Synopsis.pdf

PDF 26 KB Posted

Attached to
Remanufacture F108 Turbine Clearance Control Valve
Solicitation number
FA8122-20-R-0006
Issued by

View the file

Other files

File Type Posted
2775642_RQR.pdf PDF
2778944_CDRL1_REPORT.pdf PDF
2767169_DID.pdf PDF
2767175_DID.pdf PDF
Copy of F108 TCCV Pricing Matrix (Protected).xlsx XLSX spreadsheet
2767170_DID.pdf PDF
GFP.pdf PDF
2780852_TRNSPDATA_REPORT.pdf PDF
2767173_DID.pdf PDF
2778938_DID.pdf PDF
2769515_PKGRQMT_REPORT.pdf PDF
FA812220R0006.pdf PDF
SOW.pdf PDF
2767178_DID.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The United States Air Force through the Air Force Sustainment Center (AFSC) at the Oklahoma City Logistics Center (OC-ALC) is contemplating procuring remanufacture services of F108 Turbine Clearance Control (TCC) Valve. The Line Item cited below is for a commercial, Firm Fixed Price (FFP), One Year Basic Contract with four, 1-year option consideration. This requirement is anticipated to be competitive.

Synopsis

1. Estimated issue date is 13 March 2020 Estimated Close date 30 April 2020 3pm CST

2. RFP# - FA8122-20-R-0006

3. PR# - FD2030-19-01187

4. Nomenclature/Noun – F108 Turbine Clearance Control (TCC) Valve

5. NSN – Please Refer to Appendix I

6. PN – Please Refer to Appendix I

7. Application (Engine or Aircraft) – F108 Engine

8. RMC– R1C

9. History – Last buy 04 JUN 2015, FA8122-15-D-0007

10. Description: Controls the turbine blade-to-shroud clearance during steady-state conditions. It ports either hot (9th stage), cooler (5th) stage, or warm mixed (5th and 9th stages) air to the turbine shroud support rings. The TCCV is stainless steel weighing 7 pounds and is 6 inches long, 7.5 inches high, with a width of 3 inches.

Five Year Fixed Price Commercial Requirements Type Contract is contemplated. A one-year basic, with four one-year options. Please refer to Appendix I for CLIN, NSN breakdown and Required Delivery.

This acquisition will be competed as Full and Open Competition.

Current Approved Sources:

Triumph Accessory Services Cage Code: 5KM29 GE Engine Services Cage Code: 062W2

11. Mandatory Language: N/A

12. Export Control: No

13. Buyer: Amy Younger Contracting Officer: Steve Kimbrell

405-734-4634 405-734-8035 amy.younger@us.af.mil steven.kimbrell.1@us.af.mil

14. IUID Note to Contractor: If unit price exceeds $5,000.00 then UID requirements will apply.

mailto:steven.kimbrell.1@us.af.mil

15. Place of Contract Performance: Contractor’s facility

ALL SYNOPSES:

An Ombudsman has been appointed to hear concerns from offerors or potential offerors during the proposal development phase of this acquisition. The purpose of the Ombudsman is not to diminish the authority of the program director or contracting officer, but to communicate contractor concerns, issues, disagreements, and recommendations to the appropriate government personnel. When requested, the Ombudsman will maintain strict confidentiality as to source of the concern. The Ombudsman does not participate in the evaluation of proposals or in the source selection process. Interested parties are invited to call the Ombudsman at 405-736-3273. DO NOT CALL THIS NUMBER FOR SOLICITATION

REQUESTS.

Appendix I

PR Line Item 0001 – Remanufacture of F108 Turbine Clearance Control (TCC) Valve

NSN: 4810-01-460-3279PR

P/N: 7061M31G05

Noun: F108 Turbine Clearance Control (TCC) Valve

Year BEQ Estimated Dates

Basic 130 04 Jun 20 – 03 Jun 21

Option I 130 04 Jun 21 – 03 Jun 22

Option II 131 04 Jun 22 – 03 Jun 23

Option III 133 04 Jun 23 – 03 Jun 24

Option IV 136 04 Jun 24 – 03 Jun 25

Total Contract 660 04 Jun 20 – 03 Jun 25

Required Delivery – 15 each every 30 calendar days ARO. Early delivery is acceptable.

PR Line Item 0002 – Test Inspection Report

NSN: 4810-01-DTH-19-0169PN

Noun: F108 Turbine Clearance Control (TCC) Valve

Year BEQ Estimated Dates

Basic 2 04 Jun 20 – 03 Jun 21

Option I 2 04 Jun 21 – 03 Jun 22

Option II 2 04 Jun 22 – 03 Jun 23

Option III 2 04 Jun 23 – 03 Jun 24

Option IV 2 04 Jun 24 – 03 Jun 25

Total Contract 10 04 Jun 20 – 03 Jun 25

Required Delivery – 1 each every 30 calendar days ARO. Early delivery is acceptable.

PR Line Item 0003 is Data Requirements which is not separately priced.