STATEMENT OF WORK for Rolls Royce Phase 2

1.0 INTRODUCTION

This Statement of Work (SOW) addresses the requirements and tasks associated with the production and delivery of 104 part numbers in varying quantities to support T-45 F405-RR-401 Engine maintenance at NASM and NASK. The engine support equipment will be utilized to remove and inspect at-risk Low Pressure Turbine modules utilizing the existing Balancing Machines, to dress the engine as required and to support the Service Life Extension Program (SLEP).

2.0 APPLICABLE DOCUMENTS

3.0 REQUIREMENTS

3.1 General

The Contractor shall manufacture and deliver the support equipment identified below in accordance with this SOW and the requirements of the contract.

Part Number
Alt PN
Nomenclature
NIIN
Total Qty

S3S23038000

Trolley Set, Engine Installation
994636930
1

HU21667

Bolt

S3S14739000

Curvic coupling bolts, slave

BH23-2108

Jig, clocking assembly
LLERF8594
2

S3S20041000

HP Compressor dummy shaft
993481029
1

1012025

Box, angle plate
991591638
4
CP10520
S3S20324000
Beam Sling
996073794
1
CP4579/2A
3568AS887-1
Turnover Frame
994458140
0
HC25655
S3S20355000
Rail legs
996175443
4

HU16942

Lifting tool
996171705
1

HU16970

Support ring
996171708
1
HU17474/1
S3S20317000
Lifting tool (pre-mod)
997026551
1
HU17947
S3S20333000
Build Stand (Pre-mod)
HU17947
1

HU17950

Lifting tool
996171874
1

HU19023

Cover Plate
996171928
1

HU19718

Support ring
996195774
1

HU20019

Stand
996195775
1

HU21230

Dial indicator (pre-mod)
996175435
5

HU21566

Bearing housing
996171997
1

HU21578

Slipper Blocks
996171999
12

HU21703

Support arms
996172016
4

HU21704

Lifting Adapter
996172015
1
HU21705
99-131-3471
Lifting adapter
996172017
2

HU22641

Stand
996175200
1
HU22642
99-253-6588
Location plate
996175201
1
HU22934
S3S20336000
Support Ring (Pre-mod)
996175304
1

HU23878

Adapter
997337592
1

HU24426

Lifting tool
996058751
1

HU24537

Beam Sling
994712525
3

HU24839

Adapter ( Distant piece)
997332052
2
HU2533
S3S20338000
Protective cover (pre-mod)
996172212
2

HU27126

Adapter
999117063
1
HU27161
3568AS880-1
Turnover adapter
995097113
0

S3S20787000

Turnover adapter

NCU9171
S3S20349000
Build stand (pre-mod)
996172139
4

S3S14729000

Alignment plate
994130711
1

S3S14797000

Hoisting adapter
993340079
1

S3S14798000

Stand Assembly
993251873
1
SMH1644
S3S20344000
Stand (pre-mod)
996175324
1

1011925

Magnetic base

1011926

Pillar knuckle assembly

1011927

Cross bar knuckle assembly

HU17512/1

Immobiliser

S3S20806000

Stator immobiliser

HU17513

Adapter

HU17516

Split "Whitemetal bearing"

HU21032

Socket spanner

HU21033

Tool Bolts

HU31411

Bolts

HU29139

Spacer washer
992887132
1
HU29563/1
HU29563-01
Center bolt
999029336
1

S3S20798000

Inverting/lifting tool

S3S20863000

Case immobiliser

S3S20927000

Storage Trolley

S3S20808000

Lifting Bar

S3S20843000

Roller bearing housing

S3S20869000

Dummy Casing

881-8-267-000 lifting tool

HU18011/4
HU18011/4
HP Turbine simulator
991653994
2
HU18591/1
HU18591-01
PMI Mandrel
996171921
2
J77525-1A
J77525-1A
Turnover Stand (pre-mod)
996172028
3

31314

Turnover Stand (post-mod)

996172028

Turnover Stand (post-mod)

S3S20343000
SMH1550-01
Build stand (post mod)
996172348
1

S3S20794000

Lifting Cap assembly
992501556
4

S3S20920000

Beam Sling
999875581
1

S3S20925000

Lifting tool Assembly
992627204
1

S3S20926000

Lifting tool assembly
997640492
1

S3S24029000

Balancing Support, cradle assembly
994063346
4
CP30119
032IY-048
SLING, ADAPTER ECU FRONT
990965146
2
CP30120/2
CP30120-02
SLING, ENGINE CHANGE UNIT
998610076
5

CP30165/2

CART, ECU INSTALLATION
992543719
1
UT693
S3S20306000
TOOL, GROUND IDLE ADJUST
991144871
1
S3S20718000
260162300
SUPPORT, ENGINE SLING
999578011
5

1015318

PIPE, BLEED
991732793
2

CP30166

ADAPTER HOIST SERVICE STAND
992450583
2
CP30155
032IY-049
STAND, JET PIPE
991474430
4
CP30117
4GC12085
SLING,ECU REAR SUPPORT
992087795
2
CP30164-02
S3S20777000
STAND,ECU SERVICE
992705433
2

S3S20016000

HARNESS TEST SET
995735288
2

S3S14653000

BAG, WATER VAPOUR PROOF (RE-USABLE)
998149675
4
CP30162-03
S3S20776000
ENGINE STAND, TRANSPORT
998850293
4
1014980
RSK1434-18
BOX,CONTROL,BUFS SOLENIOD
999579394
2
HU32608-2
S3S20881000
TOOL,ADJUSTING SUB-IDLE FUEL CONT UNIT (SIFCU)
999579394
2
109823-016
AX65564
PROBE,P3-T3,HP COMPRESSOR
109823-026
AS21508
BOLT
109823-060
3201-0409
PIN-RIGGING CAMBOX THROT LEVER
109823-061
62991740820150
CLAMP,O"BOGS
62990410790720
109823-062
CLAMP,STARTER TO ENGINE
109823-065
AGS2105-411
PIN-RIGGING CAMBOX
109823-079
KU10804
BLEED UNION,P3
109823-025
AS21411
BOLT
109823-082
62993160790520
CLAMP,HYDRAULIC PUMP
109823-081
62993160790720
CLAMP,ALTERNATOR DRIVE
109823-080
62993160790720
CLAMP,STARTER MOTOR
AS21013
400480080
BOLT, ENGINE SLING SUPPORT
AGS2105-409
1107983
PIN,THROTTLE RIGGING
AGS2105-411
AGS2105-411
PIN, THROTTLE SOV RIGGING (LONG PIN)
109823-075
S3S20150000
LEAD,IGNITER,MDA LENGTH 4 FT
109823-023
ATFSCH9984
FILTER HOUSING ASSEMBLY,OIL
109823-030
ATFSCH5845
ADAPTER,OIL PRESSURE AND TEMPERATURE
109823-021
RY 87914
NUT,UNION,M.16 X 1.5
109823-072
FLEX062082
AIR STARTER INLET - FLEX CLIP
ADJ862003
AX7724AX96
JET PIPE ASSEMBLY, F405-RR-401
AX567030
NA
PROBE ASSY, P6 EXHAUST GAS DISCHARGE

3.2 Quality Assurance

The Contractor shall have in place a production quality assurance (QA) system. This QA system shall be able to ensure that manufactured configuration items are built to print, functional, and reliably made IAW controlling technical drawings, specifications and standards. Each item manufactured as part of this contract shall have passed a Government final inspection prior to DD-250.

3.3 Government Inspection and Acceptance

Government Inspection and Acceptance of all production units shall be accomplished at the source by representatives of Defense Contract Management Agency (DCMA).

3.5 Packaging, Preservation and Shipping

Packaging Requirement

The contractor shall preserve and pack materiel IAW ASTM D3951-18 (excluding paragraphs 4.2-4.3) and require same by vendors and subcontractors (for materiel being shipped to the government).

The use of loose fill materials, asbestos, excelsior, newspaper and shredded paper (all types) are prohibited. In addition, all Wood Packaging Materials (WPM) shall be heat treated or chemically treated in accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15:2009, "Regulation of Wood Packaging Material in International Trade."

Marking

Marking shall be in accordance with MIL-STD-129R.

Additionally, special marking labels (fragile, delicate, etc) shall be applied to all unit, intermediate and shipping containers as an integral part of the total pack. The contractor shall select the appropriate special marking label (s) as additional means to protect the items during packaging, handling, storage, transit and removal from the pack Transportation

Transportability issues shall be identified and addressed to ensure all shipments can be transported with unrestricted movement via over-the-road transport. Transportability problem items shall be identified in accordance with MIL-STD-1366E criteria. Requirements for shipment of DOD materiel shall meet, as a minimum, the requirements of the following rules and regulations, as applicable to the mode of transportation in the Defense Transportation Regulation, DTR DOD 4500.9-R, Part II, Uniform Freight Classification Rules, National Motor Freight Classification Rules, and American Trucker’s Association Rules.

4.0 Technical Manual Requirements 4.1 Support Equipment (SE) Manuals (CDRL B001) The contractor shall provide the government updated Work Packages (WPs) for existing SE publications or complete WPs for New SE. Drafts of the WPs shall be delivered to the government in PDF and MS OFFICE (or compatible) editable product, in accordance with CDRL B001. The final version of the manual shall be delivered in PDF and MS OFFICE (or compatible) format. New WPs shall include an illustrated parts break down (IPB) of the unit which shall be broken down into a Group Associated Part List (GAPL), consisting of the part nomenclature, the part number, Manufacture’s Cage Codes and the Source Maintenance Recoverability Code (SMR). WPs shall provide user operational instructions, along with scheduled periodic maintenance instructions and Preoperational Checklists. The WPs shall provide preservation, storage and troubleshooting instructions.

4.2 In Process Review (CDRL B002)

The contractor shall conduct an In-process Review (IPR) of the WPs, in accordance with CDRL B002. The In-process review shall be conducted at a site agreed to by the contractor and the government. The contractor shall do the following during the IPR:

· Identify grammatical errors in the manual

· Simplify language which may hinder user safety and equipment usability

· Identify Warning, Cautions, and Notes (Alerts) that need to be inserted into the content of the manual

· Identify steps in the operation and maintenance procedures which may have been omitted

· Identify additional graphics if required.

The Government shall review all of the technical data and provide any comments to the contractor within thirty (30) days. Comments shall be included in the final deliverable copy. IPR date to be identified after contract award.

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
FORM APPRVD OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit

B C. Category: TDP ( ) TM( XX ) Other ( ) - Engineering Data

D. System/Item

SLEP Procurement E. Contract/PR No.

N68335- F. Contractor

Contractor

1. Data Item No.

B001

2. Title of Data Item

Document Changes

3. Subtitle

Technical Aircraft Manual and updated Source Data (WPs)

4. Authority (Data ID No.)

DI-MISC-80358

5. Contract Reference

SOW 4.4.3.6

6. Requiring Office

NAVAIRLKE 6.7.1.2

7. DD 250 REQ

DD

9. Dist. Statement Req.

A

10. Frequency

See Block 16

12. Date of first submission

See Block 16

14. Distribution

8. APPCODE

Acceptance

11. As of Date

13. Date of Subsequent Submission

Address
Draft
Reg
Repr
16. Remarks
NAVAIRLKE 6.7.6.1.2
1
1

NAVAIRLKE 1.3.3.8

NAVAIRLKE

4.8.4.3

1
1

Final shall be delivered in an editable Adobe, Index Portable Document Format (IPDF) and editable MS Word on DVD-ROM

TOTAL
2
3

G. Prepared By

Dana Merrill H. Date

18-Jan-22 I. Approved By

Willie Cusaac J. Date

18-Jan-22

17. Price Group
18. Estimated Total Price:
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
FORM APPRVD OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments, regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis HWY, Suite 1204, Arlington VA, 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-01880, Washington, DC 20503. Please Do Not Return your form to either of these addresses. send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in block E.

A. Contract Line Item No.

B. Exhibit

A C. Category: TDP ( ) TM( ) Other ( XX ) - Engineering Data

D. System/Item

SLEP Procurement E. Contract/PR No.

N68335- F. Contractor

Contractor

1. Data Item No.

A003

2. Title of Data Item

Technical Interchange Meeting Minutes

3. Subtitle

In Process Reviews

4. Authority (Data ID No.)

DI-ADMN-81250A

5. Contract Reference

SOW 4.3.1

6. Requiring Office

NAVAIRLKE 6.7.1.2

7. DD 250 REQ

LTR

9. Dist. Statement Req.

A

10. Frequency

See Block 16

12. Date of first submission

See Block 16

14. Distribution

8. APPCODE

See Block 16

11. As of Date

13. Date of Subsequent Submission

See Block 16

Address
Draft
Reg
Repr
16. Remarks
NAVAIRLKE 6.7.6.1.2
1
1
Block 8: Government approval/disapproval will be given within 30 days after receipt of document of IPRs. The contractor shall incorporate all comments and resubmit document for government approval within 30 days after receipt of government response and in accordance with the SOW.
NAVAIRLKE 1.3.3.8

NAVAIRLKE

4.8.4.3

1
1

Block 10/12: Initial delivery after IPR completion in contractor format electronically via email.

Final shall be delivered in contractor format electronically via email, Block 13: Revision as required shall be incorporated and resubmitted in accordance with the SOW and CDRL.

TOTAL
2
3

G. Prepared By

Dana Merrill H. Date

18-Jan-22 I. Approved By

Willie Cusaac J. Date

18-Jan-22