STATEMENT OF WORK for Rolls Royce Phase 2
1.0 INTRODUCTION
This Statement of Work (SOW) addresses the requirements and tasks associated with the production and delivery of 104 part numbers in varying quantities to support T-45 F405-RR-401 Engine maintenance at NASM and NASK. The engine support equipment will be utilized to remove and inspect at-risk Low Pressure Turbine modules utilizing the existing Balancing Machines, to dress the engine as required and to support the Service Life Extension Program (SLEP).
2.0 APPLICABLE DOCUMENTS
3.0 REQUIREMENTS
3.1 General
The Contractor shall manufacture and deliver the support equipment identified below in accordance with this SOW and the requirements of the contract.
| Part Number |
| Alt PN |
| Nomenclature |
| NIIN |
| Total Qty |
S3S23038000
| Trolley Set, Engine Installation |
| 994636930 |
| 1 |
HU21667
Bolt
S3S14739000
Curvic coupling bolts, slave
BH23-2108
| Jig, clocking assembly |
| LLERF8594 |
| 2 |
S3S20041000
| HP Compressor dummy shaft |
| 993481029 |
| 1 |
1012025
| Box, angle plate |
| 991591638 |
| 4 |
| CP10520 |
| S3S20324000 |
| Beam Sling |
| 996073794 |
| 1 |
| CP4579/2A |
| 3568AS887-1 |
| Turnover Frame |
| 994458140 |
| 0 |
| HC25655 |
| S3S20355000 |
| Rail legs |
| 996175443 |
| 4 |
HU16942
| Lifting tool |
| 996171705 |
| 1 |
HU16970
| Support ring |
| 996171708 |
| 1 |
| HU17474/1 |
| S3S20317000 |
| Lifting tool (pre-mod) |
| 997026551 |
| 1 |
| HU17947 |
| S3S20333000 |
| Build Stand (Pre-mod) |
| HU17947 |
| 1 |
HU17950
| Lifting tool |
| 996171874 |
| 1 |
HU19023
| Cover Plate |
| 996171928 |
| 1 |
HU19718
| Support ring |
| 996195774 |
| 1 |
HU20019
| Stand |
| 996195775 |
| 1 |
HU21230
| Dial indicator (pre-mod) |
| 996175435 |
| 5 |
HU21566
| Bearing housing |
| 996171997 |
| 1 |
HU21578
| Slipper Blocks |
| 996171999 |
| 12 |
HU21703
| Support arms |
| 996172016 |
| 4 |
HU21704
| Lifting Adapter |
| 996172015 |
| 1 |
| HU21705 |
| 99-131-3471 |
| Lifting adapter |
| 996172017 |
| 2 |
HU22641
| Stand |
| 996175200 |
| 1 |
| HU22642 |
| 99-253-6588 |
| Location plate |
| 996175201 |
| 1 |
| HU22934 |
| S3S20336000 |
| Support Ring (Pre-mod) |
| 996175304 |
| 1 |
HU23878
| Adapter |
| 997337592 |
| 1 |
HU24426
| Lifting tool |
| 996058751 |
| 1 |
HU24537
| Beam Sling |
| 994712525 |
| 3 |
HU24839
| Adapter ( Distant piece) |
| 997332052 |
| 2 |
| HU2533 |
| S3S20338000 |
| Protective cover (pre-mod) |
| 996172212 |
| 2 |
HU27126
| Adapter |
| 999117063 |
| 1 |
| HU27161 |
| 3568AS880-1 |
| Turnover adapter |
| 995097113 |
| 0 |
S3S20787000
Turnover adapter
| NCU9171 |
| S3S20349000 |
| Build stand (pre-mod) |
| 996172139 |
| 4 |
S3S14729000
| Alignment plate |
| 994130711 |
| 1 |
S3S14797000
| Hoisting adapter |
| 993340079 |
| 1 |
S3S14798000
| Stand Assembly |
| 993251873 |
| 1 |
| SMH1644 |
| S3S20344000 |
| Stand (pre-mod) |
| 996175324 |
| 1 |
1011925
Magnetic base
1011926
Pillar knuckle assembly
1011927
Cross bar knuckle assembly
HU17512/1
Immobiliser
S3S20806000
Stator immobiliser
HU17513
Adapter
HU17516
Split "Whitemetal bearing"
HU21032
Socket spanner
HU21033
Tool Bolts
HU31411
Bolts
HU29139
| Spacer washer |
| 992887132 |
| 1 |
| HU29563/1 |
| HU29563-01 |
| Center bolt |
| 999029336 |
| 1 |
S3S20798000
Inverting/lifting tool
S3S20863000
Case immobiliser
S3S20927000
Storage Trolley
S3S20808000
Lifting Bar
S3S20843000
Roller bearing housing
S3S20869000
Dummy Casing
881-8-267-000 lifting tool
| HU18011/4 |
| HU18011/4 |
| HP Turbine simulator |
| 991653994 |
| 2 |
| HU18591/1 |
| HU18591-01 |
| PMI Mandrel |
| 996171921 |
| 2 |
| J77525-1A |
| J77525-1A |
| Turnover Stand (pre-mod) |
| 996172028 |
| 3 |
31314
Turnover Stand (post-mod)
996172028
Turnover Stand (post-mod)
| S3S20343000 |
| SMH1550-01 |
| Build stand (post mod) |
| 996172348 |
| 1 |
S3S20794000
| Lifting Cap assembly |
| 992501556 |
| 4 |
S3S20920000
| Beam Sling |
| 999875581 |
| 1 |
S3S20925000
| Lifting tool Assembly |
| 992627204 |
| 1 |
S3S20926000
| Lifting tool assembly |
| 997640492 |
| 1 |
S3S24029000
| Balancing Support, cradle assembly |
| 994063346 |
| 4 |
| CP30119 |
| 032IY-048 |
| SLING, ADAPTER ECU FRONT |
| 990965146 |
| 2 |
| CP30120/2 |
| CP30120-02 |
| SLING, ENGINE CHANGE UNIT |
| 998610076 |
| 5 |
CP30165/2
| CART, ECU INSTALLATION |
| 992543719 |
| 1 |
| UT693 |
| S3S20306000 |
| TOOL, GROUND IDLE ADJUST |
| 991144871 |
| 1 |
| S3S20718000 |
| 260162300 |
| SUPPORT, ENGINE SLING |
| 999578011 |
| 5 |
1015318
| PIPE, BLEED |
| 991732793 |
| 2 |
CP30166
| ADAPTER HOIST SERVICE STAND |
| 992450583 |
| 2 |
| CP30155 |
| 032IY-049 |
| STAND, JET PIPE |
| 991474430 |
| 4 |
| CP30117 |
| 4GC12085 |
| SLING,ECU REAR SUPPORT |
| 992087795 |
| 2 |
| CP30164-02 |
| S3S20777000 |
| STAND,ECU SERVICE |
| 992705433 |
| 2 |
S3S20016000
| HARNESS TEST SET |
| 995735288 |
| 2 |
S3S14653000
| BAG, WATER VAPOUR PROOF (RE-USABLE) |
| 998149675 |
| 4 |
| CP30162-03 |
| S3S20776000 |
| ENGINE STAND, TRANSPORT |
| 998850293 |
| 4 |
| 1014980 |
| RSK1434-18 |
| BOX,CONTROL,BUFS SOLENIOD |
| 999579394 |
| 2 |
| HU32608-2 |
| S3S20881000 |
| TOOL,ADJUSTING SUB-IDLE FUEL CONT UNIT (SIFCU) |
| 999579394 |
| 2 |
| 109823-016 |
| AX65564 |
| PROBE,P3-T3,HP COMPRESSOR |
| 109823-026 |
| AS21508 |
| BOLT |
| 109823-060 |
| 3201-0409 |
| PIN-RIGGING CAMBOX THROT LEVER |
| 109823-061 |
| 62991740820150 |
| CLAMP,O"BOGS |
| 62990410790720 |
| 109823-062 |
| CLAMP,STARTER TO ENGINE |
| 109823-065 |
| AGS2105-411 |
| PIN-RIGGING CAMBOX |
| 109823-079 |
| KU10804 |
| BLEED UNION,P3 |
| 109823-025 |
| AS21411 |
| BOLT |
| 109823-082 |
| 62993160790520 |
| CLAMP,HYDRAULIC PUMP |
| 109823-081 |
| 62993160790720 |
| CLAMP,ALTERNATOR DRIVE |
| 109823-080 |
| 62993160790720 |
| CLAMP,STARTER MOTOR |
| AS21013 |
| 400480080 |
| BOLT, ENGINE SLING SUPPORT |
| AGS2105-409 |
| 1107983 |
| PIN,THROTTLE RIGGING |
| AGS2105-411 |
| AGS2105-411 |
| PIN, THROTTLE SOV RIGGING (LONG PIN) |
| 109823-075 |
| S3S20150000 |
| LEAD,IGNITER,MDA LENGTH 4 FT |
| 109823-023 |
| ATFSCH9984 |
| FILTER HOUSING ASSEMBLY,OIL |
| 109823-030 |
| ATFSCH5845 |
| ADAPTER,OIL PRESSURE AND TEMPERATURE |
| 109823-021 |
| RY 87914 |
| NUT,UNION,M.16 X 1.5 |
| 109823-072 |
| FLEX062082 |
| AIR STARTER INLET - FLEX CLIP |
| ADJ862003 |
| AX7724AX96 |
| JET PIPE ASSEMBLY, F405-RR-401 |
| AX567030 |
| NA |
| PROBE ASSY, P6 EXHAUST GAS DISCHARGE |
3.2 Quality Assurance
The Contractor shall have in place a production quality assurance (QA) system. This QA system shall be able to ensure that manufactured configuration items are built to print, functional, and reliably made IAW controlling technical drawings, specifications and standards. Each item manufactured as part of this contract shall have passed a Government final inspection prior to DD-250.
3.3 Government Inspection and Acceptance
Government Inspection and Acceptance of all production units shall be accomplished at the source by representatives of Defense Contract Management Agency (DCMA).
3.5 Packaging, Preservation and Shipping
Packaging Requirement
The contractor shall preserve and pack materiel IAW ASTM D3951-18 (excluding paragraphs 4.2-4.3) and require same by vendors and subcontractors (for materiel being shipped to the government).
The use of loose fill materials, asbestos, excelsior, newspaper and shredded paper (all types) are prohibited. In addition, all Wood Packaging Materials (WPM) shall be heat treated or chemically treated in accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15:2009, "Regulation of Wood Packaging Material in International Trade."
Marking
Marking shall be in accordance with MIL-STD-129R.
Additionally, special marking labels (fragile, delicate, etc) shall be applied to all unit, intermediate and shipping containers as an integral part of the total pack. The contractor shall select the appropriate special marking label (s) as additional means to protect the items during packaging, handling, storage, transit and removal from the pack Transportation
Transportability issues shall be identified and addressed to ensure all shipments can be transported with unrestricted movement via over-the-road transport. Transportability problem items shall be identified in accordance with MIL-STD-1366E criteria. Requirements for shipment of DOD materiel shall meet, as a minimum, the requirements of the following rules and regulations, as applicable to the mode of transportation in the Defense Transportation Regulation, DTR DOD 4500.9-R, Part II, Uniform Freight Classification Rules, National Motor Freight Classification Rules, and American Trucker’s Association Rules.
4.0 Technical Manual Requirements 4.1 Support Equipment (SE) Manuals (CDRL B001) The contractor shall provide the government updated Work Packages (WPs) for existing SE publications or complete WPs for New SE. Drafts of the WPs shall be delivered to the government in PDF and MS OFFICE (or compatible) editable product, in accordance with CDRL B001. The final version of the manual shall be delivered in PDF and MS OFFICE (or compatible) format. New WPs shall include an illustrated parts break down (IPB) of the unit which shall be broken down into a Group Associated Part List (GAPL), consisting of the part nomenclature, the part number, Manufacture’s Cage Codes and the Source Maintenance Recoverability Code (SMR). WPs shall provide user operational instructions, along with scheduled periodic maintenance instructions and Preoperational Checklists. The WPs shall provide preservation, storage and troubleshooting instructions.
4.2 In Process Review (CDRL B002)
The contractor shall conduct an In-process Review (IPR) of the WPs, in accordance with CDRL B002. The In-process review shall be conducted at a site agreed to by the contractor and the government. The contractor shall do the following during the IPR:
· Identify grammatical errors in the manual
· Simplify language which may hinder user safety and equipment usability
· Identify Warning, Cautions, and Notes (Alerts) that need to be inserted into the content of the manual
· Identify steps in the operation and maintenance procedures which may have been omitted
· Identify additional graphics if required.
The Government shall review all of the technical data and provide any comments to the contractor within thirty (30) days. Comments shall be included in the final deliverable copy. IPR date to be identified after contract award.
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPRVD OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
B C. Category: TDP ( ) TM( XX ) Other ( ) - Engineering Data
D. System/Item
SLEP Procurement E. Contract/PR No.
N68335- F. Contractor
Contractor
1. Data Item No.
B001
2. Title of Data Item
Document Changes
3. Subtitle
Technical Aircraft Manual and updated Source Data (WPs)
4. Authority (Data ID No.)
DI-MISC-80358
5. Contract Reference
SOW 4.4.3.6
6. Requiring Office
NAVAIRLKE 6.7.1.2
7. DD 250 REQ
DD
9. Dist. Statement Req.
A
10. Frequency
See Block 16
12. Date of first submission
See Block 16
14. Distribution
8. APPCODE
Acceptance
11. As of Date
13. Date of Subsequent Submission
| Address |
| Draft |
| Reg |
| Repr |
| 16. Remarks |
| NAVAIRLKE 6.7.6.1.2 |
| 1 |
| 1 |
NAVAIRLKE 1.3.3.8
NAVAIRLKE
4.8.4.3
| 1 |
| 1 |
Final shall be delivered in an editable Adobe, Index Portable Document Format (IPDF) and editable MS Word on DVD-ROM
| TOTAL |
| 2 |
| 3 |
G. Prepared By
Dana Merrill H. Date
18-Jan-22 I. Approved By
Willie Cusaac J. Date
18-Jan-22
| 17. Price Group |
| 18. Estimated Total Price: |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) |
| FORM APPRVD OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.
A. Contract Line Item No.
B. Exhibit
A C. Category: TDP ( ) TM( ) Other ( XX ) - Engineering Data
D. System/Item
SLEP Procurement E. Contract/PR No.
N68335- F. Contractor
Contractor
1. Data Item No.
A003
2. Title of Data Item
Technical Interchange Meeting Minutes
3. Subtitle
In Process Reviews
4. Authority (Data ID No.)
DI-ADMN-81250A
5. Contract Reference
SOW 4.3.1
6. Requiring Office
NAVAIRLKE 6.7.1.2
7. DD 250 REQ
LTR
9. Dist. Statement Req.
A
10. Frequency
See Block 16
12. Date of first submission
See Block 16
14. Distribution
8. APPCODE
See Block 16
11. As of Date
13. Date of Subsequent Submission
See Block 16
| Address |
| Draft |
| Reg |
| Repr |
| 16. Remarks |
| NAVAIRLKE 6.7.6.1.2 |
| 1 |
| 1 |
| Block 8: Government approval/disapproval will be given within 30 days after receipt of document of IPRs. The contractor shall incorporate all comments and resubmit document for government approval within 30 days after receipt of government response and in accordance with the SOW. |
| NAVAIRLKE 1.3.3.8 |
NAVAIRLKE
4.8.4.3
| 1 |
| 1 |
Block 10/12: Initial delivery after IPR completion in contractor format electronically via email.
Final shall be delivered in contractor format electronically via email, Block 13: Revision as required shall be incorporated and resubmitted in accordance with the SOW and CDRL.
| TOTAL |
| 2 |
| 3 |
G. Prepared By
Dana Merrill H. Date
18-Jan-22 I. Approved By
Willie Cusaac J. Date
18-Jan-22