This is a project manual and contract document for the Los Osos Community Services District detailing the Sweet Springs Groundwater Monitoring Wells Project in Los Osos, California. The project involves the construction of two new groundwater monitoring wells located at Pismo Avenue and 5th Street. The scope of work includes drilling boreholes, installing PVC casing and screens, running geophysical logs, installing filter packs and bentonite seals, conducting well development, and constructing traffic-rated monitoring well boxes with concrete pads. A pre-bid job conference was scheduled for Wednesday, July 22, 2026, at 10:00 a.m. at the project site. Sealed bids were due by August 7, 2026, at 3:00 p.m. PST at the Los Osos Community Services District office located at 2122 9th Street, Suite 110, Los Osos, CA 93402. The contractor must possess a valid California C57 Well Driller's License at the time of bid issuance. The contract completion time is forty-five (45) calendar days from the date of the Notice to Proceed. The successful bidder will be the lowest responsive and responsible bidder, with contract award anticipated within sixty (60) calendar days from bid receipt.

Bid security equal to at least ten (10) percent of the total bid amount must accompany all proposals in the form of cash, certified check, cashier's check, or bid bond. The successful contractor will be required to furnish faithful performance and payment bonds in the full amount of the contract price and maintain liability insurance with the Owner and Engineer named as additional insureds. All contractors and subcontractors must be registered with the California Department of Industrial Relations prior to bidding and must comply with prevailing wage requirements as determined by the Director of the Department of Industrial Relations. The bid schedule includes nineteen line items ranging from mobilization and demobilization to drilling and well construction activities, with the contractor required to perform at least fifty (50) percent of the work with its own organization, except for designated specialty items. Contract documents, including specifications and drawings, are available for download from the District's website at no charge to bidders, with electronic PDF copies provided only. Unit price basis is used for payment determination, and the Owner reserves the right to increase or decrease any bid item by up to twenty-five (25) percent without change to unit pricing.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

FOR THE

LOS OSOS COMMUNITY SERVICES DISTRICT

2122 9TH STREET, SUITE 110

LOS OSOS, CA 93402

(805) 528-9370

SWEET SPRINGS GROUNDWATER MONITORING

WELLS PROJECT

Prepared by:

WALLACE GROUP

612 Clarion Court

San Luis Obispo, CA 93401 805 544-4011

JULY 2026

WG JOB NO. 0384-0011-00-00513

THIS PAGE LEFT BLANK INTENTIONALLY

CERTIFICATION

In accordance with the provisions of Section 6735 of the Business and Professions Code of the State of California, these specifications have been prepared by or under the direction of the following Professional Engineers licensed in the State of California:

Steven G. Tanaka, PE C049779, Exp. 09/30/26 stevent Image stevent Model

Sweet Springs GW Monitoring Wells TOC - 1 June 2026

PART I - NOTICE, PROPOSAL, AND AGREEMENT FORMS

TABLE OF CONTENTS

Section

NOTICE TO CONTRACTORS

NOTICE INVITING BIDS

INSTRUCTIONS TO BIDDERS

PROPOSAL

PROPOSAL FORMS

EXPERIENCE QUALIFICATIONS

BID SCHEDULE

CONTRACTOR'S LICENSING STATEMENT

LIST OF SUBCONTRACTORS

LIST OF MATERIAL/EQUIPMENT SUPPLIERS

BID SECURITY FORM

NON-COLLUSION AFFIDAVIT

AFFIRMATIVE ACTION PROGRAM

WORKER'S COMPENSATION INSURANCE CERTIFICATE

AGREEMENT AND BOND FORMS

AGREEMENT

PERFORMANCE BOND

PAYMENT BOND

CONTRACT ADMINISTRATION FORMS

NOTICE OF AWARD

NOTICE TO PROCEED

CHANGE ORDER

WORK DIRECTIVE CHANGE

NOTICE OF COMPLETION

CONSENT OF SURETY - RETAINAGE

CONSENT OF SURETY - FINAL PAYMENT

UNCONDITIONAL WAIVER AND RELEASE UPON FINAL PAYMENT

Sweet Springs GW Monitoring Wells TOC - 2 June 2026

PART II - CONDITIONS OF THE CONTRACT

Section

GENERAL CONDITIONS

SUPPLEMENTARY GENERAL CONDITIONS

PART III - TECHNICAL SPECIFICATIONS

Technical Specifications

Division 01 – General Requirements 01 11 00 Summary of Work 01 20 00 Price and Payment Procedures 01 30 00 Administrative Requirements 01 32 16 Construction Progress Schedule 01 33 00 Submittal Procedures 01 35 00 Special Project Procedures 01 50 00 Temporary Facilities and Controls 01 57 19 Construction Site Management 01 60 00 Product Requirements 01 70 00 Execution and Closeout Requirements

Division 33 – Utilities 33 24 13 Groundwater Monitoring Wells

PART IV - APPENDICES

Construction Drawings See Well Technical Specifications for Well Construction Details (located at the end of the

Technical Specifications)

PART I

NOTICE, PROPOSAL AND AGREEMENT FORMS

Sweet Springs GW Monitoring Wells NIB - Page 1 of 3 JuLY 2026

SWEET SPRINGS GROUNDWATER MONITORING WELLS PROJECT

NOTICE IS HEREBY GIVEN that the LOS OSOS COMMUNITY SERVICES DISTRICT (Owner) hereby invites sealed bids which will be received at:

LOS OSOS, CA 93402

until August 7, 2026, at 3:00 p.m. PST, or such later date as may be set by Addendum, at which time and at the above address, they will be publicly opened and read aloud for performing the following work:

DESCRIPTION OF WORK: The work is comprised of providing two new groundwater monitoring wells located at Pismo Avenue/5th Street, Los Osos, CA, as specified herein and as shown on the Contract Documents.

LOCATION OF THE WORK - The work is located in Los Osos, CA, at Pismo Avenue and 5th Street, Los Osos, CA.

BID OPENING - Telephones will not be available to bidders for the preparation of the bids or for calling in bid results. Bid forms received after the designated time will not be accepted.

Bidders, their authorized agents and other interested parties, are invited to attend the bid opening.

AWARD OF CONTRACT- The OWNER intends to award a contract to the lowest, responsive, and responsible bidder to the bid schedule delineated in these contract documents. All bids submitted shall be in accordance with the provisions of the Contract Documents and the OWNER may waive any minor irregularities or reject any and all bids. Any bid may be withdrawn prior to bid opening but not afterward.

FORM OF THE BID - Bidders must submit proposals on the proposal bid form provided.

Proposals will not be considered unless submitted on proposal forms included in the Contract Documents obtained from the OWNER. It is not mandatory, but highly recommended, that the bidder attend the pre-bid job conference scheduled for Wednesday, July 22, 2026, at 10:00 am, at the Project Site, Pismo Avenue at 5th Street, Los Osos, CA. The bidder may contact Steven Tanaka at 805-441-2293 for additional information.

BID SECURITY - Each proposal must be accompanied by cash, a certified or cashier's check, or bidder's bond on the prescribed form and made payable to the OWNER for an amount equal to at least 10 percent of the amount of the Bid, such guaranty to be forfeited should the apparent successful bidder to whom the contract is awarded fail to furnish the required bonds and insurance certificates, and enter into contract with the OWNER within the time stated in the

Sweet Springs GW Monitoring Wells NIB - Page 2 of 3 JuLY 2026

Proposal requirements. Proposals cannot be withdrawn for the period of time specified in Article 10 of the Instructions to Bidders.

PERFORMANCE SECURITIES – The successful bidder will be required to furnish a payment bond and faithful performance bond in the full amount of the Contract price, and insurance with certificates and endorsements of insurance, as provided in the Contract Documents. The required bonds must be provided only by a surety insurer who is in good standing with the State of California Department of Insurance.

CONTRACTOR LICENSING - In accordance with the provisions of California Public Contract Code Section 3300, the OWNER has determined that the contractor shall possess a valid C57 Well Driller’s License at the time of bid issuance. Failure to possess the specified license shall render the Bid as non-responsive and shall act as a bar to award of the Contract to any bidder not possessing said license at the time of award. In the event of dispute over classification of the license required, the opinion of the contractor’s State License Board shall prevail.

WAGE RATE REQUIREMENTS - In accordance with the provisions of California Labor Code Sections 1770,1773, 1773.1, 1773.6 and 1773.7 as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with the standards set forth in Section 1773 for the locality in which the work is to be performed.

A copy of said wage rates is on file at the office of the OWNER. It shall be mandatory upon the contractor to whom the work is awarded and upon any subcontractor under the contractor to pay not less than said specified rates to all workmen employed by them in the execution of the work.

CONTRACTOR REGISTRATION WITH DEPARTMENT OF INDUSTRIAL RELATIONS – In accordance with California Labor Code Section 1725.5, Contractors and Subcontractors (as defined by California Labor Code Section 1722.1) bidding on Public Works contracts in California shall be registered with the Department of Industrial Relations prior to bidding.

Contractor shall verify that this requirement has been met, prior to award of Contract.

AGREEMENT TO ASSIGN - In accordance with Section 4552 of the California Government Code, the bidder shall conform to the following requirements: In submitting a bid to a public purchasing body, the bidder offers and agrees that if the bid is accepted, it will assign to the purchasing body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act 15 U.S.C. 15, or under the Cartwright Act, Chapter 2.

DEPOSIT OF SECURITIES IN LIEU OF RETAINAGE - The Contractor may elect to receive 100 percent of payment due under the Contract Documents from time to time, without retention of any portion of the payment by the OWNER, by depositing securities of equivalent value with the OWNER in accordance with the provisions of Section 20300 of the California Public Contract Code. Such securities, if deposited by the Contractor, shall be valued by the OWNER, whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in Section 16430 of the California Government Code or bank or savings and loan certificates of deposit.

CONTRACT DOCUMENTS - Contract Documents, including Instructions to Bidders, the Contract Documents may be downloaded from the District’s web site, https://www.losososcsd.org/, or by contacting the office of the Engineer, Wallace Group, Steven Tanaka, at stevent@wallacegroup.us, or by telephone (805) 441-2293. If you download the https://www.losososcsd.org/ mailto:stevent@wallacegroup.us

Sweet Springs GW Monitoring Wells NIB - Page 3 of 3 May 2026 contract documents from the District’s web site and intend to submit a bid, you must contact the Engineer at the contact information above, to be placed on the planholders’ list.

Only PDF electronic copies of the bid documents will be made available to bidders, at no charge to bidders. The special attention of prospective bidders is called to the Instructions to Bidders portion of the Contract Documents for full directions for bidding the Work.

The successful bidder must insure that employees and applicants for employment are not discriminated against on the basis of age, color, race, national origin, ancestry, religion, sex, sexual preference, marital status, and shall comply with the Americans with Disabilities Act.

