Sweetwater CWSRF WWTP Imp CID-01 Project Manual.pdf

PDF 4 MB Posted

Attached to
Sweetwater CWSRF Wastewater Treatment Plant Improvements CID-01
Solicitation number
7729
Issued by
Montague County, Texas

About this file

Project Manual Summary

This is a Project Manual for the City of Sweetwater, Texas, detailing the bidding requirements and contract documents for TWDB CWSRF Wastewater System Improvements CID-01: Wastewater Treatment Plant Improvements (Contract No. 73892), prepared by engineering firm Enprotec | Hibbs & Todd. The work includes rehabilitation of the existing mechanical screen, replacement of five influent transfer pumps, replacement of the membrane diffuser system and supporting piping in four existing sequencing batch reactor (SBR) basins, replacement of waste activated sludge (WAS) piping and railing in four SBR basins, furnishing and installation of electrical and controls including SCADA improvements coordination, and replacement of the ultraviolet (UV) disinfection system. Alternate bid items include rehabilitating the existing belt filter press, repairing approximately 250 linear feet of sidewalk and walkway gaps around the wastewater treatment plant, and replacing SBR process air blowers. Sealed bids were due at 2:00 p.m. local time on Tuesday, June 2, 2026, at Sweetwater City Hall. Bidders were required to conduct site visits and examine bidding documents available through Civcast at www.civcastusa.com. Bidder questions regarding the meaning or intent of bidding documents were due in writing by 5:00 p.m. on Tuesday, May 26, 2026, directed to Colden S. Rich, P.E. The substantial completion period is 240 calendar days from the date of Notice to Proceed.

The contract is funded through financial assistance from the Texas Water Development Board (TWDB) Clean Water State Revolving Fund (CWSRF), with neither the U.S. Environmental Protection Agency nor the State of Texas serving as a party to the contract. Bid security in the form of a cashier's check or bid bond was required at five percent of the total bid amount, with performance and payment bonds at one hundred percent of the contract price required from surety companies holding Texas permits with a minimum Best's Key Rating of "B" or better. Liquidated damages are specified at $500 per day for failure to achieve substantial completion and $500 per day for failure to complete remaining work after substantial completion. Progress payments are made monthly at 95 percent of completed work value with five percent retainage, and upon substantial completion, payments increase to 100 percent less the value of remaining punch list items. The contract is subject to Davis-Bacon prevailing wage requirements, American Iron and Steel (AIS) requirements for federally funded projects, and Equal Employment Opportunity and Affirmative Action compliance per 41 CFR Part 60-4. Bidders must provide completed WRD-255 Bidder's Certifications, TWDB-0459 Non-Resident Bidder Compliance documentation, and Texas Ethics Commission Form 1295 prior to contract award.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF

SWEETWATER, TEXAS

PROJECT MANUAL

FOR

TWDB CWSRF WASTEWATER SYSTEM

IMPROVEMENTS

CID 01: WASTEWATER TREATMENT PLANT

IMPROVEMENTS

TWDB CWSRF CONTRACT NO.: 73892

APRIL 2026

Enprotec | Hibbs & Todd • 402 Cedar Street • Abilene, Texas 79601 • T (325) 698-5560 • F (325) 690-3240 • www.e-ht.com Abilene l Lubbock l Granbury • PE Firm Registration No. 1151 • PG Firm Registration No. 50103 • RPLS Firm Registration No. 10011900

CITY OF

SWEETWATER, TEXAS

TWDB CWSRF WASTEWATER SYSTEM IMPROVEMENTS

CID 01: WASTEWATER TREATMENT PLANT IMPROVEMENTS

TWDB CWSRF CONTRACT NO.: 73892

PROJECT MANUAL

APRIL 2026

DIVISIONS 0, 1, 9, 11, 13 and 15 DIVISION 16

Brittany D. White, P.E., #128714 Donald S. Mattern, P.E., #106161

Enprotec | Hibbs & Todd • 402 Cedar Street • Abilene, Texas 79601 • T (325) 698-5560 • F (325) 690-3240 • www.e-ht.com Abilene l Lubbock l Granbury • PE Firm Registration No. 1151 • PG Firm Registration No. 50103 • RPLS Firm Registration No. 10011900

