Synopsis A25-035 JLG Boom Lift Engine Replacement.pdf

PDF 66 KB Posted

Attached to
A25-035 JLG Boom Lift Engine Replacement
Solicitation number
FA812525Q0028
Issued by

About this file

This is a synopsis/pre-solicitation notice from the Department of the Air Force Materiel Command Air Force Sustainment Center (76 AMXG) for the replacement of an engine in a JLG 450AJ Series II Boom Lift.

The contractor must provide and install one new or remanufactured engine to replace the existing Deutz D2011L03 engine (Serial #10740091) in boom lift serial #0300139059. The work includes removing the old engine, installing the new/remanufactured engine at the contractor's facility, providing shipping of the boom lift from Tinker to contractor's facility and back, and providing core charge pricing with shipping of the bad core back to the Government. The contractor must provide performance verification and meet all outlined requirements. If the Government's core is deemed unusable, the Government will exercise the option to provide the Core Charge to the contractor.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT: Item Description, A25-035 JLG Boom Lift Engine Replacement 1.The 76 AMXG is requesting utilization of funds for a Boom Lift Engine Replacement.

2.The requested equipment item descriptions/specifications are outlined below.

•Contractor shall provide QTY 1, new or remanufactured engine for JLG 450AJSeries II Boom Lift

•Contractor shall remove the old engine Model - Deutz D2011L03 Serial #10740091 at contractor’s facility.

•Contractor shall install a new/remanufactured engine in the JLG 450AJ Series IIBoom Lift serial # 0300139059 at contractor’s facility.

•Contractor shall provide shipping for the boom lift from Tinker to contractor’s facility and back.

•Contractor shall provide Core charge pricing to include shipping of bad core back to the Government at time of quote and should the Government Core be deemed unusable then the Government will exercise the option to provide the Core Charge to the contractor.

•Contractor shall provide performance verification

•Contractor must meet all requirements outlined in accordance with (IAW) this