Date:___________________________________

OWNER: ____________________________________

GREG KWOLEK, GENERAL MANAGER

END OF NOTICE INVITING BIDS

5/28/26 stevent Text Box 7/6/26

INSTRUCTIONS TO BIDDERS

Sweet Springs GW Monitoring Wells ITB - Page 1 of 10 June 2026

1) Commencement of Work: No work shall commence before contract bonds and insurance certificates have been filed with the OWNER, the Contract has been signed by the OWNER and the Notice to Proceed has been issued by the OWNER.

2) Completion Time: The Contractor shall obligate him/herself to satisfactorily complete the work within forty five (45) calendar days. The date of the Notice to Proceed issued by the OWNER shall constitute the starting date of the Contract. Upon issuance of the Notice to Proceed, the Contractor shall immediately begin and diligently prosecute the work to completion.

3) Liquidated Damages: Per Article 6.1 of the Supplementary General Conditions.

4) Method of Payment: Payment will be made on the basis of the unit price bid and as set forth in the General Conditions and Supplementary General Conditions.

5) Form of the Bid and Signature: The proposal shall be submitted on the form attached hereto and shall be enclosed in a sealed envelope addressed and marked as hereinafter directed.

The bidder shall state the unit price for which he/she proposes to supply the labor, materials, supplies, or equipment, and perform the work required by the Specifications.

The low bidder, for purposes of award, shall be the conforming, responsible bidder offering the most favorable bid per the project base bid. All bids shall be evaluated on the same basis.

If the proposal is made by an individual, it shall be signed and his/her full name and mailing address shall be given; if it is made by a firm, it shall be signed with the partnership name of a member of the firm, who shall also sign his/her own name, and the name and address of each member shall be given; and if it is made by a corporation, the name of the corporation shall be signed by its duly authorized officer or officers attested by the corporate seal, and the names and titles of all officers of the corporation shall be given.

Bidder may only modify his bid by written communication received by the OWNER prior to said closing time; provided that it shall be the responsibility of the bidder to ensure receipt of such document by the OWNER prior to said closing time. Any written modification so received will be read aloud at the time and place fixed for opening and reading of bids.

Written communication should not reveal the Bid price but should state the addition or subtraction or other modification so that the final prices or terms will not be known by the OWNER until the sealed bid is opened.

6) Interpretation and Addenda: No oral representation or interpretations will be made to any bidders as to the meaning of the Contract Documents. All questions about the meaning or intent of the Contract Documents are to be directed to the engineer. Additions, deletions, Sweet Springs GW Monitoring Wells ITB - Page 2 of 10 June 2026 or revisions to the Contract Documents considered necessary by the engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by the engineer or District as having received the Contract Documents. Questions received less than 14 days prior to the date of Bid opening may not be answered. Only answers to such questions issued by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Addenda may also be used to make other additions, deletions, or revisions to the Contract

Documents.

Bidders shall make no special interpretation or inference of intent from differing formats in the Technical Specifications.

7) Bidder’s Examination of Contract Documents and Site:

A. It is the responsibility of the Bidders to inspect the site of the work in order to satisfy themselves, by personal examination or by such other means as they may prefer, of the location of the proposed work and the actual conditions of and at the site. Bidders may apply to the Engineer for additional information and explanation before submitting bids. However, no supplemental information requested or furnished shall vary the terms of the Contract Documents or affect the Contractor’s sole responsibility to satisfy himself as to the conditions of the work to be performed. No claim for additional compensation will be allowed which is based upon a lack of knowledge of the actual conditions or location of the Work.

Submission of a proposal by the bidder shall constitute acknowledgment that, if awarded the contract, the bidder has relied and is relying on their own examination of (a) the site of the work; (b) access to the site; and (c) all other data, matters, and things requisite to the fulfillment of the work and, on their own knowledge of existing facilities on and in the vicinity of the site of the work to be constructed under the contract, and not on any representation or warranty of the lack of knowledge of the above items. Removal, relocation, or protection of existing public utilities not identified by the District shall be done in conformance with Section 4215 of the Government Code.

B. Each bidder shall thoroughly examine and be familiar with legal and procedural documents, general conditions, specifications, drawings and addenda (if any).

Submission of a proposal shall constitute acknowledgment, upon which the Owner may rely, that the bidder has thoroughly examined and is familiar with the Contract Documents. Failure or neglect of a bidder to receive or examine any of the Contract Documents shall in no way relieve them of any obligation with respect to their proposal or to the Contract. No claim for additional compensation will be allowed which is based upon a lack of knowledge of any Contract Documents.

C. Each bidder shall review the Plans and Specifications, prior to the submission of the bid, and report any errors and omissions noted by the Contractor to the Engineer. The review by the Contractor shall be confined to the Contractor’s capacity as a contractor, and not as a licensed design professional.

Sweet Springs GW Monitoring Wells ITB - Page 3 of 10 June 2026

8) OWNER Investigations and Testings:

A. Where the engineer has made investigations of surface and subsurface conditions in areas where work is to be performed under the contract, or in other areas, some of which may constitute possible local material sources, such investigations were made only for the purpose of study and design. Where such investigations have been made, bidders or contractor may, upon written request, inspect the records of the engineer as to such investigations subject to and upon the conditions hereinafter set forth. Such inspection of records may be made at the office of the engineer.

