Synopsis - PMC.pdf

PDF 132 KB Posted

Attached to
Repair F108 Power Management Control (PMC)
Solicitation number
22915-01-286-5565PN_2915-01-139-6619PN
Issued by

About this file

This document provides a synopsis for a federal contract opportunity to repair F108 Power Management Control (PMC) units. The synopsis outlines a five-year fixed price commercial requirements contract with a base year from January 2024 to January 2025 and four one-year options. Key details include an estimated issue date of November 10, 2023 and close date of December 11, 2023 for RFP number FA8122-23-R-0006. The contractor will be required to deliver six PMC units every 45 days over the five-year ordering period for a total of 300 units. The contracting agency is the Department of the Air Force Materiel Command Air Force Sustainment Center. This is a sole source acquisition for the repair services to BAE Systems Controls Inc. The synopsis also includes an appendix outlining the CLIN structure for the various repair levels.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Synopsis

1. Estimated issue date: 11/10/23, Estimated close date: 12/11/23 5:00pm CST

2. RFP#: FA8122-23-R-0006

3. PR#: FD20302301979-04

4. Nomenclature/Noun: F108 Power Management Control (PMC)

5. NSN: 22915-01-286-5565PN and 2915-01-139-6619PN

6. PN: 7157M61P04/P06 and 7084M61G04/G05/G06

7. Application (Engine or Aircraft): F108 Engine/KC-135

8. AMC/AMSC: R3/C

9. History: Last buy: 12 Apr 2018, FA8122-18-D-0001

10. Description: The PMC is an electronic over-ride on the hydromechanical MEC, which sets fan corrected speed as a function of the power lever angle (PLA). The PMC also provides protection against excessive fan and core speed and reduces transient EGT overshoot.

A Five-Year Fixed Price Commercial Requirements Type contract is contemplated with a Five-Year (60 Month) Ordering Period. Please refer to Appendix I for CLIN breakdown.

Year Estimated Dates Quantity

Year Estimated Dates Best Estimated Quantities

(BEQ)

Base Year Jan 2024 – Jan 2025 60 Option I Jan 2025 – Jan 2026 60 Option II Jan 2026 – Jan 2027 60 Option III Jan 2027 – Jan 2028 60 Option IV Jan 2028 – Jan 2029 60

Total Jan 2024 – Jan 2029 300

Required Delivery: Deliver 6 EA every 45 days. Early delivery is acceptable.

This is a Sole Source acquisition to BAE Systems Controls Inc.

11. Mandatory Language: N/A

12. Export Control: N/A

13. Buyer: Brock May Contracting Officer: Carrie Brown

405-739-5462 312-336-5310 brock.may@us.af.mil carrie.brown.8@us.af.mil mailto:brock.may@us.af.mil

ALL SYNOPSES:

An Ombudsman has been appointed to hear concerns from oerors or potential oerors during the proposal development phase of this acquisition. The purpose of the Ombudsman is not to diminish the authority of the program director or contracting oicer, but to communicate contractor concerns, issues, disagreements, and recommendations to the appropriate government personnel. When requested, the Ombudsman will maintain strict confidentiality as to source of the concern. The Ombudsman does not participate in the evaluation of proposals or in the source selection process.

Interested parties are invited to call the Ombudsman at 405-736- 3273. DO NOT CALL THIS

NUMBER FOR SOLICITATION REQUESTS.

Appendix I

Breakdown of CLIN Structure

CLIN Description 0001 - 4001 Information CLIN

0001AA – 4001AA Level 1 Repair (Teardown and Evaluation and Common

Repairs to include missing mounting hardware, connector panel assembly, replacing the J2, J3, or J5 Connector (new), or one (used) module or connector) 0001AB – 4001AB Level 2 Repair

(New or Used Chassis Replacement or A6 Module Repair or Upgrade)

0001AC – 4001AC Level 3 Repair (Replace one New Non-A2 Module)

0001AD – 4001AD Level 4 Repair (Replace New A2 Module)

0001AE – 4001AE Level 5 Repair (Module Upgrades to include G02-G06 (rewire

A5 &A6 with new FPA and removed NLR), G03-G06 (rework A6 and NLR removed NLR pot) or G04-G06 (removed NLR pot)) 0001AF – 4001AF Level 6 Repair

(Combination of Repairs) 0002 – 4002 Over and Above (O&A) 0003 – 4003 Data

File details come from the government source that posted it. Updated .