4/17/2026 4/17/2026

CITY OF SWEETWATER

CWSRF WASTEWATER SYSTEM IMPROVEMENTS

CID 01: WASTEWATER TREATMENT PLANT IMPROVEMENTS

PROJECT MANUAL INDEX

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF THE CONTRACT

00100 Invitation for Bid 00200 Instructions to Bidders 00300 Bid Form 00410 Bid Bond 00480 Non-Collusion Affidavit of Prime Bidder 00482 Bidder’s Certifications (WRD-255) 00485 Conflict of Interest Questionnaire 00490 Certificate of Interested Parties (Form 1295) 00493 Vendor Compliance with Reciprocity on Non-Resident Bidders (TWDB-0459) 00500 Standard Form of Agreement 00610 Performance Bond 00620 Payment Bond 00630 Certificate of Insurance 00690 Contractor’s Act of Assurance (ED-103) 00691 Contractor’s Resolution on Authorized Representative (ED-104) Statement of Understanding 00700 General Conditions Special Environmental Conditions 00820 TWDB Supplemental Contract Conditions (TWDB - 0551) 00830 Site Certificate (ED-101) 00840 Prevailing Wage Rates

TWDB FORMS

DB-0154 Monthly Davis-Bacon Wage Rate Certificate of Compliance Submittal by Owner TWDB-1106-A Monthly American Iron and Steel Certificate TWDB-1106-B American Iron and Steel de minimis log

TECHNICAL SPECIFICATIONS

DIVISION 1 – GENERAL REQUIREMENTS

01010 Summary of Work 01019 Contract Considerations 01039 Cooridnation and Meetings 01090 Standard References 01300 Submittals 01400 Quality Control 01500 Construction Facilities and Temporary Controls 01600 Material and Equipment 01650 Starting of Systems 01700 Contract Closeout

DIVISION 9 - FINISHES

09800 Painting

CITY OF SWEETWATER

CWSRF WASTEWATER SYSTEM IMPROVEMENTS

CID 01: WASTEWATER TREATMENT PLANT IMPROVEMENTS

PROJECT MANUAL INDEX

DIVISION 11 – EQUIPMENT

11009 Common Control Panel 11060 Pumping Equipment: Basic Requirements 11310 Submersible Pump 11330 Automatic Bar Screen 11345 Ultraviolet Disinfection Equipment 11360 Belt Filter Press 11371 Centrifugal Blowers and Accessories 11375 Fine Bublle Diffusers

DIVISION 13 – SPECIAL CONSTRUCTION

13323 Programmable Logic Controllers

DIVISION 15 – MECHANICAL

15060 Pipes and Pipe Fittings – Basic Requirements 15066 Pipe: Stainless Steel

DIVISION 16 – ELECTRICAL

16000 General Requirements for Electrical Work 16060 Electrical Demolition 16110 Raceways and Boxes 16115 Underground Electrical Duct and Conduit 16120 Conductors 16131 Device, Pull and Junction Boxes 16190 Supporting Devices 16195 Electrical Identifications 16450 Grounding 16950 Vender Supplied Control Panel Requirements for Equipment

APPENDIX A – WWTP SCADA Hardware Replacement Scope Outline

BID DOCUMENTS

00100 - 1

INVITATION FOR BID

The City of Sweetwater will receive sealed Bids addressed to the City of Sweetwater for the CWSRF No. 73892 Wastewater System Improvements, CID 01: Wastewater Treatment Plant Improvements project until 2:00 p.m. local time on Tuesday, June 2, 2026, at Sweetwater City Hall, located at 200 E. 4th Street, Sweetwater, Texas 79556. Bids will be publicly opened and read aloud immediately thereafter at same location.

The work generally includes: Rehabilitation of the existing Mechanical Screen, replacement of five (5) influent transfer pumps, replace membrane diffuser system and supporting piping in the four (4) existing SBR basins, replace waste activate sludge (WAS) piping and railing in the four (4) existing SBR basins, furnish and install electrical and controls including coordination with SCADA integrator on SCADA improvements, and replace UV system. Alternate Bid Items include rehabilitating existing belt filter press, repair approximately 100 LF of sidewalk/walkway gaps around WWTP, and replace SBR process air blowers.

The Bidding Documents may be obtained from Civcast at www.civcastusa.com. Prospective Bidders may examine the Bidding Documents at the Engineer’s Office on Mondays through Thursdays between the hours of 7:30 a.m. and 5:30 p.m., and the City of Sweetwater Office, on Mondays through Fridays between the hours of 8:00 a.m. and 5:00 p.m.

Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing no later than 5:00 P.M. on Tuesday, May 26, 2026. The Engineer’s contact information is: Email to Colden S. Rich, P.E. @ colden.rich@e-ht.com

Each Bid shall be accompanied by a Cashier’s Check or Bid Bond, acceptable to the Owner, in an amount not less than five percent (5%) of the total amount bid, as a guarantee that the successful bidder will enter into a proper Contract and execute Bonds on the forms provided in the Contract Documents. Bid sureties will be returned to all but the three lowest acceptable bidders within five days after the opening of Bids. Remaining bid sureties will be returned after complete execution of the Contract.

The surety company providing the Bid Bond must conform to the same requirements for surety companies providing Performance and Payment Bonds described below.

The successful bidder must furnish Performance and Payment Bond on the forms furnished with the Contract Documents in the amount of one hundred percent (100%) of the total Contract price, from a surety company holding a permit from the State of Texas to act as surety. The surety company must have a minimum Best’s Key Rating of “B” or better. The surety company, the agency and agent issuing the Performance and Payment Bond must be authorized to issue such bonds in Texas in an amount equal to or greater than the total contract price.

This contract is contingent upon release of funds from the Texas Water Development Board. Any contract or contracts awarded under this Invitation for Bids are expected to be funded in part by financial assistance from the Texas Water Development Board. Neither the U.S. Environmental Protection Agency (EPA) or the State of Texas, nor any of its departments, agencies, or employees, are or will be a party to this Invitation for Bids or any resulting contract.

Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability, or genetic information. Bidders on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors-Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order No. 11375 and Executive Order No.

13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance.

http://www.civcastusa.com/ mailto:colden.rich@e-ht.com

00100 - 2

The City of Sweetwater reserves the right to reject any or all bids or to waive any informalities in the bidding.

All laborers and mechanics working on the work site and employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Drinking Water State Revolving Fund shall by paid wages as described in the section, Mandatory Davis-Bacon Act Contract Conditions.

Davis-Bacon prevailing wage requirements apply to the construction, alteration or repair of treatment works carried out, in whole or in part, with assistance made available by the Clean Water State Revolving Fund (CWSRF) or a construction project financed, in whole or in part, from the Drinking Water State Revolving Fund (DWSRF).

The Davis-Bacon prevailing wage requirements apply to Contractors and Subcontractors performing on federally funded or assisted contracts in excess of $2,000 for the construction, alteration or repair (including painting) of a treatment works project under the CWSRF or a construction project under the DWSRF.

For prime contracts in excess of $100,000, Contractors and Subcontractors must also, under the provisions of the Contract Work Hours and Safety Standards Act, as amended, pay laborers and mechanics, including guards and watchmen, at least one and one-half times their regular rate of pay for all hours worked over 40 in a workweek. The Fair Labor Standards Act may also apply to Davis-Bacon covered contracts.

Any contracts or subcontracts in excess of $2,000 must include the provisions of the Davis-Bacon Wage Rate Requirements found in TWDB Guidance No. DB-0156.

This project is subject to the American Iron and Steel (AIS) requirements of 33 U.S.C §1388 for Clean Water State Revolving Fund projects or Public Law 114-113, Consolidated Appropriations Act, 2016, or subsequent appropriations acts, for Drinking Water State Revolving Fund projects. Any contract(s) awarded under this Invitation for Proposals is/are subject to the American Iron and Steel (AIS) requirements of Section 608 of the Federal Water Pollution Control Act.”

Date Issued: April 25, 2026 By: Dr. Jerod Peek, Mayor

EJCDC® C-200, Instructions to Bidders for Construction Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

TOC Page1 of 1

INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT

TABLE OF CONTENTS

Page

Article 1— Defined Terms

Article 2— Bidding Documents

Article 3— Qualifications of Bidders

Article 4— Pre-Bid Conference

Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;

Other Work at the Site

Article 6— Bidder’s Representations and Certifications

Article 7— Interpretations and Addenda

Article 8— Bid Security

Article 9— Contingent Award of Contract

Article 10— Contract Times

Article 11— Substitute and “Or Equal” Items

Article 12— Subcontractors, Suppliers, and Others

Article 13— Preparation of Bid

Article 14— Basis of Bid

Article 15— Submittal of Bid

Article 16— Modification and Withdrawal of Bid

Article 17— Opening of Bids

Article 18— Bids to Remain Subject to Acceptance

Article 19— Evaluation of Bids and Award of Contract

Article 20— Bonds and Insurance

Article 21— Equal Employment Opportunity and Affirmative Action

Article 23— Davis Bacon Wage Rate Requirements

Article 24— Signing of Agreement

Article 25— TWDB Compliance Procedures

Article 26— Sales and Use Taxes

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

ARTICLE 1—DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.

ARTICLE 2—BIDDING DOCUMENTS

2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.

2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.

2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or invitation to bid. Owner recommends that Bidder register as a plan holder with the Issuing Office at such website, and obtain a complete set of the Bidding Documents from such website. Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.

2.04 Plan rooms (including construction information subscription services, and electronic and virtual plan rooms) may distribute the Bidding Documents, or make them available for examination.

Those prospective bidders that obtain an electronic (digital) copy of the Bidding Documents from a plan room are encouraged to register as plan holders from the Bidding Documents Website or Issuing Office. Owner is not responsible for omissions in Bidding Documents or other documents obtained from plan rooms, or for a Bidder’s failure to obtain Addenda from a plan room.

2.05 Electronic Documents

A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.

1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader Version 8.0 or later. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.

B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.06.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.

1. in the actual Contract Documents and any related document in native file format.

ARTICLE 3—QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within 15 days of Owner’s request, Bidder must submit the following information:

A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.

B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.

C. Bidder’s state or other contractor license number, if applicable.

D. Subcontractor and Supplier qualification information.

E. Other required information regarding qualifications.

3.02 Bidder is to submit the following information with its Bid to demonstrate Bidder’s qualifications to perform the Work:

A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.

B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.

C. Bidder’s state or other contractor license number, if applicable.

D. Subcontractor and Supplier qualification information.

E. Other required information regarding qualifications.

3.03 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.04 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

ARTICLE 4—PRE-BID CONFERENCE

4.01 A pre-bid conference will not be held.

ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S

SAFETY PROGRAM; OTHER WORK AT THE SITE

5.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

5.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:

a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.

b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.

c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.

B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.

5.03 Other Site-related Documents

A. No other Site-related documents are available.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

5.04 Site Visit and Testing by Bidders

A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.

B. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.

C. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

D. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

5.05 Owner’s Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.

5.06 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS

6.01 Express Representations and Certifications in Bid Form, Agreement

A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.

B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

ARTICLE 7—INTERPRETATIONS AND ADDENDA

7.01 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing no later than 5:00 P.M. on Tuesday, May 26, 2026. The Engineer’s contact information is:

A. Email to Colden S. Rich, P.E. @ colden.rich@e-ht.com

7.02 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

7.03 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.

ARTICLE 8—BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5% percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.

A. Each bidder shall furnish a bid guarantee equivalent to five percent (5%) of the bid price (Water Code 17.183). If a bid bond is provided, the Contractor shall utilize a surety company that is authorized to do business in Texas in accordance with Surety Bonds and Related Instruments, Chapter 3503 of the Insurance Code.

8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.

8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.

8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.

ARTICLE 9—CONTINGENT AWARD OF CONTRACT

9.01 This contract is contingent upon release of funds from the Texas Water Development Board.

Any contract(s) awarded under this Invitation for Bids is/are expected to be funded in part by a loan or loan with principal forgiveness from the Texas Water Development Board and a grant mailto:colden.rich@e-ht.com

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

from the United States Environmental Protection Agency, U.S. EPA. Neither the State of Texas, the U.S. EPA, nor any of its departments, agencies, or employees, are or will be a party to this Invitation for Bids or any resulting contract.

ARTICLE 10—CONTRACT TIMES

10.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.

10.02 Bidder must set forth in the Bid the time by which Bidder must achieve Substantial Completion, subject to the restrictions established in Paragraph 13.07 of these Instructions. The Owner will take Bidder’s time commitment regarding Substantial Completion into consideration during the evaluation of Bids, and it will be necessary for the apparent Successful Bidder to satisfy Owner that it will be able to achieve Substantial Completion within the time such Bidder has designated in the Bid. The Successful Bidder’s time commitments will be entered into the Agreement or incorporated in the Agreement by reference to the specific terms of the Bid.

10.03 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

ARTICLE 11—SUBSTITUTE AND “OR EQUAL” ITEMS

11.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.

ARTICLE 12—SUBCONTRACTORS, SUPPLIERS, AND OTHERS

12.01 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for the following portions of the Work within five days after Bid opening:

ARTICLE 13—PREPARATION OF BID

13.01 The Bid Form is included with the Bidding Documents.

A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

13.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.

13.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.

13.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.

13.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.

13.06 A Bid by an individual must show the Bidder’s name and official address.

13.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.

13.08 All names must be printed in ink below the signatures.

13.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.

13.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.

13.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.

13.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.

ARTICLE 14—BASIS OF BID

14.01 Unit Price

A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

ARTICLE 15—SUBMITTAL OF BID

15.01 The Bidding Documents include one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form.

A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly marked package with the Project title, and, if applicable, the designated portion of the Project for which the Bid is submitted, the name and address of Bidder, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid must be addressed to City of Sweetwater, 200 E. 4th, Sweetwater, Texas 79556, Attn: Dr. Jerod Peek, Mayor the location designated in the Advertisement.

15.02 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.

ARTICLE 16—MODIFICATION AND WITHDRAWAL OF BID

16.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.

16.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.

16.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.

ARTICLE 17—OPENING OF BIDS

17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

ARTICLE 18—BIDS TO REMAIN SUBJECT TO ACCEPTANCE

18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 19—EVALUATION OF BIDS AND AWARD OF CONTRACT

19.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.

19.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.

19.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.

19.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.

19.05 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form. To determine the Bid prices for purposes of comparison, Owner will announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them. For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.

C. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.

19.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

19.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

19.08 Provision of Texas Ethics Commission Form 1295 (“TEC Form 1295”) by Bidders: Effective January 1, 2016, pursuant to Texas Government Code § 2252.908 (the “Interested Party Disclosure Act” or the “Act”), the Owner may not award the contract to a bidder unless the bidder has provided to the Owner a completed, signed TEC Form 1295 which has been assigned a certificate number by the Texas Ethics Commission (the “TEC”). Pursuant to the rules prescribed by the TEC, the TEC Form 1295 must be completed online through the TEC’s website, assigned a certificate number, printed, signed and provided to the Owner. The TEC Form 1295 may accompany the bid or may be submitted separately, but must be provided to the Owner prior to the award of the contract. For purposes of completing the TEC Form 1295, the entity’s name is the City of Sweetwater; the contract ID number is 7729 (Engineers Project No.); and the description of goods and services is Wastewater System Improvements CID 01: Wastewater Treatment Plant Improvements. Neither the Owner nor its consultants have the ability to verify the information included in a TEC Form 1295, and neither have an obligation nor undertake responsibility for advising any bidder with respect to the proper completion of the TEC Form 1295.

ARTICLE 20—BONDS AND INSURANCE

20.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.

20.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.

ARTICLE 21—EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION

21.01 All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability, or genetic information. Bidders on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors-- Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order No. 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance.

ARTICLE 22—DAVIS BACON WAGE RATE REQUIREMENTS

22.01 Davis-Bacon prevailing wage requirements apply to the construction, alteration or repair of treatment works carried out, in whole or in part, with assistance made available by the Clean Water State Revolving Fund (CWSRF) or a construction project financed, in whole or in part, from the Drinking Water State Revolving Fund (DWSRF).

22.02 The Davis-Bacon prevailing wage requirements apply to Contractors and Subcontractors performing on federally funded or assisted contracts in excess of $2,000 for the construction, Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

alteration or repair (including painting) of a treatment works project under the CWSRF or a construction project under the DWSRF.

22.03 For prime contracts in excess of $100,000, Contractors and Subcontractors must also, under the provisions of the Contract Work Hours and Safety Standards Act (CWHSSA), as amended, pay laborers and mechanics, including guards and watchmen, at least one and one-half times their regular rate of pay for all hours worked over 40 in a workweek. The Fair Labor Standards Act may also apply to Davis-Bacon covered contracts.

22.04 Any contracts in excess of $2,000 must include the provisions of the Davis-Bacon Wage Rate Requirements. See Section III, Paragraph 11, Option 1 (governmental entities) and Option 2 (non-governmental entities) for contract clauses required for Davis =Bacon requirements. This information is also included in TWDB Guidance DB-0156, as follows (Applicant = Owner (sub-recipient)):

22.05 If the Owner (sub-recipient) is a governmental entity such as a city or district, it must insert in full the contract clauses found in TWDB Guidance DB-0156, Appendix 1: Section 3, Section 4 if the contract exceeds $100,000, and Section 5. If the Owner (sub-recipient) is a non-governmental entity such as a water supply corporation or a private company, it must insert in full the contract clauses found in TWDB Guidance DB-0156, Appendix 2: Section 3, Section 4 if the contract exceeds $100,000, and Section 5. The Owner (sub-recipient) must ensure all prime contracts require the same full text in any subcontracts. See TWDB Guidance DB-0156 for the text of the contract language that must be included.

Additional information on Davis-Bacon Wage Rate Requirements and its applicability to this contract can be found in TWDB Guidance DB-0156.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

ARTICLE 23—SIGNING OF AGREEMENT

23.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.

ARTICLE 24—TWDB COMPLIANCE PROCEDURES

24.01 This contract is subject to the American Iron and Steel (AIS) requirements. The prime construction contractor will be required to maintain a certification file, approved waivers, and De Minimis log that must be available for review by TWDB representatives.

24.02 American Iron and Steel:

A. Any contract(s) awarded under this Invitation for Bids (under the 2022 IUP or earlier) is/are subject to the American Iron and Steel (AIS) requirements of 33 U.S.C §1388 for Clean Water State Revolving Fund projects or Public Law 114-113, Consolidated Appropriations Act, 2016, or subsequent appropriations acts, for Drinking Water State Revolving Fund projects. The Contractor must complete the statement of understanding regarding this requirement, found in the Special Contract Conditions, Item No. 9. The statement of understanding must be signed by the Contractor.

ARTICLE 25—SALES AND USE TAXES

25.01 Owner is exempt from TEXAS state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes must not be included in the Bid. Refer to Paragraph SC-7.10 of the Supplementary Conditions for additional information.

Forms to be submitted with Bid:

• WRD-255, Bidder’s Certifications regarding Equal Employment Opportunity and Non-Segregated

Facilities.

• TWDB-0459, Vendor Compliance with Reciprocity on Non-Resident Bidders

00300 - 1

BID FORM

PROJECT IDENTIFICATION: Sweetwater TWDB CWSRF Wastewater System Improvements CID 01: Wastewater Treatment Plant Improvements

CONTRACT IDENTIFICATION AND NUMBER:

CID 01: Wastewater Treatment Plant Improvements Engineer Project Number 7729

THIS BID IS SUBMITTED TO: City of Sweetwater

200 E. 4th Street Sweetwater, Texas 79556

1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

2.01 Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. The Bid will remain subject to acceptance for 90 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of

OWNER.

3.01 In submitting this Bid, Bidder represents, as set forth in the Agreement, that:

A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all which is hereby acknowledged.

Addendum No. Addendum Date

B. Bidder certifies Bidder is qualified to do business in the state where the Project is located as required by laws, rules, and regulations or, if allowed by stature, covenants to obtain such qualification prior to contract award.

C. The Bidder shall provide values for specific performance parameters for the equipment being bid. The Bidder understands and agrees that the values stated in this Section for the associated performance parameters will be compared to the performance standards required in the equipment specifications. Bidders understand and agree to guarantee the performance values stated herein for the equipment bid in accordance with the guidelines specified herein.

D. Bidder understands and agrees that this PROPOSAL shall form the basis for an agreement with the OWNER.

Therefore, the undersigned agrees to enter into an agreement to perform and furnish all Work as specified or indicated in these Specifications for the amount indicated in this Bid and in accordance with the other terms and conditions of these Contract Documents.

E. Bidder accepts all of the terms and conditions of these Contract Documents including, without limitation, those dealing with the disposition of Bid security, required bonds, and the liquidated damages that may be imposed. This Bid shall remain subject to acceptance for a period of 60 days after the day of Bid opening. The Bidder shall sign and submit the Agreement with the bonds and other required documents within 10 days after the receipt of Notice of Award from the OWNER.

F. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding…