This is a project manual and bidding document issued by the Port of Seattle Commission for a Glass and Glazing Unit Price Portwide 2026 contract (SW-0322954). The Port seeks qualified contractors to provide labor, materials, equipment, and related services for glass, glazing, skylights, window films, Satellite Transportation System cars, aluminum storefront assemblies, and associated work at Seattle-Tacoma International Airport and other Port properties. Work encompasses facility restoration, remodeling, reconfiguration, new construction, hazard mitigation, repairs, installations, and maintenance. A pre-bid meeting is scheduled for October 20, 2026 at 11:00 a.m. via Microsoft Teams. Bids must be submitted electronically to SmallWorksBid@portseattle.org by October 27, 2026 at 11:00 a.m., with public bid opening held the same day via video conference. The contract is awarded for an estimated not-to-exceed amount of $350,000.00, excluding Washington State Sales Tax, with a contract term of 365 calendar days from the official award date or until the contract amount is depleted, whichever occurs first. The contract includes an option to extend up to 12 months beyond the original completion date.
Bidders must submit unit prices for labor categories (foreperson and journey-level glaziers at day, swing, and graveyard rates), laborer services, and reimbursable items including subcontractor work (markup not to exceed 7 percent), materials (markup not to exceed 20 percent), and equipment (markup not to exceed 20 percent). No bid bond is required; however, successful bidders must provide Performance and Payment Bonds in the full contract amount and Certificate of Insurance within ten days of receiving the Notice of Intent to Award. Bidders must be registered contractors in compliance with Washington State law (RCW 18.27), possess current Washington State Unified Business Identifier numbers, and meet all prevailing wage and public works requirements. Per RCW 53.08.120, prevailing wage rates in effect at the beginning of each contract year shall apply, with annual intents and affidavits required for work completed. The Port reserves the right to reject any or all bids and award to the lowest responsible bidder. This is a small works contract with indefinite quantity, meaning actual work quantities may vary substantially from estimated quantities provided for bid comparison purposes, and contractors shall not be entitled to adjustment for such variations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Issued by:
THE PORT OF SEATTLE COMMISSION
Glass and Glazing Unit Price Portwide 2026 at
Seattle-Tacoma International Airport / Seaport
PROJECT MANUAL
Divisions 00-08
SW-0322954
October 13, 2026
DIVISION 0 - BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
Document 00 00 00c - Notice to Bidders
SW-0322954
Rev. 05/03/23
NOTICE TO BIDDERS
NOTICE REGARDING PLAN HOLDER LISTS
The plan holder list is available at the Port’s Vendor Connect website at https://hosting.portseattle.org/sops/#/Dashboard; click on “Current and Past Solicitations” and search for this project, then click on “Become a Plan Holder”, you must have a login to become a plan holder.
NOTICE REGARDING BID CLARIFICATIONS
To submit questions regarding Bidding Documents, log into Vendor Connect at https://hosting.portseattle.org/sops/#/Dashboard; click on “Current and Past Solicitations” and search for this project, then click on “Become a Plan Holder”, you must have a login and be a plan holder to ask a question. If a bidder does not have online capability, submit all questions to the address in Document 00 20 00, paragraph IB-04.02 B 1.
NOTICE REGARDING SMALL WORKS UNIT PRICE CONTRACTS
Per RCW 53.08.120, Prevailing wages for all work performed pursuant to each work authorization must be the prevailing wage rates in effect at the beginning date for each contract year. Intents and affidavits for prevailing wages paid shall be submitted annually for all work completed within the previous twelve-month period of the unit priced contract.
TABLE OF CONTENTS
Rev. 1/7/2025
Glass and Glazing Unit Price Portwide 2026
TABLE OF CONTENTS
DIVISION 0
BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
NUMBER DOCUMENT TITLE
00 10 00 Advertisement for Bids 00 20 00 Instructions to Bidders 00 41 00 Bid Form 00 52 00 Agreement Forms 00 60 00 Bonds and Certificates Forms 00 70 00 General Conditions 00 80 00 Supplementary Conditions 00 83 00 Civil Rights, Title VI, and Non-Discrimination
DIVISION 1
GENERAL REQUIREMENTS
NUMBER
SECTION TITLE
01 11 00 Summary of Work 01 14 13 Airport Personnel Identification/Access Control and Security 01 14 14 Seaport Personnel Identification/Access Control 01 25 00 Substitutions 01 31 13 Project Coordination 01 32 19 Preconstruction Submittals 01 33 00 Submittals 01 35 13.13 Operational Safety on Airports During Construction 01 35 29 Safety Management 01 35 43 Environmental Regulatory Requirements 01 50 00 Temporary Facilities and Controls 01 55 26 Traffic Control 01 57 23 Pollution Prevention, Planning and Execution 01 74 00 Cleaning 01 74 19 Construction Waste Management 01 77 00 Construction Project Closeout 01 77 20 Public Works Project Closeout
TABLE OF CONTENTS
Rev. 1/7/2025
DIVISION 1
GENERAL REQUIREMENTS
NUMBER
SECTION TITLE
01 78 23.13 Aviation Operations and Maintenance Documentation 01 78 36 Warranties and Bonds
DIVISION 8
OPENINGS
NUMBER SECTION TITLE
08 51 13 Aluminum Windows 08 80 00 Glazing
Document 00 10 00 - Advertisement for Bids
SW-0322954 00 10 00-1
Rev. 06/8/2026
Small Works Bids shall be submitted via email to SmallWorksBid@portseattle.org until October 27, 2026, 11:00 a.m. for:
SW-0322954 - Glass and Glazing Unit Price Portwide 2026
The public bid opening will be hosted via video conferencing and by telephone on October 27, 2026, 11:00 a.m. The Port of Seattle is not responsible for any costs incurred in response to this Advertisement for Bids. Any bids received after the published bid submittal time will be rejected.
Join MSTeams Meeting Link to attend the Bid Opening (ctrl + mouse click) or join by phone (425) 660-9954 and use Conference ID:70378335#.
Visit the Port’s Vendor Connect procurement site for further details and to access the bid documents: https://hosting.portseattle.org/sops/#/Dashboard A Pre-Bid Meeting will be conducted on October 20, 2026, 11:00 a.m. Join via MSTeams Meeting Link (ctrl + mouse click) or join by phone (425) 660-9954 and use Conference ID:
380206127#.
See Document 00 20 00 – Instructions to Bidders- IB 4.06 for more information.
The Contractor shall provide labor, materials, equipment, and incidentals as necessary to perform work involving glass, glazing, skylights, window films, Satellite Transportation System cars, aluminum storefront type assemblies (or similar), and other work on related assemblies at Seattle-Tacoma International Airport (STIA) and other Port properties. Projects may be part of facility restoration, remodel, reconfiguration, new work, mitigation of hazards, repairs, installations, and maintenance related work. This contract does not include work for asbestos containing materials (ACM). Recycling of waste from the projects and use of recycled products is encouraged.
The contract will be awarded for an estimated amount not to exceed $350,000.00, which excludes Washington State Sales Tax.
Time limit for substantial completion of the work is 365 calendar days.
By submission of a bid, the Bidder certifies they will comply with all local, state, federal, and other laws, rules, regulations, and other requirements applicable to its operations relating to environmental responsibility, worker safety, labor, anti-discrimination and anti-human trafficking.
The Bidder/Proposer is also acknowledging that it will adhere to the Values and Standards of the Port of Seattle. A copy of the Third-Party Expectations is included in Document 00 83 00.
TITLE VI SOLICITATION NOTICE
The Port of Seattle, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4), 28 CFR § 50.3, and 49 CFR Part 21, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, all contractors will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of the owner’s race, color, national origin, sex, creed, age, or disability in consideration for an award.
Any such complaint must be in writing and filed with the Port’s Title VI Coordinator within one hundred, eighty (180) days following the date of the alleged discriminatory occurrence. Title VI Discrimination Complaint Forms may be obtained from the office of the Tittle VI Coordinator at no cost to the complainant by sending an email to TitleSixCoordinator@portseattle.org.
mailto:SmallWorksBid@portseattle.org https://teams.microsoft.com/meet/23566349608473?p=roPrRWC6aRTkKG7e1K https://hosting.portseattle.org/sops/#/Dashboard https://teams.microsoft.com/meet/269517402542810?p=JDN3tou8xGaIfc3JlN https://teams.microsoft.com/meet/269517402542810?p=JDN3tou8xGaIfc3JlN mailto:TitleSixCoordinator@portseattle.org
Document 00 10 00 - Advertisement for Bids
SW-0322954 00 10 00-2
Rev. 06/8/2026
Dated at Seattle, Washington,October 13, 2026
AUTHORIZED BY THE PORT COMMISSION OF THE PORT OF SEATTLE
Yanet Maldonado
Manager, Procurement
Roster Notification: October 13, 2026
End of Document
DIVISION 0 – BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
Document 00 20 00 – Instructions to Bidders
SW-0322954 00 20 00-1
Rev. 08/10/2026
CONTENTS
ARTICLE 1 - DEFINITIONS
IB-01.01 Definitions
ARTICLE 2 - QUALIFICATION OF BIDDERS
IB-02.01 General IB-02.02 Special Qualification Questionnaires
IB-02.03 RESERVED
IB-02.04 RESERVED
IB-02.05 Civil Rights, Title VI, and Non-Discrimination
ARTICLE 3 – BIDDER’S REPRESENTATIONS
IB-03.01 General
ARTICLE 4 - BIDDING DOCUMENTS
IB-04.01 Availability IB-04.02 Interpretation and Clarification IB-04.03 Substitutions IB-04.04 Addenda IB-04.05 Additional Information Provided by the Port
IB-04.06 RESERVED
ARTICLE 5 - BONDING & INSURANCE REQUIREMENTS
IB-05.01 Bid Bond IB-05.02 Performance and Payment Bond Costs IB-05.03 Contract Bonds and Insurance Certificates IB-05.04 Power of Attorney
ARTICLE 6 - EXECUTION OF BID
IB-06.01 Form of Bid IB-06.02 Irregular Bids IB-06.03 Responsible Bidder
IB-06.04 RESERVED
IB-06.05 RESERVED
IB-06.06 State and Local Taxes
SW-0322954 00 20 00-2
Rev. 08/10/2026
ARTICLE 7 - SUBMISSION OF BIDS
IB-07.01 Submission of Bid IB-07.02 Timely Delivery
ARTICLE 8 - WITHDRAWAL OR MODIFICATION OF BIDS
IB-08.01 Prior to Bid Opening IB-08.02 After Bid Opening IB-08.03 Resubmittal of Modified Bids
ARTICLE 9 - OPENING OF BIDS
IB-09.01
IB-09.02
IB-09.03
IB-09.04
IB-09.05
Public Opening Reading of Bids Evaluation of Bids
RESERVED
RESERVED
ARTICLE 10 - ACCEPTANCE OF BIDS (AWARD)
IB-10.01 Verification of Bid Prices
IB-10.02 RESERVED
IB-10.03 Rights of the Port IB-10.04 Failure to Execute Contract IB-10.05 Notice of Intent to Award IB-10.06 Extension of Time IB-10.07 Signing of Contract IB-10.08 Cancellation of Award
ARTICLE 11 - PROTESTS
IB-11.01 Purpose IB-11.02 Definitions IB-11.03 Timing IB-11.04 Contents of Protest IB-11.05 Administrative Appeal Procedures IB-11.06 Judicial Proceedings IB-11.07 Strict Compliance IB-11.08 Representation IB-11.09 Computation of Time
SW-0322954 00 20 00-3
Rev. 08/10/2026
IB-11.10 Acknowledgement
ARTICLE 12 - FORM OF AGREEMENT
IB-12.01 Form of Agreement
SW-0322954 00 20 00-4
Rev. 08/10/2026
ARTICLE 1: DEFINITIONS
IB-01.01 - DEFINITIONS
All definitions set forth in the General Conditions of the Contract, or other definitions within the Contract Documents are applicable to the Bidding Documents.
A. Alternate Bid: The sum stated in the Bid offered by the Bidder to be added to or deducted from the Base Bid for Work described as a change in the project. An Alternate Bid may change price, time, scope, materials, or methods of construction.
B. Base Bid: The sum stated in the Bid offered by the Bidder to perform the Work described as the base, to which Work may be added to or deducted from based upon the sum(s) of Alternate or Alternative bids accepted by the Port.
C. Bidding Documents: Bidding Documents include references therein, namely the Advertisement, Instruction to Bidders, Bid form, Sample forms, supplemental forms and the proposed Contract Documents including Addenda, if any, issued prior to the time specified for opening of the Bids.
D. Small Works: Construction contracts with a total cost less than $350,000.00.
E. Substitutions: The product, equipment, material, or method proposed by a Bidder or Contractor to be incorporated into this project in place of that specified.
Substitutions are not Alternative Bids. Substitutions shall not be considered prior to award.
F. Unit Price: An amount stated in the Bid as the price for a particular unit of the Work measured as described within the Contract Documents.
ARTICLE 2: QUALIFICATION OF BIDDERS
IB-02.01 - GENERAL
A. Generally, no prequalification requirements are imposed prior to submitting a Bid.
However, the Port of Seattle may make such investigations as they deem necessary to determine the ability of the Bidder to perform the Work. The Bidder shall furnish to the Port all such information and data for this purpose as the Port may request. The Port reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Port that such Bidder is properly qualified to carry out the obligations of the contract and to complete the Work contemplated therein.
B. The Bidder must be familiar with all Federal, State and local laws, including RCW
18.27 Registration of Contractors, ordinances and regulations which in any manner might affect those engaged or employed in the Work, the materials, equipment or procedures used in the Work, or which in any other way would affect the conduct of the Work. It is assumed the Bidder is familiar with such laws and
SW-0322954 00 20 00-5
Rev. 08/10/2026 regulations, and no plea of misunderstanding or ignorance of the law will be considered.
C. The Bidder must be registered and licensed as may be required by the laws of the State of Washington at the time Bids are publicly opened.
IB-02.02 - SPECIAL QUALIFICATION QUESTIONNAIRES
Special qualification questionnaires, if any, shall be submitted as requested.
IB-02.03 - RESERVED
IB-02.04 - RESERVED
IB-02.05 - CIVIL RIGHTS, TITLE VI, AND NON-DISCRIMINATION:
A. Bidders are required to comply with Port policies, procedures and requirements relating to Resolution 3668 – Non-Discrimination and Equal Opportunity, a copy is included in Document 00 83 00.
ARTICLE 3: BIDDER'S REPRESENTATION
IB-03.01 - GENERAL
Each Bidder, by submitting a Bid, represents that:
A. The Bidder has read and understands the Bidding Documents and that the Bid is made in accordance with all applicable documents.
B. The Bidder has inspected or investigated the site(s) of the Work (if a site investigation was offered) and has become familiar with the local conditions under which the Work is to be performed and has familiarized itself with the quantity and character of all materials to be demolished.
C. The Bid is based upon the Work described or presented within the Bidding Documents and described in detail in the Project Manual.
D. The failure or omission of the Bidder to examine all pertinent forms, instruments, applicable statutes, or other documents shall in no way relieve the Bidder from the contractual obligations required by the Bidding Documents.
E. The Bid submitted is unconditional in all respects.
ARTICLE 4: BIDDING DOCUMENTS
IB-04.01 - AVAILABILITY
A. Copies of the Project Manual and Drawings may be viewed on VendorConnect at:
https://hosting.portseattle.org/sops/.
https://hosting.portseattle.org/sops/
SW-0322954 00 20 00-6
Rev. 08/10/2026
B. Only complete sets of Bidding Documents shall be used in preparing bids. The Port of Seattle assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
C. Bidding Documents issued as stated above are for bidding purposes only. The Port does not confer a license or grant for any other use.
IB-04.02 - INTERPRETATION & CLARIFICATION
A. Bidders shall promptly notify the Port of ambiguities, inconsistencies, or errors, if any, which they may discover upon examination of the Bidding Documents or of the site and local conditions.
1. Every request for interpretation or clarification should be submitted using the Port’s VendorConnect website https://hosting.portseattle.org/sops/. If a Bidder does not have on-line capability, then submit in writing, addressed to the Bid Desk, Port of Seattle, 17900 International Blvd., Suite 400 B, Sea-Tac, WA 98188. To be given consideration the request must be received five (5) working days prior to the date fixed for the opening of the bids.
2. The Port’s responses, if there are any, which do not change the Scope of Work described in the contract documents may be mailed, delivered, telegraphed, faxed, or by other electronic means, to all plan holders of record, at the respective address furnished for such purposes, prior to the date fixed for the receipt of bids. Such letters of clarification shall not be considered part of the contract documents and therefore need not be acknowledged by the Bidders as part of the Bid Form. The Port will determine at its sole discretion whether or not any clarification or interpretation changes the Scope of Work and should be included in the Contract Documents.
3. Clarifications, interpretations, or supplemental instructions which do change the Scope of Work and or schedule described in the contract documents, will be issued only in the form of written addenda.
C. Oral interpretations or clarifications will be without legal effect.
IB-04.03 - SUBSTITUTIONS
A. The product, equipment, materials, or methods described or noted within the Bidding Documents, whether currently available or not, are to establish a standard of quality, function, appearance and dimension. A proposed substitution shall have equal attributes in all respects.
B. No substitution will be considered unless a written request for approval is submitted by the Contractor, after Award, in accordance with the applicable provisions of Section 01 25 00 of these specifications. Each such request shall describe the proposed substitution in its entirety including name of the material or https://hosting.portseattle.org/sops/
SW-0322954 00 20 00-7
Rev. 08/10/2026 equipment, drawings, catalog cuts, performance or test data and all other information required for an evaluation. The submittal shall also include a statement noting all changes required in adjoining, dependent or other interrelated work necessitated by the incorporation of the proposed substitute. The Bidder shall bear the burden of proof of merit of the proposed substitution. The Director, Engineering Services decision of approval or disapproval of a proposed substitution shall be final.
IB-04.04 - ADDENDA
A. Addenda will be issued on the Port’s VendorConnect website https://hosting.portseattle.org/sops/. Bidder is required to sign up as a plan holder to receive addenda notifications prior to the date fixed for the receipt of bids.
B. Each Bidder shall acknowledge on Bid that it has obtained all addenda issued.
C. All addenda so issued shall become part of the Contract Documents.
IB-04.05 - ADDITIONAL INFORMATION PROVIDED BY THE PORT
A. The Port is unaware of other documents containing information that would aide in preparing a bid for this work.
IB-04.06 - RESERVED
ARTICLE 5: BONDING & INSURANCE REQUIREMENTS
IB-05.01 - BID BOND
No bid bond is required for this contract.
IB-05.02 – PERFORMANCE AND PAYMENT BOND COSTS
The costs or premiums for all bonds shall be paid by the successful bidder.
IB-05.03 - CONTRACT BONDS AND INSURANCE CERTIFICATES
A. The successful bidder shall furnish Insurance Certificates, Performance Bond and a Payment Bond covering the faithful performance of the Contract and the payment of all obligations arising there under. Each Performance and Payment bond shall be in the full amount of the Contract Sum. See Document 00 70 00 - General Conditions Article G-11 for more information.
B. FAILURE TO PROVIDE BONDS
1. Failure to provide timely Performance and Payment Bonds will result in non-Award and forfeiture of any Bid bond or Security to the Port.
2. The Port may, from time to time, require the Contractor’s Surety (or
Sureties) to appear and qualify themselves upon the bonds. If such Surety (or Sureties) refuse or fail to so appear and qualify, or if the Port determines that such Surety (or Sureties) are insufficient to fulfill the terms and conditions of the bonds, then the Port shall require the Contractor to https://hosting.portseattle.org/prms/
SW-0322954 00 20 00-8
Rev. 08/10/2026 furnish additional Surety (or Sureties) as may be necessary to fulfill the terms and conditions of the bonds.
3. If the Contract Sum is increased by Change Order, the Contractor agrees to provide the Port with such additional Performance and Payment Bonds as required to assure performance of any additional Work and payment for the labor and materials incidental to such Work.
IB-05.04 - POWER OF ATTORNEY
Attorneys-in-fact who sign Bid Bonds or Contract Bonds must file with each bond a certified and effectively dated copy of their Power of Attorney.
ARTICLE 6- EXECUTION OF BID
IB-06.01 - FORM OF BID
A. Bids shall be submitted on the forms provided by the Port.
B. All blanks on the Bid Form shall be filled in by typewriter or printed by hand in ink.
C. For lump sum Bids the total Contract lump sum price shall be submitted.
D. Where so indicated by the makeup of the Bid Form, sums shall be expressed in figures only.
E. For unit price Bids a price shall be submitted for each item of the Work, an extension thereof, and the total amount bid. Such prices shall be stated in clearly legible figures only and shall be in ink or typed.
F. Alterations, erasures, or interlineations, if any, shall be in ink and initialed by the signer of the Bid.
G. The Bidder shall make no additional conditions or stipulations on the Bid or qualify its Bid in any manner.
H. The Bid Form shall include the legal name and registration number of the Bidder and a statement indicating whether Bidder is a sole proprietor, a partnership, a corporation, joint venture, or other legal entity. The Bid Form shall be signed by the person or persons legally authorized to bind the Bidder to a contract and shall be accompanied by satisfactory evidence of such authorization. A Bid submitted by an agent shall have a current Power of Attorney attached certifying agent’s authority to bind the Bidder.
I. The Bid Form shall not become a part of the Contract Documents except by inclusion into the Agreement.
SW-0322954 00 20 00-9
Rev. 08/10/2026
IB-06.02 - IRREGULAR BIDS
A bid shall be considered irregular and may be rejected by the Port for any of the following reasons:
A. If the Bid Form furnished or authorized is not used or is altered;
B. If the Bid Form is incomplete or if any required supplemental documents contain any additions, deletions, unauthorized alternate bids, conditions, or otherwise fail to conform to the Port of Seattle requirements;
C. If the Bidder adds any provisions reserving the right to reject or accept the award, or enter into the contract;
D. If the Bid fails to include a unit price for every bid item;
E. If the Port deems any of the Bid prices to be excessively unbalanced either above or below the amount of a reasonable bid for the item of work to be performed to the potential detriment of the Port.
F. If Bid is not based on United States of America dollars.
IB-06.03 - RESPONSIBLE BIDDER
It is the intent of the Port to award a contract to the “lowest responsible Bidder”. Before award, the Bidder must meet the following Bidder responsibility criteria to be considered a responsible Bidder. The Bidder may be required by the Port to submit documentation demonstrating compliance with the criteria. The Bidder must:
A. Have a current certificate of registration as a contractor in compliance with chapter
18.27 RCW, and if applicable, a plumbing contractor license in compliance with chapter 18.106 RCW, an elevator contractor license in compliance with chapter
70.87 RCW, an electrical contractor license in compliance with chapter 19.28 RCW, which must have been in effect at the time of bid submittal.
B. Have a current Washington state unified business identifier (UBI) number.
C. Have a Department of Revenue state excise tax registration number, as required in Title 82 RCW.
D. If applicable:
1. Have Industrial Insurance (workers’ compensation) coverage for the Bidder’s employees working in Washington, as required in Title 51 RCW.
2. Have a Washington Employment Security Department number, as required in Title 50 RCW.
E. Not be disqualified from bidding on any public works contract under RCW
39.06.010 or 39.12.065(3).
F. Not have a civil judgement entered by a court of limited or general jurisdiction of a willful violation, as defined by RCW 49.48.082, any provision of chapter 49.46, SW-0322954 00 20 00-10
Rev. 08/10/2026
49.48, or 49.52 RCW and no final and binding citation and notice of assessment issued by the Department of Labor and Industries (L&I).
G. If bidding on a public works project subject to the apprenticeship utilization requirements in RCW 39.04.320, not have been found out of compliance by the Washington state apprenticeship and training council for working apprentices out of ratio, without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship under chapter 49.04 RCW for the one-year period immediately preceding the date of the bid solicitation.
H. Have received training on the requirements related to public works and prevailing wage under Chapter 39.12 RCW. Bidders that have completed three or more public works projects and have had a valid business license in Washington for three or more years are exempt from this subsection.
I. Meet any supplemental criteria requirements, if applicable.
J. A Bidder may be deemed not responsible and its Bid rejected if:
1. More than one Bid on the same project from a Bidder under the same or different names.
2. Evidence of collusion with any other Bidder or Bidders. Participants in such collusion may be disqualified from submitting Bids on further work.
K. If requested, the apparent low Bidder must provide within two (2) business days of receiving the Port’s request:
1. Information demonstrating that the Bidder is responsible, consistent with the criteria set forth above. The Port may specifically request information addressing any of the items listed above. The Port reserves the right to request such documentation from other Bidders also.
L. If the Port determines that the apparent low Bidder is not responsible, the Port will notify the Bidder of its preliminary determination in writing. Within two (2) days of receipt of the preliminary determination, the Bidder may either withdraw its bid or protest the Port’s determination by presenting additional information to the Port.
(Protest procedures are outlined in Document 00 20 00 IB-11.02 and IB-11.03.)
The Port will consider the additional information before issuing its final determination. If the final determination affirms that the Bidder is not responsible, the Port will not execute a contract with any other Bidder until two (2) business days after the Bidder determined to be not responsible has received the final determination.
IB-06.04 - RESERVED
IB-06.05 - RESERVED
IB-06.06 - STATE AND LOCAL TAXES
SW-0322954 00 20 00-11
Rev. 08/10/2026
Bidders shall not add State and local retail sales taxes to any Bid Price except as may be provided for in the Bid Form Schedule of Prices.
ARTICLE 7: SUBMISSION OF BIDS
IB-07.01 - SUBMISSION OF BID
A. For Small Works only - The Bid shall be submitted electronically via email. Scan and submit the Bid on Document 00 41 00 – Bid Form, provided in this project manual, in Adobe Acrobat portable data format (PDF) to SmallWorksBid@portseatt le.org.
Include the notation “BID ENCLOSED” and the Contract Number (SW-0322954) in the Subject line of the email.
B. Oral, hand delivered, sent by postal mail, telephonic, or telegraphic bids are invalid and will not receive consideration.
C. No Bid shall be considered which has not been received by the Director, Central Procurement Office before the time fixed for the opening of Bids in the published call for Bids.
IB-07.02 - TIMELY DELIVERY
The Bid shall be submitted via email. The time the Bid is received shall be the Port of Seattle’s email server time.
ARTICLE 8: WITHDRAWAL OR MODIFICATION OF BIDS
IB-08.01 - PRIOR TO BID OPENING
Prior to the time and date designated for the receipt of Bids, a Bidder may withdraw or modify a Bid submitted earlier. Withdrawal, or modification, of the Bid shall be by written or electronic notice signed by the Bidder and received prior to the time and date designated for the receipt of Bids. Modifications submitted via electronic means shall be followed by written confirmation mailed and postmarked on or before the date set for receipt of Bids and shall include reasonable assurance of Bid security changes if applicable.
IB-08.02 - AFTER BID OPENING
A Bid may not be modified, withdrawn or canceled by the Bidder after the time and date set for the opening and for the period of time stipulated in the Bid Form. By submitting a Bid the Bidder agrees to the above conditions.
IB-08.03 - RESUBMITTAL OF MODIFIED BIDS
A Bid which has been withdrawn or modified prior to the time and date designated for the receipt of Bids may be resubmitted. The resubmitted Bid will be considered valid only if it is received prior to the date and time originally set for the receipt of Bids and contains the Bid security covering all modifications, and all documents requested in the original submittal, signed and initialed as mentioned heretofore.
SW-0322954 00 20 00-12
Rev. 08/10/2026
If the Bid is submitted via email multiple times, the latest responsive submission will govern.
ARTICLE 9: OPENING OF BIDS
IB-09.01 - PUBLIC OPENING
Bids will be opened and read publicly aloud via MS Teams meeting at the time indicated in the call for Bids unless the Port has changed through Addendum the date of opening Bids to another date, rejected any Bid or Bids, or has canceled the call for Bids. Bidders, their authorized agents, and other interested parties are invited to attend.
Refer to Document 00 10 00 Advertisement For Bids.
IB-09.02 - READING OF BIDS
Unless stated otherwise in the Advertisement, all Bids which have been properly identified and received will be publicly opened and read aloud. No evaluation of the Bids will be made at that time except for the announcement of the “Apparent Low Bidder,” if pertinent.
IB-09.03 - EVALUATION OF BIDS
After evaluation by the Director, Central Procurement Office and recommendation to the Port of Seattle Commission, the Port retains the right to reject any or all Bids.
IB-09.04 – RESERVED
IB-09.05 – RESERVED
ARTICLE 10: ACCEPTANCE OF BIDS (AWARD)
IB-10.01 - VERIFICATION OF BID PRICES
When Bids are opened and read, they will be checked for mathematical accuracy with respect to the extensions of unit bid prices and the total Bid price. If there is a discrepancy between a unit Bid price and the extended amount of any Bid item, the unit Bid price shall control. The total of extensions, corrected where necessary, will be used as the amount of the Bid for award purposes.
IB-10.02 – RESERVED
IB-10.03 - RIGHTS OF THE PORT
A. The Port shall have the right to waive any informality or irregularity in any Bid received.
B. The right is reserved to accept a Bid of the lowest responsible Bidder, to reject any or all Bids, republish the call for Bids, revise or cancel the work to be performed, or to do the work otherwise, if in the judgment of the Port Commission, the best interest of the Port is served thereby.
SW-0322954 00 20 00-13
Rev. 08/10/2026
C. Bidders are advised that regulations governing the permit application and approval process are becoming so complex and uncertain as to results that this project may not receive the approval of all regulatory agencies and therefore may not be awarded to any Bidder, notwithstanding that the price offered is within the budget approved by the Commission.
IB-10.04 - FAILURE TO EXECUTE CONTRACT
If the Bidder awarded the Contract fails to execute the Contract and furnish satisfactory bonds within ten (10) days from receipt of the Notice of Intent to Award, or declares in writing its intent to not execute the Contract, the Bid deposit shall be forfeited to the Port and the Port Commission may provide Notice of Intent to Award to the second lowest responsible Bidder. If the second lowest responsible Bidder fails to enter into the Contract and furnish bonds within ten (10) days after receipt of the Notice of Intent to Award, forfeiture of its Bid deposit shall also be made and the Contract may be awarded to the third lowest responsible Bidder, and in like manner until the Contract and bonds are executed by a responsible Bidder to whom award is made, or further Bids are rejected or the number of Bids is exhausted.
IB-10.05 - NOTICE OF INTENT TO AWARD
A. The successful Bidder will receive a “Notice of Intent to Award” by email, certified mail, express mail, or courier. The letter will direct the Bidder to provide, in writing, an acknowledgement of receipt of the “Notice of Intent to Award”. It will also list out the contract submittals required for execution of the contract.
B. The Bidder is to submit Certificates of Insurance, and the required bonds for review and approval within ten (10) days after receipt of the “Notice of Intent to Award.”
C. The Bidder shall also submit an executed Agreement form, furnished by the Port Commission, within ten (10) days after receipt of the “Notice of Intent to Award.”
IB-10.06 - EXTENSION OF TIME
If the Contract is not executed or not provided within the time required, and there appears circumstances which the Port Commission deems to warrant an extension of time, it may extend the time for execution of the Contract or for furnishing bonds for not to exceed ten (10) additional days.
IB-10.07 - SIGNING OF CONTRACT
Copies of Contract Documents shall be signed by the Port Commission or Authorized Representative and the Contractor.
IB-10.08 - CANCELLATION OF AWARD
The Port reserves the right to cancel its Intent to Award of any Contract at any time before the execution of said Contract by all parties without liability to the Port.
SW-0322954 00 20 00-14
Rev. 08/10/2026
ARTICLE 11: PROTESTS
IB-11.01 - PURPOSE
To provide a prompt, fair and equitable administrative remedy to all Bidders and Prospective Bidders regarding alleged substantive errors or omissions in the bidding documents or regarding the decision by the Port to award the Contract or notice from the Port that a Bid is non-responsive or that a Bidder is not responsible.
IB-11.02 - DEFINITIONS
Filed: Complete receipt of any document by the Port prior to the specified time indicated in these procedures. Documents received after the specified time indicated in these procedures shall be considered received the following business day.
Interested Party: An actual or prospective Bidder or Proposer whose direct, substantial economic interest would be affected by award of a contract or by the failure to award a contract.
IB-11.03 - TIMING
Any actual or prospective Bidder showing a substantial economic interest in this Contract, who is aggrieved by either the solicitation or award of this Contract, may PROTEST to the Port, only in accordance with the procedures set forth below.
A. Protests Based on the Form or Content of the Bidding Documents: Any Protest based on the form or content of the bidding documents, which is or should have been apparent prior to the date established for submittal of Bids, must be filed with the Port via email to Protests@portseattle.org. The email subject line must clearly identify the contract title and number and be labeled as a “Protest.” No protest based on the content of the bidding documents will be considered if filed later than 5PM Pacific Time five (5) business days prior to the specified bid submittal due date. Failure to timely file the protest will result in its rejection. It is the sole responsibility of the protestor to ensure the protest is timely filed.
B. Other Protests: Protests based on any other circumstances must be filed with the Port via email to Protests@portseattle.org no later than 5PM Pacific Time two (2) business days after the protestor knew or should have known of the facts and circumstances upon which the protest is based. The email subject line must clearly identify the contract title and number and be labeled as a “Protest.” No protest will be considered by the Port if all bids are rejected or if the protest is received after award of the Contract. Failure to timely file the protest will result in its rejection. It is the sole responsibility of the protestor to ensure the protest is timely filed.
mailto:Protests@portseattle.org
SW-0322954 00 20 00-15
Rev. 08/10/2026
IB-11.04 - CONTENTS OF PROTEST:
To be considered, a Protest shall be in writing and shall include: (1) the name, street address, phone number and email address of the aggrieved party; (2) the contract title and number under which the Protest is submitted; (3) the direct economic interest of the aggrieved party in the contract to be awarded under the Solicitation; (4) a detailed description of the specific grounds for the Protest and any supporting legal and/or factual documentation; and (5) the specific ruling or relief requested. In addition, in the event the protesting party asserts its responsibility as a contractor as a ground for Protest, it must address in detail each of the matters addressed in
RCW 39.04.350.
A. Initial Administrative Review: The Protest shall be promptly considered on the written submittal by the Contract Administrator. The Contract Administrator will give notice of the Protest and provide a copy to any others as required. In its sole discretion, the Contract Administrator may give notice of the Protest to other interested parties, including other Bidders. The Port reserves the right to resolve or to attempt to resolve any Protest that concerns the form or content of the solicitation and which Protest was received before the bid opening through written addenda to the bidding documents.
B. The Contract Administrator will issue a written decision on the Initial Administrative Review within two (2) business days following the receipt of the Protest, stating the reasons for the action taken. A copy of the decision shall be provided to the aggrieved party, and any other party as may be required, by email.
IB-11.05 - ADMINISTRATIVE APPEAL PROCEDURES
A. Right of Appeal. For any Solicitation in which the value of the contract to be awarded is expected to exceed $200,000, the aggrieved party may appeal the decision of the Port by filing a Notice of Administrative Appeal via email to Protests@portseattle.org not later than 5PM Pacific Time two (2) business days after filing the initial Administrative Review decision. The Notice of Administrative Appeal shall be timely, in writing and clearly labeled in the email subject line as a “Notice of Administrative Appeal.” A copy of the initial Protest shall be attached to the Notice of Administrative Appeal. The Port will provide a copy of the Notice of Administrative Appeal to other interested parties at the Port’s sole discretion.
Failure to timely file the Administrative Appeal will result in its rejection. It is the sole responsibility of the appellant to ensure the Administrative Appeal is timely filed.
B. Hearing. Promptly following the filing of the Notice of Administrative Appeal, an appeal hearing shall be conducted before a panel of at least two Port representatives (“the Panel”) normally consisting of the Director, Central Procurement Office (or designee) and a representative of the Port’s legal department. The hearing will generally be conducted within five (5) business days of the filing of the Notice of Administrative Appeal, and the aggrieved party and any other interested parties will be notified of the time and place of the hearing.
SW-0322954 00 20 00-16
Rev. 08/10/2026
C. Conduct of Hearing. Except as the Panel may allow in its discretion, no discovery shall be available. At the Administrative Appeal Hearing, the aggrieved party will be given a reasonable opportunity to present relevant testimony and evidence and to make legal arguments. Other interested parties may also be given the opportunity to do so. The hearing will be recorded, and the Panel shall maintain an official record of all documentary evidence presented at the hearing. The Panel shall issue a written Final Decision. A copy of the Final Decision shall be provided to the aggrieved party, and any other party at the Port’s sole discretion, via email.
D. Standard of Review on Administrative Appeal: On Administrative Appeal the Panel will consider the Protest, de novo. The aggrieved party shall, however, be restricted from raising any matter or ground not reasonably within the scope of the materials placed before the Port.
E. Stay of award of the contract: The Port will stay award of the contract for two (2) business days following the issuance of its Final Decision.
IB-11.06 - JUDICIAL PROCEEDINGS
All judicial proceedings must be filed within two (2) business days of the issuance of the Port’s Final Decision. The stay provided by IB-11.05E is specifically intended to ensure that any request for judicial relief proceeds orderly and that the Port is provided advance notice thereof.
Therefore, an aggrieved party that intends to commence judicial proceedings shall specifically provide notice to the Port prior to the commencement of such proceedings. The notice shall be provided via email to Protests@portseattle.org and shall be clearly labeled in the email subject line as “Request for Judicial Relief. ”
IB-11.07 - STRICT COMPLIANCE
Strict compliance with these protest procedures is essential in furtherance of the public interest.
Any aggrieved party that fails to comply strictly with these protest procedures is deemed, by such failure, to have waived and relinquished forever any right or claim with respect to alleged irregularities in connection with the solicitation or award of the Contract. No person or party may pursue any judicial or administrative proceedings challenging the solicitation or award of this Contract, without first exhausting the administrative procedures specified herein.
IB-11.08 - REPRESENTATION
An aggrieved party may participate personally or, if a corporation or other artificial person, by a duly authorized representative. Whether or not participating in person, an aggrieved party may be represented, at the party’s own expense, by counsel.
IB-11.09 - COMPUTATION OF TIME
In computing any period of time prescribed by this procedure, the day of the act or event from which the designated period of time begins to run shall not be included. The last day of the period
SW-0322954 00 20 00-17
Rev. 08/10/2026 shall be included. The term “business day” shall mean any day on which the Port of Seattle is open for regularly conducted business. Any document received after the close of regular business hours (8:00 a.m. to 5:00 p.m.) shall be deemed received the following business day.
IB-11.10 - ACKNOWLEDGEMENT
By submitting a bid in response to this solicitation, the Bidder acknowledges that it has reviewed and acquainted itself with the bid protest procedures herein and agrees to be bound by such procedures as a condition of submitting a bid.
ARTICLE 12: FORM OF AGREEMENT
IB-12.01 - FORM OF AGREEMENT
Unless otherwise provided in the Supplementary Conditions, the Contract for Work will be executed on the Port’s standard Agreement form, a sample of which is included in Document 00 52 00 - Agreement Forms, for Work between the Port and the Contractor.
Document 00 41 00 - Bid Form
SW-0322954 00 41 00-1
Rev. 12/11/17
Contractor Name: _________________________ Date: _________________________
Contract Number: SW-0322954 Contract Title: Glass and Glazing Unit Price Portwide 2026
TO: Port of Seattle Bid Desk Director, Central Procurement Office SmallWorksBid@portseattle.org
1. Bid: Having carefully examined the Contract Documents titled:
a. SW-0322954 Project Manual
Contractor bids to furnish all the labor, materials, equipment, superintendence, insurance, performance bond, payment bond, safety requirements, personnel badges and other accessories and services necessary to estimate, perform, and complete all of the work required by and in strict accordance with the above documents and the implied intent thereof, for the dollar values and mark-up percentages as identified in the following Schedule of Unit Prices. Contractor shall allocate overhead, insurance, fees, profit and all project costs to Unit Prices as deemed appropriate. All Contract costs shall be reflected in the Schedule of Unit Prices. Reference Section 00 70 00 G-6.2 for information on loaded rates.
Following is a list of work disciplines and quantities that will be used for calculating a total amount in order to determine the low Bidder. The methodology being utilized includes unit quantities and/or weights that will be applied to the Schedule of Unit Prices supplied by the Bidder. The Bidder shall write its loaded unit prices and extension calculations. After the bid opening, the Port of Seattle will verify mathematical accuracy with respect to the extensions of unit bid prices and the total bid price. The Contract shall be awarded to the lowest responsible and responsive Bidder. The stated unit quantities will specifically not be a part of the resultant Contract Documents. The Port does not represent or warrant to the Bidder that the actual work provided under this Contract (if any) will be consistent with unit quantities or weights that may be assigned by the Port for purposes of determining the low Bidder. On the contrary, the actual work provided under this Contract (if any) may vary substantially from the unit quantities or weights assigned by the Port for purposes of determining the basis of award, and the winning Bidder shall not be entitled to any adjustment in its unit prices as a result of any variation – no matter how significant – between actual unit quantities and/or weights and those used for purposes of determining the basis of award.
SW-0322954 00 41 00-2
Rev. 12/11/17
SCHEDULE OF UNIT PRICES
ITEM
ITEMS OF WORK
BID
QUANTITY
BID UNIT
CONTRACT UNIT PRICES AMOUNT
1 Foreperson – Day Rate 100
2 Foreperson – Swing Rate 80
3 Foreperson – Graveyard Rate 200
4 Journey Level Glazier – Day Rate 170
5 Journey Level Glazier – Swing Rate 80
6 Journey Level Glazier – Graveyard Rate 485
7 Journey Level Laborer – Day Rate 20
8 Journey Level Laborer – Swing Rate 20
9 Journey Level Laborer – Graveyard Rate 20
Materials, Equipment, Subcontractors for miscellaneous work not listed above. Reimbursable items at Contractor’s verified invoice cost plus mark-up bid percent: (Item #s 10-12). If whole numbers are not used for percentages, POS will round to the nearest whole number.
10 Subcontractor:
mark-up not to exceed 7%
$8,000 X ______% + $8,000 = →
11 Materials:
mark-up not to exceed 20%
$80,000 X ______% + $80,000 = →
12 Equipment:
mark-up not to exceed 20%
$11,000 X ______% + $11,000 = →
TOTAL BID PRICE:
2. State Sales Tax: State or Local retail sales taxes have not been added to the Total Bid Price stated above, except as may be provided for “Public Road Construction” in GC-04.11 of the General Conditions, these Contract Documents.
3. Completion: The resultant on-call contract will last one (1) year, 365 calendar days, from the official Contract award date, which is the date the Port of Seattle signs the Agreement, or until the Contract amount is depleted, whichever comes first. This Contract contains an option to extend the Contract time up to 12 months beyond the original Contract completion date.
SW-0322954 00 41 00-3
Rev. 12/11/17
4. Progress Payment Retention: In accordance with RCW 60.28.011, the undersigned elects that, during the life of the Contract, the money withheld from Contract progress payments be retained in the financial institution indicated below. Failure to indicate a choice shall be construed as approval of Item (a).
a. A fund with the Port. (There is no interest with this option)
b. An interest bearing account with a bank which is listed on the State of Washington Public
Depositaries current list.
c. Retention Bond
5. Addenda: Receipt of addenda numbered [___] through [___] is hereby acknowledged.
6. Legal Representation: In all legal matters relating to this Contract, the undersigned will be represented by:
7. Bid Withdrawal: The above bid will not be withdrawn within ninety (90) days after the actual date of the opening thereof.
8. By submission of this bid, each bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, that this bid has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this bid with any other bidder or with any competitor.
9. Wage Certification. The bidder certifies under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct: within the three-year period immediately preceding the bid solicitation date, the bidder has not been a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction.
FAILURE OF A BIDDER TO SUBMIT THE FORMS WITH ITS BID, EXECUTED WHERE
REQUIRED, MAY DISQUALIFY THE BID.
Contractor
Sole Proprietorship Partnership Limited Liability Company Corporation Joint Venture
Washington Employment Security Department No. ______________ in accordance with Title RCW 50.
Washington State Registration No. __________________ since ___________ expires ___________ (date) (date)
Signature of Authorized Official
Name ______________________________ Title _______________________________
SW-0322954 00 41 00-4
Rev. 12/11/17
Date of Signature: __________________________
Place of Signature: City ______________________________ State: ____________________
Address (of Contractor): ________________________________________________________
Phone: ________________________
Email: ___________________________________
Name Partners (if a Partnership):________________________________________
Document 00 52 00 - Agreement Forms
SW-0322954 00 52 00-1
Rev. 05/09/2022
The following documents are included in these specifications as examples, in order that the Bidder be informed of the requirements of the Contract, in the event the Bidder is awarded the Contract:
1. “Agreement”
2. “Contractor’s Release of Claim”
AGREEMENT FORM
THE PORT OF SEATTLE (“Port”) and the undersigned (“Contractor”) agree as follows:
ARTICLE I
The Project The Contractor shall perform and provide all of the Work required by the Contract Documents, for the following Project:
TITLE: Glass and Glazing Unit Price Portwide 2026 CONTRACT #: SW-0322954 LOCATION: Portwide The Contractor shall Substantially Complete the Work no later than 365 Days following the Contract Execution Date, which is the date the Port countersigns this Agreement Form as reflected below.
Additional Milestones may be provided elsewhere in the Contract Documents. Subject to additions and deductions by Change Order, the Port will pay Contractor the not-to-exceed Contract Sum of Three Hundred Fifty Thousand and 00/100 Dollars ($350,000.00) as more specifically set forth in the General Conditions and according to the attached Schedule of Prices from Contractor’s Bid Form dated , which is incorporated herein.
ARTICLE I I
The Contract Documents The Contract Documents consist of the documents listed below. The following is an enumeration of the Contract Documents, not necessarily in order of precedence. The order of precedence is set forth in the General Conditions.
1. This Agreement Form; and
2. The Work Authorizations; and
3. The Specifications, which include the General Conditions and Supplementary Conditions (if any); and
PORT OF SEATTLE CONTRACTOR
Signature:
By: Yanet Maldonado
Title: Manager,…