T-1964-0150 Addendum_No2package.pdf

PDF 8 MB Posted

Attached to
WHITE MARSH COMFORT STATION
Solicitation number
BPM038009
Issued by
Baltimore County, Maryland

About this file

This document is an Addendum No. 2 issued by the Maryland Transit Administration (MTA) for the T-1964-0150 WHITE MARSH COMFORT STATION contract. The contract is for the installation of a prefabricated bus operator restroom facility, including providing water, sanitary sewer, electrical services, temporary parking facilities, and asphalt patching within the White Marsh Park and Ride in Baltimore County, Maryland. The addendum includes a question and answer document, revised plan sheets, and added/revised special provisions. Bids must be submitted by 2 P.M. local time on Friday, August 4, 2023.

The contract has no minimum self-performance requirement for the prime contractor. Concrete repairs using grout and injected epoxy are paid under the Reinforced Concrete Bus Pad and Monolithic Curb Repair item. Aggregate base course is paid under the Variable Depth Graded Aggregate Base item. The contract does not specify any set-asides, and there is no information provided about the incumbent contractor or current contract details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6 Saint Paul Street, Baltimore, MD 21202-1614 | 410.539.5000 | 1.866.RIDE.MTA | TTY 410.539.3497 | mta.maryland.gov

TO: All Prospective Proposers

FROM: Maryland Transit Administration

SUBJECT: Addendum No. 2

T-1964-0150 WHITE MARSH COMFORT STATION

DATE: July 20, 2023

Addendum No. 2 is thirty-three (33) pages and includes the following:

ITEM No. 1 -- Provides official Question & Answer Document.

ITEM No. 2 – Provides Revised Plan Sheets: Drawings TI-01, G-01, CV-04, CV-05, CV-06, CV-

08 ES-06, UT-01, UT-02, MT-04, MT-05, and EL-02

ITEM No. 3 – Provides added/revised special provisions: Table of Contents; 03 05 00 Common

Work Results for Concrete; 03 64 23 Pressure Injected Epoxy Crack Repair; and

32 13 13 Concrete Paving.

ITEM No. 4 – Provides new DUE DATE: Bids must be submitted through the eMMA portal and marked "Bid for Contract No. T-1964-0150 WHITE MARSH COMFORT

STATION", no later 2 P.M. local time, Friday, August 4, 2023.

All other terms and conditions remain unchanged.

Sincerely, Christie E. Williams, CPPB

Chief of Construction, Procurement

Acknowledgement of receipt of Addendum No. 2 to T-1964-0150.

Vendor Name: ___________________________________________________________

Authorized Representative’s Signature Date

This is the end of Addendum No. 2

OFFICIAL QUESTIONS & ANSWERS DOCUMENT

T-1964-0150- White Marsh Comfort Station Addendum 2

July 20, 2023, Page 1 of 2

1. QUESTION: The radius of the turns along the portions of the directional bore water and electric service limits within the MTA lot cannot be accomplished using directional boring.

ANSWER: The alignments for the directional bore water and electric service limits within the MTA lot have been revised to make directional bore more feasible, although the vertical alignment will be deeper to avoid existing utilities. Revised Drawings include TI-01, G-01, CV-04, CV-05, CV-06, ES-06, UT-01, UT-02, MT-04, MT-05, & EL-02. There are no changes to the related Special Provisions or Bid Items.

2. QUESTION: Under what item is concrete repairs using grout and injected epoxy indicated on sheet CV-06 paid? Please provide details and specs for this work.

ANSWER: The Pressure Injected Epoxy Crack Repairs are paid for under Item 029 – Reinforced Concrete Bus Pad and Monolithic Curb Repair. Added a new special provision Section 03 64 23, Pressure Injected Epoxy Crack Repair; revisions made to special provision Section 03 05 00, Common Work Results for Concrete and Section 32 13 13, Concrete Paving; and repair details have been added to Drawing CV-08.

3. QUESTION: Please confirm that there is no minimum self-performance requirement for the Prime Contractor.

ANSWER: The contract special provisions, Contract Terms And Conditions, 01 13 00, 1.4, Work to be Performed by the Contractor’s Staff, A. states: Execute on the site, with its own organization, work equivalent to at least twenty five percent of the total amount of the Contract price. No revision to the contract documents required.

4. QUESTION: Are we to replace any pavement markings removed to perform the work?

Under what item is this paid?

ANSWER: The replacement of any existing pavement markings impacted by construction shall be considered incidental to the lump sum bid for Maintenance of Traffic, Item 005. No revision to the contract documents required.

OFFICIAL QUESTIONS & ANSWERS DOCUMENT (Continued)

White Marsh Comfort Station, T-1964-0150, Addendum 2 July 20, 2023, Page 2 of 2

5. QUESTION: Is all GAB for the backfill of the retaining wall, under the restroom and under the retaining wall footing paid for under item 28? If not under what item is it paid?

ANSWER: The GAB for backfill of the retaining wall and under the restroom are paid for under Item 028 – Variable Depth Graded Aggregate Base. The GAB under the retaining wall footing is incidental to Item 032 – Retaining Wall. No revision to the contract documents required.

6. Is all saw cutting required for the work paid for under item 20?

ANSWER: Yes, all saw cutting is paid for under Bid Item 020, Saw Cutting. No revision to the contract documents required.

7. Please confirm HDPE conduit is acceptable for the electric directional drill conduit.

ANSWER: HDPE conduit is acceptable as indicated in the specifications. Contractor shall refer to specification 33 05 23 for conduit requirements. No revision to the contract documents required.

TABLE OF CONTENTS (cont’d)

DESCRIPTION PAGE NO.

T- 1964-0150 ADDENDUM N0. 2 TOC-2

SPECIAL PROVISIONS

01 11 00 SUMMARY OF WORK........................................................................ SP – 1

01 13 00 CONTRACT TERMS AND CONDITIONS ........................................ SP – 5

01 15 00 CONSTRUCTION PROCEDURES .................................................... SP – 11

01 18 13 INTERFACE REQUIREMENTS ........................................................ SP – 19

01 21 00 MISCELLANEOUS WORK ALLOWANCES .................................. SP – 22

01 31 15 COORDINATION AND MEETINGS ................................................ SP – 24

01 33 00 SUBMITTALS .................................................................................... SP – 27

01 43 00 QUALITY ASSURANCE QUALITY CONTROL ............................ SP – 40

01 52 13 ENGINEER'S FIELD OFFICE TYPE 4 ............................................. SP – 58

01 55 26 MAINTENANCE OF TRAFFIC ......................................................... SP – 59

01 57 13 TEMPORARY EROSION AND SEDIMENT CONTROL ................ SP – 69

01 61 00 PRODUCTS ......................................................................................... SP – 73

01 78 00 CLOSE OUT ........................................................................................ SP – 75

01 91 00 COMMISSIONING ............................................................................. SP – 79

02 06 30 TEST PIT EXCAVATION ................................................................ SP – 103

02 24 00 ENVIRONMENTAL ASSESSMENT .............................................. SP – 105

02 41 13 SELECTIVE SITE DEMOLITION ................................................... SP – 126

03 05 00 COMMON WORK RESULTS FOR CONCRETE ........................... SP – 130

03 20 33 CONCRETE REINFORCING ........................................................... SP – 135

03 30 00 CAST-IN-PLACE CONCRETE ........................................................ SP – 140

03 64 23 PRESSURE INJECTED EPOXY CRACK REPAIR…………….. SP – 149A

03 80 00 SAW CUTTING ................................................................................ SP – 150

10 14 53 TRAFFIC SIGNAGE......................................................................... SP – 152

T- 1964-0150 ADDENDUM N0. 2 TOC-3

13 40 00 FABRICATED PRECAST ENGINEERED STRUCTURE ............. SP – 156

26 05 00 ELECTRICAL SERVICE CONNECTION – BUILDING ................. SP - 165

26 05 19 LOW-VOLTAGE ELECT. POWER CONDUCTORS & CABLES SP – 170

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS . SP – 174

26 05 29 HANGERS AND SUPPORT FOR ELECTRICAL SYSTEMS ......... SP - 178

26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS ........ SP – 184

26 05 53 IDENTIFICATIONS FOR ELECTRICAL SYSTEMS .................... SP – 190

26 05 73 ARC-FLASH ANALYSIS ................................................................. SP – 200

26 24 16 PANELBOARDS ................................................................................ SP - 209

31 10 00 SITE CLEARING .............................................................................. SP – 214

31 23 00 EXCAVATION AND FILL .............................................................. SP – 216

31 23 33 TRENCHING AND BACKFILLING ............................................... SP – 225

32 01 16 HOT MIX ASPHALT........................................................................ SP – 230

32 11 23 AGGREGATE BASE COURSES ..................................................... SP – 237

32 13 13 CONCRETE PAVING ...................................................................... SP – 241

32 16 13 CURBS AND GUTTERS .................................................................. SP – 245

32 16 23 SIDEWALKS .................................................................................... SP – 248

32 32 00 RETAINING WALLS ....................................................................... SP – 251

32 92 00 TURF AND GRASSES ..................................................................... SP – 254

33 05 00 COMMON WORK RESULTS FOR UTILITIES ............................. SP – 260

33 05 23 DIRECTIONAL BORE CONDUIT INSTALLATION ..................... SP - 263

33 10 00 WATER UTILITIES .......................................................................... SP - 269

33 30 00 SANITARY SEWER UTILITIES ...................................................... SP - 293

33 40 00 STORM DRAIN UTILITIES .............................................................. SP - 318

33 46 00 CONTINGENT BUILDING SUBDRAINAGE AND SUBGRADE. SP - 322

T- 1964-0150 ADDENDUM N0. 2 TOC-4

APPENDICES

APPENDIX A – LIST OF CONTRACT DRAWINGS ........................................................ A-1

APPENDIX B – SPECIAL DETAILS .................................................................................. B-1

APPENDIX C – FEDERAL MINIMUM WAGE RATES ................................................... C-1

APPENDIX D – BUY AMERICA REQUIREMENTS ......................................................... D-1

APPENDIX E – PERMITS AND WAIVERS ........................................................................ E 1

APPENDIX F – CONSTRUCTION DATA REQUIREMENT LIST ................................... F 1

APPENDIX G – GENERAL PROVISIONS FOR CONSTRUCTION CONTRACTS

APPENDIX H – SUPPLEMANTARY GENERAL PROVISIONS FOR CONSTRUCTION

CONTRACTS

APPENDIX I – CONTRACTOR’S SAFETY & HEALTH PLAN GUIDELINES

COMMON WORK RESULTS FOR CONCRETE 03 05 00 - 1

T-1964-0150 ADDENDUM 2 SP- 130

SECTION 03 05 00

COMMON WORK RESULTS FOR CONCRETE

1.1 RELATED DOCUMENTS

A. Plans and general provisions of the Contract including General Provisions for Construction Contracts and Supplementary General Provisions for Construction Contracts and Division 01 Specification Sections apply to this Section.

1.2 SUMMARY

A. This section specifies providing Portland cement concrete, including materials, proportioning, batching, mixing, delivering and testing. Portland cement concrete shall be composed of Portland cement, fine aggregate, coarse aggregate, and water, with or without admixtures as approved, proportioned and mixed as specified herein.

B. Related Requirements

1. Section 01 33 00: Submittals

2. Section 03 20 33: Concrete Reinforcing

3. Section 03 30 00: Cast-In-Place Concrete

4. Section 03 64 23: Pressure Injected Epoxy Crack Repair

1.3 REFERENCES

A. For additional references, refer to the General Provisions and Supplementary Provisions.

B. Abbreviations and Acronyms:

1. MDOT-SHA: Maryland Department of Transportation – State Highway Administration

1.4 ACTION/INFORMATIONAL SUBMITTALS

A. In accordance with Specification Section 01 33 00, submit the following:

1. Source Quality Control Submittals:

a. Samples of materials being used including names, sources and descriptions.

b. Certification that the concrete ingredients and proportions will result in a concrete mix meeting the requirements specified.

2. Hot and Cold Weather Concreting:

a. Submit proposed methods for compliance with hot and cold weather mixing and delivery requirements.

jed Stamp

COMMON WORK RESULTS FOR CONCRETE 03 05 00 - 2

T-1964-0150 ADDENDUM 2 SP- 131

b. Proposed methods for controlling temperature and plans for placing concrete which take into account the sun, heat, wind, ambient air temperature or other limitations of facilities that will prevent proper finishing or curing.

3. Certificates:

a. Submit with each mix design, laboratory test reports and mill or manufacturer’s certificates attesting to conformance of ingredients with specifications.

b. In case the source, brand or characteristic properties of ingredients need to be varied during the term of the Contract, submit revised laboratory mix report in accordance with procedures specified for original mix design.

c. Submit certificate stating that each admixture used is identical in composition to the sample used for acceptance testing and is compatible with all other materials in the design mix.

4. Batch Tickets:

a. Before unloading at the site, submit delivery ticket from concrete supplier with each batch delivered to the site setting forth the following information:

1) Name of supplier

2) Name of batching plant and location

3) Serial number of ticket

4) Date

5) Truck number and batch number

6) Specific job designation (Contract number and location)

7) Volume of concrete (cubic yards)

8) Specific class of concrete

9) Time loaded and amount of water added

10) Type and brand of cement

11) Weight of cement

12) Maximum size of aggregates

13) Weights of coarse and fine aggregates, respectively

14) Maximum permissible amount of water to be added at the site, if any

15) Type and amount of admixtures

16) Mix design designation

COMMON WORK RESULTS FOR CONCRETE 03 05 00 - 3

T-1964-0150 ADDENDUM 2 SP- 132

b. Test Reports:

1) Submit to the Engineer a record of the results of tests

2.1 MATERIALS

A. Concrete Mixes shall conform to MDOT-SHA Standard Specifications

902.10 and 420.02.04, except as follows:

1. 902.03.02 Slag Cement is not permitted and 902.06.04.(a) Fly Ash is not permitted.

2. Unless noted otherwise.

B. Grout shall conform to MDOT-SHA Standard Specification 902.11, unless noted otherwise.

C. Concrete reinforcing shall conform to Section 03 20 00, unless noted otherwise.

D. Production Plants shall conform to MDOT-SHA Standard Specification 915, unless noted otherwise.

E. Water shall conform to MDOT-SHA Standard Specification 921.01, unless noted otherwise.

2.2 SOURCE QUALITY CONTROL

A. Source Quality Control shall conform to MDOT-SHA Standard Specifications 915.03, unless noted otherwise.

3.1 FIELD QUALITY CONTROL

A. Concrete Sampling and Testing:

1. Furnish 4" x 8" cylinder molds and concrete required for casting specimens and for the specified sampling and testing.

2. Perform slump and air content tests for each 50 cubic yards, or fraction thereof, placed.

3. Perform variability test and other tests required for each 100 cubic yards, or fraction thereof, placed.

4. Prepare one set of standard cylinders in accordance with ASTM C172 for each 100 cubic yards, or fraction thereof, placed for compressive strength testing by the Engineer.

B. Tests:

1. Sample according to ASTM C31, C42 and C172.

2. Test for air content according to ASTM C231 or C173 as applicable.

COMMON WORK RESULTS FOR CONCRETE 03 05 00 - 4

T-1964-0150 ADDENDUM 2 SP- 133

3. Test for unit weight, yield, air content, cement content and unit weight according to ASTM C138.

4. Test for slump according to ASTM C143.

5. Test mixes with chemical additives according to ASTM C494 and as required by the Engineer.

3.2 MIX EQUIPMENT

A. Batching Plant shall conform to MDOT-SHA Standard Specifications 915.03, unless noted otherwise.

3.3 MIXING AND DELIVERY

A. General:

1. Mixing and Delivery shall conform to MDOT-SHA Standard Specifications 915.03, unless noted otherwise.

2. Hand Mixing:

a. Hand-mixed concrete, when authorized, shall be made in batches not larger than one-third cubic yard, and shall be mixed on a watertight, level platform.

b. Coarse aggregate shall be measured in measuring boxes, spread on the platform, and the fine aggregate spread on the coarse aggregate; the total depth of the two layers shall be not more than one foot.

c. The dry cement shall be spread on the aggregate and the whole dry mass shall be turned not less than two times.

d. Clean water shall then be evenly added, and the whole mass shall be turned not less than three times not including placing in the carriers and forms.

3.4 PLACING:

A. Non-Shrink Non-Metallic Grout: Perform grout placement in accordance with the recommendations of ACI and the manufacturer’s published specifications for mixing and placing. Place non-shrink non-metallic grout only where indicated on the Contract Drawings.

B. Neat Cement: Perform grout placement in accordance with the requirements of Section 03 30 00.

3.5 REPAIR OF DEFECTIVE CONCRETE:

A. Repair defective concrete in accordance with Section 03 30 00.

4.1 COMMON WORK RESULTS FOR CONCRETE:

A. Common Work Results for Concrete will not be measured for payment.

COMMON WORK RESULTS FOR CONCRETE 03 05 00 - 5

T-1964-0150 ADDENDUM 2 SP- 134

B. Common Work Results for Concrete will not be paid directly but will be incidental to the pertinent items.

END OF SECTION

PRESSURE INJECTED EPOXY CRACK REPAIR 03 64 23 - 1

T-1964-0150 ADDENDUM 2 SP-149A

SECTION 03 64 23

PRESSURE INJECTED EPOXY CRACK REPAIR

1.1 RELATED DOCUMENTS

A. Plans and general provisions of the Contract, including General Provisions for Construction Contracts and Supplementary General Provisions for Construction Contracts and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. This section consists of cleaning, surface sealing, setting injection ports, and subsequent pressure injection of epoxy into cracks, in accordance with these special provisions, the standard specifications, and as directed by the Engineer.

B. Related Requirements:

1. Section 03 05 00 Common Work Results for Concrete

2. Section 03 20 33 Concrete Reinforcement

3. Section 03 30 00 Cast-In-Place Concrete

4. Section 32 13 13 Concrete Paving

1.3 REFERENCES

A. For additional references, refer to the General Provisions and Supplementary Provisions.

1.4 ACTION/INFORMATIONAL SUBMITTALS

A. In accordance with Section 01 33 00, submit the following:

1. Product Data:

a. Submit epoxy injection material for approval

b. Submit installation plan for approval

c. Submit equipment data for approval

2. Source Quality Control Submittals:

a. Submit the source of materials identified in Part 2 for approval.

2.1 EPOXY:

A. The epoxy used for surface sealing and setting injection ports shall meet the following requirements:

PRESSURE INJECTED EPOXY CRACK REPAIR 03 64 23 - 2

T-1964-0150 ADDENDUM 2 SP-149B

1. 30 minute minimum gel time

2. 2600 psi minimum tensile strength at 72 degrees Fahrenheit after 3 days

3. 0.002 maximum linear coefficient of shrinkage on cure

4. 11,000 psi minimum compressive strength at 7 days

5. 200,000 minimum compressive modulus

6. 3,700 psi minimum bond strength at 14 days

B. The epoxy used for pressure injection shall conform to MDOT-SHA Standard Specification 921.04, C 881, Type I and the additional following requirements:

1. 11,000 psi minimum compressive strength at 7 days

2. 7,000 psi minimum tensile strength at 7 days

3. 2,400 psi minimum bond strength at 14 days

C. Submit the grade for approval after the Contractor’s analysis of areas to be injected.

D. The system shall be moisture insensitive and shall not be used when the ambient or concrete temperature is 50 degree Fahrenheit or below, nor temperatures lower than recommended by the manufacturer.

E. The expiration date of acceptance of this material shall be one year after the date of manufacture. Any unauthorized tampering or breaking of the seals on the containers between the time of sampling and delivery to the job site will be cause for rejection of the material.

3.1 GENERAL:

A. The locations for the pressure injection of cracks will be delineated by the Engineer.

B. Ensure that the epoxy manufacturer’s technical representative will be present for the duration of the injection process, and submit details of the proposed method of repairs and the injection procedure for approval.

C. Prior to beginning repair, clean all cracks of loose matter such as dirt, laitance, oil, grease, salt, or any other contaminants.

D. Inject the epoxy with a positive displacement pump system having a suitable mixing chamber where the epoxy components are accurately metered and thoroughly mixed immediately prior to injection. A clear, legible, and accurate pressure gauge shall be located in the supply line adjacent to the mixing chamber.

E. The equipment shall also be capable of providing a continuous and uninterrupted pressure head up to 200 psi to continually force the injection

PRESSURE INJECTED EPOXY CRACK REPAIR 03 64 23 - 3

T-1964-0150 ADDENDUM 2 SP-149C

of epoxy into the cracks. Epoxy flow shall be capable of being fully controlled by the operator controls at the mixing chamber.

F. Ensure that all working personnel are familiar with the equipment, materials, and procedures to be used during the operation.

G. All materials and equipment, including backup equipment, shall be at the work site before injection operations begin. All equipment shall be in proper calibration and in good working order as determined by the Engineer. A pressure check shall be performed by inserting two independent valves and gauges capable of sensing the pressure build-up behind each valve. The valves on the pressure check device shall be closed and the equipment operated until the gauge pressure on each line reads 200 psi. The pump shall be stopped, and the gauge pressure shall not drop below 190 psi within three minutes.

H. The pressure check shall be run for each injection machine at the beginning and at the end of every day that the unit is to be used in the work of crack repair.

I. Epoxy shall be injected only by the use of the automatic mechanical pumping, metering, and mixing equipment described above. Pressure pot systems and caulking guns or grease guns will not be permitted.

J. Mix the two components in accordance with the manufacturer’s recommendations. Maintain the ratio of the components within a tolerance of five percent by volume.

K. Acceptable solvents used for cleaning include mineral spirits, methyl ethyl ketone, acetone, low boiling naphtha, xylene, and any other nonchlorinated solvent.

3.2 PORT INSTALLATION:

A. Prior to injection of the epoxy in the crack, apply a surface seal material to the face of the crack to prevent the liquid resin from leaking out. The surface seal material shall be useable on vertical, horizontal, and overhead applications and completely bridge the crack when applied to the face of the crack.

B. Establish openings to inject the epoxy through the surface seal material along the entire length of the crack and provide entry ports. The holes shall be 3/4 in. diameter, spaced 6 to 12 in. apart and be of sufficient depth to ensure maximum dissemination of the pressure of the epoxy throughout this area.

C. Set inserts in drilled holes that are cleaned to remove any dust or debris left by drilling operations. Exercise special care to ensure that oil or other contaminants are not introduced into the air feed hoses, or deposited on any air blown surfaces.

PRESSURE INJECTED EPOXY CRACK REPAIR 03 64 23 - 4

T-1964-0150 ADDENDUM 2 SP-149D

3.3 INJECTION:

A. Force the epoxy into the internal voids and cracks by means of hydraulic pressure to completely fill all internal voids. If the surface seal material has insufficient strength and adhesion to confine the injected epoxy until it has cured, remove the surface seal material and furnish and place a new surface seal material at no additional cost to MTA.

B. Before injecting any epoxy, test for proper epoxy component mix ratio by removing the mixing head of the injection machine and simultaneously pumping approximately 1 total pint of the two adhesive components through the ratio check device. Both adhesive components shall be simultaneously discharged into the calibrated containers during the same time period and shall be compared to determine the mix ratio. Test the mixing head by activate the automatic mixing and metering pump and discharge approximately 1 pint of the mixed epoxy into a disposable container. The Engineer will observe this trial operation to determine that the equipment is working properly. If the equipment is not working properly, immediately repair it to full working condition or replace with the backup equipment. If the backup equipment is used, additional and fully operable equipment shall be provided as its backup equipment.

C. Testing for proper epoxy component mix ratio shall be performed at the beginning and at the end of every day the unit is used in the work of crack repair.

D. At all times during the course of the work, the contractor must keep complete and accurate records available to the engineer of the ratio and pressure tests.

E. The engineer at any time without prior notification of the Contractor may request the contractor to conduct additional ratio and pressure tests. This request may be made up to one time per day per test.

F. Ensure that the feed line from the mixing equipment is securely held or properly attached to the port. Then initiate the epoxy injection in conformance with the manufacturer’s recommendations.

G. Start the injection at the lowest row of holes and at the hole nearest the center line of structure. Continue injection at the first port until the epoxy begins to flow out of the port at the next highest elevation. Then plug the first port and start injection at the second port until the epoxy flows from the next port. Continue this sequence until the entire crack is repaired.

H. Monitor the injection procedure to ensure the epoxy flow does not cease before the injection epoxy exudes from the adjacent port. If the epoxy flow stops before epoxy appears at the adjacent port, move the feed line to the adjacent port and seal the port just used.

I. During the course of all operations, ensure extreme care to observe for breaking out of epoxy. When breaking out occurs, stop the injection and

PRESSURE INJECTED EPOXY CRACK REPAIR 03 64 23 - 5

T-1964-0150 ADDENDUM 2 SP-149E

move the line to another crack. Resume injecting in the original location after a minimum elapse of 24 hours.

J. Accomplish a continuous injection operation by replenishing the epoxy supply tanks in the mixing equipment before they are exhausted.

Thoroughly stir each epoxy component before adding it to its respective storage tank in the mixing equipment. No discontinuity of epoxy flow through the feed lines of either component shall be permitted.

K. The Contractor shall provide the Resident Engineer with dispensed samples, not exceeding 2 fluid ounces, whenever requested. The samples are to be taken undisturbed at the outlet following in-line mixing. These samples are to be provided in addition to any sampling or other procedures recommended by the manufacturer of the proportioning dispenser.

L. Any work stoppage permitting mixed epoxy to remain in the injection equipment more than 15 minutes requires cleaning the mixing chamber and all equipment in contact with the mixed epoxy. Quantities of epoxy purged from the injection equipment shall not be included for payment.

M. After the injection process has been completed and the epoxy allowed to fully cure, remove the injection ports and surface seal from all surfaces. Cut or knock off ports, and grind off the surface seal and any spillage flush with the original surface.

N. Repair any damage to the concrete due to these operations in a manner satisfactory to the Engineer at no additional cost to MTA.

O. The cured injected epoxy shall have penetrated a minimum of 90 percent of the visible crack. Acceptance will be based upon drilling cores of the repaired concrete to determine the depth of penetration from representative locations selected by the Engineer. If the penetration is less than 90 percent of the visible crack along the sides of the core, the crack from which the core was taken will be deemed unsatisfactory and will not be included for payment. A minimum of three 4 in. diameter core samples for the full crack depth of the member or area being repaired shall be required for each 100 ft or fraction thereof per job site. Fill the cored holes with epoxy grout.

3.4 CORE TESTING:

A. Core testing requirements for this project shall be determined by the Resident Engineer based on the conditins encountered on site at the time of the repairs.

B. When required, cores shall be removed periodically at the sole discretion of Resident Engineer. The results evident by core examination shall be the sole criteria in determining whether the requirements of the specification have been met. The cores shall be at least 2” diameter and 6” in depth. Core locations shall be selected by the Resident Engineer and shall be removed only in the presence of the MTA representative. Cores and core holes shall be carefully indexed as to location.

PRESSURE INJECTED EPOXY CRACK REPAIR 03 64 23 - 6

T-1964-0150 ADDENDUM 2 SP-149F

C. Injection cannot proceed beyond the initial 50 feet until two cores have been submitted to, and approved by, the Resident Engineer.

D. One core is to be furnished from each additional 100 feet or as requested by the Resident Engineer. No cores will be required within 3” of the extremity of the crack seal.

E. Following their removal, the cores will be examined for penetration. If requirements are met, the cores will be demolished. If no major fracture occurs on a glue line, the core is acceptable. If the core breaks on a glue line, the fragments shall be inspected and/or tested to determine if the failure is attributable to improper metering or mixing of the epoxy. If so, the core shall be considered unsatisfactory and additional cores will be required of the contractor at his own expense from the same vicinity to determine the scope of defective work.

F. All cores shall be filled after inspection with rapid hardening cementitious material at no additional cost to MTA.

4.1 PRESSURE INJECTED EPOXY CRACK REPAIR:

A. Pressure Injected Epoxy Crack Repair will not be measured for payment.

B. Pressure Injected Epoxy Crack Repair will not be paid for directly, but will be included in the Reinforced Concrete Bus Pad And Monolithic Curb Repair Item.

END OF SECTION

CONCRETE PAVING 32 13 13 - 1

T-1964-0150 ADDENDUM 2 SP-247

SECTION 32 13 13

CONCRETE PAVING

1.1 RELATED DOCUMENTS

A. Plans and general provisions of the Contract, including General Provisions for Construction Contracts and Supplementary General Provisions for Construction Contracts and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. This section specifies the installation of plain and reinforced concrete pavement.

2. Depending on the type (plain or reinforced) Portland cement concrete pavement shall include:

a. Furnishing and installing aggregate base course

b. Furnishing and installing concrete forms

c. Furnishing and installing reinforcing steel, tie-ins and load transfer devices

d. Furnishing and installing structural concrete

e. Performing concrete finishing work

f. Performing saw-cuts and joints

g. Controlling concrete curing

h. Performing concrete bus pad crack repair

B. Related Requirements:

1. Section 03 05 00: Common Work Results for Concrete

2. Section 03 20 33: Concrete Reinforcement

3. Section 03 30 00: Cast-In-Place Concrete

4. Section 03 64 23: Pressure Injected Epoxy Crack Repair

5. Section 32 11 23: Aggregate Base Courses

1.3 REFERENCES

A. For additional references, refer to the General Provisions and Supplementary Provisions.

1.4 ACTION/INFORMATIONAL SUBMITTALS

A. In accordance with Section 01 33 00, submit the following:

CONCRETE PAVING 32 13 13 - 2

T-1964-0150 ADDENDUM 2 SP-248

1. Product Data:

a. Submit Mix Design for approval

b. Submit Paving Plan for approval

c. Submit Equipment data for approval

2. Source Quality Control Submittals:

a. Submit the source of materials identified in Part 2 for approval.

2.1 AGGREGATE:

A. Aggregate shall conform to MDOT-SHA Standard Specification 902, unless noted otherwise.

2.2 FORMWORK:

A. Formwork shall conform to MDOT-SHA Standard Specification 520, unless noted otherwise.

2.3 CONCRETE REINFORCEMENT:

A. Concrete Reinforcement shall conform to MDOT-SHA Standard Specification 908, unless noted otherwise.

2.4 CONCRETE:

A. Concrete shall conform to MDOT-SHA Standard Specification 902, unless noted otherwise.

2.5 JOINT SEALANTS:

A. Joint Sealants shall conform to MDOT-SHA Standard Specification 911, unless noted otherwise.

2.6 CURING MATERIALS:

A. Curing Materials shall conform to MDOT-SHA Standard Specification 902, unless noted otherwise.

2.7 GROUT

A. Grout shall conform to MDOT-SHA Standard Specification 902, unless noted otherwise.

2.8 EPOXY ADHESIVES

A. Epoxy Adhesives shall conform to MDOT-SHA Standard Spcification 921, unless noted otherwise.

CONCRETE PAVING 32 13 13 - 3

T-1964-0150 ADDENDUM 2 SP-249

3.1 EQUIPMENT

A. Equipment shall conform to MDOT-SHA Standard Specification 520.03.01, unless noted otherwise.

3.2 WEATHER RESTRICTIONS

A. Weather Restrictions shall conform to MDOT-SHA Standard Specification 520.03.02, unless noted otherwise.

3.3 AGGREGATE BASE COURSE:

A. Foundation shall conform to MDOT-SHA Standard Specification 520.03.03, unless noted otherwise.

B. Section 32 11 23 Aggregate Base Courses

3.4 FORMWORK:

A. Formwork shall conform to MDOT-SHA Standard Specification 520.03.04, unless noted otherwise.

3.5 SLIP FORM PAVING

A. Slip Form Paving shall conform to MDOT-SHA Standard Specification 520.03.05, unless noted otherwise.

3.6 REINFORCEMENT INSTALLATION:

A. Reinforcement Installation shall conform to MDOT-SHA Standard Specification 520.03.06, unless noted otherwise.

3.7 CONCRETE PLACEMENT:

A. Concrete Placement shall conform to MDOT-SHA Standard Specification 520.03.07, unless noted otherwise.

3.8 CONCRETE FINISHING:

A. Concrete Finishing shall conform to MDOT-SHA Standard Specification 520.03.09, unless noted otherwise.

B. Finish shall be a broom finish in accordance with Section 03 05 00 Common Work Results for Concrete.

3.9 TEXTURING AND EDGING:

A. Texturing and Edging shall conform to MDOT-SHA Standard Specification 520.03.11, unless noted otherwise.

3.10 CURING:

A. Aggregate shall conform to MDOT-SHA Standard Specification 520.03.12, unless noted otherwise.

CONCRETE PAVING 32 13 13 - 4

T-1964-0150 ADDENDUM 2 SP-250

3.11 JOINTS

A. Formwork shall conform to MDOT-SHA Standard Specification 520.03.14, unless noted otherwise.

3.12 PORTLAND CEMENT CONCRETE PAVEMENT REPAIR

A. Portland Cement Concrete Pavement Repair shall conform to MDOT-SHA Standard Specification 522, unless noted otherwise.

3.13 OPENING TO TRAFFIC

A. Formwork shall conform to MDOT-SHA Standard Specification 520.03.16, unless noted otherwise.

B. The pavement may be opened to vehicular traffic after having attained a compressive strength of 3000 psi. Field samples will be tested per T 23.

3.14 DOWEL BAR PLACEMENT

A. Dowel Bar Placement tolerances shall conform to MDOT-SHA Standard Specification 520.03.17, unless noted otherwise.

B. No adjustment for payment shall be made for out of tolerance dowel bars, however, the work may be determined to be non-conforming by the Engineer.

4.1 PORTLAND CEMENT CONCRETE PAVEMENT – 8 INCH DEPTH:

A. Portland Cement Concrete Pavement – 8 Inch Depth will not be measured for payment.

B. Portland Cement Concrete Pavement – 8 Inch depth will not be paid for directly, but will be considered incidental to the Baltimore County Concrete Combination Curb & Gutter, R-21, 7 Inch Depth item as specified in the Contract documents.

4.2 REINFORCED CONCRETE BUS PAD AND MONOLITHIC CURB

REPAIR

A. Reinforced Concrete Bus Pad and Monolithic Curb Repair shall be measured per square yard and shall include furnishing and installing all compacted graded aggregate base, formwork, reinforcing steel, concrete, expansion joints, joint sealants, concrete bus pad crack repair, steel plate removal, finishing, and curing materials.

B. Reinforced Concrete Bus Pad and Monolithic Curb Repair shall be paid for at the Contract unit price bid per square yard of concrete placed and accepted, which will be full compensation for all material, tools, labor and all work incidental to complete the item as specified.

END OF SECTION

p w

M T

A G

B P

W A

P P

M T

A

P W

D a t a

D o c u m e n t s

C u r r e n t

P r o j e c t s

M

A P

S

B U

S

F a c i l i t i e s

S

W h i e r o m f o a t i o n

E n g i n e e r i n g

C a d d a d r v e y

P l e e t s p

T I d g n

MARYLAND TRANSIT ADMINISTRATION

MARYLAND DEPARTMENT OF TRANSPORTATION

Maryland

FACILITIES ENGINEERING, ADA & SUSTAINABILITY DIVISION

CONTRACT NO.

DRAWING NO.

SHEET NO.

OF

PRIME AE Group, Inc.

WHITE MARSH MALL

NECKER

HALLFIELD

MANOR

EAST

SILVERGATE

SPRING

STATION

SOUTHFIELD AT

WHITEMARSH

AD95

J F K

HW

Y

M

EM

O

RI

AL

MARSH

WHITE

BLVD

WHITE

BG43

P E R R Y

H A

L L

B L V

D

HALL

BL

VD

PE

RR

Y

BUCK

S

SCHOOLHOUSE RD

SILVER

SPRING

RD

A V E

SLA

TER

B A B

IK

O W

RD

R D

RI

N

G

RD

RD

RIN

G

A V E

DR

S O

U T

H F

IELD

D R

CORPORATE

BEACONSF

IEL

D DR

BLVD

HONEYGO

C

AS

TLEMILL

CIR

S A

N D

P

IP

E R

C

IR

DR

HALLFIELD

MANOR

W A

YARBOR

M A

N O

R F

IE

L D

R D

A

R

LE

N R

D

RDA

M

BERMI

LL

M

ISP

RD

Y V O

N N E

A V E

W

IN

TERO

D E

WAY

BERRYFIELD

D R

R O

S E

HAVE

N

R D

D O

T T Y

R D

LINDA

AVE

RD

B R

O A

D

BRID

GE

SILVER

TEAL

RD

G A

R

LA

N

D

A V

E

C

IR

BEDROCK

BUCKS SCHOOLHOUSE RD LOOP

ESTERMANCIR

S

IL

V E R

L A

M E A

D O

W

FARM

R D

COLE

D R

G A

R

LA

N

D A

V E

C

T

S E L

W

IN

KIN

G

AVE

HEATHERM

ILL

R D

W C T

C

IR

B

RIDGEFORD

C A S T L E

C R E E K

C

IR

S T A

R K

C T

Q U

E E

N

SBERRY

RDTR

EE RD

A

LA

N

B R O

O K

S H

IR

LE

Y

A V E

S H

E R

IN

G T O

N R

D

SPRINGHOUSE

C

IR

B E

A C

O N

S W

O O

D

C T

W

IR

SING

W

AY

M

ER

T

A V E

N C T

M A

C

W

ORTHPL

C A

M

ER

O N

C T

R A

T N

A C

T

W H

IT

E

M

EA

D O

W L

A

DR

TOWN

CENTER

H

IC

K O

R Y

TH

M A

R G

E R

Y

C T

MEADOW

CTC

O

OL

CT

FALLON

LA

S H

A N

TI

S H

O R E

H A

M

C T

A V E

H

IL

L T O

P

RD

R

H U

DDLAN

JA

C

OB

F

IE

LD

RD

C T

D O

LI

N

A

C T

R E D

F

IE

L D

FARW

E

BARTLEY CT

C T

H

EA

T H

R O

W

M

A N

O R

NG

LA

O

LLOW

DUNSINANE DR

B R

Y C

E

AVE

ROYAHN

HANF

FARM RD

H A

N F

A V E

D R

B

LU

E S T O

BOTHWELL

GARTH

S A

X O

N C

IR

FLA

N

D

ERS C

T

FRE

EST

ONE

LA

ASHMILL

CT

CT

HILLTO

P

T U

L

IP

P O

P L A

R C T

DANBENCT

GODDARD FARM RD

WAY

HERSHEY

MEN

TE

ITH

CT

C

T

TR

E Y B

U

RN

TIS

BURY

CT

REDDING CT

L A

K E

F O

R E S T

C T

R E S

TO

NLA

CASTLE STONE

G

RA

FTO

N

CT

B A

M B

O R

O U

G H

C T

C T

C A

M R

O S E

K R

IS

T A

L C

T

W

IL

L O

W P

A T H C

T

CTFE

ATH

ER

STONE

K N

IG

H T S

B R

ID

G E

C T

MILLWHEELCTB

R O

N Z E

W

IN

G C

T

CT

DONN

SA

G E

B

RUSH

C

T

C T

K R

IS

S W

O O

D

HEATHROWMANOR CT

L

IN

E A

G E

C T

CLIPSTO

NE

CT

JU

XON

CT

C T

H E

D G

E F

O R

D C

T

M

IL

L B R

ID

G E

C T

S A

G E B R

U S

H C

T

A M

B O

L

IN

C T

P

IN

T A

IL

C

T LA

V

IN

G T

O N

PL

DEBENHAM

CT

C T

H A

L L F

IE

L D

KN

A

VE

S

C T

H

IL

L G

A T E

C T

C A S T E L L

C T

STOREYS

CT

CROSSWALL

CT

INDIAN

ROCK

PARK

RESERVOIR

SLATER

AVE

NECKER

AVE

WHITE

RD

MARSH

JOPPA VIEW

E.S.

21236

:967

WHITE MARSH

SILVER

WOODS

TREMPER FARM

BERRYHILL

NOTTINGHAM

WOODS

NOTTINGHAM

LAWRENCE

HILL

TARTON

HILL

i t h

R u n e m a r s h

W n R u

PU

LA

S K I

M

EM

O

RI

AL

HW

Y

K

JF

AD95

MARSH BLVD

WHITE

P H

IL

A D

E

LP

H

IA

R D

BLV

D

H O

N E Y G

O

B L V

D

H O

N E Y

G O

SPRING

RD

SILVER

FR

AN

KLI

N

SQ

U

A

RE

D R

E D

R

D R

BLVD

CAMPBELL

BEACONSFIELD

DR

R

IN

G R

D

A V

E

G E R S T

TO

WN

CEN

TE

R

D R

R A

V

EN

W O

O D

RD

T A

R T

A

N

HIL

L RD

D R

S

IL

V E R

L A

K E

L A

K E

D R

C

LIFFORD

RD

SAXON

C

IR

SILVER

K N

O L L

D R

MERCANTIL

E RD

AVE

M A

G N

O L

IA

RD

N O

T T

IN

G W

O O

D

L

K

ENNYCIR

FINSBURY

RD

LEASDALE

RD

W

IN

D

IN

G W

A Y

B E R

R Y

H

IL

L

C

IR

MOHRS

LA

S

T

IL

L W

O O

D C

IR

LO

LL

Y

J E S S

IC

A L A

H

IL

LT

O P

ACRES

R D

S

IL

V E

R H

A L L

Q U

A

IL

R U

FEATHER

HILL RD

CT

ABBEYWOOD

W O

ODFALLRD H

IL

L

L A

W R E N

C E

R D

LEAVERS

CT

R

IN

S M

A

ID

C T

T O

W N

C E N

T E R

C T

DR

RAYLO

N

D O

V E

D R

SILV

ER

HIL

LCT

CORD

O

NWA

Y

CASTLE

CREEKCIR

CREEK CIR

H O

B B

C T

M A

R

IS

S A

C T

BE

RR

YH

ILL

RD

RD

TORPO

IN

T

SHREWSBURY

CT

A V

O N

M O

RE

C T

B R

A N

T W

O O

D

C T

CASTLECREEKCIR

RD

M

ER

CANTIL

E

AYR

C T

C H

A T T E R L Y

C T

SPO

TSW

O O

B U

R B

A G

E C

T

CIR

FOX

AVE

M

AGNOLIA

S T A

B

LE

G A

T E

C T

LAVIN

G T

O N

P L

H A

LL

SDALE

CAPLAND

CT

CT

SENNETT

C T

R O

X B U

R G

H

C

AM

PBELL

BLVD

C T

S

H R E

W S B

U R

Y

G

LA

MIS

G

ARTH

LA

G

W R

A G

B Y

C T

CT

VERITY

LEEW

O

O D

R D

HILLSLEIGH CT

PARK

GAMESTATE

PROTECTIVE ASSOCIATION

OF BALTIMORE

MD FISHAND

BG43

S

05/30/2023

00/00/0000

RPC002212 Facilities Engineering, ADA and Sustainability

Pamela Burdell, Chief of Civil Engineering

N

CONTRACT NO.

T-1964-0150

BALTIMORE COUNTYSCALE: 1"=1000'

AREA

PROJECT

TI-01

Sustainability

Facilities Engineering, ADA &

Manager

Toby D. Johnson RA, LEED AP

WHITE MARSH COMFORT STATION

MARK LOTZ16507

05/30/2023

16507 MARK LOTZ

MDE NO. 23-SF-0070

GRAPHIC SCALE

ADA DESIGN CERTIFICATION

DESIGN CERTIFICATION

OWNERS / DEVELOPER CERTIFICATION

MD. REGISTRATION NO.

PRINTED NAME

DESIGNER'S SIGNATUREDATE

DATE OWNER/DEVELOPER SIGNATURES

PRINTED NAME AND TITLE

WITH THE REQUIREMENTS OF THE AMERICANS WITH DISABILITIES ACT (ADA).

"I HEREBY CERTIFY THAT THIS PLAN HAS BEEN DESIGNED IN ACCORDANCE

DATE DESIGNER'S SIGNATURE

MD. REGISTRATION NO.

PRINTED NAME

APPROVED:DATE:

P.E. R.L.S. OR R.L.A. (CIRCLE)

P.E. R.L.S. OR R.L.A. (CIRCLE)

VICINITY MAP

MARYLAND TRANSIT ADMINISTRATION

LOCATION:

CERT. NO.

MANAGEMENT, RESPECTIVELY"

26.17.01 AND 26.17.02 FOR EROSION AND SEDIMENT CONTROL AND STORMWATER

116 AND SECTIONS 4-201 AND 215, AND THE CODE OF MARYLAND REGULATIONS (COMAR)

INCLUDING SUPPLEMENTS, THE ENVIRONMENT ARTICLE SECTIONS 4-101 THROUGH

CONTROL, THE 2000 MARYLAND STORMWATER DESIGN MANUAL, VOLUMES I AND II

THE 2011 MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT

"I HEREBY CERTIFY THAT THIS PLAN HAS BEEN DESIGNED IN ACCORDANCE WITH

MANAGEMENT FACILITIES WILL BE MAINTAINED IN ACCORDANCE WITH APPROVED PLANS."

DEPARTMENT OF THE ENVIRONMENT. I/WE HEREBY CERTIFY THAT STORMWATER

APPROPRIATE INSPECTION AND ENFORCEMENT AUTHORITY OR THE STATE OF MARYLAND,

I/WE HEREBY AUTHORIZE THE RIGHT OF ENTRY FOR PERIODIC ON-SITE EVALUATION BY

PROGRAM FOR THE CONTROL OF EROSION AND SEDIMENT BEFORE BEGINNING THE PROJECT.

ATTENDANCE AT A MARYLAND DEPARTMENT OF THE ENVIRONMENT APPROVED TRAINING

PERSONNEL INVOLVED IN THE CONSTRUCTION PROJECT WILL HAVE A CERTIFICATE OF

DEVELOPMENT WILL BE DONE PURSUANT TO THIS PLAN AND THAT ANY RESPONSIBLE

"I/WE HEREBY CERTIFY THAT ALL CLEARING, GRADING, CONSTRUCTION, AND/OR

1000 20005001000

ADDENDUM 22 WTB 7/10/23

Maryland

PROFESSIONAL CERTIFICATION

License No. Expiration Date A P P

R C

H E

C K

D R

A W

N D

E S

G N

NO. DESCRIPTION

REVISIONS

BY DATE

DATE: SCALE: OF

DRAWING NO.

CONTRACT NO.

SHEET NO.

p w

M T

A G

B P

W A P

P :M

T A

P W

D a t a

D o c u m e n t s r r e o je c t

A P

S

S c il it ie s it r m f o a t io n

E n g in e e r in g

C a d d a r v e y

P la e e t s p

G I0

.d g n the State of Maryland engineer under the laws of am a duly licensed professional approved by me, and that I documents were prepared or

I hereby certify that these

PRIME AE Group, Inc.

16507 05/30/2023

GENERAL DRAWINGS

2 G-01 INDEX OF SHEETS

3 GN-01 GENERAL NOTES

4 CS-01 CIVIL ABBREVIATIONS AND SYMBOLS

CIVIL DRAWINGS

5 CV-01 CIVIL DETAILS & CROSS SECTIONS

6 CV-02 CIVIL DETAILS

7 CV-03 EXISTING CONDITION PLAN

8 CV-04 CIVIL PLAN

9 CV-05 CIVIL PLAN

10 CV-06

11 CV-07

12 CV-08

EROSION AND SEDIMENT CONTROL DRAWINGS

13 ES-01 EROSION AND SEDIMENT CONTROL NOTES

14 ES-02 EROSION AND SEDIMENT CONTROL VEGETATIVE STABILIZATION 1 OF 2

15 ES-03 EROSION AND SEDIMENT CONTROL VEGETATIVE STABILIZATION 2 OF 2

16 ES-04 EROSION AND SEDIMENT CONTROL DETAILS

17 ES-05 EROSION AND SEDIMENT CONTROL DETAILS

18 ES-06 EROSION AND SEDIMENT CONTROL PLAN

19 ES-07 EROSION AND SEDIMENT CONTROL PLAN

UTILITY DRAWINGS

20 UT-01

21 UT-02

ARCHITECTURAL DRAWINGS

23 AR-01 PRECAST CONCRETE RESTROOM BUILDING

MAINTENANCE OF TRAFFIC DRAWINGS

24 MT-01

25 MT-02

26 MT-03

STRUCTURAL

30 ST-01 RETAINING WALL

ELECTRICAL

31 EL-01 ELECTRICAL LEGEND, NOTES, AND ABBREVIATIONS

32 EL-02

33 EL-03

CIVIL PLAN

BUS PAD DETAILS

PROPOPSED SANITARY SEWER PLAN AND PROFILE

PROPOSED WATER PLAN AND PROFILE

UT-0322 FORCE MAIN AND PUMP DETAILS

27 MT-04

MT-05

MAINTENANCE OF TRAFFIC GENERAL NOTES & SEQUENCE OF CONSTRUCTION

29 MT-06

MAINTENANCE OF TRAFFIC - STAGE 1

MAINTENANCE OF TRAFFIC - STAGE 2

MAINTENANCE OF TRAFFIC - STAGE 3

MAINTENANCE OF TRAFFIC - STAGE 4

MAINTENANCE OF TRAFFIC - DRAINAGE INLET

INLET/ CONCRETE BUS PAD REPAIR DETAILS

SITE PLAN AND RISER DIAGRAM

ELECTRICAL PANEL SCHEDULE

FEBRUARY 2023

JED

TLL

JLG

MDL

G-01

2N.T.S.

INDEX OF SHEETS

TI-01 TITLE SHEET

WHITE MARSH

COMFORT STATION

MDE NO. 23-SF-0070

DESCRIPTION

NO.

DWG.

NO.

DWG.

NO.

SHEET

NO.

SHEET

INDEX OF SHEETS

2 ADDENDUM 2 WTB 7/10/23

License No. Expiration Date A P P

R C

H E

C K

D R

A W

N D

E S

G N

NO. DESCRIPTION

REVISIONS

BY DATE

DATE: SCALE: OF

DRAWING NO.

CONTRACT NO.

SHEET NO.

p w

M T

A G

B P

W A P

P :M

T A

P W

D a t a

D o c u m e n t s r r e o je c t

A P

S

S c il it ie s r m f o a t io n

E n g in e e r in g

C a d d a r v e y

P e e t s p

C V

O p t io n

.d g n the State of Maryland engineer under the laws of am a duly licensed professional approved by me, and that I documents were prepared or

I hereby certify that these

PRIME AE Group, Inc.

T-1964-0150

WHITE MARSH

COMFORT STATION

MDE NO. 23-SF-0070

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

CONC

INV

INV

INV

BUS LOADING ONLY

INV

RESERVED PARKING

INV

TRAV PT JMT2

NO PARKING

NO PARKING

14"

INV

TRAV PT WTB157TRAV PT WTB157

12"

SS

L

A O

U

N

T

E

C

SD

MTA WMPR

10"

8"

JB

E.M. SD

10"

PED XING

SD

TRAV PT JMT3TRAV PT JMT3

8"

SS

L

A O

U

N

T

E

C

PED XING

10"

12" TRIPLE

SD

VEHICEL CHARGER

MULCH

10" DOUBLE

12" TRIPLE

SS

L

A O

U

N

T

E

C

SS

L

A O

U

N

T

E

C

ELEC VEH PARKING

DO NOT ENTER

5"

SS

L

A O

U

N

T

E

C

ELEC VEH CHARGING

ONE WAY

INV

SD

6"

SS

L

A O

U

N

T

E

C

INV

3"

E.M.

STOP

INV

INV

12"

SS

L

A O

U

N

T

E

C

HBX

MTA PARKING

STAY RIGHT

INV

TRAV PT WTB151

14"

14"

SS

L

A O

U

N

T

E

C

SS

L

A O

U

N

T

E

C

BGE #10017A

JB

HBX

SD

SD

TEL

SS

L

A O

U

N

T

E

C

SS

L

A O

U

N

T

E

C

E

INV

16"

22"

BGE #102501

SD

3"

SS

L

A O

U

N

T

E

C

MTA PARKING

SD

SD

SD

4'

5'

3'

SS

L

A O

U

N

T

E

C

G

E.M.

JB

HBX

INV

8"

INV

INV

BRICK BOARDER

26"

3'

SS

L

A O

U

N

T

E

C

INV

TRAV PT WTB33

2'

WHITE MARSH

12"

2'

2'

2'

3' 3'

12" MULTI

5'

KEEP RIGHT

YIELD

KEEP RIGHT

SD

CONC

12"

MTA PARKING

MTA PARKING ONLY

HAZARD MARKER

SD

10"

SS

L

A O

U

N

T

E

C

JB

14"

HBX

SD

TRAV PT JMT4

6"

YIELD

FLOWERS

2'

SS

L

A O

U

N

T

E

C

SS

L

A O

U

N

T

E

C

WEIGHT LIMIT

NO U TURN

PAVERS

SS

L

A O

U

N

T

E

C

INV

3'

HBX

FLOWERS

E

INV

12"

22"

MEGABUS CHARTER PARKING

INV

16"

INV

SD

INV

WHITE MARSH PARK-N-RIDE

YIELD

10"

HAZARD

12"

INV

12"

INV

INV

8"

INV

CONC

ISLAND

INV

HBX

HBX

SD

SD

10"

INV

INV

3' 3'

EXXON

12"

E

INV

INV

5"

COMCAST "BURIED FIBER OPTIC CAB

UTIL

HBX

RIGHT LANE MUST TURN RIGHT

TV

HBX10

12"

12"

HBX

10"

HBX

12"

SD

TRAV PT WTB32

HBX

SD

8"

30"

WHITE MARSH PARK-N-RIDE RIGHT L

26"

NO PARKING ANYTIME

SD

HBX

W

W

TRAV PT WTB31

W

ONE WAY

STOP

8"

5CORDON WAY

MD-43

FOOD/GAS POST ONLY

P/S

PST

SS

EX. SD

EX.

S

IDEWALK

E X

T D (T

Y P

EX. TD(TYP)

EX. TD(TYP)

E X

C U

R B (T

Y P

EX. PARKING LOT

E X

S

ID

E W

A L

K

E X

C U

R B (T

Y P

EX. SIDEWALK

SS

E X

C U

R B (T

Y P

SS

E X

S D

E X

S

D

E X

C U

R B (T

Y P

E X

C U

R B (T

Y P

E X

C U

R B (T

Y P

E X

C U

R B (T

Y P

SFM

SFM

S F

M kkk kkk

UG

UG

UG

UG

0+00

1+00

2+00 3+00

3+06

R=800'

E=1464988.9325 N=623813.1710

Southside Oil LLC

(Site 28095)

L. 29609 F. 263

Residue of Lot 1

White Marsh Business Community

Section B - Lot 1

P.B. 47 Pg. 100

CONC. MON (BROKEN) FOUND (HELD)

CONC. MON. (BROKEN) FOUND

CONC. MON. (BROKEN) FOUND

CONC. MON (BROKEN) FOUND (HELD)

White Marsh Mall Associates &

White Marsh II Associates

L. 8446 F. 438

GRASS

TRAV PT JMT2

MTA

SS

L

A O

U

N

T

E

C

SS

L

A O

U

N

T

E

C

SS

L

A O

U

N

T

E

C

SS

L

A O

U

N

T

E

C

UG

N

C O R D O N W

A Y

H O

N E

Y G

O

B L

V D

H O

N E

Y G

O

B L

V D

MERCANTILE ROAD

MTA PARK AND RIDE

WHITE MARSH

CV-05

INSET A CV-05

INSET B

CV-05

INSET C

CV-05

INSET E

CV-05

INSET D

A

B

C

E

D

CV-05

F INSET F

E

N 623350 N 623350

E

N 623650

E

EXISTING ROW LINE

EXISTING ROW LINE

EXISTING ROW LINE

EXISTING ROW LINE

SEE DRAWING CV-05

30' 30'0 60'

SCALE: 1"=30'

PLAN

1"=30'SCALE:

PROPOSED CURB & GUTTER

PROPOSED SIDEWALK

LEGEND

PROPOSED SEWER FORCE MAIN

PROPOSED WATER SERVICE

PROPOSED ELECTRICAL SERVICE

SIDEWALK REMOVAL

LIMIT OF DISTURBANCE

FEBRUARY 2023

JED

TLL

JLG

MDL

CV-04

81"=30'

CIVIL PLAN

2 ADDENDUM 2 7/10/23

PRIME

UG

PROFESSIONAL CERTIFICATION

License No. Expiration Date A P P

R C

H E

C K

D R

A W

N D

E S

G N

NO. DESCRIPTION

REVISIONS

BY DATE

DATE: SCALE: OF

DRAWING NO.

CONTRACT NO.

SHEET NO.

p w

M T

A G

B P

W A P

P :M

T A

P W

D a t a

D o c u m e n t s r r e o je c t

A P

S

S c il it ie s r m f o a t io n

E n g in e e r in g

C a d d a r v e y

P e e t s p

C V

O p t io n

.d g n the State of Maryland engineer under the laws of am a duly licensed professional approved by me, and that I documents were prepared or

I hereby certify that these

PRIME AE Group, Inc.

10' 10'0 20'

SCALE: 1"=10'SCALE:

PLAN

1"=10'

SCALE:

REF:

CV-05

SHT-REF

1"=10' SCALE:

REF:

CV-05

SHT-REF

1"=10'

SCALE:

REF:

CV-05

SHT-REF

1"=10' SCALE:

REF:

CV-05

SHT-REF

1"=10'

SCALE:

REF:

CV-05

SHT-REF

1"=10'

COMFORT STATION COORDINATES

NORTHING EASTINGBUILDING CORNER

A B

C D

E

SCALE:

REF:

CV-05

SHT-REF

1"=10'

F

PROPOSED CURB & GUTTER

PROPOSED SIDEWALK

LEGEND

PROPOSED SEWER FORCE MAIN

PROPOSED WATER SERVICE

PROPOSED ELECTRICAL SERVICE

SIDEWALK REMOVAL

LIMIT OF DISTURBANCE

ELEVATION

FFE

ELEVATION

EX. GROUND

82.50

82.50

N/A

82.50

82.50

80.11

80.03

N/A

80.91

80.22

81.74

81.74

81.74

81.74

81.74

1464655.5037

1464653.5269

1464663.9210

1464667.8747

1464657.4805

623527.8320

623519.3082

623516.8976

623533.9452

623536.3558

MID-POINT (1 TO 4)

INSET A UTILITY CUT INSET B UTILITY CUT

INSET C UTILITY CUT INSET D UTILITY CUT

INSET E UTILITY CUT INSET F UTILITY CUT

FOR ALL UTILITY CUTS.

BACKFILL TO BE PLACED AND COMPACTED

NOTE:

FEBRUARY 2023

JED

TLL

JLG

MDL

CV-05

91"=10'

WALL ELEV.

TOP OF RET.

T-1964-0150

WHITE MARSH

COMFORT STATION

MDE NO. 23-SF-0070

2 ADDENDUM 2 7/10/23

PRIME

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

BUS LOADING ONLY

RESERVED PARKING

NO PARKING

NO PARKING

14"

INV

12"

SD

MTA WMPR

10"

8"

JB

E.M. SD

PED XING

SD

TRAV PT JMT3TRAV PT JMT3

8"

SS

L

A O

U

N

T

E

C

PED XING

10"

SD

MULCH

SS

L

A O

U

N

T

E

C

SS

L

A O

U

N

T

E

C

ELEC VEH PARKING

DO NOT ENTER

ELEC VEH CHARGING

ONE WAY

6"

3"

STOP

MTA PARKING

SD

3"

MTA PARKING

EX. SD

EX.

S

IDEWALK

EX. SIDEWALK

E X

C U

R B (T

Y P

S F

M kkk kkk

UG

UG

UG

0+00

1+00

White Marsh Mall Associates &

White Marsh II Associates

COMFORT STATION

PROPOSED 17.5' X 10.67'

EX. TREE STUMPS TO BE REMOVED.

AND SOD.

REPLACE WITH TOPSOIL

REMOVE EX. SIDEWALK.

TIE INTO EX. SIDEWALK

CV-01

CV-01

CURB ELEVATIONS

MEET EX. TOP OF

COMPLIANT SIDEWALK

RECONSTRUCT ADA

80.90

81.20

81.81

81.53

81.69

81.66

81.53

80.41

81.72

81.62

81.58

81.74'

FFE

E

N 623450

N 623450

N 623550

AT NEAREST JOINT

TIE INTO EX. SIDEWALK

PROPOSED RETAINING WALL

N

MERCANTILE ROAD

CORNER 1

CORNER 2

CORNER 4

CORNER 3

CV-02

88 SF 5 INCH CONCRETE SIDEWALK

CV-02

345 SF 5 INCH CONCRETE SIDEWALK

DIRECTIONAL BORE

ELECTRICAL SERVICE

DIRECTIONAL BORE

WATER SERVICE

DIRECTIONAL BORE

SEWER FORCE MAIN

EXISTING ROW LINE

UTILITY CUT

GRINDER PUMP

5 SY TOPSOIL AND SODDING

WATER UTILITY CUT

ELECTRIC UTILITY CUT

CV-01

CV-01

SEE DETAIL

CV-01

PAVEMENT PATCHING

3 SY FULL DEPTH

CV-02

5 10

WHITE MARSH PARK-N-RIDE RIGHT L

E X

C U

R B (T

Y P

AND SODDING

6 SY TOPSOIL

SS

PAVEMENT PATCHING

7 SY FULL DEPTH

CV-02

TRAV PT WTB151

02+00

AND SODDING

8 SY TOPSOIL

10"

3+00

3+06

CURB & GUTTER

COMBINATION

5 LF REPLACE 7 INCH

CV-02

VEHICEL CHARGER

ELEC VEH PARKING

E.M.

12"

BGE #10017A

JB

TEL

16"

BGE #102501

UG

AND SODDING

6 SY TOPSOIL

License No. Expiration Date A P P

R C

H E

C K

D R

A W

N D

E S

G N

NO. DESCRIPTION

REVISIONS

BY DATE

DATE: SCALE: OF

DRAWING NO.

CONTRACT NO.

SHEET NO.

p w

M T

A G

B P

W A P

P :M

T A

P W

D a t a

D o c u m e n t s r r e o je c t

A P

S

S c il it ie s r m f o a t io n

E n g in e e r in g

C a d d a r v e y

P e e t s p

C V .d g n the State of Maryland engineer under the laws of am a duly licensed professional approved by me, and that I documents were prepared or

I hereby certify that these

PRIME AE Group, Inc.

T-1964-0150

WHITE MARSH

COMFORT STATION

MDE NO. 23-SF-0070

06060

TRAV

PT

WTB15

6A

INV

INV

INV

INV

70 70

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

INV

8"

INV

CONC

INV INV

" 10'

W

TRAV

PT

WTB15

TRAV

PT

WTB15

INV

TRAV

PT

JMT1

BUS

LOADIN

G

ONLY

INV

RES

ERVED

PARKIN

G

10" 10' W

INV

SD

TRAV

PT

JMT2

NO

PARKIN

G

NO

PARKIN

G

14"

INV

TRAV

PT

WTB15

TRAV

PT

WTB15

12"

SS

L A

O U

N

T

E

C

SD

MTA

WMPR

10"

8"

JB

E.M

SD

10"

PED

XIN

G

SD

TRAV

PT

JMT3

TRAV

PT

JMT3

8"

SS

L A

O U

N

T

E

C

PED

XIN

G

10"

12"

TRIP

LE

SD

VEHIC

EL C

HARGER

MULCH

10"

DOUBLE

12"

TRIP

LE

SS

L A

O U

N

T

E

C

SS

L A

O U

N

T

E

C

ELEC

VEH P

ARKIN

G

DO

NOT

ENTER

5"

SS

L A

O U

N

T

E

C

ELEC

VEH C

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .