- Fort Campbell Construction Multiple Award Task Order Contract (MATOC) Pre-Solicitation Synopsis Federal contract opportunity
- Solicitation number
- W9124823R0001
About this file
This document provides a pre-solicitation synopsis for a multiple award task order contract to provide construction services at Fort Campbell, Kentucky. The Mission and Installation Contracting Command of the Department of the Army will award indefinite delivery/indefinite quantity contracts with a total ceiling value of $275 million to provide maintenance, repair, and minor construction across Fort Campbell for a five-year ordering period starting in August 2023. Services will include trades such as carpentry, roofing, electrical work, and general construction. Responses are due by the date specified in the forthcoming solicitation. This acquisition is reserved exclusively for HUBZone small businesses with a size standard of $45 million in average annual revenue.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Synopsis
W91248-23-R-0001 Fort Campbell Construction MATOC Base Contract
1) Action Code: N/A
2) Date: 1/11/2023
3) Year: 2023
4) Contracting Office Zip Code: 42223
5) Product or Service Code: Z2JZ: Repair or Alteration of Miscellaneous Buildings
6) Contracting Office Address: MICC Fort Campbell, Bldg 6923 38th and Desert Storm
Avenue, Fort Campbell, KY 42223
7) Proposed Solicitation Number: W91248-23-R-0001
8) Closing Response Date: TBD
9) Contracting Officer: Eric C. Boston 10)Solicitation Number: W91248-23-R-0001 11)Contract Award Dollar Amount: $275,000,000.00 (Ceiling)
12) Line item Number: Contract Line Item Numbers (CLINs) shall be 0001.
13)Contract Award Date: TBD.
14)Contractor: TBD.
15)Description: Mission and Installation Contracting Command (MICC) – Fort Campbell has a requirement from the Fort Campbell Directorate of Public Works (DPW) to procure a broad range of maintenance, repair, and minor construction projects at Fort Campbell, Kentucky (KY). The contractor shall provide all supervision, personnel, equipment, tools, transportation, materials, and supplies to perform construction services across the Fort Campbell footprint. The construction tasks will include new construction as well as Maintenance and Repair (M&R) related to a variety of trades such as: carpentry, roofing, painting, electrical, HVAC, plumbing, masonry, demolition, roadwork, storm drainage, earthwork, welding, construction of new structures or facilities, energy conservation, environmental, logistical, operational type work and other general construction work. The specific description of work will be identified in each individual task order. All work shall be performed in accordance with all applicable federal, state, and local rules/laws, to achieve and maintain economical, safe, sanitary, operational and un-deteriorated conditions to include other items necessary to perform construction services as defined in the Statement of Work (SOW). The ordering period will span five (5) years and is expected to start in or around August 2023. The assigned National American Industry Classification System (NAICS) code is 236220 “Commercial and Institution Building Construction”, with a small business size standard of $45M. The magnitude of this requirement is estimated to be $275,000,000.00.
In accordance with FAR Part 36.211 Distribution of Advance Notices and Solicitations, contractors are required to submit requests for equitable adjustment as a result of change orders to the issuing Contracting Officer. Contractors are required to acknowledge the change order within 30 days and are to submit their request for adjustment which includes all supporting documents as soon as possible, but not later than the required completion date of the contract. In the table below is the agency’s past performance, for the period of three fiscal years, regarding the time required to definitize equitable adjustments for change orders under construction contracts.
Table 1. Change Order Definitization Time to definitize after receipt of an adequate change order definitization proposal under construction contracts
Number of change order proposals definitized under construction contracts
30 days or less 1 31 to 60 days 1 61 to 90 days 0 91 to 180 days 0
181 to 365 days 0 366 or more days 0
16) Place of Contract Performance: Fort Campbell, Kentucky 42223
17) Set-aside Status: This acquisition is a 100% HUBZone set-aside, pursuant to the requirements of FAR Subpart 19.13.