T-1795-0150- ADDENDUM No. 7.pdf

PDF 606 KB Posted

Attached to
WABASH VEHICLE WASH UPGRADE
Solicitation number
BPM040431
Issued by
Maryland

About this file

This document is Addendum No. 7 to the Maryland Transit Administration's (MTA) contract T-1795-0150 for the WABASH VEHICLE WASH UPGRADE project. The addendum provides a new bid submission deadline of 2 PM EST on Thursday, March 28, 2024, through the eMMA portal. It also includes the sign-in sheet for the third site visit and additional questions and answers. All other terms and conditions remain unchanged.

The WABASH VEHICLE WASH UPGRADE contract is for the procurement and installation of a new vehicle wash system, including detergent arches, wash brushes, and spray arches, as well as modifications to the existing building to accommodate the new system. The contractor is responsible for providing the required 115 RE rails as per the specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FROM: Maryland Transit Administration

SUBJECT: Addendum No. 7

T-1795-0150- WABASH VEHICLE WASH UPGRADE

DATE: March 7, 2024

Addendum No. 7 is three (3) pages and includes the following:

ITEM No. 1 --- Provides a new DUE DATE: Bids must be submitted through the eMMA portal and marked "Bid for Contract

No. T-1795-0150 WABASH VEHICLE WASH UPGRADE", no later 2 P.M. EST, Thursday, March 28, 2024.

ITEM No. 2 --- Provides the sign-in sheet for the third site visit.

ITEM No. 3 --- Provides additional “RFI” Questions and Answers.

All other terms and conditions remain unchanged.

Christie E. Williams, CPPB

Chief of Construction, Procurement

Acknowledgement of receipt of Addendum No.7 to T-1795-0150.

Vendor Name: ___________________________________________________________

Authorized Representative’s Signature Date

This is the end of Addendum No. 7

T-1795-0150 WABASH VEHICLE WASH UPGRADE QUESTIONS AND ANSWERS

1. Is the MTA furnishing the 115 RE rails for the project? If so, what lengths and are they drilled?

Answer: Rails are to be provided by contractor as per specification section 34 11 13