND WILL NOT HAVE CONTROL OF, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, OR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE CONSTRUCTION WORK; NOR WILL THE ENGINEER BE RESPONSIBLE FOR THE CONTRACTOR'S FAILURE TO CARRY OUT THE CONSTRUCTION WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
33. ALL EXTERIOR CONCRETE PADS AND SUPPORTS NOT TO BE PAINTED SHALL BE SEALED PER THE SPECIFICATIONS.
34. GC SHALL FURNISH ALL CONTROL PANELS FROM MANUFACTURER TO EC FOR LAYOUT AND INSTALLATION.
35. DEMOLITION AND/OR REMOVAL SHALL INCLUDE THE REMOVAL AND PROPER DISPOSAL OF ALL ANCILLARY ITEMS TO THOSE ITEMS TO BE REMOVED OR DEMOLISHED. REMOVAL OF STRUCTURES SHALL ALSO INCLUDE REMOVAL OF ALL SUBSTRUCTURES(IE. FOUNDATIONS WALLS, FOOTINGS, SUB-SURFACE PIPING, ELECTRICAL SYSTEMS, ETC.) & ASSOCIATED CONCRETE (I.E. CONCRETE SLABS, PADS, SUPPORTS, ETC.) UNLESS OTHERWISE SHOWN. REMOVAL ANCILLARY PLUMBING/PIPING SYSTEMS, ETC. HOLES, VOIDS, ETC. FROM DEMOLITION SHALL BE FILLED WITH GROUT, FINISHED SMOOTH AND BE COATED
TO MATCH ADJACENT AREAS.
AC ASBESTOS CEMENT
ACP ASBESTOS CEMENT PIPE
AD AEROBIC DIGESTER
ALUM ALUMINUM
ASPH ASPHALT
AV ACTUATED VALVE
B/O BOTTOM OF
BFV BUTTERFLY VALVE
BLDG BUILDING
BM BENCH MARK
BOC BOTTOM OF CHANNEL
BRNG BEARING
BV BALL VALVE
BW BUTT WELDED
CAP CAPACITY
CB CATCH BASIN
CF CUBIC FEET
CFD CUBIC FEET PER DAY
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CIP CAST IRON PIPE
CIPP CURED IN PLACE PIPE
CJ CONSTRUCTION JOINT
CL CENTER LINE
℄ CENTER LINE
CL2 CHLORINE
CLG CEILING
CLR CLEAR / CLEARANCE
CO CLEAN OUT
CONC CONCRETE
COORD COORDINATE
CP CONTROL PANEL
CPLG COUPLING
CPP CORRUGATED POLYETHYLENE PIPE
CPVC CHLORINATED POLYVINYL CHLORIDE
CTJ CONTROL JOINT
CV CHECK VALVE
CY CUBIC YARD
DET DETAIL
DI DUCTILE IRON
DIA DIAMETER
DIP DUCTILE IRON PIPE
DN DOWN
DR DIMENSION RATIO
DWG DRAWING
EC ELECTRICAL CONTRACTOR
EF EACH FACE
EFF EFFLUENT
EG EXISTING GRADE
EJ EXPANSION JOINT
ELEC ELECTRIC / ELECTRICAL
ELEV ELEVATION
ENCL ENCLOSE / ENCLOSURE
ENGR ENGINEER
ENT ENTRANCE
EOG EDGE OF GRAVEL
EOP EDGE OF PAVEMENT
EP EXPLOSION PROOF
EX EXISTING
EXP EXPANSION
EXT EXTERIOR
FCA FLANGED COUPLING ADAPTER
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FIX FIXTURE
FL FLANGED
FLR FLOOR
FLS FLOAT SWITCH
FMT FLOW METER
FM FORCE MAIN
FRP FIBER REINFORCED PLASTIC
GA GAUGE
GAC GRANULAR ACTIVATED CARBON
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GND GROUND
GPM GALLONS PER MINUTE
GR GRADE
GSKT GASKET
GV GATE VALVE
HDD HORIZONTAL DIRECTIONAL DRILLING
HDPE HIGH DENSITY POLYETHYLENE
HDWR HARDWARE
HGR HANGER
HGT HEIGHT
HOR HORIZONTAL
HP HORSEPOWER
HTR HEATER
HWL HIGH WATER LEVEL
HYD HYDRANT
ID INSIDE DIAMETER
IN INCH
INCL INCLUDE
IND INDICATE
INF INFLUENT
INT INTERIOR
INV INVERT
IPS IRON PIPE SIZE
JT JOINT
LAT LATERAL
LAV LAVATORY
LCP LOCAL CONTROL PANEL
LG LENGTH / LONG
LOD LIMITS OF DISTURBANCE
LP LOW PRESSURE
LT LEVEL TRANSDUCER
LV LOUVER
LWL LOW WATER LEVEL
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MBR MEMBRANE BIOREACTOR
MECH MECHANICAL
MEMB MEMBRANE
MET METAL
MFR MANUFACTURER
MGD MILLION GALLONS PER DAY
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MJ MECHANICAL JOINT
MO MASONRY OPENING
NO NUMBER
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OPER OPERABLE / OPERATOR
OPNG OPENING
ORIG ORIGINAL
PAR PARALLEL
PAVT PAVEMENT
PCF POUNDS PER CUBIC FOOT
PERF PERFORATED
PERP PERPENDICULAR
PL PROPERTY LINE
PLT PLATE
PLB PLUMBING
POLY POLYETHYLENE
PREFAB PREFABRICATED
PRV PRESSURE RELIEF VALVE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PV PLUG VALVE
PVC POLYVINYL CHLORIDE
PW POTABLE WATER
RCP REINFORCED CONCRETE PIPE
RD ROAD
RECF ROLLED EROSION CONTROL FABRIC
RED REDUCER
REM REMOVE
REQD REQUIRED
RM ROOM
ROB RUN OF BANK
RPZ REDUCED PRESSURE ZONE
RR RAILROAD
SAN SANITARY
SBR SEQUENCING BATCH REACTOR
SCH SCHEDULE
SDR STANDARD DIMENSION RATIO
SF SQUARE FOOT
SG STOP GATE
SHT SLUDGE HOLDING TANK
SP STOP PLATE
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STA STATION
T/O TOP OF
TBR TO BE REMOVED
TOC TOP OF CONCRETE
TOS TOP OF SLAB
TOT TOP OF TANK
TRANS TRANSFORMER
TYP TYPICAL
UGE UNDERGROUND ELECTRIC
ULS ULTRASONIC LEVEL SENSOR
UR URINAL
UV ULTRAVIOLET
VAR VARIETY
VERT VERTICAL
WL WATER LEVEL
WSE WATER SURFACE ELEVATION
WSTP WELDED STEEL PIPE
WT WEIGHT
WW WETWELL
WWF WELDED WIRE FABRIC
YD YARD
ABBREVIATIONS
SOIL BORING LOG
NO. DEPTH SOIL / ROCK CLASSIFICATION NOTES
1 TERMINATED AT 10 FT. BROWN SILTY CLAY, SOME TRACE FINE SAND WATER ENCOUNTERED @ 3.6 FT AFTER BORING WAS COMPLETED SUSPECTED
SURFACE WATER INFLUENCE.
2 TERMINATED AT 10 FT. BROWN SILTY CLAY NO WATER ENCOUNTERED
3 REFUSAL AT 8.7 FT. BROWN SILTY CLAY, GREY LIMESTONE, MEDIUM HARD, WEATHERED, LAMINATED
TO THIN BEDDED. AT 5.0 FT, OLIVE GREEN, VERY CALCAREOUS MUDSTONE, VERY
SOFT, FRIABLE WEATHERED, LAMINATED. AT 7.7 FT GREY LIMESTONE
WATER ENCOUNTERED AT 2.3 FT AFTER BORING WAS COMPLETED.
4 REFUSAL AT 7.6 FT. FILL BROWN SILTY CLAY, COAL, ASH TO 1.2 FEET. BROWN SILTY CLAY, COARSE-FINE SAND, SOME COARSE GRAVEL
NO WATER ENCOUNTERED.
PR
O
JE
C
T:
D
EP
AU
VI
LL
E W
W
TP
D
IS
IN
FE
C
TI
O N
S
YS
TE
M
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
T O
W N
O F
C
LA
YT
O
N
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
G1
FO
UR
TH
C
OA
ST
IN
C
G R
AV
ES
, C
LA
YT
O
N N
EW
Y
O R
K, 5/
3-
/4
-7 w w w
.fo ur th co as t.c om w w w .s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
A S
S H
O W
N
JR
C W
A W
SEPTEMBER 30, 2025
JANUARY 16, 2026
G
EN
ER
AL
N O
TE
S
AN
D
LE
G
EN
D
MH-1A
CO
MH-1
CO
CO
CO
CO
CO
CO
CO
CO
CO
MH-2
MH-4
MH-8
MH-7
MH-6
CO
CO
CO
CO
MH-9
MH-13
MH-13A
MH-13B
CAROLINE STREET
EL
IZ
A
ST
RE
ET
SCHOOL STREET
LS-2
MH-10
STEPH
AN
IE STR
EET
MH-10A
MH-11
MH-14
MH-15
CO
MH-16
CO
CO
FACTORY STREET
JAMES STREET
N
YS
R T.
MH-11A
MH-11B
MH-18
MH-19
MH-20
CO
CO
CO
MH-20A
MH-20B
MH-23
MH-23A
MH-23B
MH-24
MH-21
MH-22
STEP
CO
N
YS
R T.
MH-18A
CO
MH-17
CO
CO
CAROLINE STREET
MH-25
CO
CO
CO
CO
MH-26 MH-27
MH-28
MH-29 MH-30
CO
CO CO
CO
COCO
SYLVIA STREET
LS-1
MH-25A
CO
WASTEWATER TREATMENT PLANT
PR
O
JE
C
T:
C
LI
EN
T:
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
O1
FO
UR
TH
C
OA
ST
IN
C
G
R
AV
ES
, C
LA
YT
O N
N
EW
Y O
R K, 5/
3-
/4
-7 w w w .fo ur th co as t.c om w w w
.s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
AUGUST 22, 2025
SI
TE
M
AP
T O
W N
O F
C
LA
YT
O
N
D
EP
AU
VI
LL
E
W
AS
TE
W
AT
ER
SY
ST
EM
IN
PR
O
VE
M
EN
TS N
TS
R
JC
D
LH
N
S E
W
I:\ M un ic ip al iti es
\C la yt on
, T ow n of
\D ep au vi lle S ew er
D isi nf ec tio n\
D ra w in gs \S
IT
EM
AP
.d w g, /2
5/
:1 8:
A
M
MH-1
MH-6
MH-10
MH-11B
MH-1A
MH-7
MH-10A
MH-13
MH-2
MH-8
MH-11
MH-13A
MH-4
MH-9
MH-11A
MH-13B
PR
O
JE
C
T:
C
LI
EN
T:
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
P-1
FO
UR
TH
C
OA
ST
IN
C
G
R
AV
ES
, C
LA
YT
O N
N
EW
Y O
R K, 5/
3-
/4
-7 w w w .fo ur th co as t.c om w w w
.s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
TO
W
N O
F C
LA
YT
O N
D
EP
AU
VE
IL
LE
W
AS
TE
W
AT
ER
SY
ST
EM
IM
PR
O
VE
M
EN
TS
OCTOBER 1, 2025
EX
IS
TI
N
G S
IT
E
PH
O
TO
S
N O
N E
R
JC
D
EB
I:\ M un ic ip al iti es
\C la yt on
, T ow n of
\D ep au vi lle S ew er
D isi nf ec tio n\
D ra w in gs \P
H O
TO
S.
dw g, 0/
1/
1:
:0
AM
MH-14
MH-18
MH-20A
MH-23
MH-15
MH-18A
MH-20B
MH-23A
MH-16
MH-19
MH-21
MH-23B
MH-17
MH-20
MH-22
MH-24
PR
O
JE
C
T:
C
LI
EN
T:
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
P-2
FO
UR
TH
C
OA
ST
IN
C
G
R
AV
ES
, C
LA
YT
O N
N
EW
Y O
R K, 5/
3-
/4
-7 w w w .fo ur th co as t.c om w w w
.s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
TO
W
N O
F C
LA
YT
O N
D
EP
AU
VE
IL
LE
W
AS
TE
W
AT
ER
SY
ST
EM
IM
PR
O
VE
M
EN
TS
OCTOBER 1, 2025
EX
IS
TI
N
G S
IT
E
PH
O
TO
S
N O
N E
R
JC
D
EB
I:\ M un ic ip al iti es
\C la yt on
, T ow n of
\D ep au vi lle S ew er
D isi nf ec tio n\
D ra w in gs \P
H O
TO
S.
dw g, 0/
1/
1:
:1
AM
263 26
263 26
4 28
5 28 6 28
7 28 8 28
9 29
EXISTING CHAIN LINK FENCE
EX SAND FILTER
DISTRIBUTION CHAMBER
EXISTING OUTFALL MH TO BE
ABANDONED IN PLACE
EXISTING OUTFALL TO
CHAUMONT RIVER
EXISTING DRIVEWAY
PROPOSED 200 AMP SERVICE
NEW EMERGENCY
GENERATOR
LIBRARY
PROPERTY LINE
NEW PROPANE TANK
NEW UV DISINFECTION
BUILDING (SEE DWG
C100 FOR DETAILS)
EX INFLUENT METER MH
(3" PARSHALL FLUME)
EX DISTRIBUTION MH
EX SEPTIC
TANK
EX SEPTIC
TANK
EX SEPTIC
TANK
EX SEPTIC
TANK
EX DOSING
TANK
EX DOSING
TANK
EX SAND FILTER
DISTRIBUTION LATERAL (TYP)
EX SAND FILTER UNDER
DRAIN (TYP)
EX SAND FILTER UNDER
DRAIN COLLECTOR (TYP)
EX SAND FILTER
DISTRIBUTION LATERAL (TYP)
EX SAND FILTER UNDER
DRAIN (TYP)
EX SAND FILTER UNDER
DRAIN COLLECTOR (TYP)
EX COLLECTOR PIPE TBR
(SEE NOTE 1)
NOTES:
1. CONTRACTOR TO REMOVE EXISTING COLLECTOR PIPE TO THE
EXTENT SHOWN TO FACILITATE THE INSTALLATION OF THE NEW
COLLECTOR PIPING TO THE NEW EFFLUENT PUMP STATION.
2. THE CONTRACTOR SHALL EXTEND THE COLLECTOR PIPES FROM THE
POINT OF DEMOLITION TO THE NEW EFFLUENT PUMP STATION
WET WELL. THE NEW PIPING SHALL MATCH THE SLOPE FROM THE
EXISTING, REMOVED COLLECTOR PIPES.
EX COLLECTOR PIPE TO
EXTEND TO NEW EFFLUENT
PUMP STATION (SEE NOTE 2
NEW 3" DR11 HDPE PUMP
DISCHARGE TO UV BUILDING.
NEW 8" SDR 35 PVC
TO OUTFALL MH
NEW 4' WIDE CONC
SIDEWALK
EX
IS
TI
NG
G
RA
VE
L D
RI
VE
W
AY
PUMP STATION
ELECTICAL FEED
NEW POST AERATION MH
NEW EFFLUENT PUMP
STATION
EX COLLECTOR PIPE TO
EXTEND TO NEW EFFLUENT
PUMP STATION (SEE NOTE 2)
B-1
B-2
B-3 B-4
NEW OUTFALL MH
SILT FENCEC203
C202
C203
C201
C202
C200
7 268
271 27
N
S
E
W
Feet 0 20 40
PR
O
JE
C
T:
S
TP
D
IS
IN
FE
C
TI
O
N
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
V
IL
LA
G
E O
F D
EX
TE
R
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
C001
FO
UR
TH
C
OA
ST
IN
C
G
R
AV
ES
, C
LA
YT
O N
N
EW
Y O
R K, 5/
3-
/4
-7 w w w .fo ur th co as t.c om w w w
.s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
AS
S
HO
W
N
JR
C W
AW
OCTOBER 1, 2025
JANUARY 16, 2026
W W
TP
O
VE
RA
LL
S
IT
E
PL
AN
AutoCAD SHX Text
COUNTY ROUTE 179
NEW POST AERATION MH
NEW EFFLUENT PUMP
STATION (SEE DWG
C200 FOR DETAILS)
EX COLLECTOR PIPE TO
EXTEND TO NEW EFFLUENT
PUMP STATION (SEE NOTE 2)
STA 0+00
STA 0+20
STA 0+40
ST
A
0+
STA 0+80 STA 1+00
ST
A
1+
3.0'
2.0'
1.0'
10.0'
10.0'12.0'
8.0'
20.0'
12.0'
8" PVC @0.79%
8"
PVC @
0.7 9%
8" PVC @
0.64%5
LF
" S
DR
P
VC
0.
10 LF 8" SDR 35 PVC @
0.64%
8" P
VC
5.
3" DR11 HDPE
3" DR11 HDPE
3" DR11 HDPE
POST AERATION MH
A STA. 0+98
60" DIA
30" DIA FRAME AND COVER
RIM ELEV 263.50'
SW INV 3'' ELEV 258.02'
NE INV 8" PVC ELEV 259.95'
EFFLUENT PS
A STA. 0+24
60" DIA
24" X 42" RECTANGULAR HATCH
RIM ELEV 263.50'
E INV 8'' PVC ELEV 256.27'
SE INV 8'' PVC ELEV 256.38'
EX OUTFALL MH
A STA. 0+16
48" DIAM
(TO BE ABANDONED IN PLACE)
RIM ELEV 264.15'
S INV 8'' PVC ELEV 256.34'
E INV 8'' PVC ELEV 256.34'
NW INV 8" PVC ELEV 256.24'
EXISTING OUTFALL TO
CHAUMONT RIVER
NEW UV DISINFECTION
BUILDING (SEE DWG
C100 FOR DETAILS)
EX COLLECTOR PIPE TBR
(SEE NOTE 1)
EX COLLECTOR PIPE TO
EXTEND TO NEW EFFLUENT
PUMP STATION (SEE NOTE 2)
NEW 3" DR11 HDPE PUMP
DISCHARGE TO UV BUILDING.
NEW 8" SDR 35 PVC
TO OUTFALL MH
5 LF 8" SDR35 PVC @1.39%
6 LF 8" SDR35 PVC @0.64%
2 LF 8" SDR35 PVC @0.57%
NEW CONCRETE SIDEWALK
NEW OUTFALL MH
A STA. 1+08
60" DIA
RIM ELEV 263.50'
SE INV 8'' PVC ELEV 255.69'
SW INV 8'' PVC ELEV 259.81'
NW INV 8" PVC ELEV 255.69'
C203
C203
C203
C203
C203
C203
C203
C203
C203
C203
4 NEW 3" DR 11 HDPE
UV EFFLUENT TO POST
AERATION MH
C201
C202
C200
C202
EX COLLECTOR PIPE TBR
(SEE NOTE 1)
C203
SILT FENCEC203
NEW 1-1/4" DR11 HDPE PUMP
SUCTION TO UV BUILDING.C203
C203
2" SCH 10 SS AIR LINE
UNDER GROUND ELECTRIC
N
S E
W
Feet 0 2 4
NOTES:
1. CONTRACTOR TO REMOVE EXISTING COLLECTOR PIPE TO THE
EXTENT SHOWN TO FACILITATE THE INSTALLATION OF THE NEW
COLLECTOR PIPING TO THE NEW EFFLUENT PUMP STATION.
2. THE CONTRACTOR SHALL EXTEND THE COLLECTOR PIPES FROM THE
POINT OF DEMOLITION TO THE NEW EFFLUENT PUMP STATION
WET WELL. THE NEW PIPING SHALL MATCH THE SLOPE FROM THE
EXISTING, REMOVED COLLECTOR PIPES.
PR
O
JE
C
T:
S
TP
D
IS
IN
FE
C
TI
O
N
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
V
IL
LA
G
E O
F D
EX
TE
R
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
C002
FO
UR
TH
C
OA
ST
IN
C
G
R
AV
ES
, C
LA
YT
O N
N
EW
Y O
R K, 5/
3-
/4
-7 w w w .fo ur th co as t.c om w w w
.s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
AS
S
HO
W
N
JR
C W
AW
OCTOBER 1, 2025
JANUARY 16, 2026
W W
TP
E
N
LA
RG
ED
SI
TE
P
LA
N
3 26
263 26
268269
274 275
280 281
288289
PROPOSED CONTOUR
EXISTING CONTOUR
Point Table Point #
Northing
1507872.81
1507887.74
1507879.63
1507864.70
1507872.81
1507864.66
1507887.75
1507879.62
1507887.80
1507890.77
1507885.44
1507885.94
1507892.50
Easting
954134.75
954148.21
954157.20
954143.73
954134.72
954143.74
954148.19
954157.21
954148.33
954151.01
954156.92
954166.82
954172.74
Elevation
263.50
263.50
263.50
263.50
263.42
263.42
263.42
263.42
263.50
263.42
263.42
263.42
263.42
Description
BUILDING CORNER
BUILDING CORNER
BUILDING CORNER
BUILDING CORNER
GR
GR
GR
GR
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
Point Table Point #
Northing
1507860.10
1507840.71
1507856.59
1507853.91
1507835.06
1507886.84
1507882.03
1507881.53
1507879.76
1507857.13
1507888.85
1507894.21
1507901.68
Easting
954208.63
954230.11
954244.68
954247.65
954230.40
954173.02
954168.68
954158.84
954157.24
954205.95
954161.83
954155.89
954162.62
Elevation
264.00
264.00
264.00
264.00
264.00
263.42
263.42
263.42
263.50
264.00
263.50
263.50
263.50
Description
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
SIDEWALK
PUMP STATION
POST AERATION MH
OUTFALL MH
N
S
E
W
Feet 0 5 10
PR
O
JE
C
T:
S
TP
D
IS
IN
FE
C
TI
O
N
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
V
IL
LA
G
E O
F D
EX
TE
R
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
C003
FO
UR
TH
C
OA
ST
IN
C
G
R
AV
ES
, C
LA
YT
O N
N
EW
Y O
R K, 5/
3-
/4
-7 w w w .fo ur th co as t.c om w w w
.s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
AS
S
HO
W
N
JR
C W
AW
OCTOBER 1, 2025
JANUARY 16, 2026
W W
TP
L
AY
O
U T
AN
D
G
RA
DI
N
G P
LA
N
El ev at io n
El ev at io n
Station
A PROFILE VIEW
240.00
245.00
250.00
255.00
260.00
265.00
270.00
275.00
280.00
285.00
240.00
245.00
250.00
255.00
260.00
265.00
270.00
275.00
280.00
285.00
0+
0+
1+
1+
EFFLUENT PS
A STA. 0+24
60" DIA
24" X 42" RECTANGULAR HATCH
RIM ELEV 263.50'
E INV 8'' PVC ELEV 256.27'
SE INV 8'' PVC ELEV 256.38'
3" DR11 HDPE
3" DR11 HDPE
8" SDR35 PVC@ 1.39%
POST AERATION MH
A STA. 0+98
60" DIA
30" DIA FRAME AND COVER
RIM ELEV 263.50'
SW INV 3'' ELEV 258.02'
NE INV 8" PVC ELEV 259.95'
UV BUILDING
SEE DWG C200 FOR
MORE DETAIL
SEE DWG C200 FOR
MORE DETAIL
8" SDR35 PVC@ 0.64%
8" SDR 35 PVC@ 5.10%
NEW OUTFALL MH
A STA. 1+08
60" DIA
RIM ELEV 263.50'
SE INV 8'' PVC ELEV 255.69'
SW INV 8'' PVC ELEV 259.81'
NW INV 8" PVC ELEV 255.69'
8" SDR35 PVC@ 0.68%
HORIZONTAL SCALE: 1" = 10'-0"
VERTICAL SCALE: 1" = 5'-0"
PR
O
JE
C
T:
S
TP
D
IS
IN
FE
C
TI
O
N
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
V
IL
LA
G
E O
F D
EX
TE
R
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
C004
FO
UR
TH
C
OA
ST
IN
C
G
R
AV
ES
, C
LA
YT
O N
N
EW
Y O
R K, 5/
3-
/4
-7 w w w .fo ur th co as t.c om w w w
.s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
AS
S
HO
W
N
JR
C W
AW
OCTOBER 1, 2025
JANUARY 16, 2026
W W
TP
P
RO
FI
LE
FMT
LT
P1001 P1002
UV FEED PUMP STATION
FMT
AERATION
B1001
AERATION
B1002
PRV
PRV
100 GPM MECHANICAL FLOW
CONTROL RESTRICTOR (TYP)
5000 GAL SEPTIC TANK 2A 5000 GAL SEPTIC TANK 2B
5000 GAL SEPTIC TANK 1A 5000 GAL SEPTIC TANK 1B
DOSING CHAMBER
DOSING CHAMBER
INFLUENT FLOW MONITORING
MANHOLE
3" PARSHALL FLUME
WWTP INFLUENT
PARAMETER AVERAGE MONTH
AVERAGE DAILY FLOW (HISTORICAL) 0.017 MGD
MAX MONTH AVERAGE DAILY FLOW (HISTORICAL) 0.038 MGD
MAX DAY FLOW (HISTORICAL) 0.222 MGD, 152 GPM
PEAK HOURLY FLOW (ESTIMATED)* 0.222 MGD, 152 GPM
PEAK INSTANTANEOUS FLOW (HISTORICAL) 0.310 MGD, 215 GPM
DESIGN FLOW (AVERAGE DAILY) .034 MGD
BOD (MAX MONTH) 118 MG/L, 37.5 LBS/DAY
TSS (MAX MONTH) 43 MG/L, 14 LBS/DAY
SEPTIC TANK CRITERIA
TOTAL VOLUME (EA TANK) 6,417GAL
MAX OPERATIONAL VOLUME (EA TANK) 5,000 GAL
TOTAL OPERATION VOLUME 20,000 GAL
HYDRAULIC RETENTION TIME (BASED ON
MAX MONTH AVERAGE DAILY FLOW) 12.63 HOURS
HYDRAULIC RETENTION TIME (BASED ON
MAX DAY FLOW) 2.16 HOURS
FLOW DISTRIBUTION MH
BYPASS
DOSING SIPHON
SIPHON SIZE 6"
AVERAGE DISCHARGE 450 GPM
FLOW RATE AT LOW WATER 350 GPM
CLOSED VESSEL UV DESIGN
NO OF UNITS 3 (2 DUTY, 1 REDUNDANT)
CONFIGURATION SERIES
FLOW (DESIGN) 100 GPM
FLOW (PER UNIT) 75 GPM
UV DOSE 30 MJ/CM2
UV TRANSMITTANCE (UVT) 35-80% UVT
MAX WATER HARDNESS 855 MG/L
BLOWER DESIGN
NO OF UNITS 2 (1 DUTY, 1 REDUNDANT)
AIR FLOW (DESIGN) 20 SCFM
DISCHARGE PRESSURE 5 PSIG
BLOWER HP 3 HP
DOSING CHAMBER CRITERIA
NO OF TANKS 2
TOTAL VOLUME (EA TANK) 3,856 GAL
MAX OPERATIONAL VOLUME (EA TANK) 2,693 GAL
DOSING VOLUME 5,386 GAL
DOSES / DAY ( MAX MONTH AVERAGE
DAILY FLOW) 7
DOSES / DAY (MAX DAY FLOW) 42
AVERAGE DOSING DURATION 12 MIN
MH 1B
MH 1CDISTRIBUTION BOX
SAND FILTER 1SAND FILTER 2SAND FILTER 3SAND FILTER 4
EFFLUENT PUMP STATION CRITERIA
CONFIGURATION 1 DUTY / 1 REDUNDANT
PUMP HP 3 HP
SPEED VARIABLE
DESIGN FLOW/HEAD/SPEED PER PUMP 100 GPM/48 FT/3450 RPM
MINIMUM FLOW/HEAD/SPEED PER PUMP 45 GPM/29 FT/2250 RPM
MAXIMUM FLOW/HEAD/SPEED PER PUMP 104 GPM/49 FT/3600 RPM
UV BUILDING
OUTFALL MH
POST AERATION MH DESIGN
DIAMETER (FT) 5 FT
WORKING VOLUME (GAL) 1564 GAL
DETENTION TIME (MIN) 15.64 MIN
NO OF DIFFUSERS 8
DIFFUSER SUBMERGENCE (FT) 10 Ft
AIR FLOW (SCFM) 20 SCFM
AIR FLOW PER DIFFUSER (SCFM) 2.5 SCFM
AS
S
HO
W
N
JR
C W
AW
JANUARY 16, 2026
PR
O
CE
SS
F
LO
W A
N D
BA
SI
S O
F
DE
SI
G
N
PR
O
JE
C T:
D
EP
AU
VI
LL
E
W W
TP
D
IS
IN
FE
C
TI
O
N S
YS
TE
M
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
T O
W N
O F
C
LA
YT
O
N
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
C005
FO
UR
TH
C
OA
ST
IN
C
G R
AV
ES
, C
LA
YT
O
N N
EW
Y
O R
K, 5/
3-
/4
-7 w w w
.fo ur th co as t.c om w w w .s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
BLOWER CONTROL
PANEL
EFFLUENT PUMP
STATION CONTROL
PANEL
200 AMP 120/240 V SINGLE
PHASE ELECTRICAL PANEL
UV DISINFECTION SYSTEM (SEE DWG C101
FOR DETAILED PLAN AND SECTIONS)
POST AERATION BLOWER NO.1 POST AERATION BLOWER NO.2
EFFLUENT FM AND METERING ASSEMBLY & UV
COOLING SYSTEM (SEE DWG C102 FOR DETAILED
PLAN AND SECTIONS)
2" SCH 10 304 SS AERATION PIPING
C101
C102
2'-4" 4'-8"
93 4"
6"
1' -9
1 2"
8" 1'-8" 1'-2" 2'-10" 8"
93 4"
3" DR 11 HDPE BELOW GRADE
(UV EFFLUENT TO POST AERATION MH)
3" DR 11 HDPE BELOW GRADE
(PUMP 1 DISCHARGE)
3" DR 11 HDPE BELOW GRADE
(PUMP 2 DISCHARGE)
FLOW
FLOW
FLO
W
FLOWFLOW
2" SCH 10 304 SS AIR SUPPLY
BELOW GRADE TO POST
AERATION MH
3" DR 11 HDPE BELOW GRADE
(TO POST AERATION MH)
FLOW
FLO
W
C102 B
SCALE:1 1" = 1'-0"
UV BUILDING PROCESS PLAN
C102
4"
1 1/4" DR 11 HDPE BELOW GRADE
(COOLING PUMP SUCTION)
FLOW
2' -0
"2' -6
"3' -0
PR
O
JE
C
T:
S
TP
D
IS
IN
FE
C
TI
O
N
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
V
IL
LA
G
E O
F D
EX
TE
R
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
C100
FO
UR
TH
C
OA
ST
IN
C
G R
AV
ES
, C
LA
YT
O
N N
EW
Y
O R
K, 5/
3-
/4
-7 w w w
.fo ur th co as t.c om w w w .s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
AS
S
HO
W
N
JR
C W
AW
OCTOBER 1, 2025
JANUARY 16, 2026
U V
BU
IL
DI
N
G
PR
O
CE
SS
P
LA
N
3" X 2" SCH 80 PVC REDUCER
2" SCH 80 PVC FITTINGS
(TYP)
2" SCH 80 BV (NORMALLY
CLOSED)
2" SAMPLE
PORT/DRAIN
2" SCH 80 PVC SOCKET X
FPT ADAPTER
2" PIPE SUPPORT (TYP)
UV REACTOR 3
GFCI RECEPTACLE
SEE NOTE 1
1'-61 2" 91
2" 1'-61 2" 3'-0"
1'-0"
2'-0" 3'-0"
1'-0"
2'-0" 5'-11 2"
1'-0" 1'-0" 1'-0" 1'-0" 1'-0"61 2" 1'-0" 1'-0" 1'-0" 1'-0"91
2"
1'-61 2" 6" 10" 1'-0" 1'-2" 10" 1'-0" 1'-0" 1'-0" 1'-2" 10" 1'-0" 1'-0" 1'-0" 1'-2" 3'-0" 51
2" 6"
2'-4" 3'-0" 2'-0" 3'-0" 2'-0" 4'-71 2" 6"
1' -2
1 4" 1'
-0
4' -6
1 4"
1' -6
1 2" 8"
3' -1
13 4" 83 4"
7"
8" 1'-0" 1'-4"
2" SCH 80 TEE, 2" MALE X
1" FPT SCH 80 PVC
BUSHING, AND 1" BV
WITH MPT
(DRAIN / SAMPLE PORT)
2" SCH 80 PVC SOCKET X
FPT ADAPTER
3" SCH 80 PVC PIPE AND FITTINGS
(TYP)
PIPE SUPPORT (TYP) 3" SCH 80 BV
(NORMALLY OPEN)
3" SCH 80 PVC PIPE
AND FITTINGS (TYP)
3'-51 2"5'-0"5'-0"
3" SCH 80 BV
(NORMALLY CLOSED)
2" SCH 80 BV
(NORMALLY OPEN)
3" SCH 80 BV
(NORMALLY OPEN)
3" SCH 80 BV
(NORMALLY OPEN)
2" SCH 80 BV
(NORMALLY OPEN)
2" SCH 80 BV
(NORMALLY OPEN)
3" SCH 80 BV
(NORMALLY CLOSED)
2" SCH 80 BV
(NORMALLY OPEN)
3" SCH 80 BV
(NORMALLY CLOSED)
3" SCH 80 BV
(NORMALLY CLOSED)
3" SCH 80 BV
(NORMALLY CLOSED)
2" SCH 80 BV
(NORMALLY CLOSED)
3" SCH 80 BV
(NORMALLY CLOSED)
3" SCH 80 BV
(NORMALLY OPEN)
UV REACTOR 2
GFCI RECEPTACLE
SEE NOTE 1
UV REACTOR 1
GFCI RECEPTACLE
SEE NOTE 1
2" SCH 80 PVC UV INLET
2" SCH 80 TEE, 2" MALE X
1" FPT SCH 80 PVC
BUSHING, AND 1" BV
WITH MPT
(DRAIN / SAMPLE PORT)
2" SCH 80 PVC BV (UV INLET)
3" SCH 80 PVC MANIFOLD
PIPE SUPPORT (TYP)
2" SCH 80 PVC BV (UV INLET)
3" X 2" SCH 80 PVC REDUCER
3" SCH 80 PVC MANIFOLD
UV REACTOR
UV REACTOR 3 UV REACTOR 2 UV REACTOR 1 3" SCH 80 PVC (UV
INLET PIPING)
3" SCH 80 PVC (UV
EFFLUENT PIPING)
C101 A
93 4"
C101 B
PIPE SUPPORT (TYP)
SCALE:1 1" = 1'-0"
UV DISINFECTION SYSTEM DETAIL
SCALE:A 1" = 1'-0"
UV DISINFECTION SYSTEM SECTION
SCALE:B 1" = 1'-0"
UV DISINFECTION SYSTEM SECTION
UV COOLING
CONNECTIONC103
PIPE SUPPORT (TYP) C103
PIPE SUPPORT (TYP)C103
PR
O
JE
C
T:
S
TP
D
IS
IN
FE
C
TI
O
N
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
V
IL
LA
G
E O
F D
EX
TE
R
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
C101
FO
UR
TH
C
OA
ST
IN
C
G R
AV
ES
, C
LA
YT
O
N N
EW
Y
O R
K, 5/
3-
/4
-7 w w w
.fo ur th co as t.c om w w w .s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
AS
S
HO
W
N
JR
C W
AW
OCTOBER 1, 2025
JANUARY 16, 2026
U V
BU
IL
DI
N
G
PR
O
CE
SS
D
ET
AI
LS
3" SCH 80 PVC PUMP 1
DISCHARGE
3" SCH 80 PVC PUMP 2
DISCHARGE 3" SCH 80 PVC BV (NORMALLY
OPEN)
3" SCH 80 PVC BV (NORMALLY
CLOSED)
3" SCH 80 PVC METER BYPASS
PIPE SUPPORT (TYP)
3" MAGNETIC FLOW METER
AND FLOW METER
TRANSMITTER
3" SCH 80 PVC BV (NORMALLY
OPEN)
3" SCH 80 PVC PUMP
DISCHARGE TO UV
DISINFECTION SYSTEM
2" 1'-6" 1'-10" 1'-6" 1'-6" 1'-2" 1'-6" 93
4" 93 4"
8" 8"
6" 91 4" 1'
-6
3" HDPE X 3" IPS MPT
ADAPTER
3" DR11 HDPE
FLOOR PIPE
PENETRATION
3" DR11 HDPE PUMP 2
DISCHARGE
3" DR11 HDPE PUMP 1
DISCHARGE
3" STEEL THREADED
FLANGE
3" SCH 80 PVC FLANGE
3" SCH 80 PVC BV
(NORMALLY OPEN)
3" SCH 80 PVC CV
3" SCH 80 PVC PIPE AND
FITTINGS (TYP)
3" SCH 80 PVC BV
(NORMALLY OPEN)
3" SCH 80 PVC BV
(NORMALLY OPEN)
3" MAGNETIC FLOW
METER AND FLOW
METER TRANSMITTER
3" SCH 80 PVC PIPE AND
FITTINGS (PUMP DISCHARGE TO
UV DISINFECTION SYSTEM)
PIPE SUPPORT (TYP)
2" 1'-6" 1'-10" 8" 93
4" 1'-6" 1'-2" 10" 8" 93 4" 93
4"
1' -0
1 2" 1'
-1 1 2"
1' -0
1 4"
93 4"
'-0
C102 A
SCALE:1 1" = 1'-0"
METERING ASSEMBLY DETAIL
1-1 4" DR 11 HDPE x SCH 80
PVC ADAPTER
SCALE:B 1" = 1'-0"
UV COOLING STYSTEM ASSEMBLY DETAIL
1-1 4" DR 11 HDPE x SCH 80
PVC ADAPTER
FLOOR PIPE PENETRATION
1- 14" DR11 HDPE UV
COOLING PUMP INTAKE
FROM WET WELL
1-1
4" SCH 80 PVC BV
1-1
4" SCH 80 PVC CV
1-1
4" SCH 80 PVC PIPE
AND FITTINGS
1" SOCKET X 14" FPT SCH 80 PVC BUSHING AND
2-1/2", SINGLE SCALE, 0-100 PSI PRESSURE
GAUGE W/ 14" BOTTOM CONNECTION
1" SCH 80 PVC PIPE AND
FITTINGS
1" SCH 80 PVC UNION
1- 14" X 1" SCH 80
PVC REDUCER
1- 14" SCH 80 PVC
1- 14" X 1 - 14" SCH 80 PVC TEE
1- 14" X 12" SCH 80 PVC REDUCING
TEE W/ 12" SCH 80 PVC BV
1- 14" X 12" SCH 80 PVC REDUCER
2" SCH 80 PVC BV
2" SCH 80 PVC PIPE AND FITTINGS
34 GALLON PRESSURE TANK BY
AMTROL OR EQUAL
2 HP JET PUMP, MODEL NO. JSR5
BY GOULDS WATER TECHNOLOGY
OR EQUAL.
30-50 PSI PRESSURE
SWITCH
FABRICATED STEEL
PUMP BASE STAND
SECURED TO FLOOR.
FABRICATED WITH L
2X2X1
4 AND 14" STEEL
PLATE
1-1
4" SCH 80 PVC BV
1-1
4" SCH 80 PVC
CV
1-1
4" SCH 80 PVC PIPE
AND FITTINGS
1" SOCKET X 14" FPT SCH 80 PVC
BUSHING AND 2-1/2", SINGLE
SCALE, 0-100 PSI PRESSURE GAUGE
W/ 14" BOTTOM CONNECTION
1" SCH 80 PVC PIPE AND FITTINGS
1" SCH 80 PVC UNION
2 HP JET PUMP, MODEL NO. JSR5 BY
GOULDS WATER TECHNOLOGY OR EQUAL.
30-50 PSI PRESSURE
SWITCH
1- 14" X 1" SCH 80
PVC REDUCER
1- 14" SCH 80 PVC
1- 14" X 1 - 14" SCH 80 PVC TEE
1- 14" X 12" SCH 80 PVC REDUCING
TEE W/ 12" SCH 80 PVC BV
1- 14" X 12" SCH 80 PVC REDUCER
2" SCH 80 PVC BV
2" SCH 80 PVC PIPE AND FITTINGS
34 GALLON PRESSURE TANK BY
AMTROL OR EQUAL
1' -2
1 2"
4"
2'-9"
4'-3"
6'-81 2"
2"
1' -2
1 4"
SCALE:2 1" = 1'-0"
UV COOLING STYSTEM ASSEMBLY DETAIL
SCALE:A 1" = 1'-0"
METERING ASSEMBLY SECTION
C102 B
C103
C103
PR
O
JE
C
T:
S
TP
D
IS
IN
FE
C
TI
O
N
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
V
IL
LA
G
E O
F D
EX
TE
R
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
C102
FO
UR
TH
C
OA
ST
IN
C
G R
AV
ES
, C
LA
YT
O
N N
EW
Y
O R
K, 5/
3-
/4
-7 w w w
.fo ur th co as t.c om w w w .s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
AS
S
HO
W
N
JR
C W
AW
OCTOBER 1, 2025
JANUARY 16, 2026
U V
BU
IL
DI
N
G
PR
O
CE
SS
D
ET
AI
LS
2" CV
2" PRV
2" FLEXIBLE PIPE
CONNECTOR
DISCHARGE SILENCER
VIBRATION INSULATION
PADS
LOUVER
2" STEEL THREADED FLANGE
2" 304 SS WELDED FLANGE
INLET FILTER / SILENCER
ALUMINUM INSULATED
SOUND ENCLOSURE
BLOWER MOTOR
2" SCH 10 304 SS WELDED
90 DEG ELBOW
2" LUG STYLE BF W/
LEVER HANDLE
2" 304 SS WELDED STEEL
FLANGE
2" 304 SS WELDED STEEL
FLANGE
2" SCH 10 304 SS BLOWER
DISCHARGE
7"
SCALE:B 1" = 1'-0"
BLOWER ASSEMBLY SECTION
PIPE HANGER (TYP)
PIPE SUPPORT (TYP)
2" SCH 80 BV
(NORMALLY OPEN)
2" SCH 80 BV
(NORMALLY OPEN)
UV REACTOR 1
GFCI RECEPTACLE
SEE NOTE 1
2" X 2" SCH 80 PVC TEE
2" SOCKET X 12" SOCKET SCH
80 PVC BUSHING
2" SOCKET X 14" FPT SCH 80
PVC BUSHING
4" SCH 80 PVC NIPPLE
PURGE VALVE RELOCATION
KIT BY HALLET OR EQUAL
90 DEG 14" FPT X 58" OD TUBING
ADAPTER
4" SCH 80 PVC NIPPLE
8" OD X 12" LLDPE TUBING
2" SOCKET X 2" FPT SCH 80
PVC TEE
2" MPT X 12" FPT PVC BV
2" MPT X 5/8" OD TUBING
ADAPTER
SCALE:1 1" = 1'-0"
UV COOLING SYSTEM CONNECTION DETAIL
2" SCH 80 PVC PIPE AND
FITTINGS SECURED TO WALL
C103
C103
PIPE CLAMP
REDUCER
SS EXTENSION PIPE
THREADED COMPANION FLANGE
W/ (4) 1 2" EXPANSION ANCHORS
SCALE:2 SCALE: NTS
PIPE SUPPORT DETAIL
EX
AC
T
HE
IG
HT
T O
B E
D
ET
ER
M
IN
ED
IN
F
IE
LD
ADJUSTMENT SCREW AND LOCK NUT
NEOPRENE CUSHION
STEEL FLANGE
THREADED ROD
PIPE CLAMP
NEOPRENE CUSHION
SECURE TO ROOF
TRUSS OR BLOCKING
W/ (4) 38" X 2-1/2" LAG
SCALE:3 SCALE: NTS
PIPE HANGER SUPPORT DETAIL
PR
O
JE
C
T:
S
TP
D
IS
IN
FE
C
TI
O
N
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
V
IL
LA
G
E O
F D
EX
TE
R
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
C103
FO
UR
TH
C
OA
ST
IN
C
G R
AV
ES
, C
LA
YT
O
N N
EW
Y
O R
K, 5/
3-
/4
-7 w w w
.fo ur th co as t.c om w w w .s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
AS
S
HO
W
N
JR
C W
AW
OCTOBER 1, 2025
JANUARY 16, 2026
U V
BU
IL
DI
N
G
PR
O
CE
SS
D
ET
AI
LS
STAINLESS STEEL CHAIN
1/4" STAINLESS STEEL CABLE
D-L WINCH ASSEMBLY
STAINLESS STEEL TUBE
DAVIT
STATIC LOOP
SAFETY HOOK
STAINLESS STEEL
TUBE MAST (1 REQD.)
" 5'
-0
LI
FT
IN
G
HE
IG
HT
3-1/2" DIA
SECURED BY (4) 78"
THROUGH BOLTS
8"
WEEP HOLE
SCALE:2 N.T.S.
DAVIT CRANE DETAIL
3" SCH 40 PVC CAP
PRESSURE TRANSDUCER
2" HOLES DRILLED AT 6" O.C.
BACKUP FLOAT (TYP)
3" SS HOSE CLAMP 6" ABOVE
FLOAT ELEVATION TO SECUTRE
FLOAT CABLE TO PVC PIPE (TYP)
ADDITIONAL 3" SS HOSE CLAMP
(24" MAX O.C.)
3" SCH 40 PVC
PIPE SUPPORT (TYPE 2) 24" MAX
SPACING (TYP)
6" 4"
2' -0
2'
-0
2' -0
2'
-0
2' -0
2'
-0
2' -0
8"
3' -6
'-0
60" DIA PRECAST CONC MH
SUBMERSIBLE EFFLUENT
PUMP (TYP)
36" X 30" ALUMINUM
HATCH
PUMP BASE AND GUIDE
RAIL SYSTEM(TYP)
90.0°
45.0°
9" 9"
SCALE:1 1/2" = 1'-0"
EFFLUENT PUMP STATION DETAIL
PLAN
SECTION A
PUMP BASE
SUBMERSIBLE EFFLUENT PUMP
3" BASE ELBOW AND FLANGE
3" SCH 80 PVC FLANGE
3" SCH 80 PVC DISCHARGE PIPE
PIPE SUPPORT (TYPE 2) 24" MAX
SPACING (TYP)
3" SCH 80 PVC FLANGE
3" 304 SS FLANGE
3" HDPE X SS MPT TRANSITION ADAPTER
3" DR 11 HDPE 90 DEG BUTT FUSION
WELDED ELBOW
3" DR 11 HDPE PUMP DISCHARGE
B/O WETWELL ELEV
246.88'
8" SDR 35 PVC INLET
256.28'
3" SCH 40 PVC INV ELEV
260.45'
PIPE PENETRATION (TYP) C200
2" SCH 80 PVC INV ELEV
261.05'
JUNCTION BOX
2" SCH 80 PVC CONDUIT W/ POWER AND
CONTROL WIRING TO CONTROL PANEL
SCH 40 304 SS GUIDE RAIL
304 SS LIFTING CHAIN
DAVIT CRANE36" X 30"
ALUMINUM
HATCH
C200 5 C200
3" SCH 40 PVC VENT
2" SCH 80 PVC CONDUIT W/ POWER AND
CONTROL WIRING TO CONTROL PANEL
2' -6
5 FT DIA PRECAST CONC MANHOLE
PRECAST CONC SLAB TOP
SS CABLE RACK C200
.0
8" SDR 35 PVC INLET
PIPE PENETRATION (TYP)
3" SCH 40 PVC VENT
3" DR11 HDPE UV EFFLUENT PIPE
3" DR11 HDPE UV EFFLUENT PIPE
PUMP OFF ELEV
247.88'
PUMP ON ELEV
251.88'
B/O WETWELL ELEV
246.88'
HIGH WATER ALARM ELEV
252.88'
3' -0
C200
A
LEVEL CONTROL ASSEMBLY
(SEE SECTION A)C200
SCALE:3 1/2" = 1'-0"
LEVEL CONTROL ASSEMBLY
PUMP ON ELEV
251.88'
HIGH WATER ALARM ELEV
252.88'
PUMP OFF ELEV
247.88'
45.0°C200
GRADE ELEV
263.00'
BACK FILL WITH SUITABLE
ONSITE MATERIAL
TOP SOIL SEED AND MULCH.
FINISHED GRADE SLOPE
AWAY
C203
T/O WET WELL ELEV
263.50'
CRUSHED STONE OR COMPACTED
GRAVEL SUBBASE 12" MIN ON EARTH.
6" MIN ON ROCK
MODULAR LINK SEAL BY LINK-SEAL OR EQUAL
C203
C203
C203
C203
C200
PIPE SUPPORT 24" MAX SPACING
(TYP)
1-1/4" SCH 80 PVC
1-1/4" DR 11 HDPE 90 DEG BUTT FUSION
WELDED ELBOW
1-1/4" DR 11 HDPE COOLING PUMP
SUCTION
PIPE PENETRATION (TYP)
2" SCH 80 PVC INV ELEV
261.05'
2" SCH 80 PVC CONDUIT W/ POWER AND
CONTROL WIRING TO CONTROL PANEL
5 FT DIA PRECAST CONC MANHOLE
PRECAST CONC SLAB TOP
GRADE ELEV
263.00'
T/O WET WELL ELEV
263.5'
1-1 4" DR 11 HDPE x SCH 80
PVC ADAPTER
T/O WET WELL ELEV
263.50'
COOLING PUMP SUCTION PIPE INV
247.88'
B/O WETWELL ELEV
246.88'
SCALE:4 1/2" = 1'-0"
COOLING PUMP SUCTION PIPE ASSEMBLY
1-1/4" DR11 HDPE COOLING PUMP
SUCTION LINE
C203
C200
C200
C202
AS REQ 3"3"3"
AS
R
EQ
3"
DIAMOND PLATE SURFACE
SLAM LATCH
3" ALUMINUM FRAME
HOLD OPEN ARM
SLAM LOCK
SQUARE KEY WRENCH
SPRING LIFTING MECHANISM
31 2"
NEOPRENE PERIMETER GASKET
SCALE:5 N.T.S.
HATCH DETAIL
1'-6"
SCALE:6 N.T.S.
CABLE RACK DETAIL
0.188" HOOK DIAMETER
(6) CABLE HOOKS)
2" X 4 12" 304 SS CONCRETE ANCHOR
(3" MIN EMBEDMENT)
3"
2"
7"
304 SS FLOAT BRACKET
0.188" HOOK DIAMETER
2" X 4 12" 304 SS CONCRETE ANCHOR
(3" MIN EMBEDMENT)
304 SS FLOAT BRACKET
PIPE
CONC WALL
DIA. PER
MANUFACTURERS
RECOMMENDATIONS
MODULAR LINK SEAL BY LINK-SEAL OR EQUAL
MODULAR LINK SEAL SEE NOTES 1 &2
NOTES:
1. SEALING ELEMENTS SHALL BE EPDM.
2. SIZING SHALL BE IN ACCORDANCE WITH THE MANUFACTURES
RECOMMENDATIONS FOR THE APPLICATION
NON SHRINK GROUT
SCALE:7 N.T.S.
PIPE PENETRATION DETAIL
PR
O
JE
C
T:
S
TP
D
IS
IN
FE
C
TI
O
N
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
V
IL
LA
G
E O
F D
EX
TE
R
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
C200
FO
UR
TH
C
OA
ST
IN
C
G R
AV
ES
, C
LA
YT
O
N N
EW
Y
O R
K, 5/
3-
/4
-7 w w w
.fo ur th co as t.c om w w w .s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
AS
S
HO
W
N
JR
C W
AW
OCTOBER 1, 2025
JANUARY 16, 2026
W W
TP
S
IT
E
DE
TA
IL
S
PLAN (OVERALL LAYOUT)
SCALE:1 1/2" = 1'-0"
POST AERATION MANHOLE DETAIL
8" SDR35 PVC OUTLET TO
OUTFALL MH
3" DR11 HDPE UV
EFFLUENT
ASSEMBLY
DIFFUSER ASSEMBLY (TYP)
SCH 80 PVC PIPE AND
FITTINGS
3" DR 11 HDPE UV EFFLUENT
B/O WETWELL ELEV
249.30
RIM ELEV
263.50'
3" DR11 HDPE INV ELEV
258.02'
GRADE ELEV
263.00'
8" SDR35 PVC INV ELEV
259.95'
3" SCH 40 PVC INV ELEV
261.64'
2" SCH 10 SS INV ELEV
261.64'
B.O. WETWELL ELEV.
249.30
PIPE PENETRATION (TYP)
1' -0
"1' -6
2'
-0
2' -0
2'
-0
3" SCH 80 PVC FLANGE
3" DR 11 DHPE FLANGE ADAPTER
3" DI BACKUP RING
3" DR 11 DHPE UV EFFLUENT
PIPE SUPPORT (TYPE 2) 24" MAX
SPACING (TYP)
3" SCH 80 PVC
3" SCH 80 PVC 90 DEG
ELBOW
3" SCH 80 PVC
RIM ELEV.
263.50'
GRADE ELEV.
263.00'
3" SCH 80 PVC, UV EFFLUENT PIPE
ASSEMBLY
8"
1'-4"
45.0°45 .0
SECTION A
PLAN (AERATION GRID LAYOUT)
45.0°45.0°
1' -4
1'
-4
16" 8"
1'-4"
1'-4"1'-315 16"
DIFFUSER ASSEMBLY (TYP)
GUIDE SUPPORT (TYP)
SCH 80 PVC PIPE AND FITTINGS (TYP)
PIPE PENETRATION
(TYP)
2" SCH 10 304 SS AIR
SUPPLY ASSEMBLY
3" SCH 80 PVC VENT PIPE
AND FITTINGS
DIFFUSER GRID CL ELEV
249.97'
PIPE SUPPORT (TYPE 2)
(TYP)
SCH 80 PVC PIPE AND
FITTINGS
PIPE SUPPORT (TYPE 2)
(TYP)
SCALE:3 1/2" = 1'-0"
UV EFFLUENT PIPE ASSEMBLY DETAIL
2" SCH 80 PVC, AIR SUPPLY
ASSEMBLY
2" SCH 10 SS INV ELEV
261.64'
RIM ELEV
263.50'
GRADE ELEV
263.00'
B/O WETWELL ELEV
249.30
DIFFUSER GRID CL ELEV
249.97' 1'
-6
2' -0
2'
-0
2' -0
2'
-0
1' -8
9 16
8"
2" SCH 80 PVC PIPE AND
FITTINGS
2" SCH 80 PVC FLANGE
2" 304 SS PIPE FLANGE
2" SCH 10 304 SS AIR PIPE
PIPE PENETRATION (TYP)
PIPE SUPPORT
(TYPE 2) (TYP)
DIFFUSER ASSEMBLY
(TYP)
SCH 80 PVC PIPE AND
FITTINGS
GUIDE SUPPORT (TYP)
SCALE:2 1/2" = 1'-0"
AIR SUPPLY ASSEMBLY DETAIL
C203
C201
C201
1'-4"
3" DR11 HDPE INV ELEV
258.02'
C201
C202
C201
C201
C202
C203
C203
BACK FILL WITH SUITABLE
ONSITE MATERIAL IN NON
PAVEMENT AREAS
TOP SOIL SEED AND
MULCH. FINISHED
GRADE SLOPE AWAY
PIPE PENETRATION
PIPE BEDDING (TYP)C203
C200
GUIDE SUPPORT (TYP)C201
C202
C201
C201
C201
C201
CRUSHED STONE OR COMPACTED
GRAVEL SUBBASE 12" MIN ON EARTH.
6" MIN ON ROCK
WRENCH 9" DIFFUSER
(FOR TIGHTENING RETAINING RING)
RETAINER RING 9" DIFFUSER
(DO NOT LUBRICATE THREADS)
MEMBRANE DISC-9"
W/ INTEGRAL O-RING
DIFFUSER HOLDER
(DO NOT LUBRICATE THREADS)
64" DIA ORIFICE
AIR DISTRIBUTOR
SCALE:5 NTS
DIFFUSER ASSEMBLY
SCALE:6 NTS
GUIDE SUPPORT
316 SS HEX NUT
316 SS FLAT WASHER
316 SS LOCATING PLATE
316 SS SUPPORT BASE
8" DIA 316 SS WEDGE-TYPE
ANCHOR BOLT, 1-1/4" PROJECTION &
2-1/2" EMBEDDMENT
SCALE:4 NTS
ANCHOR ASSEMBLY
304 SS GUIDE CLAMPS
5/16" DIA 316 SS ROD
ANCHOR ASSEMBLY
SCH 80 PVC AIR SUPPLY PIPE
304 SS GUIDE CLAMPS
5/16" DIA 316 SS ROD
ANCHOR ASSEMBLY
SCH 80 PVC AIR SUPPLY PIPE
PR
O
JE
C
T:
S
TP
D
IS
IN
FE
C
TI
O
N
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
V
IL
LA
G
E O
F D
EX
TE
R
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
C201
FO
UR
TH
C
OA
ST
IN
C
G R
AV
ES
, C
LA
YT
O
N N
EW
Y
O R
K, 5/
3-
/4
-7 w w w
.fo ur th co as t.c om w w w .s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
AS
S
HO
W
N
JR
C W
AW
OCTOBER 1, 2025
JANUARY 16, 2026
W W
TP
S
IT
E
DE
TA
IL
S
NOTE:
FOR INSIDE DROP PIPE
USE 5'-0" I.D. M.H.
BACK FILL WITH SUITABLE ONSITE
MATERIAL
RIM ELEV
263.50'
GRADE ELEV
263.42'
8" SDR35 PVC INV ELEV
259.81'
CAST IN PLACE CONC BASE. 4000 PSI
CONCRETE BELOW
SPRING LINE OF PIPE
REMOVE TOP HALF OF EXISTING PIPE
8" SDR35 PVC INV ELEV
255.69'
4000 PSI CONCRETE BENCH
WALL AREA BETWEEN EXISTING PIPE
AND DOGHOUSE OPENINGS SHALL BE
FILLED WITH NON- SHRINK GROUT
TYP MANHOLE JOINT W/ 2 LAYERS OF
BUTYL SEALANT BETWEEN EACH
SECTION.
PRECAST REINFORCED CONCRETE
MANHOLE SECTIONS AND BASE WITH
BITUMASTIC WATERPROOF COATING
ON EXTERIOR
8" SDR35 PVC FROM POST
AERATION MH 8" X 8" SAN TEE
FOR SDR 35 PIPE
8" SDR 35 PVC DROP PIPE
1' -0
" M
AX
CONTRACTOR SHALL FURNISH AND
INSTALL COPOLYMER POLYPROPYLENE
RUNGS. RUNGS ARE TO BE PLACED AT
12" MIN SPACING
TOP SOIL SEED AND MULCH.
FINISHED GRADE SLOPE AWAY
MANHOLE FRAME AND COVER. SET
FRAME 1" MIN. ABOVE GRADE PLAN
SECTION A
SCALE:1 1/2" = 1'-0"
OUTFALL MH DETAIL
8" SDR35 PVC FROM POST
AERATION MH
EX 8" SDR35 PVC FROM EX OUTFALL
MH (TO BE ABANDONED)
ONCE ONLINE, CONTRACTOR SHALL
FILL EXISTING PIPE END WITH NON
SHRINK GROUT
ONCE ONLINE, CONTRACTOR SHALL
FILL EXISTING CHANNEL WITH NON
SHRINK GROUT
8" X 8" SAN TEE AND DROP
PIPE ASSEMBLY
8" X 8" SAN TEE AND DROP
PIPE ASSEMBLY
EX 8" SDR35 PVC TO REMAIN
12" X 8"X 4" CONC BLOCK (SIDE WALL
SUPPORT)
CAST IN PLACE CONC BASE. 4000
PSI CONCRETE BELOW
SPRING LINE OF PIPE
4000 PSI CONCRETE BENCH
30" DIA MANHOLE OPENING
PRECAST REINFORCED CONCRETE
MANHOLE SECTIONS AND BASE WITH
BITUMASTIC WATERPROOF COATING
ON EXTERIOR
CONTRACTOR SHALL FURNISH AND
INSTALL COPOLYMER POLYPROPYLENE
RUNGS. RUNGS ARE TO BE PLACED AT
12" MIN SPACING
90.0°90.0°
90.0°
2" SHARP FACE GOTHIC
1" DIA HANDLING HOLE
(2) CLOSED PICKHOLE
11 2"
11 2"
2'-101
8" DIA2"
2'-7 1 16"
2'-101 4"
11 2" 4"
2'-73 4"
3'-0 3 16"
3'-41 2"
PLAN
COVER SECTION
FRAME SECTION
SCALE:2 1/2" = 1'-0"
FRAME AND COVER DETAIL
PIPE PENETRATION
PIPE BEDDING (TYP)
CRUSHED STONE OR COMPACTED
GRAVEL SUBBASE 12" MIN ON EARTH.
6" MIN ON ROCK
12" X 8"X 4" CONC BLOCK (SIDE
WALL SUPPORT)
C202
C203
C200
C203
8"
OFF SET PIPE CLAMP
31 4"2' -0
C202
C203
PIPE CLAMP
REDUCER
SS EXTENSION PIPE
THREADED COMPANION FLANGE
W/ (4) 12" EXPANSION ANCHORS
SCALE:3 SCALE: NTS
PIPE SUPPORT (TYPE 1) DETAIL
EX
AC
T
HE
IG
HT
T O
B E
D
ET
ER
M
IN
ED
IN
F
IE
LD
SCALE:4 N.T.S.
PIPE SUPPORT (TYPE 2)
ADJUSTMENT SCREW AND LOCK NUT
NEOPRENE CUSHION
THREADED CONC INSERT ANCHOR
THREADED ROD
PIPE CLAMP
NEOPRENE CUSHION
SCALE:5 N.T.S.
PIPE SUPPORT (TYPE 3)
4" X 4 12" 316 SS ANCHOR BOLT
OFFSET BASE
HEX NUT AND BOLT SIZED
PER MANUFACTURER
ACCORDING TO PIPE SIZE
PIPE CLAMP SIZED PER
MANUFACTURER
ACCORDING TO PIPE SIZE
O
FF
SE
T
TO
B
E
SP
EC
IF
IE
D
NOTES:
1. CONTRACTOR TO RESTORE TOP 12" ACCORDING TO
THE MANHOLE LOCATION. REFER TO RESTORATION
DETAILS
CONTRACTOR TO REMOVE FRAME, COVER, GRADE
RINGS, AND BRICK TO 12" BELOW EXISTING GRADE.
INLET PIPE
FOR DROP MANHOLES WITH INTERNAL
DROP, CONTRACTOR TO CUT EXISTING
TEE AND REMOVE DROP PIPE.
CONTRACTOR TO PLUG AND FILL ALL
INLET AND OUTLET PIPES WITH NON
SHRINK GROUT
CONTRACTOR TO PLUG AND FILL ALL
INLET AND OUTLET PIPES WITH NON
SHRINK GROUT
CONTRACTOR TO PLUG AND FILL ALL
INLET AND OUTLET PIPES WITH NON
SHRINK GROUT
SCALE:6 1/2" = 1'-0"
MANHOLE ABANDONMENT DETAIL
PR
O
JE
C
T:
S
TP
D
IS
IN
FE
C
TI
O
N
IM
PR
O
VE
M
EN
TS
C
LI
EN
T:
V
IL
LA
G
E O
F D
EX
TE
R
REVISED:
DATE:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SC
AL
E:
C202
FO
UR
TH
C
OA
ST
IN
C
G R
AV
ES
, C
LA
YT
O
N N
EW
Y
O R
K, 5/
3-
/4
-7 w w w
.fo ur th co as t.c om w w w .s tla w re nc ee ng in ee rin g.
co m
ST
LA
W
RE
NC
E
EN
GI
NE
ER
IN
G
DP
C
AS
S
HO
W
N
JR
C W
AW
OCTOBER 1, 2025
JANUARY 16, 2026
W W
TP
S
IT
E
DE
TA
IL
S
TOPSOIL, SEED AND MULCH
MIN 4" TOP SOIL WHEN COMPACTED
SITE RESTORATION SUITABLE ON-SITE MATERIAL
AS APPROVED BY THE ENGINEER
(NO MATERIAL IN EXCESS OF
6" IN SIZE)
SCALE:4 NTS
LAWN RESTORATION DETAIL
SEED MIXTURE
KENTUCKY BLUE GRASS (3 VAR MIN) 15-40 PERCENT
FINE FESCUE (2 VAR MIN MUST
INCLUDE CREEPING RED)
30-50 PERCENT
PERENNIAL RYEGRASS (2 VAR MIN) 15-40 PERCENT
ANNUAL RYEGRASS (2 VAR MIN) 5-15 PERCENT
NOTES:
1. TOPSOIL SHALL BE FERTILE, FRIABLE, NATURAL LOAM FREE OF SUBSOIL, CLAY LUMPS, BRUSH, STONES OR OTHER
DELETERIOUS MATERIALS LARGER THAN TWO (2) INCHES IN GREATEST DIMENSION, CONFORMING TO THE REQUIREMENTS OF NYSDOT SECTION 713-01 AND MEETING THE FOLLOWING GRADATION REQUIREMENTS:
SIEVE - PERCENT PASSING
- 2" = 100 %
- 1" = 85 - 100%
- 14" = 65 - 100%
2. SEED: APPLY SEED MIX AT A RATE 1.5 TO 2 TIMES THE MANUFACTURERS RECOMMENDED RATE EVENLY IN TWO
INTERSECTING DIRECTIONS.
3. DO NOT SEED AREAS MORE THAN THAT WHICH CAN BE MULCHED ON SAME DAY.
4. MULCH: SHALL CONSIST OF CLEAN STRAW.
5. IMMEDIATELY FOLLOWING SEEDING AND COMPACTING, APPLY MULCH TO A THICKNESS OF 18 INCHES. APPLY
WATER WITH FINE SPRAY IMMEDIATELY AFTER EACH AREA HAS BEEN MULCHED. SATURATE TO 4 INCHES OF SOIL.
SLOPE VARIES
PREMOULDED BITUMINOUS
EXPANSION JOINT FILLER
W/ SEALANT
6" X 6" - 2.9 X 2.9 WWF
REINFORCING MESH AT MID DEPTH
6" SUBBASE COURSE TYPE 4 ITEM 304.14
4" CAST IN PLACE CONC
FG
SUBGRADE
SCALE:3 NTS
CONCRETE SIDEWALK
NOTES:
1. EXPANSION JOINTS TO BE PROVIDED EVERY 20 FEET.
2. CONTROL JOINTS SHALL BE 0.5" WIDE AND PROVIDED EVERY 5 FEET
3. CONCRETE SHALL BE 4000 PSI CLASS D AIR ENTRAINED AS PER NYSDOT SPECIFICATIONS.
4. EXPOSED CONCRETE SURFACE TO BE BROOM FINISHED & ALL EDGES TO BE TROWELED.
5. ALL EXPOSED CONCRETE TO RECEIVE TWO COATS OF CURING COMPOUND- SEALER SUCH AS "ACCUSEAL", CURE-N-HAND "POLYCLEAR" OR APPROVED EQUAL.
6. EXPANSION JOINTS TO BE PLACED BETWEEN ADJACENT SLABS, AT BUILDING LINE, AT CURBS, OR AT PENETRATING
STRUCTURES.
20' MAX.
POSTS SHALL BE SPACED
NO MORE THAN 10' APART
SEDIMENT FILTER LOG
(DIAMETER VARIES)
FLOW
DIRECTION
FILL GAPS BETWEEN LOG
AND SOIL SURFACE
WITH ON-SITE
MATERIAL COMPACTED
TO A HEIGHT OF NO
MORE THAN 13 THE LOG
DIAMETER
VARIES (SEE NOTE 10)
(SEE NOTE 2)
10'TOE OF
SLOPE
DISTURBED
GRADE
TYP POST (SEE NOTE 4)
3" T
O
RESOURCE
REQUIRING
PROTECTION
SECTION A-A
SEDIMENT FILTER LOG
SILT FENCE
MESH REINFORCEMENT
IF SPECIFIED
TYP POST
(SEE NOTE 4)
FOR POST SPACING
SEE SILT FENCE END
WRAPPING DETAILPLAN
SILT FENCE PLACEMENT
TYP PSOT (SEE NOTE 4)
WIRE MESH SUPPORT (IF
SPECIFIED)
SILT FENCE GEOTEXTILE
FLOW
DIRECTION
EXCAVATE TRENCH,
BURY FABRIC AND
BACKFILL / COMPACT
EXCAVATED MATERIAL
VARIES (SEE NOTE 8)
(SEE NOTE 2)
10'
TOE OF
SLOPE
DISTURBED
GRADE
" M
IN
HE
IG
HT
AB
O
VE
GR
O U
N D
MESH HEIGHT 30" (MIN)
RESOURCES
REQUIRING
PROTECTION
EM
BE
D
" M
IN
4" (MIN)6"
(M
IN
FLOW
DIRECTION
CONTOURS (T
YP)
EDGE OF RESOURCE TO BE
PROTECTED
SLOPE LENGTH
VARIES (SEE
NOTE 8 &10)
ANGLED FENCE OR
LOG END (TYP) (SEE
NOTE 3)
LIMITS OF PROPOSED
DISTURBANCE
100' (M
AX) (S
EE
N
OTE
3)
SECTION A-A
SILT FENCE - TEMPORARY
SILT FENCE END WRAPPING
DETAIL
SECOND FENCE
FIRST FENCE
FIRST POST SECOND POST
ROTATE POSTS TOGETHER
BEFORE INSTALLATION
APPLICATION NOTES:
A. THE PRIMARY PURPOSE OF A SILT FENCE OF SEDIMENT FILTER LOG IS TO INTERCEPT SEDIMENT LADEN RUNOFF BY IMPOUNDING WATER BEHIND THE FENCE OR LOG SO THAT SEDIMENT FALLS OUT
OF SUSPENSION.
B. IDENTIFY ONSIDE AND OFFSITE RESOURCES THAT NEED TO BE PROTECTED USING THE SILT FENCE OR SEDIMENT FILTER LOG (E.C. WETLANDS, PONDS, WATERWAYS, OR ENVIRONMENTALLY SENSITIVE AREAS). SILT FENCE OR SEDIMENT FILTER LOGS ARE TYPICALLY USED WITH EROSION OR SEDIMENT
CONTROL MEASURES, SUCH AS MULCH AND/OR ROLLED EROSION CONTROL FABRIC.
C. SILT FENCE OR SEDIMENT FILTER LOGS SHALL NOT BE USED IN OR ACROSS A FLOWING CHANNEL, OR
AREAS OF CONCENTRATED FLOW. DO NOT USE SILT FENCE OR SEDIMENT FILTER LOGS AS A
PERIMETER CONTROL, TO DEFINE PROPERTY LINES, OR TO DELINEATE A RESOURCE.
GENERAL NOTES:
1. SILT FENCE OF SEDIMENT FILTER LOGS SHALL BE INSTALLED ON A LINE OF EQUAL ELEVATION (CONTOUR). IT MAY BE INSTALLED AT INTERMEDIATE POINTS UP SLOPES AS WELL AS AT THE
BOTTOM.
2. FOR LOCATIONS THAT WARRANT PLACEMENT OF SILT FENCE OR SEDIMENT FILTER LOGS AT THE BASE OF SLOPES, SILT FENCE OR SEDIMENT FILTER LOGS SHALL BE PLACED A MINIMUM OF 10 FEET FROM THE TOE OF THE SLOPE. TO PROVED ADEQUATE AREA FOR SEDIMENT STORAGE AND FACILITATE
MAINTENANCE OF THE SEDIMENT CONTROL AREA.
3. THE ENDS OF A ROW OF SILT FENCE OR SEDIMENT FILTER LOGS SHALL BE ANGLED UP SLOPE TO PREVENT CHANNELIZED FLOW FROM BEING CONVEYED PAST THE ENDS OF THE FENCE. A SECTION OF
SILT FENCE OF SEDIMENT FILTER LOGS SHOULD NOT EXCEED 100 FEET IN LENGTH.
4. WOOD POSTS FOR SILT FENCE SHALL HAVE A CROSS-SECTION AREA OF 3.5 SQUARE INCHES OR STEEL POSTS SHALL BE "T" OR "U" SHAPE AND 1.33 POUND/FEET (MINIMUM) FOR STEEL. SPACING FOR THE PROVIDED SILT FENCE POSTS SHALL BE AS DESIGNATED ON THE DEPARTMENT APPROVED LIST FOR SILT FENCE. THE LENGTH OF SILT FENCE POSTS SHALL BE 40 INCHES. WOOD POSTS FOR SEDIMENT FILTER LOGS SHALL BE NOMINAL 2X2. THE LENGTH OF FILTER LOG POSTS SHALL BE 16" GRATER THAN
THE DIAMETER OF THE LOG.
5. THE BOTTOM EDGE OF SILT FENCE SHALL BE BURIED A MINIMUM OF 6" BELOW GROUND. THE FENCE
SHALL BE INSTALLED WITH THE POST ON THE DOWNSLOPE SIDE OF THE FABRIC.
6. WHERE ENDS OF GEOTEXTILE FABRIC COME TOGETHER, THEY SHALL BE OVERLAPPED AND FOLDED AND STAPLED TO PREVENT SEDIMENT BYPASS, OR THE END POSTS OF TWO SECTIONS SHALL BE
WRAPPED AS SHOWN IN THE DETAIL FOR SILT FENCE END WRAPPING.
7. SEDIMENT SHALL BE REMOVED WHEN ACCUMULATION REACHES ONE-HALF OF THE ABOVE GROUND
HEIGHT OR WHEN BULGES DEVELOP IN THE FABRIC. SEDIMENT SHALL BE DISPOSED OF AS
UNSUITABLE MATERIAL.
8. THE FOLLOWING ARE MAXIMUM SLOPE LENGTHS (DISTANCE BETWEEN ROWS) FOR SILT FENCE
INSTALLATION.
* FOR SLOPES LESS THAN 5% SILT FENCE IS NOT REQUIRED UNLESS IN SENSITIVE AREAS OR HIGHLY
ERODIBLE SOIL
** STANDARD SILT FENCE IS FABRIC ROLLS STAPLED TO WOODEN POSTS DRIVEN 18 INCHES INTO THE
GROUND
*** REINFORCED SILT FENCE IS FABRIC PLACED AGAINST WELDED WIRE MESH WITH ANCHORED STEEL
POSTS DRIVEN 18 INCHES INTO THE GROUND.
9. INSTALLATION OF SILT FENCE OR SEDIMENT FILTER LOG, INCLUDING EXCAVATION, BACKFILL, AND
COMPACTION OF…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .