About this file
This document is an Addendum No. 2 issued by the Maryland Transit Administration (MTA) for the T-1964-0150 WHITE MARSH COMFORT STATION contract. The contract is for the installation of a prefabricated bus operator restroom facility, including providing water, sanitary sewer, electrical services, temporary parking facilities, and asphalt patching within the White Marsh Park and Ride in Baltimore County, Maryland. The addendum includes a question and answer document, revised plan sheets, and added/revised special provisions. Bids must be submitted by 2 P.M. local time on Friday, August 4, 2023.
The contract has no minimum self-performance requirement for the prime contractor. Concrete repairs using grout and injected epoxy are paid under the Reinforced Concrete Bus Pad and Monolithic Curb Repair item. Aggregate base course is paid under the Variable Depth Graded Aggregate Base item. The contract does not specify any set-asides, and there is no information provided about the incumbent contractor or current contract details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| T-1964-0150_IFB_Doc_FINAL-COMPLETE.pdf | ||
| T-1964-0150_Addendum_No1 (1).pdf | ||
| T-1964-0150 Addendum_No3_package.pdf | ||
| T-1964-0150 Addendum_No5.pdf | ||
| T-1964-0150 Addendum_No4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6 Saint Paul Street, Baltimore, MD 21202-1614 | 410.539.5000 | 1.866.RIDE.MTA | TTY 410.539.3497 | mta.maryland.gov
TO: All Prospective Proposers
FROM: Maryland Transit Administration
SUBJECT: Addendum No. 2
T-1964-0150 WHITE MARSH COMFORT STATION
DATE: July 20, 2023
Addendum No. 2 is thirty-three (33) pages and includes the following:
ITEM No. 1 -- Provides official Question & Answer Document.
ITEM No. 2 – Provides Revised Plan Sheets: Drawings TI-01, G-01, CV-04, CV-05, CV-06, CV-
08 ES-06, UT-01, UT-02, MT-04, MT-05, and EL-02
ITEM No. 3 – Provides added/revised special provisions: Table of Contents; 03 05 00 Common
Work Results for Concrete; 03 64 23 Pressure Injected Epoxy Crack Repair; and
32 13 13 Concrete Paving.
ITEM No. 4 – Provides new DUE DATE: Bids must be submitted through the eMMA portal and marked "Bid for Contract No. T-1964-0150 WHITE MARSH COMFORT
STATION", no later 2 P.M. local time, Friday, August 4, 2023.
All other terms and conditions remain unchanged.
Sincerely, Christie E. Williams, CPPB
Chief of Construction, Procurement
Acknowledgement of receipt of Addendum No. 2 to T-1964-0150.
Vendor Name: ___________________________________________________________
Authorized Representative’s Signature Date
This is the end of Addendum No. 2
OFFICIAL QUESTIONS & ANSWERS DOCUMENT
T-1964-0150- White Marsh Comfort Station Addendum 2
July 20, 2023, Page 1 of 2
1. QUESTION: The radius of the turns along the portions of the directional bore water and electric service limits within the MTA lot cannot be accomplished using directional boring.
ANSWER: The alignments for the directional bore water and electric service limits within the MTA lot have been revised to make directional bore more feasible, although the vertical alignment will be deeper to avoid existing utilities. Revised Drawings include TI-01, G-01, CV-04, CV-05, CV-06, ES-06, UT-01, UT-02, MT-04, MT-05, & EL-02. There are no changes to the related Special Provisions or Bid Items.
2. QUESTION: Under what item is concrete repairs using grout and injected epoxy indicated on sheet CV-06 paid? Please provide details and specs for this work.
ANSWER: The Pressure Injected Epoxy Crack Repairs are paid for under Item 029 – Reinforced Concrete Bus Pad and Monolithic Curb Repair. Added a new special provision Section 03 64 23, Pressure Injected Epoxy Crack Repair; revisions made to special provision Section 03 05 00, Common Work Results for Concrete and Section 32 13 13, Concrete Paving; and repair details have been added to Drawing CV-08.
3. QUESTION: Please confirm that there is no minimum self-performance requirement for the Prime Contractor.
ANSWER: The contract special provisions, Contract Terms And Conditions, 01 13 00, 1.4, Work to be Performed by the Contractor’s Staff, A. states: Execute on the site, with its own organization, work equivalent to at least twenty five percent of the total amount of the Contract price. No revision to the contract documents required.
4. QUESTION: Are we to replace any pavement markings removed to perform the work?
Under what item is this paid?
ANSWER: The replacement of any existing pavement markings impacted by construction shall be considered incidental to the lump sum bid for Maintenance of Traffic, Item 005. No revision to the contract documents required.
OFFICIAL QUESTIONS & ANSWERS DOCUMENT (Continued)
White Marsh Comfort Station, T-1964-0150, Addendum 2 July 20, 2023, Page 2 of 2
5. QUESTION: Is all GAB for the backfill of the retaining wall, under the restroom and under the retaining wall footing paid for under item 28? If not under what item is it paid?
ANSWER: The GAB for backfill of the retaining wall and under the restroom are paid for under Item 028 – Variable Depth Graded Aggregate Base. The GAB under the retaining wall footing is incidental to Item 032 – Retaining Wall. No revision to the contract documents required.
6. Is all saw cutting required for the work paid for under item 20?
ANSWER: Yes, all saw cutting is paid for under Bid Item 020, Saw Cutting. No revision to the contract documents required.
7. Please confirm HDPE conduit is acceptable for the electric directional drill conduit.
ANSWER: HDPE conduit is acceptable as indicated in the specifications. Contractor shall refer to specification 33 05 23 for conduit requirements. No revision to the contract documents required.
TABLE OF CONTENTS (cont’d)
DESCRIPTION PAGE NO.
T- 1964-0150 ADDENDUM N0. 2 TOC-2
SPECIAL PROVISIONS
01 11 00 SUMMARY OF WORK........................................................................ SP – 1
01 13 00 CONTRACT TERMS AND CONDITIONS ........................................ SP – 5
01 15 00 CONSTRUCTION PROCEDURES .................................................... SP – 11
01 18 13 INTERFACE REQUIREMENTS ........................................................ SP – 19
01 21 00 MISCELLANEOUS WORK ALLOWANCES .................................. SP – 22
01 31 15 COORDINATION AND MEETINGS ................................................ SP – 24
01 33 00 SUBMITTALS .................................................................................... SP – 27
01 43 00 QUALITY ASSURANCE QUALITY CONTROL ............................ SP – 40
01 52 13 ENGINEER'S FIELD OFFICE TYPE 4 ............................................. SP – 58
01 55 26 MAINTENANCE OF TRAFFIC ......................................................... SP – 59
01 57 13 TEMPORARY EROSION AND SEDIMENT CONTROL ................ SP – 69
01 61 00 PRODUCTS ......................................................................................... SP – 73
01 78 00 CLOSE OUT ........................................................................................ SP – 75
01 91 00 COMMISSIONING ............................................................................. SP – 79
02 06 30 TEST PIT EXCAVATION ................................................................ SP – 103
02 24 00 ENVIRONMENTAL ASSESSMENT .............................................. SP – 105
02 41 13 SELECTIVE SITE DEMOLITION ................................................... SP – 126
03 05 00 COMMON WORK RESULTS FOR CONCRETE ........................... SP – 130
03 20 33 CONCRETE REINFORCING ........................................................... SP – 135
03 30 00 CAST-IN-PLACE CONCRETE ........................................................ SP – 140
03 64 23 PRESSURE INJECTED EPOXY CRACK REPAIR…………….. SP – 149A
03 80 00 SAW CUTTING ................................................................................ SP – 150
10 14 53 TRAFFIC SIGNAGE......................................................................... SP – 152
T- 1964-0150 ADDENDUM N0. 2 TOC-3
13 40 00 FABRICATED PRECAST ENGINEERED STRUCTURE ............. SP – 156
26 05 00 ELECTRICAL SERVICE CONNECTION – BUILDING ................. SP - 165
26 05 19 LOW-VOLTAGE ELECT. POWER CONDUCTORS & CABLES SP – 170
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS . SP – 174
26 05 29 HANGERS AND SUPPORT FOR ELECTRICAL SYSTEMS ......... SP - 178
26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS ........ SP – 184
26 05 53 IDENTIFICATIONS FOR ELECTRICAL SYSTEMS .................... SP – 190
26 05 73 ARC-FLASH ANALYSIS ................................................................. SP – 200
26 24 16 PANELBOARDS ................................................................................ SP - 209
31 10 00 SITE CLEARING .............................................................................. SP – 214
31 23 00 EXCAVATION AND FILL .............................................................. SP – 216
31 23 33 TRENCHING AND BACKFILLING ............................................... SP – 225
32 01 16 HOT MIX ASPHALT........................................................................ SP – 230
32 11 23 AGGREGATE BASE COURSES ..................................................... SP – 237
32 13 13 CONCRETE PAVING ...................................................................... SP – 241
32 16 13 CURBS AND GUTTERS .................................................................. SP – 245
32 16 23 SIDEWALKS .................................................................................... SP – 248
32 32 00 RETAINING WALLS ....................................................................... SP – 251
32 92 00 TURF AND GRASSES ..................................................................... SP – 254
33 05 00 COMMON WORK RESULTS FOR UTILITIES ............................. SP – 260
33 05 23 DIRECTIONAL BORE CONDUIT INSTALLATION ..................... SP - 263
33 10 00 WATER UTILITIES .......................................................................... SP - 269
33 30 00 SANITARY SEWER UTILITIES ...................................................... SP - 293
33 40 00 STORM DRAIN UTILITIES .............................................................. SP - 318
33 46 00 CONTINGENT BUILDING SUBDRAINAGE AND SUBGRADE. SP - 322
T- 1964-0150 ADDENDUM N0. 2 TOC-4
APPENDICES
APPENDIX A – LIST OF CONTRACT DRAWINGS ........................................................ A-1
APPENDIX B – SPECIAL DETAILS .................................................................................. B-1
APPENDIX C – FEDERAL MINIMUM WAGE RATES ................................................... C-1
APPENDIX D – BUY AMERICA REQUIREMENTS ......................................................... D-1
APPENDIX E – PERMITS AND WAIVERS ........................................................................ E 1
APPENDIX F – CONSTRUCTION DATA REQUIREMENT LIST ................................... F 1
APPENDIX G – GENERAL PROVISIONS FOR CONSTRUCTION CONTRACTS
APPENDIX H – SUPPLEMANTARY GENERAL PROVISIONS FOR CONSTRUCTION
CONTRACTS
APPENDIX I – CONTRACTOR’S SAFETY & HEALTH PLAN GUIDELINES
COMMON WORK RESULTS FOR CONCRETE 03 05 00 - 1
T-1964-0150 ADDENDUM 2 SP- 130
SECTION 03 05 00
COMMON WORK RESULTS FOR CONCRETE
1.1 RELATED DOCUMENTS
A. Plans and general provisions of the Contract including General Provisions for Construction Contracts and Supplementary General Provisions for Construction Contracts and Division 01 Specification Sections apply to this Section.
1.2 SUMMARY
A. This section specifies providing Portland cement concrete, including materials, proportioning, batching, mixing, delivering and testing. Portland cement concrete shall be composed of Portland cement, fine aggregate, coarse aggregate, and water, with or without admixtures as approved, proportioned and mixed as specified herein.
B. Related Requirements
1. Section 01 33 00: Submittals
2. Section 03 20 33: Concrete Reinforcing
3. Section 03 30 00: Cast-In-Place Concrete
4. Section 03 64 23: Pressure Injected Epoxy Crack Repair
1.3 REFERENCES
A. For additional references, refer to the General Provisions and Supplementary Provisions.
B. Abbreviations and Acronyms:
1. MDOT-SHA: Maryland Department of Transportation – State Highway Administration
1.4 ACTION/INFORMATIONAL SUBMITTALS
A. In accordance with Specification Section 01 33 00, submit the following:
1. Source Quality Control Submittals:
a. Samples of materials being used including names, sources and descriptions.
b. Certification that the concrete ingredients and proportions will result in a concrete mix meeting the requirements specified.
2. Hot and Cold Weather Concreting:
a. Submit proposed methods for compliance with hot and cold weather mixing and delivery requirements.
jed Stamp
COMMON WORK RESULTS FOR CONCRETE 03 05 00 - 2
T-1964-0150 ADDENDUM 2 SP- 131
b. Proposed methods for controlling temperature and plans for placing concrete which take into account the sun, heat, wind, ambient air temperature or other limitations of facilities that will prevent proper finishing or curing.
3. Certificates:
a. Submit with each mix design, laboratory test reports and mill or manufacturer’s certificates attesting to conformance of ingredients with specifications.
b. In case the source, brand or characteristic properties of ingredients need to be varied during the term of the Contract, submit revised laboratory mix report in accordance with procedures specified for original mix design.
c. Submit certificate stating that each admixture used is identical in composition to the sample used for acceptance testing and is compatible with all other materials in the design mix.
4. Batch Tickets:
a. Before unloading at the site, submit delivery ticket from concrete supplier with each batch delivered to the site setting forth the following information:
1) Name of supplier
2) Name of batching plant and location
3) Serial number of ticket
4) Date
5) Truck number and batch number
6) Specific job designation (Contract number and location)
7) Volume of concrete (cubic yards)
8) Specific class of concrete
9) Time loaded and amount of water added
10) Type and brand of cement
11) Weight of cement
12) Maximum size of aggregates
13) Weights of coarse and fine aggregates, respectively
14) Maximum permissible amount of water to be added at the site, if any
15) Type and amount of admixtures
16) Mix design designation
COMMON WORK RESULTS FOR CONCRETE 03 05 00 - 3
T-1964-0150 ADDENDUM 2 SP- 132
b. Test Reports:
1) Submit to the Engineer a record of the results of tests
2.1 MATERIALS
A. Concrete Mixes shall conform to MDOT-SHA Standard Specifications
902.10 and 420.02.04, except as follows:
1. 902.03.02 Slag Cement is not permitted and 902.06.04.(a) Fly Ash is not permitted.
2. Unless noted otherwise.
B. Grout shall conform to MDOT-SHA Standard Specification 902.11, unless noted otherwise.
C. Concrete reinforcing shall conform to Section 03 20 00, unless noted otherwise.
D. Production Plants shall conform to MDOT-SHA Standard Specification 915, unless noted otherwise.
E. Water shall conform to MDOT-SHA Standard Specification 921.01, unless noted otherwise.
2.2 SOURCE QUALITY CONTROL
A. Source Quality Control shall conform to MDOT-SHA Standard Specifications 915.03, unless noted otherwise.
3.1 FIELD QUALITY CONTROL
A. Concrete Sampling and Testing:
1. Furnish 4" x 8" cylinder molds and concrete required for casting specimens and for the specified sampling and testing.
2. Perform slump and air content tests for each 50 cubic yards, or fraction thereof, placed.
3. Perform variability test and other tests required for each 100 cubic yards, or fraction thereof, placed.
4. Prepare one set of standard cylinders in accordance with ASTM C172 for each 100 cubic yards, or fraction thereof, placed for compressive strength testing by the Engineer.
B. Tests:
1. Sample according to ASTM C31, C42 and C172.
2. Test for air content according to ASTM C231 or C173 as applicable.
COMMON WORK RESULTS FOR CONCRETE 03 05 00 - 4
T-1964-0150 ADDENDUM 2 SP- 133
3. Test for unit weight, yield, air content, cement content and unit weight according to ASTM C138.
4. Test for slump according to ASTM C143.
5. Test mixes with chemical additives according to ASTM C494 and as required by the Engineer.
3.2 MIX EQUIPMENT
A. Batching Plant shall conform to MDOT-SHA Standard Specifications 915.03, unless noted otherwise.
3.3 MIXING AND DELIVERY
A. General:
1. Mixing and Delivery shall conform to MDOT-SHA Standard Specifications 915.03, unless noted otherwise.
2. Hand Mixing:
a. Hand-mixed concrete, when authorized, shall be made in batches not larger than one-third cubic yard, and shall be mixed on a watertight, level platform.
b. Coarse aggregate shall be measured in measuring boxes, spread on the platform, and the fine aggregate spread on the coarse aggregate; the total depth of the two layers shall be not more than one foot.
c. The dry cement shall be spread on the aggregate and the whole dry mass shall be turned not less than two times.
d. Clean water shall then be evenly added, and the whole mass shall be turned not less than three times not including placing in the carriers and forms.
3.4 PLACING:
A. Non-Shrink Non-Metallic Grout: Perform grout placement in accordance with the recommendations of ACI and the manufacturer’s published specifications for mixing and placing. Place non-shrink non-metallic grout only where indicated on the Contract Drawings.
B. Neat Cement: Perform grout placement in accordance with the requirements of Section 03 30 00.
3.5 REPAIR OF DEFECTIVE CONCRETE:
A. Repair defective concrete in accordance with Section 03 30 00.
4.1 COMMON WORK RESULTS FOR CONCRETE:
A. Common Work Results for Concrete will not be measured for payment.
COMMON WORK RESULTS FOR CONCRETE 03 05 00 - 5
T-1964-0150 ADDENDUM 2 SP- 134
B. Common Work Results for Concrete will not be paid directly but will be incidental to the pertinent items.
END OF SECTION
PRESSURE INJECTED EPOXY CRACK REPAIR 03 64 23 - 1
T-1964-0150 ADDENDUM 2 SP-149A
SECTION 03 64 23
PRESSURE INJECTED EPOXY CRACK REPAIR
1.1 RELATED DOCUMENTS
A. Plans and general provisions of the Contract, including General Provisions for Construction Contracts and Supplementary General Provisions for Construction Contracts and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. This section consists of cleaning, surface sealing, setting injection ports, and subsequent pressure injection of epoxy into cracks, in accordance with these special provisions, the standard specifications, and as directed by the Engineer.
B. Related Requirements:
1. Section 03 05 00 Common Work Results for Concrete
2. Section 03 20 33 Concrete Reinforcement
3. Section 03 30 00 Cast-In-Place Concrete
4. Section 32 13 13 Concrete Paving
1.3 REFERENCES
A. For additional references, refer to the General Provisions and Supplementary Provisions.
1.4 ACTION/INFORMATIONAL SUBMITTALS
A. In accordance with Section 01 33 00, submit the following:
1. Product Data:
a. Submit epoxy injection material for approval
b. Submit installation plan for approval
c. Submit equipment data for approval
2. Source Quality Control Submittals:
a. Submit the source of materials identified in Part 2 for approval.
2.1 EPOXY:
A. The epoxy used for surface sealing and setting injection ports shall meet the following requirements:
PRESSURE INJECTED EPOXY CRACK REPAIR 03 64 23 - 2
T-1964-0150 ADDENDUM 2 SP-149B
1. 30 minute minimum gel time
2. 2600 psi minimum tensile strength at 72 degrees Fahrenheit after 3 days
3. 0.002 maximum linear coefficient of shrinkage on cure
4. 11,000 psi minimum compressive strength at 7 days
5. 200,000 minimum compressive modulus
6. 3,700 psi minimum bond strength at 14 days
B. The epoxy used for pressure injection shall conform to MDOT-SHA Standard Specification 921.04, C 881, Type I and the additional following requirements:
1. 11,000 psi minimum compressive strength at 7 days
2. 7,000 psi minimum tensile strength at 7 days
3. 2,400 psi minimum bond strength at 14 days
C. Submit the grade for approval after the Contractor’s analysis of areas to be injected.
D. The system shall be moisture insensitive and shall not be used when the ambient or concrete temperature is 50 degree Fahrenheit or below, nor temperatures lower than recommended by the manufacturer.
E. The expiration date of acceptance of this material shall be one year after the date of manufacture. Any unauthorized tampering or breaking of the seals on the containers between the time of sampling and delivery to the job site will be cause for rejection of the material.
3.1 GENERAL:
A. The locations for the pressure injection of cracks will be delineated by the Engineer.
B. Ensure that the epoxy manufacturer’s technical representative will be present for the duration of the injection process, and submit details of the proposed method of repairs and the injection procedure for approval.
C. Prior to beginning repair, clean all cracks of loose matter such as dirt, laitance, oil, grease, salt, or any other contaminants.
D. Inject the epoxy with a positive displacement pump system having a suitable mixing chamber where the epoxy components are accurately metered and thoroughly mixed immediately prior to injection. A clear, legible, and accurate pressure gauge shall be located in the supply line adjacent to the mixing chamber.
E. The equipment shall also be capable of providing a continuous and uninterrupted pressure head up to 200 psi to continually force the injection
PRESSURE INJECTED EPOXY CRACK REPAIR 03 64 23 - 3
T-1964-0150 ADDENDUM 2 SP-149C
of epoxy into the cracks. Epoxy flow shall be capable of being fully controlled by the operator controls at the mixing chamber.
F. Ensure that all working personnel are familiar with the equipment, materials, and procedures to be used during the operation.
G. All materials and equipment, including backup equipment, shall be at the work site before injection operations begin. All equipment shall be in proper calibration and in good working order as determined by the Engineer. A pressure check shall be performed by inserting two independent valves and gauges capable of sensing the pressure build-up behind each valve. The valves on the pressure check device shall be closed and the equipment operated until the gauge pressure on each line reads 200 psi. The pump shall be stopped, and the gauge pressure shall not drop below 190 psi within three minutes.
H. The pressure check shall be run for each injection machine at the beginning and at the end of every day that the unit is to be used in the work of crack repair.
I. Epoxy shall be injected only by the use of the automatic mechanical pumping, metering, and mixing equipment described above. Pressure pot systems and caulking guns or grease guns will not be permitted.
J. Mix the two components in accordance with the manufacturer’s recommendations. Maintain the ratio of the components within a tolerance of five percent by volume.
K. Acceptable solvents used for cleaning include mineral spirits, methyl ethyl ketone, acetone, low boiling naphtha, xylene, and any other nonchlorinated solvent.
3.2 PORT INSTALLATION:
A. Prior to injection of the epoxy in the crack, apply a surface seal material to the face of the crack to prevent the liquid resin from leaking out. The surface seal material shall be useable on vertical, horizontal, and overhead applications and completely bridge the crack when applied to the face of the crack.
B. Establish openings to inject the epoxy through the surface seal material along the entire length of the crack and provide entry ports. The holes shall be 3/4 in. diameter, spaced 6 to 12 in. apart and be of sufficient depth to ensure maximum dissemination of the pressure of the epoxy throughout this area.
C. Set inserts in drilled holes that are cleaned to remove any dust or debris left by drilling operations. Exercise special care to ensure that oil or other contaminants are not introduced into the air feed hoses, or deposited on any air blown surfaces.
PRESSURE INJECTED EPOXY CRACK REPAIR 03 64 23 - 4
T-1964-0150 ADDENDUM 2 SP-149D
3.3 INJECTION:
A. Force the epoxy into the internal voids and cracks by means of hydraulic pressure to completely fill all internal voids. If the surface seal material has insufficient strength and adhesion to confine the injected epoxy until it has cured, remove the surface seal material and furnish and place a new surface seal material at no additional cost to MTA.
B. Before injecting any epoxy, test for proper epoxy component mix ratio by removing the mixing head of the injection machine and simultaneously pumping approximately 1 total pint of the two adhesive components through the ratio check device. Both adhesive components shall be simultaneously discharged into the calibrated containers during the same time period and shall be compared to determine the mix ratio. Test the mixing head by activate the automatic mixing and metering pump and discharge approximately 1 pint of the mixed epoxy into a disposable container. The Engineer will observe this trial operation to determine that the equipment is working properly. If the equipment is not working properly, immediately repair it to full working condition or replace with the backup equipment. If the backup equipment is used, additional and fully operable equipment shall be provided as its backup equipment.
C. Testing for proper epoxy component mix ratio shall be performed at the beginning and at the end of every day the unit is used in the work of crack repair.
D. At all times during the course of the work, the contractor must keep complete and accurate records available to the engineer of the ratio and pressure tests.
E. The engineer at any time without prior notification of the Contractor may request the contractor to conduct additional ratio and pressure tests. This request may be made up to one time per day per test.
F. Ensure that the feed line from the mixing equipment is securely held or properly attached to the port. Then initiate the epoxy injection in conformance with the manufacturer’s recommendations.
G. Start the injection at the lowest row of holes and at the hole nearest the center line of structure. Continue injection at the first port until the epoxy begins to flow out of the port at the next highest elevation. Then plug the first port and start injection at the second port until the epoxy flows from the next port. Continue this sequence until the entire crack is repaired.
H. Monitor the injection procedure to ensure the epoxy flow does not cease before the injection epoxy exudes from the adjacent port. If the epoxy flow stops before epoxy appears at the adjacent port, move the feed line to the adjacent port and seal the port just used.
I. During the course of all operations, ensure extreme care to observe for breaking out of epoxy. When breaking out occurs, stop the injection and
PRESSURE INJECTED EPOXY CRACK REPAIR 03 64 23 - 5
T-1964-0150 ADDENDUM 2 SP-149E
move the line to another crack. Resume injecting in the original location after a minimum elapse of 24 hours.
J. Accomplish a continuous injection operation by replenishing the epoxy supply tanks in the mixing equipment before they are exhausted.
Thoroughly stir each epoxy component before adding it to its respective storage tank in the mixing equipment. No discontinuity of epoxy flow through the feed lines of either component shall be permitted.
K. The Contractor shall provide the Resident Engineer with dispensed samples, not exceeding 2 fluid ounces, whenever requested. The samples are to be taken undisturbed at the outlet following in-line mixing. These samples are to be provided in addition to any sampling or other procedures recommended by the manufacturer of the proportioning dispenser.
L. Any work stoppage permitting mixed epoxy to remain in the injection equipment more than 15 minutes requires cleaning the mixing chamber and all equipment in contact with the mixed epoxy. Quantities of epoxy purged from the injection equipment shall not be included for payment.
M. After the injection process has been completed and the epoxy allowed to fully cure, remove the injection ports and surface seal from all surfaces. Cut or knock off ports, and grind off the surface seal and any spillage flush with the original surface.
N. Repair any damage to the concrete due to these operations in a manner satisfactory to the Engineer at no additional cost to MTA.
O. The cured injected epoxy shall have penetrated a minimum of 90 percent of the visible crack. Acceptance will be based upon drilling cores of the repaired concrete to determine the depth of penetration from representative locations selected by the Engineer. If the penetration is less than 90 percent of the visible crack along the sides of the core, the crack from which the core was taken will be deemed unsatisfactory and will not be included for payment. A minimum of three 4 in. diameter core samples for the full crack depth of the member or area being repaired shall be required for each 100 ft or fraction thereof per job site. Fill the cored holes with epoxy grout.
3.4 CORE TESTING:
A. Core testing requirements for this project shall be determined by the Resident Engineer based on the conditins encountered on site at the time of the repairs.
B. When required, cores shall be removed periodically at the sole discretion of Resident Engineer. The results evident by core examination shall be the sole criteria in determining whether the requirements of the specification have been met. The cores shall be at least 2” diameter and 6” in depth. Core locations shall be selected by the Resident Engineer and shall be removed only in the presence of the MTA representative. Cores and core holes shall be carefully indexed as to location.
PRESSURE INJECTED EPOXY CRACK REPAIR 03 64 23 - 6
T-1964-0150 ADDENDUM 2 SP-149F
C. Injection cannot proceed beyond the initial 50 feet until two cores have been submitted to, and approved by, the Resident Engineer.
D. One core is to be furnished from each additional 100 feet or as requested by the Resident Engineer. No cores will be required within 3” of the extremity of the crack seal.
E. Following their removal, the cores will be examined for penetration. If requirements are met, the cores will be demolished. If no major fracture occurs on a glue line, the core is acceptable. If the core breaks on a glue line, the fragments shall be inspected and/or tested to determine if the failure is attributable to improper metering or mixing of the epoxy. If so, the core shall be considered unsatisfactory and additional cores will be required of the contractor at his own expense from the same vicinity to determine the scope of defective work.
F. All cores shall be filled after inspection with rapid hardening cementitious material at no additional cost to MTA.
4.1 PRESSURE INJECTED EPOXY CRACK REPAIR:
A. Pressure Injected Epoxy Crack Repair will not be measured for payment.
B. Pressure Injected Epoxy Crack Repair will not be paid for directly, but will be included in the Reinforced Concrete Bus Pad And Monolithic Curb Repair Item.
END OF SECTION
CONCRETE PAVING 32 13 13 - 1
T-1964-0150 ADDENDUM 2 SP-247
SECTION 32 13 13
CONCRETE PAVING
1.1 RELATED DOCUMENTS
A. Plans and general provisions of the Contract, including General Provisions for Construction Contracts and Supplementary General Provisions for Construction Contracts and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. This section specifies the installation of plain and reinforced concrete pavement.
2. Depending on the type (plain or reinforced) Portland cement concrete pavement shall include:
a. Furnishing and installing aggregate base course
b. Furnishing and installing concrete forms
c. Furnishing and installing reinforcing steel, tie-ins and load transfer devices
d. Furnishing and installing structural concrete
e. Performing concrete finishing work
f. Performing saw-cuts and joints
g. Controlling concrete curing
h. Performing concrete bus pad crack repair
B. Related Requirements:
1. Section 03 05 00: Common Work Results for Concrete
2. Section 03 20 33: Concrete Reinforcement
3. Section 03 30 00: Cast-In-Place Concrete
4. Section 03 64 23: Pressure Injected Epoxy Crack Repair
5. Section 32 11 23: Aggregate Base Courses
1.3 REFERENCES
A. For additional references, refer to the General Provisions and Supplementary Provisions.
1.4 ACTION/INFORMATIONAL SUBMITTALS
A. In accordance with Section 01 33 00, submit the following:
CONCRETE PAVING 32 13 13 - 2
T-1964-0150 ADDENDUM 2 SP-248
1. Product Data:
a. Submit Mix Design for approval
b. Submit Paving Plan for approval
c. Submit Equipment data for approval
2. Source Quality Control Submittals:
a. Submit the source of materials identified in Part 2 for approval.
2.1 AGGREGATE:
A. Aggregate shall conform to MDOT-SHA Standard Specification 902, unless noted otherwise.
2.2 FORMWORK:
A. Formwork shall conform to MDOT-SHA Standard Specification 520, unless noted otherwise.
2.3 CONCRETE REINFORCEMENT:
A. Concrete Reinforcement shall conform to MDOT-SHA Standard Specification 908, unless noted otherwise.
2.4 CONCRETE:
A. Concrete shall conform to MDOT-SHA Standard Specification 902, unless noted otherwise.
2.5 JOINT SEALANTS:
A. Joint Sealants shall conform to MDOT-SHA Standard Specification 911, unless noted otherwise.
2.6 CURING MATERIALS:
A. Curing Materials shall conform to MDOT-SHA Standard Specification 902, unless noted otherwise.
2.7 GROUT
A. Grout shall conform to MDOT-SHA Standard Specification 902, unless noted otherwise.
2.8 EPOXY ADHESIVES
A. Epoxy Adhesives shall conform to MDOT-SHA Standard Spcification 921, unless noted otherwise.
CONCRETE PAVING 32 13 13 - 3
T-1964-0150 ADDENDUM 2 SP-249
3.1 EQUIPMENT
A. Equipment shall conform to MDOT-SHA Standard Specification 520.03.01, unless noted otherwise.
3.2 WEATHER RESTRICTIONS
A. Weather Restrictions shall conform to MDOT-SHA Standard Specification 520.03.02, unless noted otherwise.
3.3 AGGREGATE BASE COURSE:
A. Foundation shall conform to MDOT-SHA Standard Specification 520.03.03, unless noted otherwise.
B. Section 32 11 23 Aggregate Base Courses
3.4 FORMWORK:
A. Formwork shall conform to MDOT-SHA Standard Specification 520.03.04, unless noted otherwise.
3.5 SLIP FORM PAVING
A. Slip Form Paving shall conform to MDOT-SHA Standard Specification 520.03.05, unless noted otherwise.
3.6 REINFORCEMENT INSTALLATION:
A. Reinforcement Installation shall conform to MDOT-SHA Standard Specification 520.03.06, unless noted otherwise.
3.7 CONCRETE PLACEMENT:
A. Concrete Placement shall conform to MDOT-SHA Standard Specification 520.03.07, unless noted otherwise.
3.8 CONCRETE FINISHING:
A. Concrete Finishing shall conform to MDOT-SHA Standard Specification 520.03.09, unless noted otherwise.
B. Finish shall be a broom finish in accordance with Section 03 05 00 Common Work Results for Concrete.
3.9 TEXTURING AND EDGING:
A. Texturing and Edging shall conform to MDOT-SHA Standard Specification 520.03.11, unless noted otherwise.
3.10 CURING:
A. Aggregate shall conform to MDOT-SHA Standard Specification 520.03.12, unless noted otherwise.
CONCRETE PAVING 32 13 13 - 4
T-1964-0150 ADDENDUM 2 SP-250
3.11 JOINTS
A. Formwork shall conform to MDOT-SHA Standard Specification 520.03.14, unless noted otherwise.
3.12 PORTLAND CEMENT CONCRETE PAVEMENT REPAIR
A. Portland Cement Concrete Pavement Repair shall conform to MDOT-SHA Standard Specification 522, unless noted otherwise.
3.13 OPENING TO TRAFFIC
A. Formwork shall conform to MDOT-SHA Standard Specification 520.03.16, unless noted otherwise.
B. The pavement may be opened to vehicular traffic after having attained a compressive strength of 3000 psi. Field samples will be tested per T 23.
3.14 DOWEL BAR PLACEMENT
A. Dowel Bar Placement tolerances shall conform to MDOT-SHA Standard Specification 520.03.17, unless noted otherwise.
B. No adjustment for payment shall be made for out of tolerance dowel bars, however, the work may be determined to be non-conforming by the Engineer.
4.1 PORTLAND CEMENT CONCRETE PAVEMENT – 8 INCH DEPTH:
A. Portland Cement Concrete Pavement – 8 Inch Depth will not be measured for payment.
B. Portland Cement Concrete Pavement – 8 Inch depth will not be paid for directly, but will be considered incidental to the Baltimore County Concrete Combination Curb & Gutter, R-21, 7 Inch Depth item as specified in the Contract documents.
4.2 REINFORCED CONCRETE BUS PAD AND MONOLITHIC CURB
REPAIR
A. Reinforced Concrete Bus Pad and Monolithic Curb Repair shall be measured per square yard and shall include furnishing and installing all compacted graded aggregate base, formwork, reinforcing steel, concrete, expansion joints, joint sealants, concrete bus pad crack repair, steel plate removal, finishing, and curing materials.
B. Reinforced Concrete Bus Pad and Monolithic Curb Repair shall be paid for at the Contract unit price bid per square yard of concrete placed and accepted, which will be full compensation for all material, tools, labor and all work incidental to complete the item as specified.
END OF SECTION
p w
M T
A G
B P
W A
P P
M T
A
P W
D a t a
D o c u m e n t s
C u r r e n t
P r o j e c t s
M
A P
S
B U
S
F a c i l i t i e s
S
W h i e r o m f o a t i o n
E n g i n e e r i n g
C a d d a d r v e y
P l e e t s p
T I d g n
MARYLAND TRANSIT ADMINISTRATION
MARYLAND DEPARTMENT OF TRANSPORTATION
Maryland
FACILITIES ENGINEERING, ADA & SUSTAINABILITY DIVISION
CONTRACT NO.
DRAWING NO.
SHEET NO.
OF
PRIME AE Group, Inc.
WHITE MARSH MALL
NECKER
HALLFIELD
MANOR
EAST
SILVERGATE
SPRING
STATION
SOUTHFIELD AT
WHITEMARSH
AD95
J F K
HW
Y
M
EM
O
RI
AL
MARSH
WHITE
BLVD
WHITE
BG43
P E R R Y
H A
L L
B L V
D
HALL
BL
VD
PE
RR
Y
BUCK
S
SCHOOLHOUSE RD
SILVER
SPRING
RD
A V E
SLA
TER
B A B
IK
O W
RD
R D
RI
N
G
RD
RD
RIN
G
A V E
DR
S O
U T
H F
IELD
D R
CORPORATE
BEACONSF
IEL
D DR
BLVD
HONEYGO
C
AS
TLEMILL
CIR
S A
N D
P
IP
E R
C
IR
DR
HALLFIELD
MANOR
W A
YARBOR
M A
N O
R F
IE
L D
R D
A
R
LE
N R
D
RDA
M
BERMI
LL
M
ISP
RD
Y V O
N N E
A V E
W
IN
TERO
D E
WAY
BERRYFIELD
D R
R O
S E
HAVE
N
R D
D O
T T Y
R D
LINDA
AVE
RD
B R
O A
D
BRID
GE
SILVER
TEAL
RD
G A
R
LA
N
D
A V
E
C
IR
BEDROCK
BUCKS SCHOOLHOUSE RD LOOP
ESTERMANCIR
S
IL
V E R
L A
M E A
D O
W
FARM
R D
COLE
D R
G A
R
LA
N
D A
V E
C
T
S E L
W
IN
KIN
G
AVE
HEATHERM
ILL
R D
W C T
C
IR
B
RIDGEFORD
C A S T L E
C R E E K
C
IR
S T A
R K
C T
Q U
E E
N
SBERRY
RDTR
EE RD
A
LA
N
B R O
O K
S H
IR
LE
Y
A V E
S H
E R
IN
G T O
N R
D
SPRINGHOUSE
C
IR
B E
A C
O N
S W
O O
D
C T
W
IR
SING
W
AY
M
ER
T
A V E
N C T
M A
C
W
ORTHPL
C A
M
ER
O N
C T
R A
T N
A C
T
W H
IT
E
M
EA
D O
W L
A
DR
TOWN
CENTER
H
IC
K O
R Y
TH
M A
R G
E R
Y
C T
MEADOW
CTC
O
OL
CT
FALLON
LA
S H
A N
TI
S H
O R E
H A
M
C T
A V E
H
IL
L T O
P
RD
R
H U
DDLAN
JA
C
OB
F
IE
LD
RD
C T
D O
LI
N
A
C T
R E D
F
IE
L D
FARW
E
BARTLEY CT
C T
H
EA
T H
R O
W
M
A N
O R
NG
LA
O
LLOW
DUNSINANE DR
B R
Y C
E
AVE
ROYAHN
HANF
FARM RD
H A
N F
A V E
D R
B
LU
E S T O
BOTHWELL
GARTH
S A
X O
N C
IR
FLA
N
D
ERS C
T
FRE
EST
ONE
LA
ASHMILL
CT
CT
HILLTO
P
T U
L
IP
P O
P L A
R C T
DANBENCT
GODDARD FARM RD
WAY
HERSHEY
MEN
TE
ITH
CT
C
T
TR
E Y B
U
RN
TIS
BURY
CT
REDDING CT
L A
K E
F O
R E S T
C T
R E S
TO
NLA
CASTLE STONE
G
RA
FTO
N
CT
B A
M B
O R
O U
G H
C T
C T
C A
M R
O S E
K R
IS
T A
L C
T
W
IL
L O
W P
A T H C
T
CTFE
ATH
ER
STONE
K N
IG
H T S
B R
ID
G E
C T
MILLWHEELCTB
R O
N Z E
W
IN
G C
T
CT
DONN
SA
G E
B
RUSH
C
T
C T
K R
IS
S W
O O
D
HEATHROWMANOR CT
L
IN
E A
G E
C T
CLIPSTO
NE
CT
JU
XON
CT
C T
H E
D G
E F
O R
D C
T
M
IL
L B R
ID
G E
C T
S A
G E B R
U S
H C
T
A M
B O
L
IN
C T
P
IN
T A
IL
C
T LA
V
IN
G T
O N
PL
DEBENHAM
CT
C T
H A
L L F
IE
L D
KN
A
VE
S
C T
H
IL
L G
A T E
C T
C A S T E L L
C T
STOREYS
CT
CROSSWALL
CT
INDIAN
ROCK
PARK
RESERVOIR
SLATER
AVE
NECKER
AVE
WHITE
RD
MARSH
JOPPA VIEW
E.S.
21236
:967
WHITE MARSH
SILVER
WOODS
TREMPER FARM
BERRYHILL
NOTTINGHAM
WOODS
NOTTINGHAM
LAWRENCE
HILL
TARTON
HILL
i t h
R u n e m a r s h
W n R u
PU
LA
S K I
M
EM
O
RI
AL
HW
Y
K
JF
AD95
MARSH BLVD
WHITE
P H
IL
A D
E
LP
H
IA
R D
BLV
D
H O
N E Y G
O
B L V
D
H O
N E Y
G O
SPRING
RD
SILVER
FR
AN
KLI
N
SQ
U
A
RE
D R
E D
R
D R
BLVD
CAMPBELL
BEACONSFIELD
DR
R
IN
G R
D
A V
E
G E R S T
TO
WN
CEN
TE
R
D R
R A
V
EN
W O
O D
RD
T A
R T
A
N
HIL
L RD
D R
S
IL
V E R
L A
K E
L A
K E
D R
C
LIFFORD
RD
SAXON
C
IR
SILVER
K N
O L L
D R
MERCANTIL
E RD
AVE
M A
G N
O L
IA
RD
N O
T T
IN
G W
O O
D
L
K
ENNYCIR
FINSBURY
RD
LEASDALE
RD
W
IN
D
IN
G W
A Y
B E R
R Y
H
IL
L
C
IR
MOHRS
LA
S
T
IL
L W
O O
D C
IR
LO
LL
Y
J E S S
IC
A L A
H
IL
LT
O P
ACRES
R D
S
IL
V E
R H
A L L
Q U
A
IL
R U
FEATHER
HILL RD
CT
ABBEYWOOD
W O
ODFALLRD H
IL
L
L A
W R E N
C E
R D
LEAVERS
CT
R
IN
S M
A
ID
C T
T O
W N
C E N
T E R
C T
DR
RAYLO
N
D O
V E
D R
SILV
ER
HIL
LCT
CORD
O
NWA
Y
CASTLE
CREEKCIR
CREEK CIR
H O
B B
C T
M A
R
IS
S A
C T
BE
RR
YH
ILL
RD
RD
TORPO
IN
T
SHREWSBURY
CT
A V
O N
M O
RE
C T
B R
A N
T W
O O
D
C T
CASTLECREEKCIR
RD
M
ER
CANTIL
E
AYR
C T
C H
A T T E R L Y
C T
SPO
TSW
O O
B U
R B
A G
E C
T
CIR
FOX
AVE
M
AGNOLIA
S T A
B
LE
G A
T E
C T
LAVIN
G T
O N
P L
H A
LL
SDALE
CAPLAND
CT
CT
SENNETT
C T
R O
X B U
R G
H
C
AM
PBELL
BLVD
C T
S
H R E
W S B
U R
Y
G
LA
MIS
G
ARTH
LA
G
W R
A G
B Y
C T
CT
VERITY
LEEW
O
O D
R D
HILLSLEIGH CT
PARK
GAMESTATE
PROTECTIVE ASSOCIATION
OF BALTIMORE
MD FISHAND
BG43
S
05/30/2023
00/00/0000
RPC002212 Facilities Engineering, ADA and Sustainability
Pamela Burdell, Chief of Civil Engineering
N
CONTRACT NO.
T-1964-0150
BALTIMORE COUNTYSCALE: 1"=1000'
AREA
PROJECT
TI-01
Sustainability
Facilities Engineering, ADA &
Manager
Toby D. Johnson RA, LEED AP
WHITE MARSH COMFORT STATION
MARK LOTZ16507
05/30/2023
16507 MARK LOTZ
MDE NO. 23-SF-0070
GRAPHIC SCALE
ADA DESIGN CERTIFICATION
DESIGN CERTIFICATION
OWNERS / DEVELOPER CERTIFICATION
MD. REGISTRATION NO.
PRINTED NAME
DESIGNER'S SIGNATUREDATE
DATE OWNER/DEVELOPER SIGNATURES
PRINTED NAME AND TITLE
WITH THE REQUIREMENTS OF THE AMERICANS WITH DISABILITIES ACT (ADA).
"I HEREBY CERTIFY THAT THIS PLAN HAS BEEN DESIGNED IN ACCORDANCE
DATE DESIGNER'S SIGNATURE
MD. REGISTRATION NO.
PRINTED NAME
APPROVED:DATE:
P.E. R.L.S. OR R.L.A. (CIRCLE)
P.E. R.L.S. OR R.L.A. (CIRCLE)
VICINITY MAP
MARYLAND TRANSIT ADMINISTRATION
LOCATION:
CERT. NO.
MANAGEMENT, RESPECTIVELY"
26.17.01 AND 26.17.02 FOR EROSION AND SEDIMENT CONTROL AND STORMWATER
116 AND SECTIONS 4-201 AND 215, AND THE CODE OF MARYLAND REGULATIONS (COMAR)
INCLUDING SUPPLEMENTS, THE ENVIRONMENT ARTICLE SECTIONS 4-101 THROUGH
CONTROL, THE 2000 MARYLAND STORMWATER DESIGN MANUAL, VOLUMES I AND II
THE 2011 MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT
"I HEREBY CERTIFY THAT THIS PLAN HAS BEEN DESIGNED IN ACCORDANCE WITH
MANAGEMENT FACILITIES WILL BE MAINTAINED IN ACCORDANCE WITH APPROVED PLANS."
DEPARTMENT OF THE ENVIRONMENT. I/WE HEREBY CERTIFY THAT STORMWATER
APPROPRIATE INSPECTION AND ENFORCEMENT AUTHORITY OR THE STATE OF MARYLAND,
I/WE HEREBY AUTHORIZE THE RIGHT OF ENTRY FOR PERIODIC ON-SITE EVALUATION BY
PROGRAM FOR THE CONTROL OF EROSION AND SEDIMENT BEFORE BEGINNING THE PROJECT.
ATTENDANCE AT A MARYLAND DEPARTMENT OF THE ENVIRONMENT APPROVED TRAINING
PERSONNEL INVOLVED IN THE CONSTRUCTION PROJECT WILL HAVE A CERTIFICATE OF
DEVELOPMENT WILL BE DONE PURSUANT TO THIS PLAN AND THAT ANY RESPONSIBLE
"I/WE HEREBY CERTIFY THAT ALL CLEARING, GRADING, CONSTRUCTION, AND/OR
1000 20005001000
ADDENDUM 22 WTB 7/10/23
Maryland
PROFESSIONAL CERTIFICATION
License No. Expiration Date A P P
R C
H E
C K
D R
A W
N D
E S
G N
NO. DESCRIPTION
REVISIONS
BY DATE
DATE: SCALE: OF
DRAWING NO.
CONTRACT NO.
SHEET NO.
p w
M T
A G
B P
W A P
P :M
T A
P W
D a t a
D o c u m e n t s r r e o je c t
A P
S
S c il it ie s it r m f o a t io n
E n g in e e r in g
C a d d a r v e y
P la e e t s p
G I0
.d g n the State of Maryland engineer under the laws of am a duly licensed professional approved by me, and that I documents were prepared or
I hereby certify that these
PRIME AE Group, Inc.
16507 05/30/2023
GENERAL DRAWINGS
2 G-01 INDEX OF SHEETS
3 GN-01 GENERAL NOTES
4 CS-01 CIVIL ABBREVIATIONS AND SYMBOLS
CIVIL DRAWINGS
5 CV-01 CIVIL DETAILS & CROSS SECTIONS
6 CV-02 CIVIL DETAILS
7 CV-03 EXISTING CONDITION PLAN
8 CV-04 CIVIL PLAN
9 CV-05 CIVIL PLAN
10 CV-06
11 CV-07
12 CV-08
EROSION AND SEDIMENT CONTROL DRAWINGS
13 ES-01 EROSION AND SEDIMENT CONTROL NOTES
14 ES-02 EROSION AND SEDIMENT CONTROL VEGETATIVE STABILIZATION 1 OF 2
15 ES-03 EROSION AND SEDIMENT CONTROL VEGETATIVE STABILIZATION 2 OF 2
16 ES-04 EROSION AND SEDIMENT CONTROL DETAILS
17 ES-05 EROSION AND SEDIMENT CONTROL DETAILS
18 ES-06 EROSION AND SEDIMENT CONTROL PLAN
19 ES-07 EROSION AND SEDIMENT CONTROL PLAN
UTILITY DRAWINGS
20 UT-01
21 UT-02
ARCHITECTURAL DRAWINGS
23 AR-01 PRECAST CONCRETE RESTROOM BUILDING
MAINTENANCE OF TRAFFIC DRAWINGS
24 MT-01
25 MT-02
26 MT-03
STRUCTURAL
30 ST-01 RETAINING WALL
ELECTRICAL
31 EL-01 ELECTRICAL LEGEND, NOTES, AND ABBREVIATIONS
32 EL-02
33 EL-03
CIVIL PLAN
BUS PAD DETAILS
PROPOPSED SANITARY SEWER PLAN AND PROFILE
PROPOSED WATER PLAN AND PROFILE
UT-0322 FORCE MAIN AND PUMP DETAILS
27 MT-04
MT-05
MAINTENANCE OF TRAFFIC GENERAL NOTES & SEQUENCE OF CONSTRUCTION
29 MT-06
MAINTENANCE OF TRAFFIC - STAGE 1
MAINTENANCE OF TRAFFIC - STAGE 2
MAINTENANCE OF TRAFFIC - STAGE 3
MAINTENANCE OF TRAFFIC - STAGE 4
MAINTENANCE OF TRAFFIC - DRAINAGE INLET
INLET/ CONCRETE BUS PAD REPAIR DETAILS
SITE PLAN AND RISER DIAGRAM
ELECTRICAL PANEL SCHEDULE
FEBRUARY 2023
JED
TLL
JLG
MDL
G-01
2N.T.S.
INDEX OF SHEETS
TI-01 TITLE SHEET
WHITE MARSH
COMFORT STATION
MDE NO. 23-SF-0070
DESCRIPTION
NO.
DWG.
NO.
DWG.
NO.
SHEET
NO.
SHEET
INDEX OF SHEETS
2 ADDENDUM 2 WTB 7/10/23
License No. Expiration Date A P P
R C
H E
C K
D R
A W
N D
E S
G N
NO. DESCRIPTION
REVISIONS
BY DATE
DATE: SCALE: OF
DRAWING NO.
CONTRACT NO.
SHEET NO.
p w
M T
A G
B P
W A P
P :M
T A
P W
D a t a
D o c u m e n t s r r e o je c t
A P
S
S c il it ie s r m f o a t io n
E n g in e e r in g
C a d d a r v e y
P e e t s p
C V
O p t io n
.d g n the State of Maryland engineer under the laws of am a duly licensed professional approved by me, and that I documents were prepared or
I hereby certify that these
PRIME AE Group, Inc.
T-1964-0150
WHITE MARSH
COMFORT STATION
MDE NO. 23-SF-0070
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
CONC
INV
INV
INV
BUS LOADING ONLY
INV
RESERVED PARKING
INV
TRAV PT JMT2
NO PARKING
NO PARKING
14"
INV
TRAV PT WTB157TRAV PT WTB157
12"
SS
L
A O
U
N
T
E
C
SD
MTA WMPR
10"
8"
JB
E.M. SD
10"
PED XING
SD
TRAV PT JMT3TRAV PT JMT3
8"
SS
L
A O
U
N
T
E
C
PED XING
10"
12" TRIPLE
SD
VEHICEL CHARGER
MULCH
10" DOUBLE
12" TRIPLE
SS
L
A O
U
N
T
E
C
SS
L
A O
U
N
T
E
C
ELEC VEH PARKING
DO NOT ENTER
5"
SS
L
A O
U
N
T
E
C
ELEC VEH CHARGING
ONE WAY
INV
SD
6"
SS
L
A O
U
N
T
E
C
INV
3"
E.M.
STOP
INV
INV
12"
SS
L
A O
U
N
T
E
C
HBX
MTA PARKING
STAY RIGHT
INV
TRAV PT WTB151
14"
14"
SS
L
A O
U
N
T
E
C
SS
L
A O
U
N
T
E
C
BGE #10017A
JB
HBX
SD
SD
TEL
SS
L
A O
U
N
T
E
C
SS
L
A O
U
N
T
E
C
E
INV
16"
22"
BGE #102501
SD
3"
SS
L
A O
U
N
T
E
C
MTA PARKING
SD
SD
SD
4'
5'
3'
SS
L
A O
U
N
T
E
C
G
E.M.
JB
HBX
INV
8"
INV
INV
BRICK BOARDER
26"
3'
SS
L
A O
U
N
T
E
C
INV
TRAV PT WTB33
2'
WHITE MARSH
12"
2'
2'
2'
3' 3'
12" MULTI
5'
KEEP RIGHT
YIELD
KEEP RIGHT
SD
CONC
12"
MTA PARKING
MTA PARKING ONLY
HAZARD MARKER
SD
10"
SS
L
A O
U
N
T
E
C
JB
14"
HBX
SD
TRAV PT JMT4
6"
YIELD
FLOWERS
2'
SS
L
A O
U
N
T
E
C
SS
L
A O
U
N
T
E
C
WEIGHT LIMIT
NO U TURN
PAVERS
SS
L
A O
U
N
T
E
C
INV
3'
HBX
FLOWERS
E
INV
12"
22"
MEGABUS CHARTER PARKING
INV
16"
INV
SD
INV
WHITE MARSH PARK-N-RIDE
YIELD
10"
HAZARD
12"
INV
12"
INV
INV
8"
INV
CONC
ISLAND
INV
HBX
HBX
SD
SD
10"
INV
INV
3' 3'
EXXON
12"
E
INV
INV
5"
COMCAST "BURIED FIBER OPTIC CAB
UTIL
HBX
RIGHT LANE MUST TURN RIGHT
TV
HBX10
12"
12"
HBX
10"
HBX
12"
SD
TRAV PT WTB32
HBX
SD
8"
30"
WHITE MARSH PARK-N-RIDE RIGHT L
26"
NO PARKING ANYTIME
SD
HBX
W
W
TRAV PT WTB31
W
ONE WAY
STOP
8"
5CORDON WAY
MD-43
FOOD/GAS POST ONLY
P/S
PST
SS
EX. SD
EX.
S
IDEWALK
E X
T D (T
Y P
EX. TD(TYP)
EX. TD(TYP)
E X
C U
R B (T
Y P
EX. PARKING LOT
E X
S
ID
E W
A L
K
E X
C U
R B (T
Y P
EX. SIDEWALK
SS
E X
C U
R B (T
Y P
SS
E X
S D
E X
S
D
E X
C U
R B (T
Y P
E X
C U
R B (T
Y P
E X
C U
R B (T
Y P
E X
C U
R B (T
Y P
SFM
SFM
S F
M kkk kkk
UG
UG
UG
UG
0+00
1+00
2+00 3+00
3+06
R=800'
E=1464988.9325 N=623813.1710
Southside Oil LLC
(Site 28095)
L. 29609 F. 263
Residue of Lot 1
White Marsh Business Community
Section B - Lot 1
P.B. 47 Pg. 100
CONC. MON (BROKEN) FOUND (HELD)
CONC. MON. (BROKEN) FOUND
CONC. MON. (BROKEN) FOUND
CONC. MON (BROKEN) FOUND (HELD)
White Marsh Mall Associates &
White Marsh II Associates
L. 8446 F. 438
GRASS
TRAV PT JMT2
MTA
SS
L
A O
U
N
T
E
C
SS
L
A O
U
N
T
E
C
SS
L
A O
U
N
T
E
C
SS
L
A O
U
N
T
E
C
UG
N
C O R D O N W
A Y
H O
N E
Y G
O
B L
V D
H O
N E
Y G
O
B L
V D
MERCANTILE ROAD
MTA PARK AND RIDE
WHITE MARSH
CV-05
INSET A CV-05
INSET B
CV-05
INSET C
CV-05
INSET E
CV-05
INSET D
A
B
C
E
D
CV-05
F INSET F
E
N 623350 N 623350
E
N 623650
E
EXISTING ROW LINE
EXISTING ROW LINE
EXISTING ROW LINE
EXISTING ROW LINE
SEE DRAWING CV-05
30' 30'0 60'
SCALE: 1"=30'
PLAN
1"=30'SCALE:
PROPOSED CURB & GUTTER
PROPOSED SIDEWALK
LEGEND
PROPOSED SEWER FORCE MAIN
PROPOSED WATER SERVICE
PROPOSED ELECTRICAL SERVICE
SIDEWALK REMOVAL
LIMIT OF DISTURBANCE
FEBRUARY 2023
JED
TLL
JLG
MDL
CV-04
81"=30'
CIVIL PLAN
2 ADDENDUM 2 7/10/23
PRIME
UG
PROFESSIONAL CERTIFICATION
License No. Expiration Date A P P
R C
H E
C K
D R
A W
N D
E S
G N
NO. DESCRIPTION
REVISIONS
BY DATE
DATE: SCALE: OF
DRAWING NO.
CONTRACT NO.
SHEET NO.
p w
M T
A G
B P
W A P
P :M
T A
P W
D a t a
D o c u m e n t s r r e o je c t
A P
S
S c il it ie s r m f o a t io n
E n g in e e r in g
C a d d a r v e y
P e e t s p
C V
O p t io n
.d g n the State of Maryland engineer under the laws of am a duly licensed professional approved by me, and that I documents were prepared or
I hereby certify that these
PRIME AE Group, Inc.
10' 10'0 20'
SCALE: 1"=10'SCALE:
PLAN
1"=10'
SCALE:
REF:
CV-05
SHT-REF
1"=10' SCALE:
REF:
CV-05
SHT-REF
1"=10'
SCALE:
REF:
CV-05
SHT-REF
1"=10' SCALE:
REF:
CV-05
SHT-REF
1"=10'
SCALE:
REF:
CV-05
SHT-REF
1"=10'
COMFORT STATION COORDINATES
NORTHING EASTINGBUILDING CORNER
A B
C D
E
SCALE:
REF:
CV-05
SHT-REF
1"=10'
F
PROPOSED CURB & GUTTER
PROPOSED SIDEWALK
LEGEND
PROPOSED SEWER FORCE MAIN
PROPOSED WATER SERVICE
PROPOSED ELECTRICAL SERVICE
SIDEWALK REMOVAL
LIMIT OF DISTURBANCE
ELEVATION
FFE
ELEVATION
EX. GROUND
82.50
82.50
N/A
82.50
82.50
80.11
80.03
N/A
80.91
80.22
81.74
81.74
81.74
81.74
81.74
1464655.5037
1464653.5269
1464663.9210
1464667.8747
1464657.4805
623527.8320
623519.3082
623516.8976
623533.9452
623536.3558
MID-POINT (1 TO 4)
INSET A UTILITY CUT INSET B UTILITY CUT
INSET C UTILITY CUT INSET D UTILITY CUT
INSET E UTILITY CUT INSET F UTILITY CUT
FOR ALL UTILITY CUTS.
BACKFILL TO BE PLACED AND COMPACTED
NOTE:
FEBRUARY 2023
JED
TLL
JLG
MDL
CV-05
91"=10'
WALL ELEV.
TOP OF RET.
T-1964-0150
WHITE MARSH
COMFORT STATION
MDE NO. 23-SF-0070
2 ADDENDUM 2 7/10/23
PRIME
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
BUS LOADING ONLY
RESERVED PARKING
NO PARKING
NO PARKING
14"
INV
12"
SD
MTA WMPR
10"
8"
JB
E.M. SD
PED XING
SD
TRAV PT JMT3TRAV PT JMT3
8"
SS
L
A O
U
N
T
E
C
PED XING
10"
SD
MULCH
SS
L
A O
U
N
T
E
C
SS
L
A O
U
N
T
E
C
ELEC VEH PARKING
DO NOT ENTER
ELEC VEH CHARGING
ONE WAY
6"
3"
STOP
MTA PARKING
SD
3"
MTA PARKING
EX. SD
EX.
S
IDEWALK
EX. SIDEWALK
E X
C U
R B (T
Y P
S F
M kkk kkk
UG
UG
UG
0+00
1+00
White Marsh Mall Associates &
White Marsh II Associates
COMFORT STATION
PROPOSED 17.5' X 10.67'
EX. TREE STUMPS TO BE REMOVED.
AND SOD.
REPLACE WITH TOPSOIL
REMOVE EX. SIDEWALK.
TIE INTO EX. SIDEWALK
CV-01
CV-01
CURB ELEVATIONS
MEET EX. TOP OF
COMPLIANT SIDEWALK
RECONSTRUCT ADA
80.90
81.20
81.81
81.53
81.69
81.66
81.53
80.41
81.72
81.62
81.58
81.74'
FFE
E
N 623450
N 623450
N 623550
AT NEAREST JOINT
TIE INTO EX. SIDEWALK
PROPOSED RETAINING WALL
N
MERCANTILE ROAD
CORNER 1
CORNER 2
CORNER 4
CORNER 3
CV-02
88 SF 5 INCH CONCRETE SIDEWALK
CV-02
345 SF 5 INCH CONCRETE SIDEWALK
DIRECTIONAL BORE
ELECTRICAL SERVICE
DIRECTIONAL BORE
WATER SERVICE
DIRECTIONAL BORE
SEWER FORCE MAIN
EXISTING ROW LINE
UTILITY CUT
GRINDER PUMP
5 SY TOPSOIL AND SODDING
WATER UTILITY CUT
ELECTRIC UTILITY CUT
CV-01
CV-01
SEE DETAIL
CV-01
PAVEMENT PATCHING
3 SY FULL DEPTH
CV-02
5 10
WHITE MARSH PARK-N-RIDE RIGHT L
E X
C U
R B (T
Y P
AND SODDING
6 SY TOPSOIL
SS
PAVEMENT PATCHING
7 SY FULL DEPTH
CV-02
TRAV PT WTB151
02+00
AND SODDING
8 SY TOPSOIL
10"
3+00
3+06
CURB & GUTTER
COMBINATION
5 LF REPLACE 7 INCH
CV-02
VEHICEL CHARGER
ELEC VEH PARKING
E.M.
12"
BGE #10017A
JB
TEL
16"
BGE #102501
UG
AND SODDING
6 SY TOPSOIL
License No. Expiration Date A P P
R C
H E
C K
D R
A W
N D
E S
G N
NO. DESCRIPTION
REVISIONS
BY DATE
DATE: SCALE: OF
DRAWING NO.
CONTRACT NO.
SHEET NO.
p w
M T
A G
B P
W A P
P :M
T A
P W
D a t a
D o c u m e n t s r r e o je c t
A P
S
S c il it ie s r m f o a t io n
E n g in e e r in g
C a d d a r v e y
P e e t s p
C V .d g n the State of Maryland engineer under the laws of am a duly licensed professional approved by me, and that I documents were prepared or
I hereby certify that these
PRIME AE Group, Inc.
T-1964-0150
WHITE MARSH
COMFORT STATION
MDE NO. 23-SF-0070
06060
TRAV
PT
WTB15
6A
INV
INV
INV
INV
70 70
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
INV
8"
INV
CONC
INV INV
" 10'
W
TRAV
PT
WTB15
TRAV
PT
WTB15
INV
TRAV
PT
JMT1
BUS
LOADIN
G
ONLY
INV
RES
ERVED
PARKIN
G
10" 10' W
INV
SD
TRAV
PT
JMT2
NO
PARKIN
G
NO
PARKIN
G
14"
INV
TRAV
PT
WTB15
TRAV
PT
WTB15
12"
SS
L A
O U
N
T
E
C
SD
MTA
WMPR
10"
8"
JB
E.M
SD
10"
PED
XIN
G
SD
TRAV
PT
JMT3
TRAV
PT
JMT3
8"
SS
L A
O U
N
T
E
C
PED
XIN
G
10"
12"
TRIP
LE
SD
VEHIC
EL C
HARGER
MULCH
10"
DOUBLE
12"
TRIP
LE
SS
L A
O U
N
T
E
C
SS
L A
O U
N
T
E
C
ELEC
VEH P
ARKIN
G
DO
NOT
ENTER
5"
SS
L A
O U
N
T
E
C
ELEC
VEH C
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .