Timber Retaining Wall w/Culvert - Camp Ripley MN
Solicitation number
2000018804
Issued by
Mower County, Minnesota

About this file

This addendum to a solicitation issued by the Minnesota Department of Military Affairs revises the specifications and scope of work for a timber retaining wall and culvert construction project at Camp Ripley Training Center in Little Falls, Minnesota. The project scope has been modified to construct approximately 405 feet of timber retaining wall (reduced from 500 feet) standing 2 feet tall using 6"x6" timbers spiked together with #4x18" rebar, along with installation of a 12-inch corrugated metal pipe culvert with a flared end section. The revised scope includes removal of existing soil and bituminous pavement, grading, riprap placement, and seeding of the berm. Material estimates have been updated to include 3,000 linear feet of 6"x6" timber, 20 linear feet of 12" corrugated metal pipe culvert, one 12" flared end section, 5 square yards of riprap, and 270 cubic yards of grading. The solicitation due date remains November 23, 2026, at 10:00 a.m. Central Time, with a non-mandatory pre-bid meeting held on November 18, 2026. The State expects substantial project completion by Fall 2026, with seeding completion required no later than June 30, 2027.

The addendum clarifies key responsibilities and project parameters through responses to bidder questions. The State will provide electrical locating services, fill material, and all seed material (MNDOT Ditch mix or equivalent); the contractor is responsible for hauling excavated fill from a site approximately 4 miles away and will not perform hydro seeding. The State has declined substitution of block retaining walls for timber construction due to ricochet safety considerations. The estimated contract value is $55,000, with bids over $50,000 requiring a 5% surety bond. Prevailing wage requirements apply under Minnesota Statutes 177.41 to 177.44, and contractors must maintain commercial general liability and automobile liability insurance of $2,000,000 each, plus workers' compensation and builder's risk coverage equal to the contract amount. The contract carries federal funding through a National Guard Bureau master cooperative agreement. Award will be made to the lowest responsible bidder, with offers remaining firm for 180 days.

View the file

Other files

File Type Posted
1RFB_Event_18804.pdf PDF
3RFB_SampleContractandExhibits.pdf PDF
2RFB_Attachments.pdf PDF
Timber_Retaining_Wall_w_Culvert_-_Camp_Ripley_MN.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Military Affairs

15000 HWY 115

Little Falls, MN 56345

SOLICITATION ADDENDUM

Addendum No.: 1 Date of Addendum: November 19, 2026

Due Date, Time: November 23, 2026, 10:00 AM CT Revised Due Date, Time: N/A

Buyer: Michelle Walker Agency: Department of Military Affairs

SWIFT Event/Posting Ref. No.: 2000018804/37856 Title: Timber Retaining Wall w/Culvert Camp Ripley MN

SCOPE OF ADDENDUM

This addendum containing the following revisions, additions, deletions, or clarifications is hereby made part of the Solicitation, including the Sample Contract and Exhibits if applicable.

The purpose of this addendum is to:

• Revise the Solicitation or Sample Contract and Exhibits

• Respond to questions received by the deadline stated in the Solicitation.

Responders acknowledge receipt of this addendum by responding to SWIFT Event No.2000018804, Version 2 (or more recent version) by the solicitation due date and time.

Except as modified by this addendum, all the terms and conditions remain in full force and effect.

ADDENDUM

I. The State revises the Solicitation or Sample Contract and Exhibits as follows (strike through is used for deletions and underlining for insertions):

1. Exhibit C: Specifications, Duties, and Scope of Work to the Sample Contract is DELETED and REPLACED with the following:

Scope of Work: Project will consist of constructing approximately 500 405 feet long by 2 feet tall timber retaining wall to eliminate soil erosion to the target berm.

Project will include:

• Removal of existing soil and bituminous pavement to allow for the construction of the retaining wall;

• Retaining wall will be constructed with 6”x6” timbers, on top of existing bituminous, spiked together with

#4x18” rebar to hold in place;

Estimate materials:

• 2408LF 3000LF - 6" X 6" Timber

• 20LF - 12" Corrugated Metal Pipe (CMP) Culvert

• 1 EA. - 12" Corrugated Metal Pipe (CMP) Flared end Section (FES)

• 5SY - Riprap

• 133CY – 270CY Grading

Addendum_rev_2023.04.14 Page 2 of 2

II. Below are the State’s responses to questions received by the deadline stated in the Solicitation.

1. Question 1: Will the Supplier be responsible for locating existing electrical wires before construction begins?

Answer 1: The State is responsible for providing all electrical locating services.

2. Question 2: When is seeding of the berm to be completed?

Answer 2: Spring of 2027 (NLT 30 JUNE 2027).

3. Question 3: Is hydro seeding required?

Answer 3: No; hydro seeding would not be required; to be seed with MNDOT Ditch mix or equivalent.

4. Question 4: Is the Supplier responsible for providing fill?

Answer 4: No; the State will provide the fill; the Supplier will be responsible for hauling the fill from excavation site located roughly 4 miles away to project site.

5. Question 5: Would the State consider substituting the timber retaining wall for a block retaining wall?

Answer 5: No; wooden timbers reduce the likelihood of ricochets.

6. Question 5: When is the project to be completed?

Answer 5: The State exceptions are the project is to be substantially completed by Fall 2026.

END OF ADDENDUM