About this file

This is a Synopsis for Architect and Engineering (A-E) Services Indefinite Delivery Contracts (IDC) issued by the U.S. Army Corps of Engineers Kansas City District. The solicitation seeks to award one Unrestricted Multiple Award Task Order Contract (MATOC) for civil planning and design services, with a target of seven total contracts, four of which are reserved for small businesses. The contract will have a $95 million total contract capacity, with task order limits of $10,000 minimum and $21 million maximum per order.

The contract will cover a wide range of civil works planning and design services, including flood risk management, water supply, environmental infrastructure, navigation, ecosystem restoration, and support for military installations. Services may include project reports, feasibility studies, engineering design, environmental compliance documents, hydraulic modeling, cultural resources surveys, and various technical analyses. The contract will have a five-year base ordering period with one two-year option period, with anticipated award in June 2026. Interested firms must submit a Standard Form 330 electronically through the PIEE Solicitation Module by 10:00 AM CST on January 15, 2026, following specific submission guidelines.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARCHITECT AND ENGINEERING SERVICES

W912DQ26RA006

Synopsis Architect-Engineering (A-E) Services

Indefinite Delivery Contracts (IDC) For Civil Planning and Design Services

For The Kansas City District

1. CONTRACT INFORMATION: The U.S. Army Corps of Engineers (USACE) Kansas City District (NWK) intends to solicit, negotiate, and award one Unrestricted with Small Business Reserve Multiple Award Task Order Contract (MATOC) in accordance with 40 U.S.C. Chapter 11, Selection of Architects and Engineers (formerly known as the Brooks Architect Engineer Act) as implemented in Federal Acquisition Regulation (FAR) Subpart 36.6 and Defense Federal Acquisition Regulation (DFARS) Subpart 236.6.

Firms will be selected for negotiations based on demonstrated competence and qualifications for the required work. The Architect-Engineer (A-E) contracts are required for Civil planning, design, and support during construction for Kansas City District and throughout the Northwestern Division (NWD) Area of Responsibility (AOR). The contracts will involve the preparation of a wide variety of civil works planning and design documents, environmental documents, studies, and specifications for projects. This contract may also be utilized to support planning and design on military installations, Hazardous, Toxic, and Radioactive Waste (HTRW) projects, and Interagency & International Services (IIS) projects within the NWD boundaries that are not supported by existing contracts. Selection of Indefinite Delivery Contracts (IDC) will be based on design criteria described below. Selection of task orders will be based on appropriate selection criteria consistent with the statute for Selection of Architects and Engineers, FAR Subpart 36.6, and USACE procedures for Selection of Task Orders on A-E IDCs.

This announcement is open to all firms regardless of size. The government has a target to award seven (7) contracts, four (4) of which are intended to be reserved for Small Businesses that will share $95 million in total contract capacity. The government reserves the right to increase or decrease the number of contract awards.

The task order ordering limitation will be $10,000 minimum and $21 million maximum or up to the un-obligated value of the contract, whichever is less. The guaranteed minimum within this MATOC pool is $2,500 for each resulting contract. Work will be issued by negotiated firm-fixed-price (FFP) task orders. Firm(s) that are selected for negotiation of a contract may be required to submit additional information at a later time for use in the evaluation of qualifications for specific selection of task orders. The period of performance for task orders awarded under this MATOC will be determined based upon the work requirements included in the task order solicitations and negotiated task order award documents. All prime and associated subcontractor / teaming partners may be required to comply with requirements outlined in DoD Cybersecurity Maturity Model Certification (CMMC) Program memorandum dated 15 January 2025, which is available at https://dodprocurementtoolbox.com/site-pages/cybersecurity-other-resources (“Implementing the Cybersecurity Maturity Model Certification (CMMC) Program”). Each task order will identify the compliance assessment level required for the contract; the https://dodprocurementtoolbox.com/site-pages/cybersecurity-other-resources base contract requirement does not require CMMC compliance.

The MATOC will have a five (5) year base ordering period, with one two (2) year option period. Award of the MATOC is anticipated in June 2026.

The North American Industrial Classification System (NAICS) codes for this procurement is 541330 (Engineering Services), which has a small business size standard of $25,500,000 (CFR Title 13, Chapter 1, Part 121.201) in average annual receipts.

Large businesses selected must comply with FAR 52.219-9 regarding the requirement for a small business subcontracting plan on the part of the work it intends to subcontract. The plan is not required with this submittal but will be required with the price proposal of the firm selected for negotiations. The subcontracting goals for the Kansas City District which will be considered in negotiation of this contract are:

(1) at least 35% of a contractor's intended subcontract amount be placed with small businesses (SB) (which includes all categories of small businesses);

(2) at least 15% of a contractor's intended subcontract amount be placed with small disadvantaged businesses (SDB);

(3) at least 6% of a contractor's intended subcontract amount be placed with women-owned small businesses (WOSB);

(4) at least 3% of a contractor’s intended subcontract amount be placed with HUBZone small businesses;

(5) at least 3% of a contractor’s intended subcontract amount be placed with veteran-owned small businesses (VOSB); and

(6) at least 3% of a contractor’s intended subcontract amount be placed with service-disabled veteran-owned small businesses (SDVOSB).

The wages and benefits of service employees (see FAR 22.10) performing under these contracts must be at least equal to those determined by the Department of Labor under the Service Contract Act. Service wage rates will be determined relative to the employee’s office location rather than the location of work.

Firms must have a Unique Entity Identification (UEI) number and be registered in the U.S. Government’s official website System for Award Management (SAM.gov). If you were not previously registered, please go to https://www.sam.gov. Instructions for new registration are also located at the following link: https://sam.gov/content/entity-registration. Offerors may obtain information on registration and annual confirmation requirements at https://www.sam.gov/help.

Additionally, in accordance with FAR Part 22.1303, all firms meeting the criteria for filling a VETS-4212 report must complete their VETS-4212 report. Information can be found at the Department of Labor website https://www.dol.gov/agencies/vets/programs/vets4212 or call the service center at 1-866-237-0275 or the VETS Service Desk via email at vets4212-customersupport@dolncc.dol.gov; you will be asked to provide your company name, employer identification number (EIN), and UEI number.

http://www.sam.gov/ https://sam.gov/content/entity-registration https://sam.gov/content/entity-registration https://www.sam.gov/help https://www.dol.gov/agencies/vets/programs/vets4212

2. PROJECT INFORMATION: The required A-E services will relate to design and construction for flood risk management (FRM), water supply, environmental infrastructure, navigation, recreation, and ecosystem-restoration projects. Services may include, but are not limited, to the preparation of civil works project reports, Feasibility Study and Post Authorization Change Requests (PACR), engineering, design of plans and specifications for construction, surveying, engineering during construction, environmental compliance documents, quality control (including independent external and agency technical reviews), risk assessments, cost engineering and other engineering in support of horizontal civil projects.

Projects will include design documents for an array of purposes, including flood risk management/damage reduction, pump stations, operations projects, dams, levees, relief wells or other under-seepage controls, channel modifications, grade control structures, roadways/traffic, stormwater/sewer infrastructure, wetlands and riparian restorations, habitat river/stream bank stabilizations, river/stream hydraulics, and river/stream/reservoir aquatic restorations, and support of other USACE civil design projects.

Mission requirements could include ancillary structures, culverts, railroad track and appurtenance design, roadways, lighting, traffic control, construction phase services, geotechnical analysis, stability analyses, under-seepage calculations, structural analysis, hydrologic and hydraulic modeling, economic analysis, and other ancillary items to support the mission.

Projects may require water and water related computational analyses, studies or projects for reservoir operations, river/channel/stream (1D, 2D, or 3D) hydraulics, including steady and unsteady state conditions, sediment transport, and pipe flow.

Hydrologic, hydraulic, and consequences modeling conducted using USACE (e.g. HEC- RAS, HEC-HMS, HEC-SSP, HEC-ResSIM, HEC-Metvue, RMC-Bestfit, RMC-RFA, LIFESIM, HEC-FDA, HEC-FIA, SMS codes such as AdH) or potentially other industry software allowed by USACE Communities of Practice.

Projects for water supply planning or design documentation, water treatment and distribution, water reliability analysis/studies/projects, and water related computations;

and reservoir sedimentation analyses using software listed above.

Services may include consulting, analyses, and design services including expert elicitation for risk methodology; risk analyses and screenings; issue evaluation studies;

reservoir water control manual updates; base condition risk assessments; dam/levee safety modification studies; construction sequencing/scheduling, techniques, activities, evaluations and methodologies; periodic inspections and/or assessments; determination of total and incremental risk reduction benefits that can be realized from corrective actions; and other studies and evaluations under the dam safety, levee safety and flood risk management programs, including implementation of FRM natural and nature-based features.

The projects may include all necessary environmental compliance (i.e. National Environmental Policy Act (NEPA), Clean Water Act Endangered Species Act, Fish and Wildlife Coordination Act, Clean Air Act, Bald and Golden Eagle Protection Act, National Historic Preservation Act, and related laws), cultural resources, geographic information systems (GIS), socioeconomic analyses, value engineering, and engineering and design disciplines required for the various project purposes.

Services may include environmental analysis across a broad range of tasks that would include environmental law compliance. Competence with quantitative ecological modeling for purposes of determining compensatory mitigation needs and/or ecological function improvement of a proposed project alternative. Vegetation and wildlife surveys, reporting, and data analysis efforts, including for migratory birds, raptors, bird nests, bats, bat habitat suitability, and surveys for other ESA listed species. Development of monitoring and adaptive management plans for environmental and/or mitigation features, including development of appropriate monitoring metrics, success criteria, monitoring protocols, data collection sheets, and annual report templates.

Services may include a suite of Cultural Resources activities including but not limited to the following. Background and literature search of available Cultural Resources information documented in a report, production of histories and/or historic contexts, archaeological identification survey involving pedestrian inventory, and limited subsurface testing (as appropriate), historic architecture inventory, formal Testing and Evaluation for National Register of Historic Places (NRHP) eligibility, and archaeological excavation for mitigation of adverse effects.

Services required shall be multidisciplinary in nature (i.e., Archaeologist, Architectural, Biologist, Computer-Aided Design and Drafting (CADD) Technician, Civil Engineer, Construction Phase Services, Cost Engineer, Cultural Resource Specialist, Economic Analysis, Electrical Engineer, Environmental Engineer, Geotechnical Engineer, Geologist, GIS, Hydraulic Engineer, Hydrologic Engineer, Interior Design, Landscape Architect, Mechanical Engineer, Physical Security Specialist, Plumbing, Programmer, Project Manager, Public Involvement/Relations, Quality Assurance, Quality Control, Registered Fire Protection Engineer, Structural Engineer, Surveying, Technical Writing (Specifications and Technical Documents), Water Resource Planner, and Social Scientist). In some cases, projects may require independent expert reviews, Computer- Aided Design and Drafting (CADD), Building Information Modeling (BIM), GIS deliverables, and Phase 1 HTRW evaluations.

Project-specific requirements will be described in each individual task order’s Statement of Work. Multiple task orders may be awarded with similar completion schedules and overlapping delivery dates.

3. SELECTION CRITERIA: The selection criteria are listed below in descending order of importance. Sub-factors within each criterion are equally important unless stated otherwise. Criteria a through e are primary and will be evaluated for all offerors.

Criteria f, g and h are secondary and will only be used as tie-breakers among firms that are essentially technically equal.

a. Specialized experience and technical competence in:

1) Designs and studies of flood risk management (FRM) /damage reduction projects, such as pump stations, operations projects, grade control structures, dams, levees, relief wells or other under-seepage controls, channel modifications, reservoir operations, floodwalls, and railroad closure structures.

2) Designs and studies to support of routine and non-routine operations, such as hydraulic steel structures/gates, hydraulic systems, water control facilities, roadways/lighting/traffic control, campsites, small ancillary structures, bridges, stormwater/sewer infrastructure (culverts), railroad requirement considerations, and levee screenings/inspections.

3) Designs and studies in support of water-resources and water supply related projects to include navigation, recreation, planning level documents for feasibility and/or re-evaluation reports, water supply, water treatment and distribution, separation of combined sanitary and stormwater systems, water reliability, and water related computation analysis, studies or projects.

4) Planning of USACE Civil Works water-resources related projects to include planning level documents and feasibility or re-evaluation reports.

5) Ecosystem restoration designs and studies for environmental infrastructure, wetlands and riparian restorations, habitat, river/stream bank stabilizations, river/stream hydraulics, and river/stream/reservoir aquatic restorations.

6) Quality management procedures. A firm should describe their Quality Management Procedures and or system(s) to ensure quality of products are produced by the firm and/or their subcontractor(s). Firms demonstrating a third-party certified (e.g. ISO 9001 or similar) quality management system will be given greater consideration. A detailed quality control plan is not required with this submission but will be required subsequent to award of the contract.

For factors a.1 through a.5, the basis of evaluation will be the project descriptions in Section F of the SF 330. The evaluation will consider characteristics such as:

breadth, depth, and complexity of experience; application of engineering principles, means of analysis, guidance, policies and criteria; application of risk and uncertainty methods; incorporation of innovative solutions; and use of software modeling tools.

For factor a.6, the basis of the evaluation will be the description of the firm’s quality management procedures in Section H of the SF 330. Sub-criteria are all equal in importance with exception for a.6 is less important than a.1 - a.5.

b. Professional Qualifications

Responding firms should demonstrate the professional qualifications for these key disciplines (provide resumes in this order):

(1) civil engineer

(2) structural engineer

(3) geotechnical engineer

(4) geologist

(5) planner

(6) biologist

(7) hydraulic engineer

(8) hydrologic engineer

(9) economist

(10) cost engineer

Additional disciplines required as part of the contract that will not be evaluated include: project manager, land surveyor, landscape architect, architect, architectural historian, mechanical engineer (HVAC), electrical engineer, social scientist, archeologist, cultural resource specialist, historian, GIS Specialist, engineering technician, clerical, environmental engineer, public involvement/relations, physical security specialist, fire protection engineer, and water resource engineer.

Additional disciplines may be required under this contract, including but not limited to administrative, aerial photographer, drill crew, CADD technician, surveyor, and technical writing (Specifications and Technical Documents). Resumes nor additional qualification are not required for these disciplines and will not be evaluated.

The basis of evaluation will be information provided in section E of the SF 330. The SF 330 shall include a matrix in Section G showing experience of the proposed disciplines on the projects listed in Section F of the SF 330. The education, professional registration, certifications, overall and longevity with the firm, and relevant experience will be considered. All disciplines are equal in importance. This criterion is primarily concerned with the qualifications of the key personnel and not the number of personnel. The number of personnel is addressed under the capacity criterion below. The personnel for each discipline should be clearly identified in section E. Only one resume (the lead for that discipline) will be evaluated for each key discipline.

c. Past Performance

Recent and relevant past performance on Department of Defense (DoD) and other contracts with respect to cost control, quality of work, and compliance with performance schedules will be considered. The Contract Performance Assessment Reports System (CPARS) is the primary source of information on past performance.

CPARS will be queried for all firms submitting a SF330. If deemed appropriate by the evaluation board, performance evaluations for any significant teaming partners/subcontractors who have previously been prime A-E contractors may also be considered. Significant teaming partners/subcontractors are those firms whose qualifications are being used in Section F projects. In addition to CPARS, the board may seek information on past performance from other sources. If no recent or relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will receive a neutral evaluation. A neutral rating is considered neither a positive nor negative.

d. Knowledge of local conditions:

1) Within Iowa, Kansas, Missouri, and Nebraska

2) Within NWD Boundary not including Iowa, Kansas, Missouri, and Nebraska

(Colorado, Idaho, Minnesota, Montana, North Dakota, Oregon, South Dakota, Washington, Wisconsin, Wyoming)

For this criteria, d.1 is significantly more important than d.2. The evaluation for sub-criteria d.1 and d.2 will consider:

a) River, stream, soil and climatic conditions (key disciplines: hydrologic engineer, hydraulic engineer, and biologist)

b) Local construction methods (key disciplines: structural engineer, geotechnical engineer, civil engineer)

c) Local construction climate impact on cost estimating (key discipline: cost estimator).

The basis of the evaluation will be from the personal experience of all proposed personnel in the listed key disciplines located in Section E of the SF 330. One rating will be determined for each of the three local conditions.

e. Capacity to initiate work and complete within the time parameters of the project.

The evaluation will consider the availability of an adequate number of personnel among the proposed team in the following key disciplines: hydraulic engineer, hydrologic engineer, geotechnical engineer, civil engineer, and structural engineer .

Include a Part II form for each firm that is part of the proposed team.

SECONDARY SELECTION CRITERIA. The following secondary criteria will only be used as a tie-breaker among firms that are essentially technically equal. The secondary criteria will not be co-mingled with the primary criteria in the evaluation. The following secondary selection criteria are listed in descending order of importance.

f. Small Business Participation (not applicable to small businesses).

Extent of participation of small businesses (SB), small disadvantaged businesses

(SDB), women-owned small businesses (WOSB), HUBZone small businesses, Veteran Owned small businesses, Service Disabled Veteran Owned Small Businesses, historically black colleges and universities (HBCU), and minority institutions (MI) will be measured as a percentage of the total anticipated contract effort. The greater the participation, the greater the consideration. Large businesses will be expected to place subcontracts to the maximum practical extent with Small and Small Disadvantaged firms in accordance with Public Law 95-507. The basis of the evaluation will be information submitted in Section H of the SF 330. This criterion is not applicable to small businesses.

g. Geographic Proximity.

Responding firms should identify any offices operated in close proximity to the Kansas City District and the contribution these office(s) will make in support of the project. The basis of the evaluation will be information submitted in Section H of the

SF 330.

h. Volume of DoD AE contract awards in the last 12 months.

Responding firms should cite all contract numbers, task orders and modifications, award dates and total negotiated fees for any DoD AE contract awarded within the past twelve (12) months. This information will assist in effecting an equitable distribution of DoD AE contracts among qualified firms. The basis of the evaluation will be information submitted in Section H of the SF 330.

4. SUBMITTAL REQUIREMENTS: Interested firms having the capabilities to perform this work must submit one Standard Form (SF) 330 electronic copy using the instructions for the Procurement Integrated Enterprise Environment (PIEE) below no later than 10:00 AM CST on January 15, 2026. Provide individual SF 330, Part II, for the prime firm and all consultants in the SF 330. Only one SF 330 Part I for the team as a whole shall be included. Include the firm's Unique Entity ID (UEI) numbers in SF 330, Part I, Section B, Block 5.

A maximum of fifteen (15) projects for the proposed team (including joint ventures and teaming partners) may be provided in section F. A “project” is defined as work performed at one site or a single installation. An Indefinite Delivery Contract (IDC) will not be considered a “project” for the purposes of evaluation. If the offeror provides a specific task order as a project, it should provide the base contract number and the task order number for reference purposes. If the offeror provides a site-specific contract as a project, it should provide the contract number for reference purposes. Project descriptions shall clearly describe the extent of work completed, the extent of work performed by the team (i.e. disciplines and scope), extent of design completed by the proposed team (i.e. preparation of design-build package; 100% design; report, etc.), and dates of completion for design and construction. Clearly cite whether the experience is that of the prime (or joint venture), consultant or an individual for each project and the percentage of work performed in Section F. Work cited that is experience of the prime (or joint venture) from an office other than that identified in Section C should be so labeled. Projects (or phases of projects) with design or planning district final report completed before December 2015 will not be considered. Projects (or phases of projects) for which design or planning district final report is not complete will not be considered.

Section E resumes shall provide recent (completed after December 2015) and relevant services in the key discipline role identified for this contract. Resumes are limited to 2-pages.

Interviews will be held with the most highly qualified firms. Interviews will be conducted telephonically after determination of the most highly qualified firms.

Interested firms are reminded, per FAR 36.606, that subcontractors, outside associates, and consultants whose qualifications are utilized for selection and negotiated for award may not be changed without obtaining the Contracting Officer’s written consent before making any substitutions.

The SF 330 should have a total page limitation of 150 printed pages with Section H limited to twenty (20) pages. Each project in Section F is limited to two (2) pages; Part II is excluded from the 150 printed page limit. All pages shall be 8.5 inches x11 inches except graphic sheets, like organization charts, which can be 11 inches X 17 inches will be counted as a single page. Do not have multiple pages on 11” x 17” sheets (2 opposing pages). Tabs do not count against the page count limit, but information contained on divider tabs will not be evaluated. For all SF 330 sections, use no smaller than 11 point font. This is not a request for proposal. Submit electronic responses utilizing the instructions in section 7 below.

5. ADDITIONAL INFORMATION: During Request for Price Proposal (RFPP) or following contract award, additional qualifications may be requested to be added to Section H, as a full complete SF 330 for contract file. The additional qualification shall be limited to a total of 10-pages. The additional qualifications will not be evaluated during selection but will be utilized for future task order selections and minimize the need for requesting supplemental information.

Firms may demonstrate additional project experience similar to the requirements listed in section 2 and meet the “project” requirements indicated in section 4 by providing project summary list or matrix. Additional project experience is limited to 4-pages and no more than 50 additional projects may be presented. Projects should include, at a minimum, the title, contract number, and brief scope description.

Firms may demonstrate additional professionals as indicated in section 3.B by providing professional summaries including qualifications (education, professional registration, certifications) and experience (overall and relevant experience, longevity with the firm).

Additional professionals are limited to 6-pages.

6. QUESTIONS.

Technical inquiries and questions relating to this synopsis shall be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org). To submit and review inquiry items, prospective offerors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective offeror once the reply is available for viewing.

***Please Note: Firms shall only submit one question per inquiry. All inquiries containing multiple questions shall be rejected.

Project Title: W912DQ26RA006 Civil Planning and Design Services The Bidder Inquiry Key is: 4SHAFG-WK23XF

The Bidder Inquiry System will be unavailable for new inquiries ten calendar days before the due date of SF 330s in order to ensure adequate time is allotted to form an appropriate response to inquiries and amend the synopsis if necessary.

Offerors are requested to review the synopsis in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@projnet.info.

Instructions for first-time ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. Select agency USACE

3. Enter the Bidder Inquiry Key listed above.

4. Enter the email address you would like to use for communication.

5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret

Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Instructions for future ProjNet Bidder Inquiry Access:

1. For future access to ProjNet, you will not be provided any type of password. You mailto:%20staff@projnet.info.

will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. Select agency USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Click Continue. A page will then open asking you to enter the answer to your

Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

7. INSTRUCTIONS FOR SUBMITTING ELECTRONIC SF 330s:

All firms are required to submit their SF 330s with the minimum content as specified above. SF 330s without the minimum content may be rejected. SF 330s will be received until the date and time indicated above.

ELECTRONIC SF 330 SUBMISSION IS REQUIRED THROUGH PIEE Solicitation Module at https://piee.eb.mil/.

Training and instructions are accessible through PIEE – Web Based Training (WBT) at https://pieetraining.eb.mil/wbt/ (For instructions specific to posting an offer, select ‘Solicitation Module’ -- ‘Proposals (Offers)’ – ‘Posting Offer’)

For Frequently Asked Questions (FAQs) and additional training, go to the DoD Procurement Toolbox – eBusiness -- Solicitation Module at https://dodprocurementtoolbox.com/site-pages/solicitation-module

Although you can search, review, and open non-restricted solicitations without logging in, you must establish a personal account in the system and register for the Proposal Manager role before you are able to submit your firm’s SF 330. This account is activated by your Contractor Administrator (CAM).

Instructions for registering are as follows:

1. Navigate to https://piee.eb.mil/

2. Select New User [top right]

3. Select Register

4. Select Vendor

5. Create a User ID and Password and follow the prompts [next]

6. Create Security Questions [next]

7. Complete your User Profile Information [next]

8. Complete your Supervisor or Approving Official Information. This official will act as the CAM who will ultimately approve your account. [next]

9. Complete Roles - Step 1. Select SOL-Solicitation, Step 2. Select Proposal https://piee.eb.mil/ https://pieetraining.eb.mil/wbt/ https://dodprocurementtoolbox.com/site-pages/solicitation-module https://piee.eb.mil/

Manager, Step 3. Click Add Roles, Step 4. Fill in your Location Code (CAGE code) [next]

10. Provide a justification for your registration [next]

VERIFY ACCOUNT STATUS/CAPABILITIES.

Once the Proposal Manager account has been approved, verify that your account is showing active under the profile page. Also, once you click on the specified solicitation, verify that the “Offer” tab is visible next to the “Solicitation” tab at the top of the page. The SF 330 will be submitted through the “Offer” tab. It is imperative that this is verified early in the process in order to mitigate any potential problems with the submission of your proposal.

For questions concerning your account, please contact the WAWF Helpdesk at 866- 618-5988. If you are still experiencing problems after the above referenced efforts have been made, please contact the Contract Specialist / Contracting Officer immediately. In the unlikely event the PIEE system and/or Solicitation Module is not operational, and the offeror is unable to access or use the system, the Offeror shall immediately notify the Contracting Officer, Laura Hedrick, Laura.I.Hedrick@usace.army.mil and Contracting Specialist, Erick Ottoson, Erick.S.Ottoson@usace.army.mil. Notification must occur prior to the submission deadline and shall be in writing through authorized email identified in the solicitation. If an alternate method for offer submission is authorized via email due to system outages, the Offeror must obtain prior approval from the Contracting Officer to use the alternate submission method.

Ensure all documentation submitted meets supported file extensions identified in PIEE FAQs. Narrative portions of the offer shall be in Adobe Acrobat Portable Document Format (PDF) searchable text format. Embedded sound or video (e.g., MPEG) files are not authorized and shall not be included.

Primary Point of Contact:

Erick Ottoson Contract Specialist Erick.S.Ottoson@usace.army.mil mailto:Laura.I.Hedrick@usace.army.mil file://coe-nwknv002kan.nwk.ds.usace.army.mil/InternalProjects/AE%20Management/Selections/2026-06-01%20Civil%20Design%20UR-SB%20MATOCs/01%20Approvals/Synopsis,%20Board%20Appointment,%20Selection%20Plan/Source%20Documents/Erick.S.Ottoson@usace.army.mil mailto:Erick.S.Ottoson@usace.army.mil