The records of such investigations are not a part of the contract and are made available for inspection solely for the convenience of the bidder or contractor. It is expressly understood and agreed by bidder or contractor that neither the OWNER nor the engineer assumes any responsibility whatsoever with respect to the sufficiency or accuracy of the investigations thus made, the records thereof, or of the interpretation set forth therein or made by the engineer in his use thereof and there is no representation, warranty or guarantee, either express or implied, that the conditions indicated by such investigations or records thereof are correct or representative of those existing throughout such areas or any part thereof, or that unanticipated developments may not occur or that materials other than, or in proportions different from, those indicated may not be encountered.

B. Where a log of test borings or other investigations of subsurface conditions have been made by the OWNER in respect to foundation or other structural design, and that information is shown in the plans, said information represents only the statement by the OWNER as to the character of material which has been actually encountered by it in its investigation, and is only included for the convenience of bidders. Water levels that may be shown on a log of test borings are valid on for the stated date of observation. The water level may change from season to season and from year to year. Investigations of subsurface conditions are made for the purpose of design, and the OWNER assumes no responsibility whatever in respect to the sufficiency or accuracy of borings or of the log of test borings or other preliminary investigations, or of the interpretation thereof, and there is no guaranty, either expressed or implied, that the conditions indicated are representative of those existing throughout the work, or any part of it, or that unobserved or unanticipated developments may not occur. Making such information available to bidders is not to be construed in any way as waiver of the provisions of this section and bidders must satisfy themselves through their own investigations as to conditions to be encountered.

C. The availability or use of information described in these Instructions to Bidders and other bid documents shall not be construed in any way as a waiver of the provisions of the Instructions of Bidders and a Bidder or Contractor is cautioned to make such an investigation and examination as it deems necessary to satisfy itself as to conditions to be encountered in the performance of the work and, with respect to possible local material sources, the quality and quantity of material available from such property and the type and extent of processing that may be required in order to produce material conforming to the requirements of the Specifications.

Sweet Springs GW Monitoring Wells ITB - Page 4 of 10 June 2026

D. No information derived from such inspection of records of investigations or compilations thereof made by Engineer, will in any way relieve the bidder or contractor from any risk or from properly fulfilling the terms of the contract.

E. Information derived from inspection of topographic maps, or from Plans showing location of utilities and structures will not in any way relieve the contractor from any risk, or from properly examining the site and making such additional investigations as it may elect, or from properly fulfilling all the terms of the contract.

9) Addenda or Bulletins: Any addenda or bulletins issued during the time of bidding shall form a part of the Contract Documents and Specifications, shall be covered in the proposal, and shall be made part of the Contract. Receipt of addenda must be acknowledged in the appropriate space on the Proposal Form. Failure to acknowledge all such addenda will be cause to reject the bid as being non-responsive. It is the Bidder’s responsibility to determine whether any addenda or bulletins have been issued.

10) Preparation of the Proposal: All blank spaces in the Proposal Forms, Contract

Documents, and Bid Schedule shall be properly filled in. The phrasing of the proposal shall not be changed and no additions shall be made to the items mentioned therein.

Unauthorized conditions, limitations, or provisions attached to a proposal will render it invalid and may cause its rejection. Alterations by erasure or inter-lineation must be explained or noted in the proposal over the signature of the bidder. Alternative proposals will not be considered unless specifically provided for in the Bid Schedule.

A Bidder may withdraw his/her proposal before the time fixed for opening of bids, without prejudice to himself, by submitting a written request to the OWNER for its withdrawal, and his proposal will be returned to him unopened when reached in the procedure of opening bids. No proposal may be withdrawn after the hour fixed for opening bids without rendering the accompanying certified or cashier's check or bidder's bond subject to forfeiture as liquidated damages in like manner as in the case of failure to execute the Contract after award, as provided hereinafter.

No proposal received after the time named or at any place other than the place stated in the Notice to Bidders will be considered. All proposals will be opened and declared publicly. Bidders, their representatives, and others interested are invited to be present at the opening. The OWNER reserves the right to waive any minor irregularities in any proposal, to reject any or all proposals, to reject one part of a proposal and accept the other, except to the extent that bids are qualified by specific limitations, and to make award to the apparent lowest responsible bidder for a period of 60 calendar days from the receipt of the award of bid. No proposal can be withdrawn for a period of 60 calendar days from the date of award of the bid, unless otherwise required by law. Where bonds are required, the bidder shall name in his/her bid the surety or sureties who have agreed to furnish said bonds.

11) Licensing of Contractors: Before submitting bids, Contractors shall be licensed in accordance with the provisions of Chapter 9, Division 3, of the Business and Professions Code of the State of California.

A photocopy of the appropriate license(s) shall be submitted with the proposal.

Sweet Springs GW Monitoring Wells ITB - Page 5 of 10 June 2026

In accordance with California Labor Code Section 1725.5, Contractors and Subcontractors (as defined by California Labor Code Section 1722.1) bidding on Public Works contracts in California shall be registered with the Department of Industrial Relations prior to bidding.

Proof of registration with the DIR will be required prior to award of any public works contract.

12) List of Subcontractors Filed With Bid: Each proposal shall have listed on the forms provided, the name and address of each subcontractor to whom the bidder proposes to sublet portions of the work in excess of one-half of one percent of the total amount of the proposal. For the purpose of this paragraph, a subcontractor is defined as anyone who contracts with the Contractor to furnish materials and labor, labor only, and/or one who specially fabricates and/or installs a portion of the work or improvement according to detailed drawings contained in the Contract Documents. All listings and subsequent substitutions, if any, shall be done in conformance with the Subletting and Subcontracting Fair Practices Act, Public Contract Code Section 4100 et seq.

I. The Contractor shall perform with its own organization work amounting to not less than 50 percent of the original total contract price, except that any work designated “Specialty Items” may be performed by subcontract and the amount of any such “Specialty Items” so performed may be deducted from the original total contract price before computing the amount of work required to be performed by the Contractor with its own organization.

When items of work in the Bid schedule are preceded by the letter (S), such items shall be deemed designated “Specialty Items.” Where an entire item is subcontracted, the value of work subcontracted will be based on the contract item bid price. When a portion of an item is subcontracted, the value of work subcontracted will be based on the estimated percentage of the contract item bid price, determined from information submitted by the Contractor, subject to approval by the Engineer.

13) Submission of Bids: All Bids must be submitted not later than the time prescribed, at the place and in the manner set forth in the Invitation to Bid. The OWNER shall not consider any Bid received after the time fixed or received at any place other than the place stated in the Invitation to Bid. Bids must be made on the prescribed Bid forms. A complete Bid requires submission of fully completed and executed: Bid, Designation of Subcontractors (if applicable), Bid Bond (or other bid guarantee), Experience Qualifications and Noncollusion Declaration. Each Bid must be submitted in a sealed envelope, so marked as to indicate its contents without being opened, and addressed in conformance with the instructions in the Notice Inviting Bids. The bidder is wholly responsible to see that its Bid is submitted at the time and place named for the opening of bids.

Bids shall acknowledge receipt of all addenda (identified by addendum no.) issued during the bidding period. Failure to acknowledge an addendum or clarification may result in the Bid being rejected as not responsive.

Bids shall be open at the time and place specified in the Notice Inviting Bids, unless changed by addendum. All Bids will be opened and read publicly. Bidders, their representatives and other interested parties, are invited to be present at the opening.

13a) Discrepancy in Bids: In the event of discrepancy between unit prices and totals, unit prices will prevail. [In case of discrepancy between words and figures, words will prevail.]

14) Bidders Interested in More Than One Bid: No person, firm, or corporation shall make, file, or be interested in more than one proposal for the same work unless alternate bids are

Sweet Springs GW Monitoring Wells ITB - Page 6 of 10 June 2026 specifically requested. A person, firm, or corporation who has submitted a sub-proposal to a bidder, or who has quoted prices of materials to a bidder, is not hereby disqualified from submitting a sub-proposal or quoting prices to other bidders.

15) Additive Bid Items: If additive bid items are called for, the Contract may be awarded at the election of the Governing Board to the lowest responsible bidder on the base bid, or on the base bid and any additive or combination of additives.

16) Award of Contract: Award of the contract, if awarded, will be made to the lowest responsive, responsible Bidder who’s Bid complies with the requirements of the Contract Documents. Unless otherwise specified, any such award will be made within the period stated in the Notice Inviting Bids that the bids are to remain open. Unless otherwise indicated, a single award will be made for all the Bid items in an individual Bid Schedule.

In the event the work is contained in more than one Bid Schedule, the owner may award Schedules individually or in combination. In the case of two or more Bid Schedules which are alternative to each other, only one of such alternative schedules will be awarded.

2) Before a Bid is considered for award, the OWNER may, in addition to the Experience Qualifications form, require a Bidder to submit a statement of facts and detail as to his business, technical organization and financial resources and equipment available and to be used in performing the work. Additionally, the OWNER may require evidence that the Bidder has performed other work of comparable magnitude and type. The OWNER expressly reserves the right to reject any Bid if it determines that the business and technical organization, equipment, financial and other resources or other experience of the Bidder (including the Bidder's subcontractors) is not sufficiently qualified for the work bid upon and, therefore, justifies such rejection.

17) Return of Bid Security: Within 14 days after award of the contract, the owner will, if requested, return the Bid securities accompanying such Bids that are not being considered in making the award. All other Bid securities will be held until the Agreement has been finally executed. They will then be returned, if requested, to the respective Bidders who’s Bids they accompany.

18) Lowest Responsible Bidder: In selecting the lowest responsible bidder, consideration will be given to the general competency of the bidder for the performance of the work covered by the bid. To receive favorable consideration, a bidder will be required to present evidence that he/she has successfully performed similar work of comparable magnitude or submit other evidence satisfactory to the OWNER that Bidder or his/her associates are personally competent to manage the proposed undertaking and to carry it forward to a successful conclusion. Professional integrity and honesty of purpose shall be essential requirements.

19) Local Conditions: Bidders shall read the Specifications, examine the reference drawings, inspect the project site, and make their own estimates of the existing facilities and the difficulties which will attend the execution of the work called for by the proposed contract, including local conditions, uncertainty of weather, project difficulty, and all other contingencies.

Bidders shall satisfy themselves by personal examination of the location of the proposed Work, and by such other means as they may choose as to actual conditions, actual quantities, and requirements and as to the accuracy of the quantities stated in the Bid Schedule. Information derived from the maps, plans, Specifications, profiles, or drawings, or from the Engineer or his/her assistants, shall not relieve the Bidder of this responsibility.

Sweet Springs GW Monitoring Wells ITB - Page 7 of 10 June 2026

Bidders shall not at any time after the submittal of a bid make or have any claim for damages or anticipated profits or loss of profit or otherwise because of any difference between the quantities of work actually done and material furnished and the unit price stated in the Bid Schedule. Bidders are encouraged to attend a pre-bid conference at the date, time, and location specified in the Notice Inviting Bids.

20) Substitution of Materials: All materials are mentioned as standards. Should a Contractor desire to substitute materials or methods for those specified, he shall state on a separate sheet attached to his bid the price deduction he will make if such a substitution is accepted in material and/or method. Such substitution submittal, however, may not be used in the determination of the lowest qualified bidder. Question of all such substitution shall be determined prior to the award of the Contract, as no substitution will be permitted after the Contract is signed unless approved in writing by the Engineer.

21) Payments: Payments to the Contractor on account of the Contract shall be made in accordance with the terms set forth in Article 1.7, Section 20104.5 of the State Public Contract Code, General Conditions and Supplementary General Conditions.

22) Execution of Contract: The apparent successful bidder shall execute a written Contract on the Form of Agreement attached hereto, secure the payment of workmen's compensation, furnish good and approved bonds, and proof of specified insurance as required in the following Articles, all in accordance with the provisions hereof within 15 calendar days or such additional time as may be allowed by the Engineer from the date of the mailing of a notice of award of bid according to the address given by him, of the acceptance of his proposal. If a bidder to whom award is made fails or refuses to enter into Contract as herein provided, or to conform to any of the stipulated requirements in connection therewith, the money represented by Bidder's security check or Bond shall be forfeited to the OWNER, the award will be annulled, and at the discretion of the OWNER the Contract may be awarded to the next lowest bidder; and such bidders shall fulfill every stipulation embraced herein as if he were the party to whom the first award was made. A corporation to which an award is made may be required, before the Contract is finally executed, to furnish evidence of its corporate existence, of its right to do business in California, and of the authority of the officer signing the Contract and bonds for the corporation.

23) Bonds: A bidder to whom the Contract is awarded shall, within the time mentioned in the preceding Article, furnish a bond with a responsible corporate surety or corporate sureties conditioned upon the faithful performance of the said bidder of all covenants and stipulations in the Contract. Said bond is hereinafter referred to as the Faithful Performance Bond. Within the time mentioned in the preceding Article, the bidder to whom the Contract is awarded shall furnish such faithful performance bond, and shall also furnish a Payment Bond within said time frame. The Faithful Performance Bond and the Payment Bond shall be in the form approved by the OWNER and in the amount stipulated in the GENERAL CONDITIONS.

The surety or sureties on all bonds furnished must be satisfactory to the OWNER. The party required to furnish bonds pursuant to these instructions shall furnish such bonds at his/her own cost and expense. The OWNER reserves the right to reject any bond if, in the opinion of the Engineer, the sureties' acknowledgment is not in the form included within the Contract Documents or in another form substantially as prescribed by law.

Sweet Springs GW Monitoring Wells ITB - Page 8 of 10 June 2026

24) Insurance Policies and Bonds: Attention is directed to the provisions of the Insurance Code of the State of California with reference to the writing of insurance policies and bonds covering risks located in this state, and the premiums and commissions thereon. A bidder to whom the Contract is awarded shall furnish, at the time his bond or bonds are submitted for approval, satisfactory evidence that the requirements of said Code have been observed, including proof of unemployment insurance. The required bonds must be provided only by surety insurer who is duly admitted by the Insurance Commissioner of the State of California.

25) Liability Insurance: Before the Contract is executed on behalf of the OWNER, a bidder to whom the Contract has been awarded shall furnish to the OWNER the necessary policy or certificate of liability insurance in which the OWNER and the Engineer shall be named as additional insureds with the bidder in the amount specified in the SUPPLEMENTARY GENERAL CONDITIONS, ARTICLE 11, entitled "Insurance." The policy shall insure the OWNER, the Engineer, the OWNER's officers and employees, the bidder, his employees and his Subcontractors and their employees, and their heirs, agents, and employees, while acting within the scope of their duties, against all claims arising out of or in connection with the work to be performed and shall remain in full force and effect until the work is accepted by the OWNER. The Policy shall provide for the limits stated with any insurance policy carried out by the OWNER.

26) Assignment of Contract: No assignment by the Contractor of any contract to be entered into in accordance with the Notice Inviting Bids and these Instructions to Bidders, or any part thereof, or of funds to be received thereunder, will be recognized by the awarding authority unless such assignment has had prior approval of the awarding authority and the surety has had notice of such assignment in writing and has given his/her written consent thereto.

27) Non-Collusion Affidavit: Section 7106 of the Public Contract Code requires that each bidder execute a Non-collusion Affidavit on all public works contracts. Bidder shall execute the Non-collusion Affidavit included with the Contract Documents and submit it to the OWNER with the Proposal.

28) Disqualification of Bidder: If there is a reason to believe that collusion exists among any of the bidders, none of the bids of the participants in such collusion will be considered, and the OWNER may likewise elect to reject all bids received.

29) Rejection of Proposals: The OWNER reserves the right to reject any proposals which are incomplete, obscure, or irregular, any proposals which omit a bid on any one or more items for which bids are required; any proposals which omit unit prices if unit prices are required; any proposal in which unit prices are unbalanced in the opinion of the OWNER;

any proposals accompanied by insufficient or irregular proposal guaranty; and any proposals from bidders who have previously failed to perform properly or to complete contracts of any nature on time.

30) Relief of Bidders: Attention is directed to the provisions of Public Contract Code Section

5100, et seq., concerning relief of bidders, and in particular to the requirement therein that if a bidder claims a mistake was made in its bid, the bidder shall give the OWNER written notice within five (5) calendar days after the opening of the bids of the alleged mistake, specifying in the notice, in detail, how the mistake occurred.

Sweet Springs GW Monitoring Wells ITB - Page 9 of 10 June 2026

31) Debarred Contractors and Subcontractors: No contractor or subcontractor who is ineligible to bid work on, or be awarded, a public works project under Labor Code sections

1771.1 or 1777.7 can bid on, be awarded or perform work as a subcontractor on the Project. The Contractor is prohibited from performing work on the Project with a subcontractor who is ineligible to perform work on a public works project under these sections of the Labor Code.

32) Taxes: Bid prices shall include all applicable federal, state, and local taxes.

33) Bid Protest Procedures: Any bid protest relating to the form or content of the bidding or

Contract Documents must be submitted in writing to the OWNER, LOS OSOS

COMMUNITY SERVICES DISTRICT, 2122 9TH STREET, SUITE 110, LOS OSOS, CA

93402 at least ten (10) business days before the original date set for the bid opening. Any bidder who submits a bid shall be deemed to have waived any protest to the form or content of the bidding or Contract Documents.

Any bid protest relating to the award of the contract for the work must be submitted in writing to Owner at the address specified above. The protest must be received before 5:00 p.m. of the third business day following bid opening.

The initial protest document shall contain a complete statement of the basis for the protest.

The protest shall refer to the specific portion(s) of the bid documents which forms the basis for the protest. The protest shall include the name, address and telephone number of the person representing the protesting party.

The party filing the protest shall concurrently transmit a copy of the initial protest document and any attached documentation to all other parties who have a direct financial interest that may be adversely affected by the outcome of the protest. Such parties shall include all other bidders or proposers who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest. The documents shall be transmitted by fax or overnight mail.

The procedure and time limits set forth in this paragraph are mandatory and are the Bidder’s sole and exclusive remedy in the event of bid protest. Failure to comply with these procedures shall constitute a waiver of any right to further pursue the bid protest, including filing a Government Code claim or legal proceedings.

34) Items Required for a Completed Proposal:

a) Signed Proposal Form

b) Experience Qualifications Form

c) Bid Schedule (acknowledge addenda, if any)

d) Contractor's Licensing Statement

e) List of Subcontractors

f) List of Material/Equipment Suppliers

g) Acknowledgment of Insurance Requirements

h) Bid Security Form and Bid Bond

i) Non-Collusion Affidavit

j) Certificate of Bidder Regarding Affirmative Action Program

k) Proof of Worker’s Compensation Insurance

l) One photo copy of each license required by these Instructions to Bidders

Sweet Springs GW Monitoring Wells ITB - Page 10 of 10 June 2026

m) References (or other information)

END INSTRUCTIONS TO BIDDERS

Sweet Springs GW Monitoring Wells June 2026

PROPOSAL

LOS OSOS, CA 93402

Board of Directors:

The undersigned hereby proposes to perform all work for which a contract may be awarded to it and to furnish any and all supervision, plant, labor, services, material, accessories, tools, equipment, supplies, transportation, utilities, and all other items and facilities necessary therefore as provided in the Contract Documents, entitled:

together with all appurtenances thereto, all as set forth in the Contract Documents including Addenda ________, _________, and _________; and further proposes and agrees that, if its Proposal is accepted, it will contract in the form and manner stipulated to perform all the work called for in the Contract Documents, and to complete all such work in strict conformity therewith within the time limits set forth therein, and that it will accept as full payment therefore the price or prices set forth in the Bid Schedule forming a part hereof.

A bid bond or cashiers/certified check properly made payable to:

LOS OSOS COMMUNITY SERVICES DISTRICT

hereinafter designated as the OWNER, for the sum of:

________________________________ dollars ($ _______________), which amount is not less than 10 percent of the total amount of the bid, is attached hereto and is given as a guarantee that the undersigned will execute the Agreement and furnish the required bonds and insurance if awarded the contract and, in case of failure to do so within the time provided, the proceeds of said check shall be forfeited to the OWNER.*

* Sureties or surety liability to the OWNER for forfeiture of the face amount of the bond shall be considered as established.

It is understood and agreed that:

1. The undersigned has carefully examined all of the documents contained in the Table of

Contents and which shall comprise those documents specifically referred to in ARTICLE 4 of the Agreement;

2. The undersigned has, by investigation at the site the Work and otherwise, satisfied itself as to the nature, location, and quantity of the Work and has fully informed itself as to all conditions and matters which can in any way affect the Work or the cost thereof;

3. The undersigned fully understands the scope of the Work and has checked carefully all words and figures inserted in its Proposal and further understands that the OWNER will in no way be responsible for any errors or omissions in the preparations of this Proposal;

4. The undersigned will execute the Agreement and furnish the required Performance and

Payment Bonds and proof of the specified insurance coverage within the time frame specified in Articles 22 through 25 of the Instructions to Bidders. This Proposal may not be withdrawn for a period of time specified in Article 10 of the Instructions to Bidders, unless otherwise required by law. If any bidder shall withdraw its bid within said period, the Bidder shall be liable under the provisions of the Bid Security, or the Bidder and its Surety shall be liable under the Bid Bond, as the case may be;

5. The undersigned hereby certifies that this Proposal is genuine and not sham or collusive or made in the interest or in behalf of any person not herein named, and the undersigned has not directly or indirectly induced or solicited any other bidder to put in a sham bid, or any other person or corporation to refrain from bidding; the undersigned has not in any manner sought by collusion to secure for itself an advantage over any other bidder;

6. In conformance with the current statutory requirements of Section 1860 et. seq. of the

Labor Code of the State of California, the undersigned confirms the following as his or her certification:

I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for worker's compensation or to undertake self insurance in accordance with the provisions before commencing the performance of the Work of this contract.

7. The undersigned has submitted the following with this proposal as required for a completed bid:

a) Signed Proposal Form

b) Experience Qualifications Form

c) Bid Schedule (acknowledge addenda, if any)

d) Contractor's Licensing Statement

e) List of Subcontractors

f) List of Material/Equipment Suppliers

g) Acknowledgment of Insurance Requirements

h) Bid Security Form and Bid Bond

i) Non-Collusion Affidavit

j) Certificate of Bidder Regarding Affirmative Action Program

k) Proof of Worker’s Compensation Insurance

l) One photo copy of each license required by these Instructions to

Bidders

m) References (or other information)

NOW: In compliance with the Notice Inviting Bids and all the provisions herein before stipulated; the undersigned with full cognizance thereof, hereby proposes to perform the entire Work for the prices set forth in the attached Bid Sheet(s) upon which award of contract is based.

Dated ________________________ Bidder ____________________________

Bidders Post Office Address By _______________________________

License number, expiration date Title ______________________________

EXPERIENCE QUALIFICATIONS

(To Accompany Proposal)

The bidder has been engaged in the contracting business, under the present business name, for 5 years. Experience in work of a nature similar to that covered in the proposal extends over a period of 5 years.

The bidder, as a contractor, has never failed to satisfactorily complete a contract awarded to him, except as follows:

The following contracts have been satisfactorily completed in the last three (3) years for the persons, firm, or authority indicated, and to whom reference is made:

LOCATION AND FOR

YEAR TYPE OF WORK CONTRACT AMOUNT WHOM PERFORMED

The following is a list of a plant and equipment owned by the bidder, which is definitely available for use on the proposed work as required:

QUANTITY NAME, TYPE, AND CAPACITY CONDITION LOCATION

Signed: ________________________________

Title: ________________________________ (Same as for signature on proposal)

BID SCHEDULE

Refer to Section 01 20 00, Price and Payment Procedures, for further definitions of the bid items in this Bid Schedule.

Item (includes installation) Units Quantity Unit Price Item Price

Mobilization/demobilization. Includes well permit application, enroachment permit application, traffic control/signage and other applicable provisions per encroachment permit, work area demarkation.

Lump Sum 1

Sweet Springs #1: Drill nominal 18-inch borehole and cement 10-inch SDR

21 PVC condutor casing to 50 feet depth Linear feet 50

Sweet Springs #1: nominal 9-inch diameter borehole from base of conductor to 500 feet depth.

Linear feet 450

Sweet Springs #1: Run borehole hole geophysical logs (SP, long and short normal, LL3, gamma ray, sonic).

Lump Sum 1

Sweet Springs #1: 2.5-inch diameter, Sch 80 PVC with blank from wellhead to 440 feet depth, 2.5-inch diameter, 0.020-inch perforations from 440 to 480 feet depth, and blank from 480 to 490 feet depth with end cap.

Linear feet 490

6 Sweet Springs #1 and #2:Centralizers (top and bottom of each screen). Each 4

Sweet Springs #1: coated time release bentonite pellet seals from 400 to 420 feet.

Linear feet 20

8 Sweet Springs #1: Filter pack (8 x 20 sand) from 420 to 500 feet depth. Linear feet 80

Sweet Springs #1: High-solids bentonite grout seal from wellhead to 400 feet depth.

Linear feet 400

Sweet Springs #2: Drill nominal 18-inch borehole and cement 10-inch SDR

21 PVC conductor casing to 50 feet depth Linear feet 50

Sweet Springs #2: Drill nominal 9-inch diameter borehole from bottom of conductor to 380 feet depth (no geophysics).

Linear feet 330

Sweet Springs #2: 2.5-inch diameter, Sch 80 PVC with blank from wellhead to 320 feet depth, 0.020-inch perforations from 320 to 360 feet depth, and blank from 360 to 370 feet depth with end cap.

Linear feet 370

13 Sweet Springs #2: Filter pack (8 x 20 sand) from 300 to 380 feet depth. Linear feet 80

Sweet Springs #2: Coated time release bentonite pellet seals from 280 to

300 feet depth.

Linear feet 20

Sweet Springs #2: High-solids bentonite grout seal from wellhead to 280 feet depth.

Linear feet 280

16 Sweet Springs #1 and #2: Air-lift well development (1 hour each). Hour 2

Sweet Springs #1 and #2: Development water containment and percolation on-site.

Lump Sum 1

Sweet Springs #1 and #2: 8-inch diameter traffic rated monitoring well box with locking well plugs and concrete pad.

Lump Sum 2

19 Sweet Springs #1 and #2: Drilling fluid and cuttings disposal. Lump Sum 1

TOTAL

20 Abandon test hole if necessary (do not add to total). Linear feet 880

Total Base Bid Amount in Words: ____________________________________

Signature of Bidder: _______________________________ Date: _______________

The undersigned agrees to perform, for the benefit of the OWNER, the work itemized herein, and in accordance with all San Luis Obispo County, State, and Federal laws.

All materials and equipment used in the execution of the described work shall comply with all applicable State and Federal codes, regulations and requirements.

The Contractor shall verify all measurements and submit a unit price for the facilities shown above. Payment will be made on a unit price basis.

The Work to be performed described in the above BID SCHEDULE shall consist of furnishing all plant, tools equipment, materials, supplies, and manufactured articles and furnishing all labor, transportation, and services, including fuel, power, water, and essential communications, and performing all Work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract…