Synopsis.pdf
PDF 26 KB Posted
- Solicitation number
- FA8122-20-R-0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2775642_RQR.pdf | ||
| 2778944_CDRL1_REPORT.pdf | ||
| 2767169_DID.pdf | ||
| 2767175_DID.pdf | ||
| Copy of F108 TCCV Pricing Matrix (Protected).xlsx | XLSX spreadsheet | |
| 2767170_DID.pdf | ||
| GFP.pdf | ||
| 2780852_TRNSPDATA_REPORT.pdf | ||
| 2767173_DID.pdf | ||
| 2778938_DID.pdf | ||
| 2769515_PKGRQMT_REPORT.pdf | ||
| FA812220R0006.pdf | ||
| SOW.pdf | ||
| 2767178_DID.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The United States Air Force through the Air Force Sustainment Center (AFSC) at the Oklahoma City Logistics Center (OC-ALC) is contemplating procuring remanufacture services of F108 Turbine Clearance Control (TCC) Valve. The Line Item cited below is for a commercial, Firm Fixed Price (FFP), One Year Basic Contract with four, 1-year option consideration. This requirement is anticipated to be competitive.
Synopsis
1. Estimated issue date is 13 March 2020 Estimated Close date 30 April 2020 3pm CST
2. RFP# - FA8122-20-R-0006
3. PR# - FD2030-19-01187
4. Nomenclature/Noun – F108 Turbine Clearance Control (TCC) Valve
5. NSN – Please Refer to Appendix I
6. PN – Please Refer to Appendix I
7. Application (Engine or Aircraft) – F108 Engine
8. RMC– R1C
9. History – Last buy 04 JUN 2015, FA8122-15-D-0007
10. Description: Controls the turbine blade-to-shroud clearance during steady-state conditions. It ports either hot (9th stage), cooler (5th) stage, or warm mixed (5th and 9th stages) air to the turbine shroud support rings. The TCCV is stainless steel weighing 7 pounds and is 6 inches long, 7.5 inches high, with a width of 3 inches.
Five Year Fixed Price Commercial Requirements Type Contract is contemplated. A one-year basic, with four one-year options. Please refer to Appendix I for CLIN, NSN breakdown and Required Delivery.
This acquisition will be competed as Full and Open Competition.
Current Approved Sources:
Triumph Accessory Services Cage Code: 5KM29 GE Engine Services Cage Code: 062W2
11. Mandatory Language: N/A
12. Export Control: No
13. Buyer: Amy Younger Contracting Officer: Steve Kimbrell
405-734-4634 405-734-8035 amy.younger@us.af.mil steven.kimbrell.1@us.af.mil
14. IUID Note to Contractor: If unit price exceeds $5,000.00 then UID requirements will apply.
mailto:steven.kimbrell.1@us.af.mil
15. Place of Contract Performance: Contractor’s facility
ALL SYNOPSES:
An Ombudsman has been appointed to hear concerns from offerors or potential offerors during the proposal development phase of this acquisition. The purpose of the Ombudsman is not to diminish the authority of the program director or contracting officer, but to communicate contractor concerns, issues, disagreements, and recommendations to the appropriate government personnel. When requested, the Ombudsman will maintain strict confidentiality as to source of the concern. The Ombudsman does not participate in the evaluation of proposals or in the source selection process. Interested parties are invited to call the Ombudsman at 405-736-3273. DO NOT CALL THIS NUMBER FOR SOLICITATION
REQUESTS.
Appendix I
PR Line Item 0001 – Remanufacture of F108 Turbine Clearance Control (TCC) Valve
NSN: 4810-01-460-3279PR
P/N: 7061M31G05
Noun: F108 Turbine Clearance Control (TCC) Valve
Year BEQ Estimated Dates
Basic 130 04 Jun 20 – 03 Jun 21
Option I 130 04 Jun 21 – 03 Jun 22
Option II 131 04 Jun 22 – 03 Jun 23
Option III 133 04 Jun 23 – 03 Jun 24
Option IV 136 04 Jun 24 – 03 Jun 25
Total Contract 660 04 Jun 20 – 03 Jun 25
Required Delivery – 15 each every 30 calendar days ARO. Early delivery is acceptable.
PR Line Item 0002 – Test Inspection Report
NSN: 4810-01-DTH-19-0169PN
Noun: F108 Turbine Clearance Control (TCC) Valve
Year BEQ Estimated Dates
Basic 2 04 Jun 20 – 03 Jun 21
Option I 2 04 Jun 21 – 03 Jun 22
Option II 2 04 Jun 22 – 03 Jun 23
Option III 2 04 Jun 23 – 03 Jun 24
Option IV 2 04 Jun 24 – 03 Jun 25
Total Contract 10 04 Jun 20 – 03 Jun 25
Required Delivery – 1 each every 30 calendar days ARO. Early delivery is acceptable.
PR Line Item 0003 is Data Requirements which is not separately priced.
File details come from the government source that posted it. Updated .